CalMod Program EMU Procurement Update. TJPA Board May 14, 2015

Similar documents
CalMod Program EMU Procurement Update

Caltrain Modernization EMU Procurement

Electric Multiple Unit Procurement Update

Electric Multiple Unit Procurement Update

CalMod Local Policy Maker Group (LPMG) Agenda

EMU Procurement Seats/Standees/Bikes/Bathroom

Peninsula Corridor Electrification Project Cost / Schedule Update

Peninsula Corridor Electrification Project (PCEP)

Caltrain Business Plan. Project Update July 2018 through January 2019

High Speed Rail Conference

Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae

Caltrain Business Plan

Agenda. Preliminary Station Footprint High Speed Train Station in the City of Millbrae

DIRIDON STATION JOINT POLICY ADVISORY BOARD AGENDA

Staff Contact: Carlos de Melo, Community Development Director, (650)

San Francisco to San Jose Preliminary Alternatives Analysis

Agenda. Open House Presentation Question and Answer Break Out Groups Report Out & Close

SAN FRANCISCO TO SAN JOSE PROJECT SECTION. City of Brisbane Baylands Public Hearing June 7, 2017

Muni Forward: Get On Board! Siemens S200 SF Light Rail Vehicle

Caltrain Downtown Extension Project (DTX)

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

This Evening s Agenda. Open House 7:00 7:30 Presentation 7:30 8:00 Community Feedback8:00 9:00 Adjourn

Commuter Rail Vehicle Technology Analysis

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

CONNECTING AND TRANSFORMING CALIFORNIA

Treasure Island Mobility Management Program

TORONTO TRANSIT COMMISSION REPORT NO.

Treasure Island Mobility Management Program

Above & Beyond ADA. Metro Service Councils. Metro s Response to Growing ADA Ridership. Los Angeles County Metropolitan Transportation Authority

Peninsula Corridor Electrification Update Meeting

CalMod Local Policy Maker Group (LPMG) Agenda

Roma McKenzie-Campbell Amtrak, Project Manager. Caroline Ducas VHB, Senior Transit Planner. Boston, Massachusetts

Commuter Rail Vehicle Technology Analysis

2019 New Transit Service Plan

State of California Transit and Intercity Passenger Rail Program. Caltrain Grant Application Overview January 2018

Train Operations Analysis of Two versus Three Mainline Tracks for the San Francisco Downtown Rail Extension

SAN FRANCISCO TO SAN JOSE PROJECT SECTION

Caltrain / California HSR Blended Operations Analysis Supplemental Analysis Requested by Stakeholders. Service Plan / Operations Considerations Study

February 2011 Caltrain Annual Passenger Counts Key Findings

Mountain View Automated Guideway Transit Feasibility Study Community Meeting September 25, 2017

Customer Service, Operations and Safety Committee. Rail Car Deployment Strategies

Table of Contents. Attachment 1 Caltrain Service History Attachment 2 Tables and Graphs Caltrain Annual Passenger Counts 1 of 12 Final

TORONTO TRANSIT COMMISSION REPORT NO.

An Overview of High Speed Rail. David Randall Peterman Congressional Research Service

Above & Beyond ADA Metro s Response to Growing ADA Ridership

Caltrain Business Plan

ATAS TAXIS. Goals. Responsibilities. Accomplishments: What got done?

Treasure Island Toll Policy, Affordability and Transit Pass Programs. TIMMA Board Meeting December 11, 2018

Funding Scenario Descriptions & Performance

BART s Transbay Core Capacity Project

5. Adjourn BOARD OF DIRECTORS 2019

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

BUS RAPID TRAN SIT. Institute of Tra nsporta tion Engineers October 17, 2013

Key Findings. February 2009 Caltrain Annual Passenger Counts

Mobility Management: Caltrain

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

Agenda. Transbay Program. Brief History. Benefits of Transbay Ridership Financial Program Project Risks

Husky Stadium: TMP Modernization Project

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Alternatives to an Open Competitive Commercial Collection Program Presented by Robert Craggs RAM/SWANA Conference

Waco Rapid Transit Corridor (RTC) Feasibility Study

Corridor Management Committee. March 7, 2012

Peninsula Corridor Electrification Project (PCEP)

Caltrain Downtown Extension Study Ridership Forecast Summary

A Transit Plan for the Future. Draft Network Plan

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

Draft Results and Open House

The Future of Transportation on the Caltrain Corridor

Rail~Volution 2012 R. Gregg Albright

Merger of the generator interconnection processes of Valley Electric and the ISO;

Overview: Division of Rail & Mass Transportation

Program. presented by: September 22, 2010

Transportation Sustainability Program

Future of FrontRunner Final Report

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

February 2012 Caltrain Annual Passenger Counts Key Findings

Rail alignment and benefits (rab) study

Bicycle Advisory Committee CORRESPONDENCE. March 17, 2016

SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE JULY 17, 2014 PURCHASE OF HYBRID SEDANS APPROVE CONTRACT AWARD ACTION: RECOMMENDATION

L. A. Metro s Parking Management Program Principles Applied. October 17, 2011 Rail-Volution, Washington D.C.

What is the Peninsula Corridor Electrification Project (PCEP)?

Electric Vehicle Charging Station Installation and Eco-Pass Updates. Report Prepared by: A. Rolston, Parking Operations Coordinator

Mississauga Bus Rapid Transit Preliminary Design Project

Time (secs) Distance (feet) Accel (mphps) , , , , ,388 0.

Proposed Revised Network Presented 10/17/2017. Kitsap Transit Board Workshop October 17, 2017

Draft Results and Recommendations

Decision on Merced Irrigation District Transition Agreement

Mercer Island Center for the Arts Parking Management Plan

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010

Sean P. McBride, Executive Director Kalamazoo Metro Transit. Presentation to Michigan Transportation Planning Association July 13, 2016

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

CITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan

Treasure Island: Background

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Chicago Milwaukee Intercity Passenger Rail Corridor

Customer Services, Operations, and Safety Committee Board Information Item III-D May 13, 2010 Rail Fleet Plan

Transcription:

CalMod Program EMU Procurement Update TJPA Board May 14, 2015

Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service (with level boarding) Note: Board Workshop May 20 Discussion 2

Original Plan 3

Goal: Maximize Caltrain Capacity Growing Demand - Weekday ridership today: 60,000+ - Weekday ridership future: 110,000+ Today - 20+ mile trips - 95%-125% peak weekday capacity - 11% bikes on-board Future - Share train slots (6 Caltrain / 4 HSR) per hour / direction 4

Exceeding Capacity Today 5

Terminology ~50 floor (mid area) upper area ~25 floor (lower area) Platform 8 Above Top of Rail (ATOR) Double Door Single Door - Caltrain EMU Floor ATOR: 22-25 (for this presentation ~25 ) - HSR Train Floor ATOR: 48-51 (for this presentation ~50 ) 6

Original Plan Timeframe: 2020 Electrified Service ~50 ~25 1-2 steps onboard Platform 8 2 double doors (located: ~25 floor) Passengers step (1-2) from platform ADA passengers and bikes located ~25 level ADA use mini highs and wayside lifts 7

Similar to Today s Bombardier 8

Request for Information Summer 2014 Attributes Industry Confirmation Maximize Capacity Bi-level (versus single level) Previously Made US Regulation Compliance Floor Threshold Service proven options Saves costs / time ADA Buy America FRA Waiver / Alternative Compliant Vehicles Criteria Meet Caltrain Technical / Quality Standards 2 double doors per car (low level boarding) ~22 to ~25 most common Note: Anticipate adequate competition for the RFP 9

Original Plan Timeframe: Future Blended (with level boarding) 2 3 HSR/Caltrain Stations w/ New Platforms Transbay Transit Center, Millbrae, San Jose Diridon HSR at ~50 Caltrain at ~25 27 Caltrain Stations with Modified Platforms Level boarding at ~25 Remove / fill-in steps in cars Longer EMU trains and extend platforms 10

Original Plan: Level Boarding Assumption Transition level boarding (~25 ) 27 Caltrain stations New platforms 2-3 HSR / Caltrain stations 11

Stakeholder Request for EMU Modification 12

Request for Vehicle Modification HSR vehicles high-door boarding (~50 ) Can Caltrain EMUs be modified to support high door boarding? Enables common platforms in future Caltrain & HSR access to all platforms Provides system operational flexibility Regular incident recovery Emergency / disaster recovery 13

Analysis Process December 2014 to May 2015 - Carbuilder interviews w/ HSR - Technical analysis w/ HSR - Caltrain operational assessment May 2015 July 2015 - Policy discussion / decisions - Boards - Stakeholders 14

Car Builder Interviews Seven car builders participated Proposed modification solutions 1. Cars with more doors - 2 ~25 double doors and 2 ~50 single/double doors - Seat loss: 60-100 potential range per 6-car train 2. Cars with traps Positive - 2 single ~50 doors w/ traps and 2 single ~50 doors - no seat loss - Redesign existing vehicles (not starting from scratch) - Vehicle delivery (2020 revenue service) - Competition adequate 15

Alternative Plan Caltrain Operations Assessment Timeframe: 2020 Electrified Service 16

Alternative Plan A Cars with More Doors (2020) ~50 ~25 1-2 steps Platform 8 4 double doors (located: ~25 & ~50 *) Passengers / bikes use ~25 doors (1-2 steps) ADA location TBD Located at ~50 (use high doors: need high blocks / wayside lift) Located at ~25 (use low doors: need mini high / wayside lift) *Double ~50 doors may not be feasible 17

Alternative Plan A Cars with More Doors (2020) High Block Wayside lift Mini-High 18

Alternative Plan B Cars with Traps (2020) Trap: 3-5 steps ~50 Platform 8 Open Trap Close Trap Single Door w/ Trap 19

Alternative Plan B Cars with Traps (2020) 2 single doors w/ traps, 2 single doors no trap All doors to ~50 floor Single door access (longer dwell) Passengers/bikes use 2 single doors w/ traps (3-5 steps) Taller first step or step stool needed Bikes located ~25 level (use additional internal steps down) ADA location ~50 level At stations high blocks / wayside lifts Automatic / manual traps 20

Alternative Plan Caltrain Operations Assessment Timeframe: Future Blended (with level boarding) 21

Future Scenario 1 Share Platform 2-3 HSR/Caltrain Stations Caltrain/ HSR stations level boarding ~50 Caltrain stations level boarding ~25 - Existing station footprint and visual impact Alternative Plan A cars with more doors - Continue using both doors - Seats cannot be restored - Interior lift needed if ADA ~25 level - Potential mitigation by car reconfiguration Alternative Plan B cars with traps - Continue using traps 22

Future Scenario 2 Shared Platforms All 27 Stations Level boarding ~50 - Existing station footprint and visual impact For Caltrain cars with more doors - Seal low doors and use high doors only - Interior reconfiguration / restore seats - Bike circulation and storage challenge - Interior lift needed if ADA ~25 level - Potential mitigation by car reconfiguration For Caltrain cars with traps - Seal traps - Bike circulation and storage challenge 23

Next Steps JPB May 20 Workshop - Compatible boarding height discussion - Seats/Bikes/Bathroom balance JPB July Board Action - Release EMU RFP - Updated Funding Plan / HSR Additional Funding Commitment 24

Questions For more information and project updates website: www.caltrain.com/calmod email: calmod@caltrain.com 25