TURBOCHARGER ON VEHICLE INSPECTION TC 7

Similar documents
TURBOCHARGER SYSTEM TURBOCHARGER TC 1

TROUBLESHOOTING PROBLEM SYMPTOMS TABLE

TURBOCHARGER Toyota Celica DESCRIPTION OPERATION TURBOCHARGING SYSTEMS All Models

THREE WAY CATALYTIC CONVERTER (TWC) SYSTEM

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

REMOVAL AND INSTALLATION OF TRANSAXLE (4WD)

FUEL PRESSURE REGULATOR

Throttle Body (3S GTE)

1992 Toyota Cressida

EG1 509 OIL COOLER COMPONENTS FOR REMOVAL AND INSTALLATION

GENERATOR REMOVAL OF GENERATOR (4A FE) CH 6

Injectors (4A FE) FI 155. (b) If you have no sound scope, you can check the injector transmission operation with your finger.

RADIATOR CLEANING OF RADIATOR

FI 135. Fuel Pump (3S GTE)

INJECTOR ON VEHICLE INSPECTION 1. CHECK INJECTOR OPERATION

EM 112 1GR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSPECTION. Intake Air Surge Tank Side

INJECTOR COMPONENTS SF-18. Air Cleaner Hose. Accelerator Cable Water Bypass Hose Air Hose. PCV Hose. Throttle Position Sensor Connector.

EG1 485 OIL PUMP COMPONENTS FOR REMOVAL AND INSTALLATION

CHECK ENGINE COOLANT LEVEL AT RADIATOR RESERVOIR

Throttle Body (4A FE)

REMOVAL. 10. REMOVE FRONT SUSPENSION MEMBER BRACE Remove the 8 bolts and brace.

FUEL PUMP SYSTEM CIRCUIT

OIL PUMP (for 4WD and Pre-Runner)

REMOVAL FU 11 2TR-FE FUEL FUEL INJECTOR. Pinch. Checker. Detaching Switch Pull Out. Retainer. Fuel Hose Connector. Pipe. O-ring. Pinch.

PARTIAL ENGINE ASSY (2TR FE)

THREE WAY CATALYST (TWC) SYSTEM

TIMING BELT COMPONENTS

INTAKE AND EXHAUST GROUP CONTENTS GENERAL INFORMATION SERVICE SPECIFICATION AIR CLEANER

Cylinder Head Setting Bolt Tightening Adaptor Injection Measuring Tool Set EFI Fuel Pressure Gauge

REMOVAL 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL 2. REMOVE FRONT WHEEL RH. 3. REMOVE REAR WHEEL (for 4WD) (a) Move the select lever to N.

CYLINDER HEAD COMPONENTS FOR REMOVAL AND INSTALLATION

EM 97 2TR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSTALLATION

Radiator Service Tool Set Hexagon Wrench Set TOYOTA Electrical Tester Set. Capacity

PARTIAL ENGINE ASSY (2ZZ GE)

REMOVAL 1. DRAIN ENGINE COOLANT 2. REMOVE THROTTLE BODY COVER 3. DISCONNECT TIMING BELT FROM CAMSHAFT TIM- ING PULLEYS (See page EM 14)

Compressor HVAC: Service and Repair

TIMING BELT COMPONENTS EM 15

STARTER COMPONENTS FOR REMOVAL AND INSTALLATION

FUEL PUMP SYSTEM CIRCUIT

THROTTLE BODY ON VEHICLE INSPECTION EG INSPECT THROTTLE BODY (a) Check that the throttle linkage moves smoothly.

EG1 361 THROTTLE BODY

EXHAUST GAS RECIRCULATION (EGR) SYSTEM

INTAKE AND EXHAUST GROUP CONTENTS CHARGE AIR COOLER <2.0L ENGINE> GENERAL DESCRIPTION SERVICE SPECIFICATIONS...

FUEL SYSTEM PRECAUTION FU 1

2.0L 4-CYL & 2.0L 4-CYL TURBO - VIN [S]

FUEL PUMP. ON VEHICLE INSPECTION 1. CHECK FUEL PUMP OPERATION (a) Using SST, connect terminals +B and FP of the data link connector 1.

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

PARTIAL ENGINE ASSY COMPONENTS. Clip. Radiator Grille. Clip. Front Bumper Cover. Engine Under Cover LH. N m (kgf cm, ft lbf) : Specified torque

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

REMOVAL. 5. REMOVE OIL DIPSTICK GUIDE (a) Remove the bolt, dipstick guide and engine wire bracket. (b) Remove the O ring from the dipstick guide.

EG2 173 EXHAUST GAS RECIRCULATION (EGR) SYSTEM

EXHAUST GAS RECIRCULATION (EGR) SYSTEM (4A FE)

Section 10 Chapter 17

CYLINDER HEAD (for Bank 2 4WD and Pre-Runner)

REMOVAL 7. DISCONNECT ACCELERATOR CABLE FROM THROTTLE BODY. 8. DISCONNECT HOSES (a) Remove the 2 bolts from the air intake chamber assembly.

EG-37 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION 2JZ-GE

Service and Repair. a. Remove the 2 nuts and 2 upper radiator support. b. Lift out the radiator and cooling fan assembly.

CYLINDER HEAD GASKET (2AZ-FE)

CH 10 ALTERNATOR COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

CO/HC INSPECTION HINT:

OIL AND FILTER INSPECTION

ENGINE ASSEMBLY. COMPONENTS (Part 1)

FUEL PUMP SYSTEM CIRCUIT

EM 92 2TR-FE ENGINE MECHANICAL ENGINE ASSEMBLY REMOVAL

Exhaust Gas Recirculation Valve, Replace J S file://c:\program Files\cosids\DATA\TMP\ rtf.html. Remove

REMOVAL AC 67. Using a clip remover, disengage the 6 clips and remove the front fender apron seal upper. (2WD)

INTAKE AND EXHAUST SYSTEM

THROTTLE BODY. Port name. Clearance between lever and stop screw. 0 mm (0 in.) 0.50 mm (0.020 in.) 0.80 mm (0.031 in.) Throttle valve fully open

ENGINE ASSEMBLY COMPONENTS EM 170 1GR-FE ENGINE MECHANICAL ENGINE ASSEMBLY V-BANK COVER VACUUM HOSE AIR CLEANER ASSEMBLY NO. 2 VENTILATION HOSE

WARNING: ALWAYS relieve fuel pressure before disconnecting any fuel related component. DO NOT allow fuel to contact engine or electrical components.

ENGINE SPECIFICATIONS


ASSEMBLY/INSTALLATION INSTRUCTIONS

CO/HC INSPECTION HINT:

2/17/2017 Timing Belt Service and Repair, Removal and Replacement

EMISSION CONTROL SYSTEMS (2JZ GE) SYSTEM PURPOSE

REPLACEMENT. 12. REMOVE ENGINE MOVING CONTROL ROD (a) Remove the 5 bolts, the engine moving control rod and the engine mounting stay.

ENGINE TUNE-UP INSPECTION OF ENGINE COOLANT INSPECTION OF ENGINE OIL INSPECTION OF BATTERY. INSPECTION OF AIR FILTER (Paper Filter Type)

IG 1 2GR-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM ENGINE ROOM R/B - IG2 FUSE - ST/AM FUSE IGNITION COIL NOISE FILTER NOISE FILTER A137458E01

1999 E-Series Workshop Manual

ACC CUT RELAY INSPECTION

INTAKE/EXHAUST SYSTEM 7 C TURBOCHARGER

ENGINE COOLING Click on the applicable bookmark to selected the required model year

2000 Toyota Truck Tundra. Timing Belt: Service and Repair

TIMING BELT (1MZ FE Jan., 2003)

INTAKE AND EXHAUST GROUP CONTENTS INTERCOOLER GENERAL INFORMATION SERVICE SPECIFICATIONS

2014 Dodge Challenger R/T. The water pump (1) is mounted directly to the timing chain cover and is equipped with a non serviceable integral pulley.

EG 18 ENGINE MECHANICAL TIMING BELT EG5EK 01 COMPONENTS FOR REMOVAL AND INSTALLATION

Turbo Boost Pressure Test

2000 Toyota Celica GT-S L4-1762cc 1.8L DOHC MFI - Removal and Installation

25. REMOVE OIL PIPE NO.1 (a) Remove the 2 oil pipe unions, and oil pipe No.1. (b) Remove the oil control valve filter LH and gaskets.

ENGINE MECHANICAL (4A FE)


1989 Nissan 300ZX. 3.0L V6 - VIN [H] & 3.0L V6 TURBO - VIN [C] 1989 Engines - 3.0L & 3.0L Turbo V6

ENGINE LUBRICATION SYSTEM

GENERAL SPECIFICATIONS

ENGINE LUBRICATION SYSTEM

12. REMOVE ENGINE MOVING CONTROL ROD (a) Remove the 4 bolts, the engine moving control rod and the bracket.

WSS- M97B51-A1 WSS- M2C930-A. 5.7L (6 qt) with filter WSE- M4G323-A4

SECTION C Engine 6.4L Diesel

Transcription:

TC7 ONVEHICLE INSPECTION 1. INSPECT INTAKE AIR SYSTEM Check for leakage or clogging between the air cleaner and turbocharger inlet and between the turbocharger outlet and cylinder head. Clogged air cleaner... Clean or replace filter Hoses collapsed or deformed... Repair or replace Leakage from connections... Check each connection and repair Cracks in components... Check and replace 2. INSPECT EXHAUST SYSTEM Check for leakage or clogging between the cylinder head and turbocharger inlet and between the turbocharger outlet and exhaust pipe. Deformed components... Repair or replace Foreign material in passages... Remove Leakage from components... Repair or replace Cracks in components... Check and replace 3. INSPECT ACTUATOR OPERATION. (a) Disconnect the actuator hose. (b) Using SST (turbocharger pressure gauge), apply approx. 61 kpa (0.62 kg cm2, 88 psi) of pressure to the actuator and check that the rod moves. If the rod does not move, replace the turbocharger as sembly. SST 0999200241 NOTICE: Never apply more than 81 kpa (0.83 kgf/cm2, 11.8 psi) of pressure to the actuator. 4. CHECK TURBOCHARGING PRESSURE (a) Using a 3way connector, connect SST (tur bocharger pressure gauge) to the hose between the intake manifold and turbocharging pressure sensor. SST 0999200241 (b) While driving with the engine running at 2,800 rpm or more with the throttle valve fully open in the 2nd gear, check the turbocharging pressure. Standard pressure: 49 81 kpa (0.50 0.83 kgf/cm 2, 7.1 11.8 psi) If the pressure is less than that specified, check the intake air and exhaust systems for leakage. If there is no leakage, replace the turbocharger assembly. If the pressure is above specification, check if the actua tor hose is disconnected or cracked. If not, replace the turbocharger assembly.

TC8 5. INSPECT IMPELLER WHEEL ROTATION (See step 1 on page TC13) 6. INSPECT TURBOCHARGING PRESSURE VSV (See page Fl226) 7. INSPECT TURBOCHARGING PRESSURE SENSOR (See page Fl235) COMPONENTS

TC9 REMOVAL OF 1. DISCONNECT CABLE FROM NEGATIVE TERMINAL OF BATTERY CAUTION: Work must be started after approx. 20 seconds or longer from the time the ignition switch is turned to the LOCK position and the negative () ter minal cable is disconnected from the battery. 2. REMOVE ENGINE UNDER COVERS 3. DRAIN ENGINE COOLANT (See page CO6) 4. REMOVE AIR CLEANER CAP (See step 7 on page EM224) 5. REMOVE SUSPENSION LOWER CROSSMEMBER (See step 33 on page EM228) 6. REMOVE FRONT EXHAUST PIPE (See step 34 on page EM229) 7. REMOVE ENGINE MOUNTING CENTER MEMBER (See step 42 on page EM229) 8. REMOVE FRONT MOUNTING INSULATOR AND BRACKET (See step 43 on page EM230) 9. REMOVE CLUTCH RELEASE CYLINDER WITHOUT DISCONNECTING TUBE (See step 26 on page EM227) 10. REMOVE GENERATOR (See page CH7) 11. REMOVE IDLER PULLEY BRACKET AND A/C COMPRESSOR WITHOUT DISCONNECTING HOSES (See step 39 on page EM80) 12. REMOVE THREEWAY CATALYTIC CONVERTER (See step 45 on page EM230) 13. REMOVE CHARGE AIR COOLER COOL AIR INLET Using a clip remover, remove the seven clips and air inlet.

TC10 14. REMOVE CHARGE AIR COOLER PROTECTOR Remove the three bolts and protector. 15. REMOVE CHARGE AIR COOLER (a) Remove the two bolts. (b) Disconnect the charge air cooler from the turbocharger and intake air connector, and remove the charge air cooler and air connector. 16. REMOVE HEAT INSULATOR Remove the three bolts and heat insulator. 17. REMOVE OXYGEN SENSOR (a) Disconnect the oxygen sensor connector. (b) Remove the two nuts, oxygen sensor and gasket. 18. REMOVE HEAT INSULATORS OF TURBINE OUTLET ELBOW (a) Remove the oil dipstick. (b) Remove the three bolts and RH heat insulator. (c) Remove the two bolts and LH heat insulator.

19. DISCONNECT HOSES (a) Water hose from radiator (b) Water hose from water inlet (c) Water bypass hose from turbo water pipe (d) Vacuum hose from actuator TC11 (e) Oil hose from turbo oil pipe 20. REMOVE STAY Remove the three bolts and turbocharger stay. 21. REMOVE (a) Remove the bolt and union bolt holding the No.1 turbo oil pipe to the cylinder block. Remove the two union bolt gaskets. (b) Remove the four nuts, turbocharger and gasket.

TC12 22. REMOVE TURBO OIL PIPE Remove the two nuts, oil pipe and gasket. 23. REMOVE TURBO WATER PIPE Remove the two nuts, two bolts, water pipe and gasket. 24. REMOVE SIDE BEARING HOUSING PLATE Remove the two nuts, housing plate and gasket. 25. REMOVE TURBINE OUTLET ELBOW Remove the six nuts, outlet elbow and gasket.

TC13 INSPECTION OF 1. INSPECT IMPELLER WHEEL ROTATION Grasp the edge of the turbine wheel and turn it. Check that the impeller wheel turns smoothly. If the impeller wheel does not turn or if it turns with a drag, replace the turbocharger assembly. 2. INSPECT AXIAL PLAY OF IMPELLER WHEEL Insert a dial indicator into the intake side, hold the turbine wheel edge by hand, and check the axial play. Standard clearance: 0.13 mm (0.0051 in.) or less If the axial play is not as specified, replace the tur bocharger assembly. 3. INSPECT RADIAL PLAY OF IMPELLER WHEEL (a) From oil outlet hole, insert a dial indicator through the hole in the spacer bearing and set it in the center of the impeller shaft. (b) Move the impeller shaft in a radial direction, and measure the radial play of the impeller shaft. Standard clearance: 0.18 mm (0.0071 in.) or less If the radial play is not as specified, replace the tur bocharger assembly.

TC14 INSTALLATION OF (see page TC8) NOTICE: After replacing the turbocharger assembly, pour approx. 20 cc (1.2 cu in.) of new oil into the oil inlet and turn the impeller wheel by hand to splash oil on the bearing. 1. INSTALL TURBINE OUTLET ELBOW Install a new gasket and the outlet elbow with the six nuts. Torque: 64 Nm (650 kgfcm, 47 ftlbf) 2. INSTALL SIDE BEARING HOUSING PLATE Install a new gasket and the housing plate with the two nuts. Torque: 11 Nm (120 kgfcm, 9 ftibf) 3. INSTALL TURBO WATER PIPE Install a new gasket and the water pipe with the two nuts and two bolts. Torque: 11 Nm (120 kgfcm, 9 ftlbf) 4. INSTALL TURBO OIL PIPE (a) Align the oil holes of a new gasket and the tur bocharger housing. (b) Install the gasket and oil pipe with the two nuts. Do not torque the nuts yet.

TC15 5. INSTALL (a) Install a new gasket and the turbocharger with the four nuts. Do not torque the nuts. (b) Install the oil pipe with the bolt, two new gaskets and union bolt. Do not torque the bolt and union bolt. (c) Tighten the four nuts holding the turbocharger to the exhaust manifold. Torque: 64 Nm (650 kgfcm, 47 ftlbf) (d) Tighten the two nuts holding the oil pipe to the turbocharger. Torque: 17 Nm (775 kgfcm, 13 ftlbf) (e) Tighten the union bolt holding the oil pipe to the cylinder block. Torque: 51 Nm (525 kgfcm, 38 ftibf) (f) Tighten the bolt holding the bracket of the oil pipe to the cylinder block. Torque: 43 Nm (440 kgfcm, 32 ftibf)

TC16 6. INSTALL STAY Install the turbocharger stay with the three bolts. Torque: To turbocharger 69 Nm (705 kgfcm, 51 ftibf) To cylinder block 59 Nm (600 kgfcm, 43 ftibf ) 7. CONNECT HOSES (a) Water hose from radiator (b) Water hose from water inlet (c) Water bypass hose from turbo water pipe (d) Vacuum hose from actuator (e) Oil hose from turbo oil pipe 8. INSTALL HEAT INSULATORS OF TURBINE OUTLET ELBOW (a) Install the RH heat insulator with the three bolts. (b) Install the LH heat insulator with the two bolts. (c) Install the oil dipstick gauge. 9. INSTALL OXYGEN SENSOR (a) Install a new gasket and the oxygen sensor with the two nuts. Torque: 44 Nm (450 kgfcm, 33 ftlbf) (b) Connect the oxygen sensor connector.

TC17 10. INSTALL HEAT INSULATOR Install the heat insulator with the three bolts. 11. INSTALL CHARGE AIR COOLER Connect the charge air cooler to the turbocharger and intake air connector, and install the charge air cooler with the two bolts. 12. INSTALL CHARGE AIR COOLER PROTECTOR Install the protector with the three bolts. 13. INSTALL CHARGE AIR COOLER COOL AIR INLET Install the cool air inlet with the seven clips. 14. INSTALL THREEWAY CATALYTIC CONVERTER (See step 6 on page EM259) 15. INSTALL A/C COMPRESSOR AND IDLER PULLEY BRACKET (See step 12 on page EM261) 16. INSTALL GENERATOR (See page CH23) 17. INSTALL CLUTCH RELEASE CYLINDER (See step 26 on page EM263)

TC18 18. INSTALL FRONT MOUNTING BRACKET AND INSULATOR (See step 7 on page EM260) 19. INSTALL ENGINE MOUNTING CENTER MEMBER (See steps 9 and 10 on page EM260) 20. INSTALL FRONT EXHAUST PIPE (See step 18 on page EM261) 21. INSTALL SUSPENSION LOWER CROSSMEMBER (See step 19 on page EM262) 22. INSTALL AIR CLEANER CAP (See step 45 on page EM266) 23. FILL ENGINE WITH COOLANT (See page CO6) Capacity (w/ Heater): 6.5 liters (6.9 U S qts, 5.7 Imp. qts ) 24. CONNECT CABLE TO NEGATIVE TERMINAL OF BATTERY 25. START ENGINE AND CHECK FOR LEAKS 26. CHECK ENGINE OIL LEVEL (See page LU5) 27. REMOVE ENGINE UNDER COVERS