Durashield Installation Manual

Similar documents
DuraShield Installation Manual

DuraShield Installation Manual

DuraShield Installation Manual

Opening Quality Doors Around The World. Installation Instructions Bi-Parting Freight Doors - Q Style (Power and Manual)

Albany RR1000. Mechanical Installation Manual. PN: 6410T0029 Version - Rev: 04/23/2014. ASSA ABLOY Entrance Systems

GATEWAY CHAINHOIST ROLL-UP BUG BARRIER OVERHEAD DOOR STANDOFF DESIGN

ROLLING CURTAIN DOOR INSTALLATION, MAINTENANCE & PARTS MANUAL MODEL 944 WARNING

SERIES B & C ROLLER DOORS INSTALLATION GUIDE

Air Commander Late Model Ford F-150

Trac-Rite ROLLING CURTAIN DOOR INSTALLATION, MAINTENANCE & PARTS MANUAL WARNING

PN: 6410T0022 Rev. 8/18/2014 Revision D Albany RR300 Stainless Mechanical Install & Owner s Manual

ROLLING CURTAIN DOOR INSTALLATION, MAINTENANCE & PARTS MANUAL WINDLOCK MODEL 955WL WARNING

l : u-: .. tt Installation Instructions Model 300 Commercial Slat Door DIAGRAM 4 DIAGRAM 1 5/16" 25 - DIAGRAM 2 --, f-a- 1/2" 24.

Patent # US 7,100,956 BA Installation Instructions Dodge Ram P/N D80006

LIGHT DUTY ROLL UP DOOR

ECO# 1801 REVISION# 000 ES DATE

Rear Roller Brush Kit Greensmaster 3150 & 3250

NOTE: Refer to hardware list provided to identify fasteners supplied. Figure 2-1

INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER

Car Gate - Q Style Installation Instructions.

UltraSlim Mechanical Install & Owner s Manual

TRANS-AM POWER RACK AND PINION INSTALLATION INSTRUCTION MANUAL

TIMING BELT (4A FE) COMPONENTS

MODEL NO & UP

Shaver Industries. Assembly Instructions Spring-Assist Vertical Vinyl Curtain Door

APTON ROLLING DOORS 1800 COPEWOOD ST. CAMDEN, NJ CAUTION

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS

UltraBig M&I Mechanical Installation

2010 Camaro SS/V Underbody Brace Installation Instructions

155A 2500 LB. Gear Drive Winch ALUMINUM NARROW PONTOON LIFT

Air Commander

GATEWAY AUTOMATIC ROLL-UP BUG BARRIER E-TRACK MOUNT

Shaver Industries. Assembly Instructions Vertical Vinyl Curtain Door DT2 Wire Rope Replacement

Technical Service BULLETIN

Fire Door (Insulated and Non- Insulated) Installation Instructions. Models CERD10, CERD11, CERD20, CERD21. ES Rev.

Fire Door (Insulated and Non- Insulated) Installation Instructions

Ford 460 Mid Mount A/C, Alternator & Power Steering Serpentine Kit Kit # Keyway Power Steering Kit # Press Fit Power Steering 01/27/17

INSTALLATION GUIDE MANUAL SHADE

REPLACING ROLTEC SPRING ARMS

INSTALLATION INSTRUCTIONS HEAVY DUTY COMBINATION ALTERNATOR/VACUUM PUMP MOUNT WITH IDLER

INSTALLATION MANUAL COUPLED SHADE PRODUCT OVERVIEW. 1. Idle End Shade

ASSEMBLY INSTRUCTIONS FOR CHARGER AND THE BOSS QUICK ATTACH GRASS BAGGER

RetroAir JAGUAR XKE S1-3.8 LHD FULL KIT CONTENTS:

R. Manually Operated: Standard closure to be manually operated push up, pull down with removable retrieval rod as standard. The effort to raise or low

Pacific Conveyors Ltd INSTALLATION AND MAINTENANCE MANUAL Rolling Shutter Doors

SERIES A & AA ROLLER DOORS INSTALLATION GUIDE

USER'S MANUAL and INSTALLATION GUIDE

WIND RATED ROLLER DOORS INSTALLATION GUIDE

36 Tiller Wheel Horse Lawn and Garden Tractor Attachment

PORTA-DOCK, INC. 100A 1200 LB. 84 WIDE ALUMINUM CANTILEVER BOAT LIFT 102A 1200 LB. 113 WIDE ALUMINUM CANTILEVER BOAT LIFT

Engine Removal/Installation

Shaver Industries. Assembly Instructions Spring Assist Vertical Vinyl Curtain Door Projection Mount

INSTALLATION GUIDE TCP RCKM-01

TO THE OWNER ASSEMBLY

NORTHSTAR TRAILERS. Assembly Guide for SPORTSTAR II Trailer

Chrysler Mid Mount A/C Kit

KLM and up Ford F-53 Chassis Motorhome Front Installation Instructions

NORTHSTAR TRAILERS. Assembly Guide for MULTISTAR Trailer

160S Rewind Option Kit Installation Instructions

Ford 460 Alternator, Air Conditioning & Power Steering Ultra Serpentine Kit Kit # Keyway Power Steering Kit # Press Fit Power Steering

6. Remove OEM bolts from engine at locations A, B, and C. Lay the wiring off to the side.

5-18 ENGINE TOP END. Cylinder Head Cover

SERVICE FIRE DOORS INSTALLATION INSTRUCTIONS

1-3/8 Designer Metals Telescoping Traversing Rod Installation Instructions

KIT # CSS-C SUSPENSION LIFT KIT

COLD AIR INTAKE INSTALLATION INSTRUCTIONS. # D Fits: i (4.8L)

Troubleshooting Guide

CSS-C SUSPENSION LIFT KIT

62 Deck Idler Kit High Speed

REMOVAL & INSTALLATION

Air Commander Part No

2406TL LOADER MOUNTING KIT KIOTI TRACTORS

FireKing. Fire Door Collection Fire protection, innovative design, optimized performance

Warranty Approval. Visual Inspection of Starters & Alternators

OPERATION AND MAINTENANCE INSTRUCTIONS

Old s 350 Rocket Mid Mount A/C Kit 16040

HPS SERIES. Steam Joints DEUBLIN COMPANY Norman Drive, West Waukegan, IL USA Phone: 847/ Fax: 847/ Rev.

Assembly Instructions

STOP---READ THIS FIRST!

625cc Big Block Installation Instructions Club Car DS / Carryall

Put the battery pack in place. The lowest cable from the battery pack goes to the Predator Divecan. The middle cable will go to the inhale lung.

DewEze Clutch Pump Kit Dodge 6.7L, 2011+, AA Pump INSTALLATION INSTRUCTIONS

PORTA-DOCK, INC. 65A 1155 DOUBLE PERSONAL WATERCRAFT LIFT

BLACKBIRD INSTALLATION SUPPLEMENT

New Holland Workmaster 25s

INSTALLATION INSTRUCTIONS

Installation Guide for the TeraFlex Elite LCG JK 4 Long Arm Suspension System

John Deere. MODEL: 510 Round Baler JD-O-OME59945

TIN KNOCKER FOURPLEX CLEAT FORMER INSTRUCTIONS & PARTS DIAGRAM

TIMING BELT (1MZ FE Jan., 2003)

Wheel Horse. 36 Tiller. Model No & Up. Operator s Manual

300 SERIES STANDARD DUTY CURVED TRACK

42A FLB WOOD BUNKS 43A FLB ALUMINUM BUNKS ALUMINUM CANTILEVER BOAT LIFT

3. Detach the battery cable bracket (5) from the OEM alternator bracket by removing two bolts. Keep the bolts.

NORTHSTAR TRAILERS. Assembly Guide for SPORTSTAR I Trailer

SUSPENSION 2-1 SUSPENSION TABLE OF CONTENTS

BRZ/FR-S 3.00 Cold Air Intake

EASY CONNECT CRANE KIT Festoon Conductor Systems

(W) INSTALLATION INSTRUCTIONS GRILLE GUARD TOYOTA TUNDRA / SEQUOIA PART # &

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Transcription:

MOTORIZED - CASING GENERAL MOUNTING DIAGRAM Chase doors Inc. 800-543-4455 Page 1 9/12

1. Wall preparation refer to following drawing Note and understand the clear opening width and height dimensions of the purchased door before proceeding with the installation. The Casing Top Header and uprights must be securely mounted to a smooth surface. The door, of course, needs to be mounted so that the head and roll are level and square. The guide tracks must also be square and level in relation to the header, the wall and each other. Failure to properly secure, level and square the door components during installation may result in premature wear and failure of components which will not be covered by manufacturer warranty. CURTAIN ROLL CURTAIN HOOD CLEAR OPENING HEIGHT FLOOR TO CURTAIN ( OPENING HT. MINUS 5-7" ) CLEAR OPENING WIDTH ( INSIDE OF TRACKS ) OVERALL WIDTH Door dimension drawing Page 2

2. Casing Assembly The Casing arrives in three parts, (refer to section 1), the left and right side casings and the hood. The Casing and the Curtain Roll should be assembled on the floor and then stood up, centered, and secured into the opening. Fasteners for assembly of the casing are supplied. Fasteners to secure the assembled casing to the wall and floor are supplied by the installer. Referring to the door size and following drawings, locate and mount the Springload Shaft Retainer and Idler Bearing using supplied fasteners for the Casing jamb surface. The Springload Shaft Retainer and Idler Bearing mounting holes are in the casing uprights. Handing of the door will determine by the location of these items. The curtain ALWAYS rolls down off the back side of the roll. Page 3

3. Roll Installation Durashield Installation Manual Be sure the curtain is coming off of the back of the roll. If not already installed, install the Springload Shaft Retainer and Idler Bearing to the left and right casings. The Idler Bearing goes on the Chain Hoist side Casing. While assembling the Casings and Hood insert the shaft end to extend through the Idler Bearing. Insert the Counterbalance Spring end of the roll into the Springload Shaft Retainer. Locate so that the keyway is up and tighten the set screw onto the shaft. Springload Shaft Retainer, left side mount Idler Bearing, right side mount NOTE: Both brackets shown mount to the Casing Jambs. Right hand shown. If no internal spring is required by application the left and right shaft ends will have the idler bearing as shown above. DO NOT UNTIE THE CURTAIN RETAINER YET! CURTAIN ROLL CURTAIN 1/2" MINIMUM CLEARENCE BETWEEN ROLL AND HEADER BASED ON THE FULLY OPENED ROLL DIAMETER Page 4

Once the Curtain Roll is mounted insure the dimension as shown 1/2" CLEARENCE BETWEEN ROLL AND FRONT OF JAMB JAMB C L 1/2" MINIMUM CLEARENCE BETWEEN ROLL AND HEADER BASED ON THE FULLY OPENED ROLL DIAMETER FRONT 0F DOOR CLEAR OPENING HEIGHT MOUNT GUIDE TRACK 2-3" BELOW FULLY OPENED ROLL DIAMETER MOUNT GUIDE TRACK IN JAMB SO THAT WHEN THE CURTAIN IS HALFWAY CLOSED THE CURTAIN IS CENTERED IN THE TRACK OPENING C L JAMB General layout showing dimensions as mounted in the Casing 4. Installing the Motorized Operator Page 5

Page 6

Page 7

5. For Connection of and Programming of Operator - refer to instructions provided with the operator At this time refer to the operator installation manual and make the power and wiring connections. Refer to your door order to determine the correct voltage for the supplied operator and for the optional activators that may have been provided with your door. Adjustment of the Limit switches and Clutch will be done after installation of the Guide Tracks. Page 8

6. Installation of Guide Tracks - refer to Door Dimension Drawings on pages 2 and 3 Measure the Guide Tracks provided as they may need to be cut on site during installation. The top of the guide tracks should be 2 inches minimum to 3 inches maximum from the fully opened curtain roll. The Guide Tracks are slotted on one end. This is the top. The side of the Guide Track should be flat against the Casing Jamb surface and securely mounted. Of course the Guide tracks must be mounted plumb and level to the Header and Curtain. The slotted tabs on the top of the track are bent outward at an angle. Bend the front and rear to form a Y shape. See drawings below. Remove plastic curtain retainers from the roll and insert the end of the curtain into the track. Guide Track Mounting Inside of door jamb Top Track Adjustment for curtain entrance Page 9

7. Limit Switch and Clutch adjustment - Page 10

8. Confirm adjustment of roll clearance in Guide Tracks - Be sure that both ends of the roll maintain proper entry of the curtain into the Guide Tracks at the curtain positions as shown below and to the minimum dimension shown on page 3. RELATIONSHIP OF ROLL TUBE TO GUIDE TRACK ENTRY CURTAIN FULLY CLOSED CURTAIN HALF OPENED CURTAIN FULLY OPENED 9. Installation of Rear Seal - Install the Rear seal by attaching it to the bottom of the header on the rear of the roll as shown. (fasteners not included) Be sure that the seal mounts so that it contacts the curtain when in the fully closed position. REAR SEAL MOUNTING HEADER MOUNTING ANGLE REAR SEAL View looking end of the Seal Page 11

10. Final Assembly - Go back and recheck all fasteners on the door assembly for tightness Confirm correct opening and closing positions. If there is a spring inside the roll there is typically no tensioning required. Confirm curtain to guide track clearances per section 7. Be sure that guide tracks are clean and grease free inside and out. Make sure end user is familiar with operation and has all manuals Page 12

Page 13