RAP H10: Accumulator Seal Replacement Instructions HPU/ASRI (Parts & Service: Accum Seal) 05/09/11. Accumulator Seal Replacement Instructions

Similar documents
RAP R10: Air Relay Valve Service and Adjustment ARV-69626/ /05/11. Air Relay Valve Service and Adjustment

Actuator Control Manual

Actuator Control Manual with ESD Valve

Shafer Poppet Block Control

Gear Products Inc N. 161st E. Ave. Tulsa, OK Phone (918) Fax (918)

Fisher TBX Hydro Plug Fixture

Fisher CVX Hydro Plug Fixture

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED

DelTech Controls L.L.C.

METERING VALVE 2" STEM GUIDED

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY

DelTorq Series 21 ACTUATOR

Baumann Sanitary Diaphragm Angle and Inline Control Valve

Flow Line Controls. Installation & Operations Manual SERIES 20/21 Pneumatic Actuators

Shafer SH Series Actuator. Service Manual SHSM Rev. 1 September 2016

Anderson Greenwood Single Active SSV Installation and Maintenance Instructions

Baumann Sanitary Diaphragm Angle & In-Line Control Valve Instructions

Parts List Single Reduction Models, Cast Iron Units

HFB Steering Gear Service Manual

STAINLESS STEEL SERIES LSSW HIGH PRESSURE HYDRAULIC CYLINDERS INSTALLATION & OPERATING INSTRUCTIONS

2244 West McDowell Road Phoenix, AZ RACE (fax) INSTALLATION INSTRUCTIONS FOR

Operation and Maintenance Instructions for Bettis GVO-C Series GVO-CLP-SR Pneumatic Actuators

Anderson Greenwood Series 800 POSRV Installation and Maintenance Instructions

MERIDIAN, 2 or 3 PIECE, TRUNNION MOUNTED BALL VALVES

FLOWSERVE CORPORATION NOBLE ALLOY VALVE PISTON CHECK VALVE REPAIR INSTRUCTIONS

Instruction Manual For DODGE. Airport Baggage Handling Systems Speed Reducers

HIGH PRESSURE CONTROL VALVE R2L ACTUATOR

Baumann Pneumatic Actuators

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2

Kimray reserves the right to modify or improve the designs or specifications of such products at any time without prior notice Kimray Inc.

Hydraulic Motors Repair Instructions

Model QED-D, QED-A, QED-L

IOM Manual. IOM Manual. Series 20/21.

Rhino VE Follower Modules

1 of 25 9/12/2013 9:07 PM

Installation, Operation and Maintenance Manual HP/DHV Rev. 1 November Shafer Hand Pump-Double Holding Valve

Fisher D2T FloPro Control Valve

MONARCH MGK-GS MDH-GS Self Priming Centrifugal Pumps OWNER'S MANUAL SAFETY WARNINGS SAFETY CAREFULLY READ THESE SAFETY

Bettis M11 Manual Hydraulic Override System Operating Instructions for HD, T, and G Series Pneumatic and Hydraulic Actuators

SD Bendix E-12 & E-15 Dual Brake Valve DESCRIPTION

Fisher 656 Diaphragm Actuator

KEYSTONE Figure 990/991 Butterfly valves Installation, operation and maintenance instructions

USER INSTRUCTIONS. NAF Trunnball DL Ball Valves. Installation Operation Maintenance. Experience In Motion FCD NFENIM A4 01/15

SERIES G3DB/AG3DB ELEVATOR

FOX Racing Shox Bypass Technical Manual.

MEMORY SEAL BALL VALVES MAINTENANCE MANUAL 2 12, Class 150 & 300, Regular Port, Flanged Unibody

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR MODEL HD732-S DOUBLE ACTING SERIES HYDRAULIC ACTUATORS

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB-SR SPRING RETURN SERIES PNEUMATIC ACTUATORS

DO NOT INSTALL, OPERATE, OR MAINTAIN AN ATI PRODUCT UNLESS TRAINED AND QUALIFIED IN PRODUCT AND ACCESSORY INSTALLATION, OPERATION AND MAINTENANCE.

P5510. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB DOUBLE ACTING SERIES PNEUMATIC ACTUATORS

HIGH PRESSURE CONTROL VALVE PISTON BALANCED

DISASSEMBLY AND ASSEMBLY


M Series Manual Handwheel Gear Actuator

Fisher 2052 Diaphragm Rotary Actuator

ASSEMBLY. Transmission Automatic Transmission 5R44E and 5R55E. Special Tool(s)

2001 Dodge RAM 3500 PICKUP

Fisher 1B and 1BR Constant Pressure Pump Governor Actuators

Service Manual for Hydraulic Cylinder

Dura Force Disc Brake System Service Manual

Baumann Mikroseal Control Valve

REPAIR INSTRUCTION - MP4120-SWS/MP4124-SWS

ANDERSON GREENWOOD SERIES 500 PILOT OPERATED SAFETY RELIEF VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Fisher 3024C Diaphragm Actuator

INSTRUCTION MANUAL AND PARTS LIST FOR SERIES 8L-630J AND 630M WARNING

KEYSTONE FIGURE 79 PNEUMATIC ACTUATOR OPERATING AND MAINTENANCE INSTRUCTIONS

PISTON ACCUMULATOR INSTALLATION, OPERATION & CARE

KTM Hindle Series 300 Ultra-Seal two piece metal seated ball valves Installation and Maintenance Instructions

PRODUCT SERVICE MANUAL FOR BK12DHZ PUMPS

Genesis Double Adjustable Shock Assembly and Repair

AV INSTALLATION, OPERATION & MAINTENANCE MANUAL

Valtek VL-HC Spring Cylinder Linear Actuators

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INJECTION PUMP

These instructions are applicable to the following models: ARI 1108 ARI HP1108

161 Series Pilots for Pilot-Operated Pressure Reducing Regulators

Operation & Service Manual

Types 1808 and 1808A Pilot-Operated Relief Valves or Backpressure Regulators

Anderson Greenwood Series 400 Piston Pilot POPRV Installation and Maintenance Instructions

DISASSEMBLY. Transmission. All vehicles

Fisher ENVIRO SEAL Packing System for Rotary Valves

This information covers procedures for replacing the sealant for the crankshaft cover on the Volvo D16F engine.

SERIES PC INSTRUCTION AND OPERATION MANUAL

INSTRUCTION MANUAL AND PARTS LIST FOR PG/RG3D_-187, 218, 250 and 312 SERIES PUMPS

Copper Sleeve, Unit Injector, Replacement

Rugby Manufacturing Hoist Cylinder Bulletin. Preface Technical Service Bulletin

Service Manual. #19 Gearmatic Winch

Y690A Series Pressure Reducing Regulators

GH-BETTIS OPERATING & MAINTENANCE INSTRUCTIONS DISASSEMBLY & ASSEMBLY FOR THE T80X-M4-S DOUBLE ACTING SERIES HYDRAULIC ACTUATORS

M Series Manual Handwheel Gear Actuator

PENBERTHY MODELS GL AND GH GAS OPERATED JET PUMPS INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Types C401, C402, C407, C421, C427, C403, and C831 Jet Bleed Internal Valve Retrofit Kits

Sachs shock manual. ( ) 2 & 4 Stroke RR Enduro. ( ) RS Dual Sport

HANCOCK 600 GATE, GLOBE AND CHECK VALVES FORGED STEEL

Martin Air Cannon Maintenance Instructions

NOTE: Visit our website at for video repair procedures, under the Tools section.

INSTRUCTION MANUAL. Anchor Darling 1878 Swing Check Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM

Valtek Spring Cylinder Linear Actuators

I N S T R U C T I O N M A N U A L

HIPSTER S TURBO 350 TRANSBRAKE

Transcription:

(Parts & Service: Accum Seal) 05/09/11 Accumulator Seal Replacement Instructions

WARNING: THIS COMPONENT CONTAINS HIGH PRESSURE HYDRAULIC FLUID AND NITROGEN GAS. EXERCISE CAUTION WHEN PERFORMING ANY TYPE OF MAINTENANCE. WEAR PROPER SAFETY ATTIRE INCLUDING SAFETY GLASSES. A. Disassembly 1. Close the Power Oil Isolation Valve. 2. Isolate the Accumulator to be repaired on both the hydraulic and nitrogen side. 3. Open the System By-Pass Valve and drain the hydraulic fluid and pressure from the Accumulator. 4. Vent the nitrogen pressure from the top of the accumulator piston. 5. Remove the Accumulator from the skid. Note: If the hydraulic power unit contains more than one accumulator, all other accumulators may be returned to service once the accumulator to be repaired has been removed from the skid. 6. Place the Accumulator horizontally on a workbench and secure. 7. Remove all piping components connected to the upper and lower heads. Do Not Remove Plugs From Heads. 8. To remove the Upper Head, install two 5/8-18 x 4" (100 mm) long hex head cap screws into the upper head. Place a pry-bar between the two cap screws and turn in a counter-clockwise direction (See Figure 1) until the upper head is free of the cylinder. CAUTION: The accumulator upper head weighs approximately 65 pounds (30 kilograms). Use caution as to not damage the threads when removing the upper head from the cylinder. 9. To remove the Lower Head, install two 3/4-10 x 4" (100 mm) long hex head cap screws into the lower head. Place a pry-bar between the two cap screws and turn in a counter-clockwise direction (See Figure 2) until the lower head is free of the cylinder. CAUTION: The accumulator lower head weighs approximately 100 pounds (45 kilograms). Use caution as to not damage the threads when removing the lower head from the cylinder. 10. If the Accumulator is equipped with a Piston Stop, remove it through the end of the cylinder that held the upper head. Take precautions to protect the accumulator cylinder and piston stop from damage. Retain the nylon guides located in each end of the piston stop (total of 6). 11. Remove the Piston from the accumulator through the end of the cylinder that held the upper head. If the piston is at the bottom of the cylinder, push towards the top. Take precautions to protect the accumulator cylinder and piston from damage. The center of the piston contains a ½-13 tapped hole that can be used to install an eyebolt or standard bolt, to ease in the removal of the piston from the Page 1

cylinder. Use caution to not damage the threads when removing the piston from the cylinder. 12. With all components removed, visually inspect the accumulator cylinder for any damage, such as grooves or nicks. 13. Remove and discard all seals and back-up rings from the accumulator components. 14. Clean all components, and inspect for damage to interior surfaces. Give close attention to the seal grooves. B. Reassembly At this time the new seals are to be installed and the accumulator reassembled. For reassembly, a thread lubricant such as NEVER-SEEZ and a, PTFE/petroleum base all-purpose, grease such as ACCROLUBE will be required. 1. Install the Lower Head first. Using the Accumulator Sub-Assembly drawing Figure 4 as a guide, place the Back- Up Ring into the seal groove first. Carefully install the O-Ring next to the Back-Up Ring. CAUTION: Do not overstretch the oring or push the o-ring across the threads of the accumulator lower head. 2. Apply grease to the O-Ring and Back- Up Ring. 3. Apply thread lubricant to the external threads of the Lower Head. 4. Carefully insert the Lower Head into the Cylinder. Do not allow the seals in the Lower Head to scrape against the internal threads of the Cylinder. 5. By hand, begin screwing the Lower Head into the Cylinder turning the Lower Head in a clockwise direction. A pry-bar may be used after the Lower Head has started correctly (See Figure 2). Note: The Cylinder is tapered to allow the seals to start into the cylinder bore without shearing them. 6. Continue screwing in the Lower Head until it is tight against the cylinder wall (See Figure 3). 7. Insert the Piston next. Use the Accumulator Sub-Assembly drawing (Figure 4) as a guide for the location of the T-Seal and wear bands. 8. Carefully place the T-Seal into its groove. Place the T-Seal s back-up rings next to the seal as shown and apply grease to the seal. 9. Apply grease to the wear band groove. 10. Place the wear band into the groove and grease again. (This will help prevent the bands from coming off the piston, when it is being placed into the accumulator cylinder) 11. Carefully insert the Piston into the Cylinder. Do not allow the seals to scrape against the internal threads of the Cylinder. 12. As the Piston enters the Cylinder, it may require a gentle nudge to get the T-Seal started into the bore. Use a soft or rubber mallet to strike the piston. Do Not Use A Metal Hammer. Strike the Piston side to side, across the diameter, to avoid binding of the Piston. Page 2

13. If a Piston Stop is used, it must be inserted next. Place grease in and around the holes that hold the nylon guides (this will help hold them in place). Place the nylon guides into the holes and insert the Piston Stop into the Cylinder. Note: The piston may have to be pushed lower into the Cylinder to accommodate the length of the Piston Stop 14. Install the Upper Head. Using the Accumulator Sub-Assembly drawing (Figure 4) as a guide, place the Back- Up Ring into the seal groove first. Carefully install the O-Ring next to the Back-Up Ring. CAUTION: Do not overstretch the oring or push the o-ring across the threads of the accumulator lower head. 15. Apply grease to the O-Ring and Back- Up Ring. 16. Apply thread lubricant to the external threads of the Upper Head. 17. Carefully insert the Upper Head into the Cylinder. Do not allow the seals in the Upper Head to scrape against the internal threads of the Cylinder. 18. By hand, begin screwing the Upper Head into the Cylinder turning the Upper Head in a clockwise direction. A pry-bar may be used after the Upper Head has started correctly (See Figure 1). Note: The Cylinder is tapered to allow the seals to start into the cylinder bore without shearing them. 19. Continue screwing in the Upper Head until it is tight against the cylinder wall (See Figure 3). The procedure is now complete and the Accumulator may be re-installed on the skid. It is recommended that a hydrostatic test be performed to check the integrity of the seals before replacing the accumulator on the skid. If no hydrostatic test is performed, use clean compressed air to push the Piston to the Lower Head. After the Accumulator has been re-installed on the skid and all connections have been made, the nitrogen should be introduced into the Accumulator first. After the nitrogen has filled the top of the Accumulator, the hydraulic supply may be established (this will allow the system to act as if oil volume had been discharged from the hydraulic power unit) For problems, which cannot be handled by our customers, we have qualified service personnel available upon request. If the need should arise, please feel free to contact: EMERSON PROCESS MANAGEMENT VALVE AUTOMATION, INC. 2500 Park Avenue West Mansfield, Ohio 44906 Telephone: (419) 529-4311 Fax: (419) 529-3688 Page 3

Figure 1: Accumulator Upper Head Figure 2 Accumulator Lower Head Page 4

Head to Cylinder Joint Figure 3 Head to Cylinder Joint Figure 3 Page 5

Grease upper and lower heads with ACCROLUBE grease until grease comes out air bleed hole on opposite side of accumulator Pc Qty. Description 01 1 Upper Head 02 1 Lower Head 03 1 Piston 04 1 Cylinder 05 2 Wear Ring 79007-023 06 2 O-ring 568-269-479-70 07 2 Back-up Ring 8-269-N2067-90 08 2 Grease Fitting 09 1 T Seal B001-TP067-N4182A 10 2 Plastic Cup 11 1 Piston Stop (if required) 12 6 Nylon Guide (if required) ¾-10 4-Holes 02 07 06 04 05 09 03 11 12 08 10 01 5/8-18 2 Holes ¾ NPTF ¼ NPTF Apply NEVER SEEZ Straight Thread Lubricant to threads top and bottom ½-13 1 Hole Air Bleed Hole Keep open Accumulator Sub-Assembly Figure 4 Accumulator Sub-Assembly Figure 4 Page 6

Please visit our website for up to date product data.www.shafervalve.com The contents of this publication are presented for informational purpose only, and while every effort has been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. We reserve the right to modify or improve the designs or specifications of such products at any time with out notice. Trademarks owned by other companies that are referred to in our product literature include: NEVER-SEEZ and ACCROLUBE www.shafervalve.com