Government Of India Ministry of Power Central Electricity Authority New Delhi

Similar documents
Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Executive Summary on Power Sector. Jul-18

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power. Central Electricity Authority. New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

Chapter 1 POPULATION

Government Of India Ministry of Power Central Electricity Authority New Delhi

POPULATION. Chapter 1

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

04-Jun-08 FILE NAME : GSDPCRNS STATE SERIES

Description Rural Urban Combined. Weights June 18 Index (Final) July 18 Index (Prov.) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

INDIAN HORTICULTURE PRODUCTION - AT A GLANCE ( and to )

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

Chapter 2 HEALTH. Women & Men In India

GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2009

Population and decadal change by residence -India: 2011 (Persons)

The Electric Power System

14.Storage Infrastructure

RPO-REC Framework: Emerging Challenges and way forward. Background Presentation

northeast group, llc India Smart Grid: Market Forecast ( ) January group.com


Remote Village Electrification

ECONOMIC SURVEY STATISTICAL APPENDIX

India Solar Market Update Q Executive Summary.

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

Gujarat Power Sector A Statistical Profile

Status Review Report on Implementation of Batteries (Management and Handling) Rules, 2001 (as amended thereof)

Frequently Asked Questions for Grid Connected Solar Rooftop Systems

Unnat Jyoti by Affordable LEDs for All Conserve Electricity, Conserve Energy

Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016

India Power Generation March 2018


Deen Dayal Upadhyaya Gram Jyoti Yojana Creating Efficiency in Electricity Distribution

Solar Regulations Grid Connected, Ground Mounted and Solar Roof Top स र ऊर ज ग र ड कन क ट ड जउ ड मजउ ट ड और स लर र फट प एव म टरर ग ववननयम

Title of the Presentation

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

Power Distribution Tariffs in India 2016 Discom Wise & Consumer Wise Comprehensive Track

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

INDUSTRY SALES REVIEW. July 2017

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

CONTENTS. Table Subject. I Area under Rubber and Average Yield per hectare

ईट ड 11/ ट

Issue 12. micrometer. data as of 31 st December 2014

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.35 ANSWERED ON

सम मनत यहद प ई ह त ल हदए गए प र चपक म म ख प रपक च म खत पक त पक अध हस त क ष प भ ज

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

Enhancing Grid Stability in India

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

ईट ड 16/ ट

ETHANOL BLENDED PETROL PROGRAMME

SOLAR PLANT PERFORMANCE IN INDIA

SOUTHERN REGIONAL POWER COMMITTEE

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

Solutions for Full Length Test - 4

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

LT ATUL KATARYA MEMORIAL SCHOOL. Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon,

Ph. No: Fax No: Website:

Industry Consumption Review. July Industry Performance Review Report of PPAC: July18

Industry Performance Review Report of PPAC: May18

List of Grid Disturbances above 10 MW. Page 1 of 8

INDUSTRY SALES REVIEW. October 2017

Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j

ववषय ववद य त पक व ट र व ह ज म पक प वव (AIS 040:2015 प अमभन अमभग रहण )

Power Sector Trends: Focus on States

HVDC Systems in India

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

Unorganised Manufacturing Sector in India Its Size, Employment and Some Key Estimates

Ph. No: Fax No: Website:

INDRA MARSHAL POWER TILLER

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

Ph. No: Fax No: Website:

Industry Sales Review March 2018

Different Techniques of Loss Minimization in Distribution System

व द य त स रक ष व द य त स च म डण रचन / आर खड प रम णपत र अभ य सक रम स म न यत द ण य ब बत.

प र ख स ख य ववषय TED 27 (13009) W - II ववद य त पक व ट र व ह प पक व तथ 30 मम ट प अ पतम पक व म पक (AIS 041:2015 प अमभन अमभग रहण)

Ph. No: Fax No: Website:

Ph. No: Fax No: Website:

(URL: F /KV Damoh/ / Date:

Indian Power System Framework

ETD 39 (10038 ) ETD 39 (10039 ) ETD 39 (10040 )

स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) Ref: ID/TSG/RB/KF/03 Dtd. : 4 th August 2016

Indian Energy Exchange December For Public Use

Solar Energy Corporation of India New Delhi-17

Automotive Vehicles Safety Belts, Restraint Systems and Safety Belt Reminder Installation Requirements

NATIONAL INSTITUTE OF WIND ENERGY

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

य पक प रच लन मस द प स ड 25(2700) तकन क स म त प स ड 25

Target October (Month) April-October (Cumulative) (Apr- Mar)

Transcription:

Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Sep-217

Executive Summary for the Month of Sept 217 Contents SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Sept 217 (BU) 1A & 1B 2 Generating Capacity Addition for Sept 217 (MW) 2 3 List of Projects Commissioned in Sept 217 3 4 All India Installed Capacity (MW) Region-wise as on 31.7.217 3 5 All India Installed Capacity (MW) Sector-wise as on 31.7.217 4 6 Transmission Lines Added during Sept 217 (Ckms) 5 7 Transformation Capacity Addition during Sept 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in Sept 217 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 1 All India PLF Sector-wise for Sept 217 1 11 T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on 31.7.217 13 Average cost of Power & Average Realisation 11 Sep-17 14 All India per capita consumption of Electricity (KWh) 15 All India Coal consumption for Power Generation (MT) Section B - Capacity Addition 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during Sept 217 13 3 Installed Capacity in various Regions including their shares. 14-19 Section C - Transmission Lines 1 Programme and Achievements of Transmission Lines in Sept 217 2 List of Transmission Lines Commissioned/Ready for commissioning during Sept 217 Section D - Sub Stations 1 Programme and Achievements of Sub-Stations in Sept 217 21 2 List of Sub Stations commissioned/ready for commisssioning during Sept 217 Section E - Electricity Generation 1 Electricity Generation (MU) Targets and Achievements for 216-17 22 Section F - Power supply position 1 Power Supply Position (Provisional) for Sept 217 23 2 Peak Demand and Peak Met (Provisional) for Sept 217 24 3 Power Supply Position (Revised) for Aug 217 25 4 Peak Demand and Peak Met (Revised) for Aug 217 26 5 Notified Power cuts / Restrictions on Industries during Sept 217 27 6 Power Supply to Agricultural Sector during Sept 217 28 Section G - Growth of Power Sector 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since 26 31 5 Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA upto Sept 217 Section H - Rate of sale of power for the year 214-215 1 Rate of sale of power for the year 214-215 33-41 2

Section A - Highlights of Power Sector SN Contents Page 1 Electricity Generation (Conventional Sources) for Sep 217 (BU) 1 2 Generating Capacity Addition for Sep 217 (MW) 2 3 List of Projects Commissioned in Sep 217 3 4 All India Installed Capacity (MW) Region-wise as on 3.9.217 3 5 All India Installed Capacity (MW) Sector-wise as on 3.9.217 4 6 Transmission Lines Added during Sep 217 (Ckms) 5 7 Transformation Capacity Addition during Sept 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in Sept 217 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 1 All India PLF Sector-wise for Sept 217 1 11 T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on 3.9.217 #### 13 Average cost of Power & Average Realisation #### 14 All India per capita consumption of Electricity (KWh) 11 15 All India Coal consumption for Power Generation (MT)

BU BU 1. Electricity Generation for Sep, 217 (BU) Type Achievement Targets Achievement % Change Sep-16 Sep-17 Sep-17 w.r.t. 216 Thermal 79.936 85.3 84.83 Hydro 14.3 17.2 14.7 Nuclear 3.95 3.548 2.68 Bhutan Import.956.719.944 All India 98.16 16.588 12.513 4.59 ### 18. 16. 14. 12. 1. 98. 96. 94. 92. 98.16 Sep-16 16.588 Sep-17 Electricity Generation During April 216 to Sept 216 & April 217 to Sept 217 (BU) Type Thermal Hydro Nuclear Bhutan Import All India Sept '16 Sept '17 % Change 483.854 58.967 5.19 77.665 81.348 4.74 18.988 17.65-1.13 3.965 3.895-1.77 584.472 611.275 4.59 7. 6. 5. 584.472 611.275 4. 3. 2. 1.. Sept '16 Sept '17 1A

Month Generation (April, 217-Aug, 217) Generation Generation from from Conventional Sources Renewable Sources Electricity Generation (Conventional & Renewable Sources) April, 217- Aug, 217 vis-à-vis April, 216- Aug, 216 Total Generation (April, 216- Aug, 216) Generation Generation from from Conventional Renewable Sources Sources Total Growth in Conventional Generation % Growth Growth in Renewable Generation Growth in Total Generation (MU) (MU) (MU) (MU) (MU) (MU) (%) (%) (%) Apr-17 13,16 6,932 11,92 99,345 5,82 14,427 3.84 36.4 5.42 May-17 17,295 8,666 115,961 99,93 6,82 16,723 7.4 27.7 8.66 Jun-17 97,525 1,228 17,753 97,326 8,118 15,444.2 25.99 2.19 Jul-17 97,912 12,928 11,84 96,442 9,554 15,996 1.52 35.32 4.57 Aug-17 94,66 1,857 15,463 95,237 9,571 14,88 -.66 13.44.62 1B Source-Wise All India Generation from Renwables Electricity Generation From Renewable (source wise) April- Aug, 217 vis-à-vis April-Aug, 216 For the Month of All Figure in MU Commulative value for the period Aug, 217 Aug, 216 Aug,217 Aug,216 Wind 7512.8 6819.39 33168.48 266.29 Solar 1665.22 925.49 885.8 471.73 Biomass 264.57 347.74 1469.15 1667.35 Bagasse 281.64 238.98 185.36 247.15 Small Hydro 111.26 1227.44 3774.7 463.62 Others 32.53 11.83 153.59 77.52 Total 1857.3 957.87 49175.73 38995.66

2. Generating Capacity Addition for Sep, 217 (MW) Type Achievement Targets Achievement Sep-16 Sep-17 % Change w.r.t. 217 Thermal 66-1. Hydro 7 3 1. Nuclear 48.5. All India 73 78.5-1. 8 7 73. 6 5 4 3 # 2 1 Sep-16 1. Sep-17 Generating Capacity Addition during April '16 to Sept' 16 & April '17 to Sept' 17 (MW) Apr -16 to Sep.16 Apr -17 to Sep -17 % Change Thermal 368.5 43 19 Hydro 32 278 1 Nuclear NA All India 3928.5 4578. 17 48 46 4578. 44 42 4 3928.5 38 36 1 Apr -16 to Sep.16 Apr -17 to Sep -17 2

(i) Thermal 3. List of Projects Commissioned During Sep 217 Uchpinda TPP U-3,( 36) MW was Commissioned on 12.9.217 Shirpur TPP U-1,(15) MW was Commissioned on 28.9.217 (ii) (iii) Hydro Sainj HEP,U-1 (5 MW) was Commissioned on 4.9.217 Sainj HEP,U-2 (5 MW) was Commissioned on 4.9.217 Nuclear NIL 4. All India Installed Capacity (MW) Region-wise as on 3.9.217 Thermal Nuclear Hydro RES Grand Total Region Coal Gas Diesel Total Northern 52489.2 5781.26. 5827.46 162. 19423.77 11712.92 9127.15 Western 69983.62 1159.41. 8143.3 184. 7447.5 18412.1 18742.63 Southern 43382.2 6473.66 761.58 5617.26 332. 11748.3 2689.91 92576.2 Eastern 2751.64 1.. 27151.64. 4834.12 993.74 32979.5 North-East 52.2 1771.5 36. 2327.7. 1312. 281.12 392.19 Islands.. 4.5 4.5.. 12.56 52.61 ALL INDIA 193426.5 25185.38 837.63 219449.51 678. 44765.42 5833.35 329298.27 35. 3. Total = 329298.27 329298.27 25. 2. 219449.51 15. 1. 5.. 44765.42 5833.35 4726 678. Thermal Nuclear Hydro RES Total Captive Thermal Nuclear Hydro RES Total Captive Note: Captive Genaration is not included in the total. RES as on 31.12.216. 3

5. All India Installed Capacity (MW) Sector-wise as on 3.9.217 Sector THERMAL Coal Gas Diesel Total Nuclear Hydro RES Grand Total State 6378.5 7113.95 363.93 71258.38. 29798. 1976.9 1333.27 Private 74496. 158.6 473.7 8555.3. 3286. 56326.45 145162.75 Central 5515. 749.83. 6264.83 678. 11681.42. 8112.25 All India 193426.5 25185.38 837.63 219449.51 678. 44765.42 5833.35 329298.27 RES as on 31.12.216 All India Installed Capacity(MW) as on 3-9-217 (Sector-Wise) ## Central, 8112.25, 25% State, 1333.27, 31% State 1333.27 Private 145162.75 Central 8112.25 Private, 145162.75, 44% 4

ckms ckms 6. Transmission Lines Added during Sep, 216 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Sep-16 Sep-17 2574 24 138 1877 248 438 59 2315 7 6 59 5 Sep-17 4 3 2 1 2315 1 Sep'16 Sep '17 Transmission Lines Added during Apr '15 to Sep '16 & Apr '16 to Sep'17 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Apr '15 - Sep'16 Apr '16 - Aug '17 2574 3623 246 5378 8678 3566 1827 15141 12551 16 14 12 1 8 6 4 2 15141 12551 Apr '15 to Sep 16 Apr '16 to Sep 17 5

MVA MVA 7. Transformation Capacity Addition During Sep, 217 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India Sep-16 Sep-17 15 45 2145 4585 15 94 83 125 5975 Transformation Capacity Addition during Sep 217 12 1 8 6 4 2 Sep-16 125 5975 Sep-17 All India Transformation Capacity Addition during Apr '16 to Sep '16 & Apr '17 to Sep'17 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India April' 16 to Sep '16 April '16 to Sep '17 15 3 135 1 1542 2445 74 862 3746 4265 7452 3746 4265 1 April' 16 to Sep '16 April '16 to Sep '17 6

8. Power Supply Position (Energy & Peak) in Aug 217 Region Energy (MU) Deficit (%) Requirement Availability Sep'16 Sep 17 Sep '16 Sep'17 Aug.16 Aug '17 Northern 33342 34,433 32671 33,798-2. -1.8 Western 28124 29,41 2812 29,297. -.4 Southern 24659 24,796 24655 24,754. -.2 Eastern 11136 11,24 1152 11,176 -.8 -.3 North Eastern 1373 1,47 1336 1,356-2.7-3.6 All India 98634 11,249 97834 1,381 -.8 -.9 Region Power (MW) Deficit (%) Peak Demand Peak Met Aug 16 Aug 17 Aug 16 Aug 17 Jun16 Jun. '17 Northern 51426 5723 581 54649-2.6-4.5 Western 4122 46369 3993 45697 -.5-1.4 ## Southern 4923 4889 4532 4852-1. -.1 Eastern 1855 2534 1824 2534 -.2. North Eastern 2435 2629 2387 252-2. -4.1 All India 15126 155573 148746 153179-1.6-1.5 7

Chattisg arh Gujarat MP Maharas htra Daman & Diu Dadar Nagar Haveli MW 4 2 17 7 1 63 352 Chan digar h Delhi Hary ana HP J&K Punj ab Raja sthan UP Utrak hand 4 MW 15 541 494 215 1726 9. Peak Shortage of Power Supply (MW) in Different Regions Chandigarh Delhi Haryana HP J&K Punjab Rajasthan UP Utrakhand Sep '16 4 494 1726 Sep '17 15 541 215 24 2 16 12 8 4 Northern States (MW) Sep '17 Sep '16 ## Chattisgarh Gujarat MP Maharashtra Daman & Diu Dadar Nagar Haveli Sep '16 4 17 7 Sept '17 352 2 63 1 5 Western States (MW) Sept '17 Sep '16 AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep Sep'16 12 7 77 1 Sep '17 3 44 12 34 5 1 Southern State (MW) Sep '17 Sep'16 77 44 34 12 3 7 12 5 1 AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep 8

Arunac hal Assam Manipu r Meghal aya Mizora m Nagala nd Tripura MW 1 7 2 7 3 1 6 2 52 Bihar DVC Jharkhand Odisha West Bengal Sikkim A&N Island MW 4 8 56 219 Bihar DVC Jharkhand Odisha West Bengal Sikkim A&N Island Sep '16 219 56 8 Sep '17 4 25 2 15 1 5 Eastern States (MW) Sep '17 Sep '16 Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura Sep '16 7 4 3 1 2 Sep '17 7 52 1 2 6 1 North-Eastern States (MW) 9

April Axis Title 62.15 64.39 % PLF 48.85 54.5 56.9 57.93 7.76 71.3 58.49 6.69 1. All India PLF* Sector-wise for Sep. 217 %PLF Sector Sep '16 Sep '17 Central 7.76 71.3 State 48.85 54.5 Private 56.9 58.49 ALL INDIA 57.93 6.69 Sector-Wise Plant Load Factor for Apr, 216 and Sep, 217 8. 7. 6. 5. 4. 3. 2. 1.. Central State Private ALL INDIA Sep '16 Sep '17 All India PLF Month-wise Month PLF 216 PLF 217 Apr 66.81 65.59 May' 62.15 64.39 June 73.24 7.15 July 67.21 68.45 Aug 69.91 66.17 Sep 57.93 6.69 All India PLF Month-wise 8 6 Axis Title 216 217 * For Coal and Lignite based Power Plants 1

11. T & D and AT&C Losses (%) 21-11 211-12 212-13 213-14 214-15 T&D Losses 23.97 23.65 23.4 21.46 22.77(P) AT&C Losses 26.35 26.63 25.48 22.58 24.62(P) Note: As per PFC for utilities selling directly to consumers P: Provisional 12. All India Village Electrification & Pumpsets Energised as on 31.5.217 Total Number of Villages Villiages Electrified (Nos.) as on 3.9.17 597464 594 396* Pump sets Energised Pump sets Energised as on 3-9-17 as on 31-3-216 243418 21185563 Figures are based on the data available in DDUGJY website. % Villages electrified 99.25 *Disclaimer: The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as Indicated in all the reports. The data in the report prior to October, 215 was Updated every month based on the information received from states/distribution utilities as and when reported but the data for all the states for a particular month was generally not made available simultaneously to reflect the countrywide picture for a particular month. Number of total villages and number of electrified villages have also been adjusted for changes observed from Census 211 data. As such, each monthly report of Village electrification of CEA is independent of the earlier published reports ### Note: From the year 24-5 onwards Definition of Village Electrification:- A village would be declared Electrified if i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality as well as Dalit Basti / hemlet where it exists. (For electrification through Non-Conventional Energy Sources a Distribution Transformer may not be necessary) ii) Electricity is provided to Public places like Schools, Panchayat Office, Health Centre, Dispensaries, Community Centres etc. and iii) The number of households electrified should be at least 1% of the total number of households in the village iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be obtained. 13. Average cost of Power & Average Realisation Average Revenue Realization(paise/unit) Gap ACS- Year Gap ACS- ARR (on Gap ACS- Average cost of supply(acs) ARR( subsidy ARR (on (paise/unit) Without booked subsidyrece Without Subsidy Subsidy) Paise/unit basis) paise/unit ived basis) paise/unit 213-14 518 4 118 76 77 214-15 52 412 18 58 6 Source:- PFC Reports on the performance of State Power Utilities 14. All India per capita consumption of Electricity ( KWh) # 214-15 11 215-16 175* # (Gross Generation+Net Import) / Mid Year Population, * Provisional 15. All India Coal consumption for Power Generation (MT) 213-14 489.4 214-15 53.4 215-16 545.9* * Actual 11

Section B - Capacity Addition SN Contents Page 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during Sep 217 and April 216 to Sep 217 13 3 Installed Capacity in various Regions including their shares. 14-19

1,897. 5,479.2 5,3. 2,. 72,34. 1. Capacity Addtion Targets and Achievements in the 12th Plan (i) Targets (MW) Type/Sector Central State Private Total Thermal 14,878. 13,922. 43,54. 72,34. Hydro 6,4. 1,68. 3,285. 1,897. Nuclear 5,3... 5,3. Total 26,182. 15,53. 46,825. 88,537. (ii) Achievements upto Mar, 217 during the 12th Plan (MW) Type/Sector Central State Private Total Thermal 15,868.6 22,21.35 53,66.5 91,73.45 Hydro 2,584.2 2,276. 619. 5,479.2 Nuclear 2,... 2,. Total 2,452.62 24,477.35 54,279.5 99,29.47 Acievement % 78.12 157.61 115.92 112.5 Achievement of Capacity Addition during the Current Plan upto March 217 12th Plan Target 88,537 MW, Achieved so far 99,29.47 MW 9,. 8,. 7,. 6,. 5,. 4,. 3,. 2,. 1,.. Thermal Hydro Nuclear Target Achievement 12

3 51 1 MW 13 1,255 3,79 3,92 MW 14,956 16,211 2. Capacity Addition Targets / Achievements During Sep 217 Schemes Sector (MW) Target Sep-17 April '17 - Sep 17 Deviation 217-18 Target* Achievement Target* Achievement (+) / (-) Central 488 634 91-543 Thermal State 3546 4446 66-3786 Pvt. 294 51 417 222-195 Total 11366 51 14956 379-11166 Central 8 3 61 3-58 Hydro State 3 1 428 1-328 Pvt. 25 217-217 Total 135 3 1 1255 13-1125 Nuclear Central 5 Central 618 3 695 94-61 All India State 3846 1 4874 76-4114 Pvt. 3145 51 4387 222-2167 ## Total 13171 3 61 16211 392-12291 Targets and Achievement during 217-18 Target 18 16 14 12 1 8 6 4 2 Thermal Hydro Nuclear Total Achievement Capacity Addition Targets/Achievements during the Month of Sep 217 1 9 8 7 6 5 4 3 2 1 Targets and Achievement during Aug 217 Target Achievement Thermal Hydro Nuclear 13

Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 3.9.217) (UTILITIES) Modewise breakup Ownership/ Sector Thermal Coal Gas Diesel Total Nuclear Grand Total State 1798. 2879.2. 19977.2. 8643.55 663.56 29284.31 Private 2276.83 558.. 23318.83. 2514. 1149.36 36882.19 Central 1263.37 2344.6. 14974.43 162. 8266.22. 2486.65 Sub Total 52489.2 5781.26. 5827.46 162. 19423.77 11712.92 9127.15 State 2228. 2849.82. 25129.82. 5446.5 311.18 3887.5 Private 33385.67 4676.. 3861.67. 481. 181.92 56643.59 Central 14317.95 3533.59. 17851.54 184. 152.. 21211.54 Sub Total 69983.62 1159.41. 8143.3 184. 7447.5 18412.1 18742.63 State 17832.5 791.98 ######## 18912.36. 11748.3 512.55 31172.94 Private 12124.5 5322.1 ######## 1792.3.. 26378.36 44298.66 Central 13425.2 359.58. 13784.6 332... 1714.6 Sub Total 43382.2 6473.66 ######## 5617.26 332. 11748.3 2689.91 92576.2 State 657. 1.. 667.. 3537.92 225.11 1433.3 Private 6225... 6225.. 291. 768.63 7284.63 Central 14256.64.. 14256.64. 15.2. 15261.84 Sub Total 2751.64 1.. 27151.64. 4834.12 993.74 32979.5 State. 492.95 36. 528.95. 422. 259.25 121.2 Private. 24.5. 24.5.. 21.88 46.38 Central 52.2 1253.6. 1773.62. 89.. 2663.62 Sub Total 52.2 1771.5 36. 2327.7. 1312. 281.12 392.19 State.. 4.5 4.5.. 5.25 45.3 Private...... 7.31 7.31 Central........ Sub Total.. 4.5 4.5.. 12.56 52.61 State 6378.5 7113.95 ######## 71258.38. 29798. 1976.9 1333.27 Private 74496. 158.6 ######## 8555.3. 3286. 56326.45 145162.75 Central 5515. 749.83. 6264.83 678. 11681.42. 8112.25 Total 193426.5 25185.38 837.63 219449.51 678. 44765.42 5833.35 329298.27 Hydro RES * (MNRE) Abbreviation:- Note : - SHP=Small Hydro Project ( 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources 1. RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNRE) as on 3.6.217 (As per latest information available with MNRE) *Break up of RES all India as on 3.6.217 is given below (in MW) : Small Bio-Power Wind Power Hydro Power BM Power/Cogen. Waste to Energy 4384.55 3258.17 8181.7 114.8 13114.85 5833.35 A. Capacity Added during Sept., 217 622 MW 1. U-1&2 of SAINJ HPS HPS (2*5=1 MW) has been commissioned and added to the State Sector of Himachal Pradesh. 2. U-3 of CHANJU-I HPS (12 MW) which was commissioned in July, 217 has been added to the Private Sector of Himachal Pradesh. 3. U-3 of UCHPINDA TPP (36 MW) has been commissioned and added to the Private Sector of Chhattisgarh. 4. U-1 of SHIRPUR TPP (15 MW) has been commissioned and added to the Private Sector of Maharashtra. B. Capacity Retired during Sept., 217 55 MW 1. CHANDRAPURA(DVC) TPS U-2 (13 MW) has been retired from the Central Sector of DVC. 2. BOKARO `B` TPS U-1&2 (2*21=42 MW) has been retired from the Central Sector of DVC. Solar Power Total Capacity Capacity Removed due to C. change to CPP from IPP during Sept., 217 MW D. Net Capacity Added during Sept., 217 A-B-C 72 MW

14 State Delhi Haryana Himachal Pradesh Jammu & Kashmir Punjab Rajasthan Uttar Pradesh Uttarakhand Chandigarh Central - Unallocated Total (Northern Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 3.9.217) RES (MNRE) Grand Total State 135. 18.4. 1935.4... 1935.4 Private 869.22 18.. 977.22.. 56.27 133.49 Central 3821.18 27.1. 428.19 12.83 723.9. 4854.11 Sub-Total 4825.4 2115.41. 694.81 12.83 723.9 56.27 7823. State 272. 15.. 287.. 184.51 59.3 413.81 Private 48.78.. 48.78. 2. 192. 4472.78 Central 1269.32 535.61. 184.94 1.94 663.7181. 2569.58 Sub-Total 87.1 685.61. 8755.72 1.94 1948.21 251.3 1156.16 State..... 694.6 256.61 951.21 Private..... 992. 579.43 1571.43 Central 17.74 62.1. 232.75 28.95 1223.88. 1485.58 Sub-Total 17.74 62.1. 232.75 28.95 291.48 836.4 48.22 State. 175.. 175.. 123. 18.3 1513.3 Private...... 51.36 51.36 Central 463.15 129.7. 592.23 67.98 148.98. 179.19 Sub-Total 463.15 34.7. 767.23 67.98 2278.98 159.39 3273.58 State 262. 15.. 277.. 257.23 127.8 5468.3 Private 5115.5.. 5115.5. 288. 14.8 6444.3 Central 871.8 264.1. 1135.9 196.81 923.42. 2255.32 Sub-Total 866.58 414.1. 92.59 196.81 3781.65 1168.6 14167.65 State 585. 63.8. 6453.8. 187.96 23.85 7565.61 Private 3882... 3882.. 14. 6362.24 1348.24 Central 1153.91 221.1. 1375.1 556.74 739.1. 267.76 Sub-Total 1885.91 824.9. 1171.81 556.74 193.97 6386.9 2584.61 State 5773... 5773.. 724.1 25.1 6522.2 Private 8714.33.. 8714.33. 842. 2297. 11853.33 Central 3315.25 549.49. 3864.74 289.48 1664.93. 5819.15 Sub-Total 1782.58 549.49. 18352.7 289.48 3231.3 2322.1 24194.68 State..... 1252.15 62.87 1315.2 Private 99. 45.. 549.. 88. 452.94 189.94 Central 332.5 69.66. 41.71 31.24 475.54. 98.49 Sub-Total 431.5 519.66. 95.71 31.24 1815.69 515.81 3313.45 State........ Private...... 17.32 17.32 Central 34.86 15.3. 49.88 8.1 11.71. 159.6 Sub-Total 34.86 15.3. 49.88 8.1 11.71 17.32 176.92 1198.83 291.5. 1489.88 237.3 71.95. 2428.87 State 1798. 2879.2. 19977.2. 8643.55 663.56 29284.31 Private 2276.83 558.. 23318.83. 2514. 1149.36 36882.19 Central 1263.37 2344.6. 14974.43 162. 8266.22. 2486.65 Grand Total 52489.2 5781.26. 5827.46 162. 19423.77 11712.92 9127.15

15 State Goa Daman & Diu Gujarat Madhya Pradesh Chhattisgarh Maharashtra Dadra & Nagar Naveli Central - Unallocated Total (Western Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 3.9.217) RES (MNRE) Grand Total State.......5.5 Private. 48.. 48....71 48.71 Central 451.12 22.2. 473.32 26... 499.32 Sub-Total 451.12 7.2. 521.32 26...76 548.8 State........ Private...... 1.46 1.46 Central 122.96 48.4. 171.36 7... 178.36 Sub-Total 122.96 48.4. 171.36 7.. 1.46 188.82 State 475. 2177.82. 6927.82. 772. 8. 777.82 Private 7765.67 396.. 11725.67.. 677.37 18496.4 Central 312.9 424.. 3436.9 559... 3995.9 Sub-Total 15527.76 6561.82. 2289.58 559. 772. 6778.37 3198.95 State 48... 48.. 173.66 83.96 5867.62 Private 5574. 1.. 5674... 3453.93 9127.93 Central 272.7 257.. 2977.7 273. 152.. 477.7 Sub-Total 12374.7 357.. 12731.7 273. 3223.66 3537.89 19766.25 State 328... 328.. 12. 11.5 3411.5 Private 759... 759... 421.81 811.81 Central 1628.44.. 1628.44 48... 1676.44 Sub-Total 12498.44.. 12498.44 48. 12. 432.86 1399.3 State 117. 672.. 1842.. 285.84 28.12 139.96 Private 12456. 568.. 1324.. 481. 744.67 2945.67 Central 4219.43 2513.. 6732.43 69... 7422.43 Sub-Total 26845.43 3753.. 3598.43 69. 3331.84 7648.79 42269.6 State........ Private...... 2.97 2.97 Central 169.21 71.4. 24.61 9... 249.61 Sub-Total 169.21 71.4. 24.61 9.. 2.97 252.58 1994. 197.59. 2191.59 228... 2419.59 State 2228. 2849.82. 25129.82. 5446.5 311.18 3887.5 Private 33385.67 4676.. 3861.67. 481. 181.92 56643.59 Central 14317.95 3533.59. 17851.54 184. 152.. 21211.54 Grand Total 69983.62 1159.41. 8143.3 184. 7447.5 18412.1 18742.63

16 State Andhra Pradesh Telangana Karnataka Kerala Tamil Nadu NLC Puducherry Central - Unallocated Total (Southern Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN SOUTHERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 3.9.217) RES (MNRE) Grand Total State 441. 235.4. 4645.4. 1673.6 89.5 648.5 Private 3873.88 3694.12 36.8 764.8.. 6321.19 13925.99 Central 167.6.. 167.6 127.27.. 1734.87 Sub-Total 9891.48 3929.52 36.8 13857.8 127.27 1673.6 641.69 2269.36 State 482.5.. 482.5. 2389.93. 6472.43 Private 839.45 95.88. 179.33.. 1868.17 3658.5 Central 1878.12.. 1878.12 148.73.. 226.85 Sub-Total 68.7 95.88. 775.95 148.73 2389.93 1868.17 12157.78 State 52.. ######## 5147.92. 3599.8 155.33 893.5 Private 1958.5. 25.2 1983.7.. 7478.48 9462.18 Central 2429.2.. 2429.2 698... 3127.2 Sub-Total 947.7. ######## 956.82 698. 3599.8 7633.81 21492.43 State.. ######## 159.96. 1881.5 145.2 2186.48 Private 615. 174.. 789... 193.7 982.7 Central 118.18 359.58. 1467.76 362... 1829.76 Sub-Total 1723.18 533.58 ######## 2416.72 362. 1881.5 338.72 4998.94 State 432. 524.8. 4844.8. 223.2 122.7 7169.98 Private 4837.67 53.1 ######## 5752.47.. 1516.74 16269.21 Central 4389.52.. 4389.52 1448... 5837.52 Sub-Total 13547.19 127.18 ######## 14986.7 1448. 223.2 1639.44 29276.71 State........ Private........ Central 1... 1.... 1. Sub-Total 1... 1.... 1. State. 32.5. 32.5... 32.5 Private.......8.8 Central 248.4.. 248.4 86... 334.4 Sub-Total 248.4 32.5. 28.9 86...8 366.98 1664... 1664. 45... 2114. State 17832.5 791.98 ######## 18912.36. 11748.3 512.55 31172.94 Private 12124.5 5322.1 ######## 1792.3.. 26378.36 44298.66 Central 13425.2 359.58. 13784.6 332... 1714.6 Grand Total 43382.2 6473.66 ######## 5617.26 332. 11748.3 2689.91 92576.2 17

State Bihar Jharkhand West Bengal DVC Odisha Sikkim Central - Unallocated Total (Eastern Region) State Assam Arunachal Pradesh Meghalaya Tripura Manipur Nagaland Mizoram INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION Coal Gas Diesel Total (As on 3.9.217) State 21... 21... 7.7 28.7 Private 281... 281... 224.52 55.52 Central 2939.33.. 2939.33. 11.. 349.32 Sub-Total 343.33.. 343.33. 11. 295.22 3835.54 State 42... 42.. 13. 4.5 554.5 Private 73... 73... 23.27 753.27 Central 748.74.. 748.74. 61.. 89.74 Sub-Total 1898.74.. 1898.74. 191. 27.32 2117.6 State 552. 1.. 562.. 986. 91.95 6697.95 Private 2275... 2275... 332.69 267.69 Central 76.77.. 76.77. 41.. 117.77 Sub-Total 8555.77 1.. 8655.77. 1396. 424.64 1476.41 State........ Private........ Central 6985.4.. 6985.4. 186.2. 7171.24 Sub-Total 6985.4.. 6985.4. 186.2. 7171.24 State 42... 42.. 261.92 6.3 2488.22 Private 2939... 2939... 188.15 3127.15 Central 1633.9.. 1633.9. 89.. 1722.9 Sub-Total 4992.9.. 4992.9. 215.92 194.45 7338.27 State..... 36. 52.11 412.11 Private..... 291.. 291. Central 87.3.. 87.3. 64.. 151.3 Sub-Total 87.3.. 87.3. 715. 52.11 854.14 111.83.. 111.83. 85.1. 1186.84 State 657. 1.. 667.. 3537.92 225.11 1433.3 Private 6225... 6225.. 291. 768.63 7284.63 Central 14256.64.. 14256.64. 15.2. 15261.84 Grand Total 2751.64 1.. 27151.64. 4834.12 993.74 32979.5 Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Coal Gas Diesel Total Nuclear INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Modewise breakup Nuclear Hydro (Renewable) Hydro (Renewable) (As on 3.9.217) RES (MNRE) Grand Total State. 323.45. 323.45. 1. 3.1 453.46 Private. 24.5. 24.5.. 15.88 4.38 Central 279.2 435.56. 714.58. 331.23. 145.81 Sub-Total 279.2 783.51. 162.53. 431.23 45.89 1539.65 State...... 14.61 14.61 Private.......27.27 Central 24.7 46.82. 71.52. 97.45. 168.97 Sub-Total 24.7 46.82. 71.52. 97.45 14.87 273.84 State..... 322. 31.3 353.3 Private.......1.1 Central 3.4 19.69. 14.9. 65.19. 25.28 Sub-Total 3.4 19.69. 14.9. 387.19 31.4 558.32 State. 169.5. 169.5.. 16.1 185.51 Private...... 5.9 5.9 Central 37.4 436.95. 474.35. 62.38. 536.73 Sub-Total 37.4 66.45. 643.85. 62.38 21.1 727.33 State.. 36. 36... 5.45 41.45 Private.......3.3 Central 31.4 71.57. 12.97. 88.93. 191.9 Sub-Total 31.4 71.57 36. 138.97. 88.93 5.48 233.38 State...... 3.67 3.67 Private.......5.5 Central 21.4 48.93. 7.33. 53.37. 123.7 Sub-Total 21.4 48.93. 7.33. 53.37 31.17 154.87 State...... 41.47 41.47 Private.......1.1 Central 2.7 4.46. 61.16. 64.19. 125.35 Sub-Total 2.7 4.46. 61.16. 64.19 41.57 166.92 Central - Unallocated 75. 63.62. 138.62. 127.26. 265.88 Total (North- Eastern Region) Ownership/ Sector RES (MNRE) State. 492.95 36. 528.95. 422. 259.25 121.2 Private. 24.5. 24.5.. 21.88 46.38 Central 52.2 1253.6. 1773.62. 89.. 2663.62 Grand Total 52.2 1771.5 36. 2327.7. 1312. 281.12 392.19 18 Grand Total

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN ISLANDS State Andaman & Nicobar lakshadweep Total (Islands) Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 3.9.217) RES (MNRE) Grand Total State.. 4.5 4.5.. 5.25 45.3 Private...... 6.56 6.56 Central........ Sub-Total.. 4.5 4.5.. 11.81 51.86 State........ Private.......75.75 Central........ Sub-Total.......75.75 State.. 4.5 4.5.. 5.25 45.3 Private...... 7.31 7.31 Central........ Grand Total.. 4.5 4.5.. 12.56 52.61 19

Section C - Transmission Lines SN Contents Page 1 Programme and Achievements of Transmission Lines in Sep. 217 and during April 216 to Sep. 217 2 2 List of Transmission Lines Commissioned/Ready for commissioning during Sep. 217

1. Programme and Achievementsof Transmission Lines in Sep 217 and during April 216 to Sep 217 (Figs. in ckms) Voltage Level /Sector Programme sep '17 Apr '16 to sep 17 217-18 Programme Achievement Programme Achievement +/- 8 kv HVDC Central Sector State Sector Total +/- 5 kv HVDC Central Sector JV/Private Sector Total 765 kv Central Sector 3665 41 2 1428 State Sector 416 416 416 335 JV/Private Sector 846 846 283 Total 4927 457 1462 246 # 4 kv Central Sector 4851 1178 1496 1738 3119 State Sector 5157 693 291 3988 4145 JV/Private Sector 1416 9 786 1414 Total 11424 1871 1877 6512 8678 22kV Central Sector 763 342 State Sector 5972 535 438 4378 1822 JV/Private Sector 5 Total 6735 535 438 472 1827 Grand Total 2386 2863 2315 12694 12551 Transmission Lines (22 kv and above) Commissioned/Ready for commissioning During Sep- 217 Sl. No. Voltage Level (kv) Name of Transmission Lines Executing Agency 1. 2. 3. 5. 6. CENTRAL SECTOR Sector As on 31-Sep-217 Line Length (ckm) 1 4 Allahabad - Kanpur line PGCIL 481 2 3 4 5 Total of CENTRAL SECTOR 4 4 4 4 Aurangabad - Boisar Loop-In (Hyderabad-Maheshwaram) portion Raghunathpur TPS -Ranchi (PG) Solapur STPP - Solapur line - II (Q) PGCIL PGCIL DVC PGCIL 69 3 311 25 151 STATE SECTOR Sector 6 7 8 9 1 11 12 13 14 Total of STATE SECTOR 4 22 22 22 22 22 22 22 22 Kharagpur - N. Chanditala Dharmapuri (Palavady) - Gurubarapally Jethana - Ajmer line Jodhpur (New) - Jhalamand (TK) Kalisindh TPS - Bhawanimandi LILO of Arasur - Karamadai at LILO of Sankhari-Jangral at Veloda LILO of Tappar-Hadala line at Vondh S/s LILO of Thiruvarur - Kadalangudi at WBSETCL TANTRANS RVPNL RVPNL RVPNL TANTRANS GETCO GETCO TANTRANS 277 58 12 4 34 75 61 4 46 715 PRIVATE SECTOR Sector 15 4 LILO of Orai-Mainpuri at Mainpuri (Balance SEUPPTCL 9 Total of PRIVATE SECTOR 9 Grand Total 2315

Section D - Sub Stations SN Contents Page 1 Programme and Achievements of Sub-Stations in May. 217 and during Apr 216 to Sep 217 2 List of Sub Stations commissioned/ready for commisssioning during Sep. 217 21

1. Programme & Achievement of sub- stations in Sep 217 and during April 216 to Sep 217 Voltage Level /Sector Programme Sep-17 (Fig. in MVA) Apr '16 - Sep '17 217-18 Programme Achievemen Programme Achievement ± 8 kv HVDC Central Sector 3 15 3 3 State Sector JV/Private Sector Total 3 15 3 3 765 kv Central Sector 175 15 15 45 6 State Sector 25 JV/Private Sector 15 15 15 Total 19 15 15 6 1 4 kv Central Sector 626 555 1185 4945 State Sector 13215 1645 1325 1277 JV/Private Sector 133 5 133 273 Total 285 555 2145 1284 2445 22 kv Central Sector 33 11 11 State Sector 1843 84 54 714 833 JV/Private Sector 18 18 Total 11173 84 83 714 862 Grand Total 53978 2895 5975 2898 4265 A Sl Name of Voltage Capacity Executing Agency No Sub Stations Ratio (MW/MVA) 1. 2. 3. 4. 5. CENTRAL SECTOR 1 2 3 Alipurduar and Agra Hyderabad Balipara S/S -ICT-I (Repl. 8 765/4 22/132 PGCIL PGCIL PGCIL 15 15 11 Total of CENTRAL 311 STATE SECTOR 4 5 6 7 8 9 1 11 12 13 Sub-Stations (22 kv and above) Commissioned/Ready for commissioning During -SEP 217 Bhadla (Distt Jhodpur)- 4/22 RVPNL 5 Narsapur (ICT-II) 4/22 TSTRANSCO 315 Dharmapuri (Palavady)- 4/23 TANTRANSCO 315 Dharmapuri (Palavady) 4/11 TANTRANSCO 2 New Chanditala 4kV- 4/22 WBSETCL 315 Mondipatty (1x8) 23/11 TANTRANSCO 8 Yawatmal (Addl ICT) 22/132 MSETCL 1 Gurgaon Sector - 2 22/66 HVPNL 1 Narsapur (ICT-I) (1 22/132 TSTRANSCO 1 Narsapur (ICT-II) (16 22/132 TSTRANSCO 16 Total of STATE SECTOR 2185 PRIVATE SECTOR 14 15 Ataur Ataur (3x6 MVA) 4/22 22/33 WUPPTCL WUPPTCL 5 18 Total of PRIVATE 68 SECTOR

Section E - Electricity Generation SN Contents Page 1 Electricity Generation (MU) Targets and Achievements for 217-18 22 Sep-17

1. Electricity Generation (MU) Targets and Achievememts for 217-18 Thermal Programme Achievement* % Ach. Programme Achievement* % Ach. Central Sector 339,749. 27,173. 28,468.57 14.77 166,314. 172,526.8 13.74 State Sector 339,494. 28,4. 24,997. 89.15 168,257. 154,84.4 91.58 Pvt.IPP Sector 344,239. 28,52. 29,713.79 14.25 171,667. 172,294.32 1.37 Pvt.UTL Sector 18,546. 1,586. 1,542.14 97.23 9,51. 1,61.37 15.8 Total 1,42,28. 85,31. 84,721.5 99.32 515,748. 58,966.89 98.69 Hydro Central Sector 55,28. 6,381. 5,953.99 93.31 36,711. 38,883.84 15.92 State Sector 73,5. 8,935. 6,442.37 72.1 41,925. 31,769.58 75.78 Pvt.IPP Sector 11,917. 1,586. 1,542.14 97.23 9,268. 9,99.88 16.93 Pvt.UTL Sector 1,45. 12. 127.12 15.93 75. 785.18 14.69 Nuclear Sector Target (217-18 Sep '17 April '16 to Sep '17 Total 12,757,385.22 17,22. 14,65.62 368.58 88,654. 81,348.48 91.76 Central Sector 4,972. 3,548. 2,675.99 75.42 22,294. 17,65.26 76.55 Total 4,972. 3,548. 2,675.99 75.42 22,294. 17,65.26 76.55 Bhutan Import 5,. 719. 944.85 131.41 3,87.25 3,965.8 128.43 Central Sector 435,749. 37,12. 37,98.55 99.99 225,319. 228,475.9 11.4 State Sector 412,499. 36,975. 31,439.37 85.3 21,182. 185,853.98 88.43 Pvt. Sector 376,152. 31,794. 32,925.19 13.56 191,195. 193,5.75 1.97 Total 1,229,4. 16,59. 12,47.96 96.8 629,783.25 611,345.71 97.7 * Provisional based on actual-cum-assesment All India Energy Generation During April 216 to Sep 217 (MU) Programme 7 6 629783 611346 Achievement 5 515748 58967 4 3 2 1 88654 81348 22294 1765 Thermal Hydro Nuclear Total Renewable Energy Generation Achievement Cummulative Achievement Figs in MU Cummulative Achievement Jul-17 Jul-16 Upto July-17 Upto July-16 12928 9442 38318.54 29424.78 22

Section F - Power supply position SN Contents Page 1 Power Supply Position (Provisional) for Aug. 217 and April 217 to Sep. 217 23 2 Peak Demand and Peak Met (Provisional) for Sep. 217 and Apr 216 to Sep 217 24 3 Power Supply Position (Revised) for Aug 216 25 4 Peak Demand and Peak Met (Revised) for Aug 216 26 5 Notified Power cuts / Restrictions on Industries during Sep 217 27 6 Power Supply to Agricultural Sector during Sep 217 28 Sep-17

ऊर ण वर वद य त आप र तण श थ र त ररप र ण (प र व णर वल कन) /Energy Power Supply Position Report (Provisional) र ज य/State आ कड़ म म यन य ननट न ट / Figures in MU net ससत बर, 217 /September,217 अप र ल,217 - ससत बर17/ April,217 to September,217 ऊर ज आवश यकतज ऊर ज उप ब धतज ऊर ज प नत क ऊर ज आवश यकतज ऊर ज उप ब धतज ऊर ज प नत क प रण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied क ष त र / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh 15 15. 995 986 9.9 द ल / Delhi 3,141 3,139 2.1 19,459 19,445 14.1 हर यजणज / Haryana 4,652 4,652. 28,668 28,668. दह जच प र श / Himachal Pradesh 789 785 4.5 4,714 4,683 31.7 र म कश / Jammu & Kashmir 1,54 1,22 32 2.1 9,19 7,275 1,834 2.1 प र जब / Punjab 5,872 5,872. 34,2 34,2. जर स थजन / Rajasthan 6,31 5,965 66 1.1 34,63 33,844 219.6 उत तर प र श / Uttar Pradesh 11,157 1,898 259 2.3 65,284 64,274 1,1 1.5 उत तर ख ड / Uttarakhand 1,138 1,136 2.2 6,979 6,956 22.3 उत तर क ष त र / Northern Region 34,433 33,798 635 1.8 23,272 2,133 3,14 1.5 छत त सगढ़ / Chhattisgarh 2,373 2,339 34 1.4 13,77 13,64 68.5 ग र जत / Gujarat 9,169 9,169. 53,812 53,812. ध य प र श / Madhya Pradesh 5,313 5,313. 3,827 3,827. हज जष ट र / Maharashtra 11,5 11,422 78.7 75,169 75,4 129.2 न औ द उ / Daman & Diu 27 27. 1,258 1,258. ज व नग हव / Dadra & Nagar 517 517. 3,61 3,61. Haveli ग वज / Goa 331 331. 2,44 2,44. पश च म क ष त र / Western Region 29,41 29,297 112.4 179,879 179,682 197.1 आन ध र प र श / Andhra Pradesh 4,58 4,571 1.2 28,283 28,262 2.1 त गजनज / Telangana 5,345 5,34 5.1 28,811 28,799 12. कनज टक / Karnataka 4,541 4,534 7.1 31,933 31,913 2.1 क / Kerala 1,926 1,917 9.5 12,49 12,379 3.2 तम नजड / Tamil Nadu 8,192 8,182 1.1 54,366 54,342 24. प ड च / Puducherry 211 21 1.6 1,381 1,377 3.2 क ष-द व प / Lakshadweep # 4 4 24 24 दक षक षण क ष त र / Southern Region 24,796 24,754 42.2 157,182 157,73 11.1 बबहज / Bihar 2,518 2,511 7.3 14,12 13,787 315 2.2 ज घजट ननग / DVC 1,746 1,74 6.3 1,625 1,544 81.8 झज खण ड / Jharkhand 675 673 2.3 3,857 3,846 1.3 ओडडशज/ Odisha 2,323 2,313 1.4 14,55 14,537 13.1 पश श च ब गज / West Bengal 3,912 3,99 3.1 27,534 27,426 18.4 म श कक / Sikkim 3 3.1 28 27. अ ड जन-ननक बज / Andaman- Nicobar # 29 27 2 7 155 138 18 11.4 प र व क ष त र/ Eastern Region 11,24 11,176 29.3 7,876 7,348 527.7 अर णजच प र श / Arunachal Pradesh 66 65 1 1.9 382 375 7 1.8 अ / Assam 92 877 44 4.8 4,988 4,749 239 4.8 णणप / Manipur 67 65 1 2. 385 377 8 2.1 घज य / Meghalaya 117 117. 722 722. म ज़ / Mizoram 37 36 1 2.7 236 23 6 2.4 नजगज ड / Nagaland 7 69 1 1.6 415 48 7 1.6 ब प ज / Tripura 13 128 2 1.7 1,417 1,397 19 1.4 उत तर-प र व क ष त र / North-Eastern Region 1,47 1,356 51 3.6 8,545 8,259 286 3.3 सम प णण भ रत / All India 11,249 1,381 868.9 619,754 615,494 4,26.7 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability.

अध कतम वर वद य त आप र तण श थ र त ररप र ण (प र व णर वल कन) /Peak Power Supply Position Report (Provisional) आ कड़ गज वजट न ट / Figures in MW net र ज य/State ससत बर, 217 /September,217 अप र ल,217 - ससत बर17/ April,217 to September,217 अधधकत ज ग अधधकत उप श ब ध ज ग क प नत क अधधकत ज ग अधधकत उप श ब ध ज ग क प नत क प रण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met क ष त र / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh 283 283. 363 363. द ल / Delhi 5,661 5,661. 6,553 6,526 27.4 हर यजणज / Haryana 9,82 8,932 15 1.7 9,671 9,539 132 1.4 दह जच प र श / Himachal Pradesh 1,413 1,413. 1,413 1,413. र म कश / Jammu & Kashmir 2,74 2,163 541 2. 2,768 2,214 554 2. प र जब / Punjab 9,978 9,978. 11,75 11,75. जर स थजन / Rajasthan 9,9 9,9. 1,347 1,347. उत तर प र श / Uttar Pradesh 2,7 17,92 2,15 1.5 2,274 18,61 2,213 1.9 उत तर ख ड / Uttarakhand 2,33 2,33. 2,33 2,33. उत तर क ष त र / Northern Region 57,23 54,649 2,554 4.5 6,749 58,448 2,31 3.8 छत त सगढ़ / Chhattisgarh 4,169 3,817 352 8.4 4,169 3,887 282 6.8 ग र जत / Gujarat 15,476 15,476. 15,695 15,695. ध य प र श / Madhya Pradesh 8,251 8,231 2.2 8,42 8,42. हज जष ट र / Maharashtra 19,49 19,428 63.3 22,542 22,494 48.2 न औ द उ / Daman & Diu 351 351. 351 351. ज व नग हव / Dadra & Nagar 79 79. 79 79. Haveli ग वज / Goa 59 58 1.2 559 558 1.2 पश च म क ष त र / Western Region 46,369 45,697 672 1.4 49,86 49,788 72.1 आन ध र प र श / Andhra Pradesh 7,951 7,951. 8,2 8, 2.2 त गजनज / Telangana 9,53 9,5 3. 9,53 9,5 3. कनज टक / Karnataka 8,451 8,47 44.5 9,992 9,987 5.1 क / Kerala 3,541 3,529 12.4 3,889 3,862 27.7 तम नजड / Tamil Nadu 13,874 13,84 34.2 15,1 14,975 26.2 प ड च / Puducherry 371 367 5 1.2 39 387 3.7 क ष-द व प / Lakshadweep # 8 8 9 9 दक षक षण क ष त र / Southern Region 4,889 4,852 37.1 42,77 42,535 235.5 बबहज / Bihar 4,543 4,543. 4,543 4,543. ज घजट ननग / DVC 2,765 2,765. 2,765 2,765. झज खण ड / Jharkhand 1,289 1,289. 1,289 1,289. ओडडशज/ Odisha 4,377 4,377. 4,377 4,377. पश श च ब गज / West Bengal 8,191 8,191. 8,191 8,191. म श कक / Sikkim 87 87. 91 91. अ ड जन-ननक बज / Andaman- Nicobar # 58 54 4 7 58 54 4 7 प र व क ष त र/ Eastern Region 2,534 2,534. 2,534 2,534. अर णजच प र श / Arunachal Pradesh 135 128 7 5.2 145 145.2 अ / Assam 1,77 1,718 52 2.9 1,77 1,718 52 2.9 णणप / Manipur 166 165 1.6 166 165 1.6 घज य / Meghalaya 325 325. 325 325. म ज़ / Mizoram 87 85 2 2.3 87 85 2 1.8 नजगज ड / Nagaland 147 141 6 4.1 147 146 1.7 ब प ज / Tripura 36 36. 312 37 5 1.5 उत तर-प र व क ष त र / North-Eastern Region 2,629 2,52 19 4.1 2,629 2,52 19 4.1 सम प णण भ रत / All India 161,85 158,55 3,255 2. 164,66 16,752 3,314 2. # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability

ऊर ण वर वद य त आप र तण श थ र त ररप र ण (स श ध त) /Energy Power Supply Position Report (Revised) (Page 2 of 2) र ज य/State आ कड़ म म यन य ननट न ट / Figures in MU net अगथत, 217 /August,217 अप र ल,217 - अगथत,217/ April,217 to August,217 ऊर ज आवश यकतज ऊर ज उप ब धतज ऊर ज प नत क ऊर ज आवश यकतज ऊर ज उप ब धतज ऊर ज प नत क प रण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied क ष त र / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh 17 17. 845 836 9 1. द ल / Delhi 3,5 3,498 2.1 16,318 16,35 12.1 हर यजणज / Haryana 5,442 5,442. 24,16 24,16. दह जच प र श / Himachal Pradesh 799 791 8 1. 3,925 3,897 27.7 र म कश / Jammu & Kashmir 1,49 1,19 3 2.1 7,65 6,73 1,532 2.1 प र जब / Punjab 6,825 6,825. 28,131 28,131. जर स थजन / Rajasthan 5,945 5,924 22.4 28,32 27,879 153.5 उत तर प र श / Uttar Pradesh 11,448 11,227 221 1.9 54,127 53,377 75 1.4 उत तर ख ड / Uttarakhand 1,174 1,17 4.3 5,841 5,82 21.4 उत तर क ष त र / Northern Region 36,792 36,236 556 1.5 168,839 166,335 2,54 1.5 छत त सगढ़ / Chhattisgarh 2,447 2,432 15.6 11,334 11,31 33.3 ग र जत / Gujarat 8,291 8,291. 44,643 44,643. ध य प र श / Madhya Pradesh 5,191 5,191. 25,514 25,514. हज जष ट र / Maharashtra 12,123 12,123. 63,669 63,618 51.1 न औ द उ / Daman & Diu 214 214. 1,51 1,51. ज व नग हव / Dadra & Nagar 517 517. 2,544 2,544. Haveli ग वज / Goa 344 344. 1,713 1,713. पश च म क ष त र / Western Region 29,127 29,112 15.1 15,47 15,384 85.1 आन ध र प र श / Andhra Pradesh 4,622 4,62 2. 23,72 23,691 11. त गजनज / Telangana 5,228 5,226 2. 23,466 23,459 7. कनज टक / Karnataka 5,339 5,333 6.1 27,392 27,379 13. क / Kerala 2,6 2,51 9.4 1,482 1,462 2.2 तम नजड / Tamil Nadu 8,628 8,625 3. 46,175 46,161 14. प ड च / Puducherry 224 223 1.6 1,169 1,167 2.2 क ष-द व प / Lakshadweep # 4 4 2 2 दक षक षण क ष त र / Southern Region 26,1 26,77 23.1 132,386 132,319 68.1 बबहज / Bihar 2,429 2,392 37 1.5 11,584 11,276 38 2.7 ज घजट ननग / DVC 1,837 1,789 48 2.6 8,879 8,84 75.8 झज खण ड / Jharkhand 614 613 2.2 3,181 3,173 8.3 ओडडशज/ Odisha 2,455 2,455 1. 12,227 12,224 3. पश श च ब गज / West Bengal 4,693 4,672 21.5 23,622 23,517 15.4 म श कक / Sikkim 34 34. 178 177. अ ड जन-ननक बज / Andaman- Nicobar # 29 27 2 7 127 111 16 12.5 प र व क ष त र/ Eastern Region 12,63 11,954 19.9 59,672 59,173 499.8 अर णजच प र श / Arunachal Pradesh 7 69 1 1.8 316 311 6 1.8 अ / Assam 93 89 4 4.3 4,68 3,872 196 4.8 णणप / Manipur 7 69 2 2.2 318 312 7 2.1 घज य / Meghalaya 117 117. 66 66. म ज़ / Mizoram 38 37 1 2.8 199 194 5 2.4 नजगज ड / Nagaland 73 72 1 1.9 344 339 6 1.6 ब प ज / Tripura 275 272 3 1. 1,287 1,27 17 1.3 उत तर-प र व क ष त र / North-Eastern Region 1,574 1,526 48 3. 7,138 6,93 235 3.3 सम प णण भ रत / All India 15,656 14,95 751.7 518,55 515,113 3,392.7 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability.

अध कतम वर वद य त आप र तण श थ र त ररप र ण (स श ध त) /Peak Power Supply Position Report (Revised) आ कड़ गज वजट न ट / Figures in MW net र ज य/State अगथत, 217 /August,217 अप र ल,217 - अगथत,217/ April,217 to August,217 अधधकत ज ग अधधकत उप श ब ध ज ग क प नत क अधधकत ज ग अधधकत उप श ब ध ज ग क प नत क प रण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met क ष त र / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh 335 335. 363 363. द ल / Delhi 6,133 6,129 4.1 6,553 6,526 27.4 हर यजणज / Haryana 9,671 9,51 17 1.8 9,671 9,539 132 1.4 दह जच प र श / Himachal Pradesh 1,369 1,369. 1,377 1,377. र म कश / Jammu & Kashmir 2,671 2,137 534 2. 2,768 2,214 554 2. प र जब / Punjab 11,74 11,74. 11,75 11,75. जर स थजन / Rajasthan 1,293 1,293. 1,347 1,347. उत तर प र श / Uttar Pradesh 2,274 17,719 2,555 12.6 2,274 18,61 2,213 1.9 उत तर ख ड / Uttarakhand 1,987 1,987. 2,27 2,27. उत तर क ष त र / Northern Region 6,749 58,448 2,31 3.8 6,749 58,448 2,31 3.8 छत त सगढ़ / Chhattisgarh 4,35 3,814 221 5.5 4,35 3,887 148 3.7 ग र जत / Gujarat 14,689 14,689. 15,695 15,695. ध य प र श / Madhya Pradesh 8,249 8,186 63.8 8,42 8,42. हज जष ट र / Maharashtra 2,15 19,951 65.3 22,542 22,494 48.2 न औ द उ / Daman & Diu 336 336. 342 342. ज व नग हव / Dadra & Nagar 79 79. 79 79. Haveli ग वज / Goa 558 558.1 559 558 1.2 पश च म क ष त र / Western Region 45,228 45,174 54.1 49,86 49,788 72.1 आन ध र प र श / Andhra Pradesh 7,461 7,448 13.2 8,2 8, 2.2 त गजनज / Telangana 9,414 9,397 17.2 9,414 9,397 17.2 कनज टक / Karnataka 8,97 8,97. 9,992 9,987 5.1 क / Kerala 3,634 3,49 144 4. 3,889 3,862 27.7 तम नजड / Tamil Nadu 13,818 13,78 38.3 15,1 14,975 26.2 प ड च / Puducherry 39 366 23 6. 39 387 3.7 क ष-द व प / Lakshadweep # 8 8 9 9 दक षक षण क ष त र / Southern Region 4,45 4,89 316.8 42,77 42,535 235.5 बबहज / Bihar 4,167 4,42 125 3. 4,394 4,131 263 6. ज घजट ननग / DVC 2,538 2,538. 2,684 2,684. झज खण ड / Jharkhand 1,26 1,26. 1,26 1,26. ओडडशज/ Odisha 4,21 4,21. 4,227 4,227. पश श च ब गज / West Bengal 7,787 7,757 3.4 7,82 7,793 27.3 म श कक / Sikkim 86 86. 91 91. अ ड जन-ननक बज / Andaman- Nicobar # 58 54 4 7 58 54 4 7 प र व क ष त र/ Eastern Region 19,37 19,22 15.8 19,37 19,22 15.8 अर णजच प र श / Arunachal Pradesh 132 13 2 1.5 145 145.2 अ / Assam 1,735 1,684 51 3. 1,744 1,684 6 3.4 णणप / Manipur 164 163 1.8 164 163 1.8 घज य / Meghalaya 297 297. 35 34 1.3 म ज़ / Mizoram 84 81 3 3.6 86 85 1.8 नजगज ड / Nagaland 138 137 1.9 147 146 1.4 ब प ज / Tripura 312 37 5 1.5 312 37 5 1.5 उत तर-प र व क ष त र / North-Eastern Region 2,529 2,442 87 3.4 2,529 2,442 87 3.4 सम प णण भ रत / All India 164,66 16,752 3,314 2. 164,66 16,752 3,314 2. # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability

ससत बर, 217 म इ डथर र पर वर वद य त कर त क वर वर वरण / Notified Power Cuts/Restrictions on Industries during September,217 र ज य /क ष त र / State/ Region ससत बर,217 / September,217 ऊर ण/म ग कर त / Energy/Demand Cut अप र ल,217 -ससत बर,217 / April,217 - September,217 उत तर क ष त र / Northern Region च ड गढ़/ Chandigarh* Data not received. Data not received. द ल / Delhi हर यजणज / Haryana No Notified Cuts No Notified Cuts दह जच प र श / Himachal Pradesh र म कश / Jammu & Kashmir* Data not received. Data not received. प र जब / Punjab जर स थजन / Rajasthan उत तर प र श / Uttar Pradesh उत तर ख ड / Uttarakhand पश च म क ष त र/ Western Region छत त सगढ़ / Chhattisgarh ग र जत / Gujarat ध य प र श / Madhya Pradesh हज जष ट र / Maharashtra ग वज / Goa दक षक षण क ष त र / Southern Region आन ध र प र श / Andhra Pradesh त गजनज / Telangana कनज टक / Karnataka क / Kerala तम नजड / Tamil Nadu प ड च / Puducherry प र व क ष त र / Eastern Region बबहज / Bihar झज खण ड / Jharkhand ओडडशज / Odisha पश श च ब गज / West Bengal No Notified Cuts No Notified Cuts

ससत बर, 217 क स क ष त र क स द य त आप र त क स रण / Power Supply to Agricultural Sector during September,217 र ज य /क ष त र / State/ Region ससत बर,217 / September,217 औसत वर वद य त आप र तण घन र म / Average Hours of Supply अप र ल,217 - ससत बर,217 / April,217 - September,217 उत तर क ष त र / Northern Region च ड गढ़/ Chandigarh* द ल / Delhi There is no agricultural load in Delhi. There is no agricultural load in Delhi. हर यजणज / Haryana 9:23 hrs/day 8: - 9:25 hrs/day दह जच प र श / Himachal Pradesh HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector. र म कश / Jammu & Kashmir* - प र जब / Punjab 8:1 hrs/day 4: - 8:48 hrs/day जर स थजन / Rajasthan 6:45 hrs/day 6.45 hrs/day उत तर प र श / Uttar Pradesh 19:8 hrs/day 18:33-19:47 hrs/day उत तर ख ड / Uttarakhand 23:58 hrs/day 22:42-24: hrs/day पश च म क ष त र/ Western Region छत त सगढ़ / Chhattisgarh 18 hrs/day 18 hrs/day ग र जत / Gujarat 8 hrs/day 8 hrs/day ध य प र श / Madhya Pradesh Three-Phase Supply(Irrigation)- 9:43 hrs /day, Three-Phase (Mixed) Supply - 23:15 hrs /day हज जष ट र / Maharashtra 8-9 hrs/day 8-9 hrs/day ग वज / Goa No restriction No restriction दक षक षण क ष त र / Southern Region आन ध र प र श / Andhra Pradesh 7 hrs/day. 7 hrs/day 3 phase (irrigartion): 9.31-9:55 hrs /day 3 phase (Mixed) Supply: 23: - 23:21 hrs /day त गजनज / Telangana 9 hrs/day. 9 hrs/day कनज टक / Karnataka 6 hrs/day 6 hrs/day क / Kerala No Restrictions No Restrictions तम नजड / Tamil Nadu 9 hrs/day (6 hrs during day time and 3 hrs during night time) 9 hrs/day (6 hrs during day time and 3 hrs during night time) प ड च / Puducherry No Restrictions No Restrictions प र व क ष त र / Eastern Region बबहज / Bihar About 18 hrs/day About 18 hrs/day झज खण ड / Jharkhand About 2 hrs/day About 2 hrs/day ओडडशज / Odisha 24 hrs/day 24 hrs/day पश श च ब गज / West Bengal About 23 hrs/day About 23 hrs/day * Data not received.

Section G - Growth of Power Sector SN Contents Page 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since -26 31 5 Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA in Sep. 217 Sep-17

Plan / Year 1. Growth of Installed Capacity Since 6th Plan (In MW) Thermal Nuclear Hydro RES (MNRE) Total Coal Gas Diesel Total End of 6th Plan 2631.83 541.5 177.37 2729.7 195 1446.2 42584.72 End of 7th Plan 41237.48 2343. 165.9 43745.57 1565 1837.63 18.14 63636.34 End of 8th Plan 54154.48 6561.9 293.9 611.28 2225 21658.8 92.1 85795.37 End of 9th Plan 6213.88 11163.1 1134.83 74428.81 272 26268.76 1628.39 1545.96 End of 1th Plan 71121.38 13691.71 121.75 8614.84 39 34653.77 776.6 132329.21 End of 11th Plan 11222.38 18381.5 1199.75 13163.18 478 3899.4 2453.45 199877.3 End of 12th Plan 193426.5 25185.38 837.629 219449.51 678 44765.42 5833.35 329298.27 Captive Generation Capacity in Industries having demand of 1 MW and above, grid interactive (as on 31-3-16) = 48279 MW* *Provisional All India Generating Installed Capacity ( MW ) (As on 31.9.217 ) ## Total Installed Capacity 329298.27 MW Coal Gas Diesel Nuclear Hydro Res Coal Gas Diesel Nuclear Hydro Res Total 193426.5 25185.38 837.629 678. 44765.4 5833.345 229251.74 29