ASIAN MAYOR S POLICY DIALOGUE FOR THE PROMOTION OF ENVIRONMENTALLY SUSTAINABLE TRANSPORT IN CITIES. 23 rd 24 th APRIL 2007, KYOTO JAPAN

Similar documents
1/3/2018 Kuala Lumpur Structure Plan 2020 : Transportation. [ English ] [ Malay ] 10.1 Introduction. Kuala Lumpur Structure Plan 2020

KUALA LUMPUR URBAN RAIL DEVELOPMENT: MALAYSIA EXPERIENCE

Leap-froging Public Transport Improvement in Kuala Lumpur City through NKRA

Ministry of Environment and Forests. Ministry of Communication

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa

Mobility of Gurugram & NCR-

Key information. Network details. Klang Valley projected population growth (million) Line details. Length (km)

Submission to Greater Cambridge City Deal

BMW GROUP DIALOGUE. HANGZHOU 2017 TAKE AWAYS.

Draft Marrickville Car Share Policy 2014

Transportation Demand Management Element

building liveable cities

Amman Green Policies Projects and Challenges. Prepared by: Eng. Sajeda Alnsour Project coordinator Sept. 20, 2017

Section 9 Residual Impacts

Singapore Autonomous Vehicle Initiative (SAVI)

Policies on Public Transport Development and Financial Schemes in Taipei

Environmentally Sustainable Transport Singapore s s Experience

Sustainable Urban Transport Project (SUTP)

Policy Coordination in Urban Transport Planning: Some Experience from Asia- Nepal and Japan

SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT

Smart Green Transportation of LG CNS. Seoul Case

Three ULTra Case Studies examples of the performance of the system in three different environments

Mobility on Demand, Mobility as a Service the new transport paradigm. Richard Harris, Xerox

The City of Toronto s Transportation Strategy July 2007

Structure. Transport and Sustainability. Lessons from Past. The Way Forward

Parking Management Strategies

Seventh Regional Environmentally Sustainable Transport (EST) Forum (23-25 April 2013, Bali,Indonesia)

1. How has traffic congestion changed in London in recent years? Are there differences in the amount, time, type and/or location of congestion?

Parking Policy as a counter measure to promote public transport Case Study of Nehru Place, Delhi

Findings from the Limassol SUMP study

Halifax Commuter Rail: A Fresh Concept

Mysuru PBS Presentation on Prepared by: Directorate of Urban Land Transport

Chapter 4. Design and Analysis of Feeder-Line Bus. October 2016

Implementing Transport Demand Management Measures

GROWTH WEEK SESSION JUNE 01 JUNE A PRESENTATION BY KHAWAJA HAIDER LATIF CEO, LAHORE TRANSPORT COMPANY GOVERNMENT OF PUNJAB, PAKISTAN

Planning for Sustainable Urban Transport Systems in India - Strengths and Weaknesses

Energy Innovation Emporium. Transport. Chair: Prof. John Nelson, Centre for Transport Research University of Aberdeen

Energy Technical Memorandum

London Transport Policy, Planning and Strategies

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Transportation Sustainability Program

Doubling the Market Share of Public Transport Worldwide by 2025: A Smart Future for Cities

The Engineering Department recommends Council receive this report for information.

The ACT s Transition to Zero Emissions Vehicles Action Plan Anna McGuire Senior Policy Officer, Climate Change Policy

Velo-city Global 2016 in Taipei PM3 Urban Challenges for Smart Cities 13:30-15:00 No Smart Sharing City

The project faces a number of challenges:

Express Rail Link. Corporate Profile

Construction commenced and ground breaking ceremony held for Mitsui Shopping Park LaLaport Kuala Lumpur (tentative name) Key Points of the Project

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010

Sustainable Mobility Project 2.0 Project Overview. Sustainable Mobility Project 2.0 Mobilitätsbeirat Hamburg 01. July 2015

EST Achievements, Progress and Future Strategies

Back to the Future? Land Use, Mobility & Accessibility in Metropolitan China Day 23 C. Zegras. Contents

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

A Transit Plan for the Future. Draft Network Plan

The development of the Milan transport system and the ECOPASS congestion charge

Urban traffic situation and possible solutions for HANOI

The Motorcycle Industry in Europe. Powered Two-Wheelers the SMART Choice for Urban Mobility

Seoul. (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%)

Transport Sector Performance Indicators: Sri Lanka Existing Situation

CSE CONCLAVE. ENABLING CITY ACTION PLAN FOR CLEAN AIR India Habitat Centre, New Delhi April 19-20,

Best Practices in Planning and Implementing BRT in China

What We Heard Report - Metro Line NW LRT

Transport systems integration into urban development planning processes

METRO STRATEGY

Opportunities and Challenges of Implementing Low Carbon, High Volume Transport in Bangladesh

Policy Options to Decarbonise Urban Passenger Transport

Incentives for Green Fleets

PROMOTING SOOT FREE PUBLIC TRANSPORT

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through

Johannesburg Inner City Traffic & Transportation Study

Transportation Infrastructure Development in Thailand: Go Green or Go Grey?

Bus The Case for the Bus

committee report General Permitted Development Order SPT response to consultation

Sofia Urban Transport challenges and strategies

Communication strategies

Develop ground transportation improvements to make the Airport a multi-modal regional

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Central London Congestion Charging Scheme. 17 March 2005 Impacts - 9 th Annual Conference. Michele Dix Director Congestion Charging Division

USE ONLY ISSUED ON 8-MARCH 2018 TUN RAZAK EXCHANGE. The New Financial City of Kuala Lumpur. Malaysian Annual Real Estate Convention 2018 (MAREC 18)

Shared mobility as an equity strategy: local and global context. Cassie Halls, Program Coordinator

what you need to know FREEWAY IMPROVEMENT PROJECT (GFIP)

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

Cycling to work. Towards a safer, more efficient and sustainable commuting. Madrid, 20 September confederación sindical de comisiones obreras

How to manage large scale infrastructures? Infrastructure planning within Toulouse s SUMP. Alexandre Blaquière. 1st December 2016

Parking: Planning, Management, Operations and Contracting. World Bank

Embracing Smart Parking The Gurugram Story By Dr. Gaurav Antil, Joint Commissioner, MCG

Seoul Transportation

Toward the Realization of Sustainable Mobility

Economy. 38% of GDP in 1970; 33% of GDP in 1998 Most significant decline in Manufacturing 47% to 29%

4. Transportation Plan

1 Downtown LRT Connector: Draft Concept

IKORODU- CMS BRT EXTENSION PROJECT

How to make urban mobility clean and green

PROMOTION OF EFFICIENT PUBLIC TRANSPORT IN MALAWI BY CHIMWEMWE KAUNDA

Recent Status of NEDO s EV Quick Charger related Projects

Ex-Ante Evaluation (for Japanese ODA Loan)

DAVID DAVID BURNS BURNS RAILROAD RAILROAD INDUSTRIAL INDUSTRIAL ENGINEERING ENGINEERING CONSULTANT CONSULTAN CHICAGO CHICAGO, USA, USA

ECTRI. URBAMOVE URBAn MObility initiative. Claudia Nobis (DLR) TRA 2006, Göteborg, Sweden June 13 th, 2006

National Road Safety Action Plan in China

Transcription:

ASIAN MAYOR S POLICY DIALOGUE FOR THE PROMOTION OF ENVIRONMENTALLY SUSTAINABLE TRANSPORT IN CITIES. 23 rd 24 th APRIL 2007, KYOTO JAPAN Mak See Deputy Director Urban Transportation Department City Hall Kuala Lumpur Malaysia. 1.0 KUALA LUMPUR - Capital City Of Malaysia. - Population : 1.42 Million (Year 2000) - Area : 243 sq km - Location : 3 0 N 102 0 E - Climate : Equatorial (Hot & Humid) - City Administration : City Hall Kuala Lumpur (CHKL) 2 1

3 4 2

2.0 EXISTING URBAN TRANSPORT INFRASTRUCTURE 2.1 Rapid development since late 1970 s brought massive urban transport infrastructure development. 2.2 KL is being served by a Ring & Radial road network system (3 Ring roads :- IRR, MRRI & MRRII & 14 radial roads). 5 On a daily basis: EXISTING TRAFFIC SITUATION 1.305 million vehicles cross MRRI. 2.125 million vehicles cross MRRII. 70% vehicle trips crossing MRRI (42,600 vehicles) and MRRII (86,500 vehicles) during AM peak hour are SOV. 65% crossing MRRI (39,100 vehicles) and MRRII (84,500 vehicles) during PM peak hour are SOV. 6 3

2.3 The public urban transport services include :- 2.3.1 Road based transport. Consist of the public bus network and an array of taxi operators to cater for commuters within the city. 2.3.2 Rail Based Transport. i) Is increasingly becoming a factor in travelling. ii)four (4) types of rail transportation which comprises: - Light Rail Transit - Monorail - KTM Commuter Trains - Express Rail Link (ERL) 7 LRT System I (RAPID KL) -Route connects Sentul to Ampang & Bukit Jalil 25 Stations. - Operation started : Dec 1996 (Phase 1: 12km) July 1998 (Phase 2: 15 km) LIGHT RAIL TRANSIT 8 4

LRT System II (RAPID KL) - Route connects Petaling Jaya to Gombak, 29 km, 23 Stations. - Operation started : Sept. 1998 (Phase 1) July 1999 (Phase 2) - Fully automated system. 9 MONORAIL KL Monorail System -An intra-city service Route connects Jalan Tun Razak to KL Sentral, 8.6 km (11 stations). -Operation started 31 August 2003. - Locally manufactured train. 10 5

KTM Commuter System - A regional commuter system providing interurban services - Route Network about 153 km (40 stations) - Started operation since 1995 - Routes:Sentul - PortKlang Rawang -Seremban KTM COMMUTER TRAINS 11 EXPRESS RAIL LINK (ERL) Express Rail Link (ERL) - 57 km KL Sentral to KLIA International Airport (5 stations). - Commence operation April 2002. - Services: KLIA Express KLIA Transit 12 6

KUALA LUMPUR INTEGRATED URBAN RAIL SYSTEMS 13 3.0 ISSUES 3.1 General 3.1.1 Low Public transport modal share resulting in high demand on road infra and traffic congestion. Between 1985 and 1997 the modal share of public transport decreased from 34.3% to 19.7%. 14 7

3.1.2 High travel demand to and from the City Centre during peak hours. 3.1.3 Although Traffic Management measures have done much to ease traffic flows particularly in the City Centre, they cannot to do so indefinitely if traffic demand on the road continues to grow. 15 3.2 Public Transport. 3.2.1 Rail based public transport. i) LRT and Commuter rail usage has been encouraging. However, optimal usage has still to be achieved due to - Inadequate interchange facilities at stations including car and motor cycle parking and pedestrian linkage. - Lack of integration between rail based stations. - Poor support services including adequate feeder bus frequency and service coverage. ii) Poor accessibility to rail-based public transport. 16 8

3.2.2 Bus Services. i) Despite the improvement to the bus system and road infrastructure, bus utilisation is low primarily as a consequence of route duplication, unreliable service frequency, overcrowding during peak hours and the poor condition of buses. - Under utilisation of bus services. - Unreliable & poor quality of services. ii) Central location of main bus terminal at Puduraya contributing to traffic congestion. 17 3.2.3 Taxis There is no shortage of taxis (24,721 taxicabs operated by 4000 plus operators) but availability is frequently a problem at peak periods and during bad weather. 3.3 Private Transportation. 3.3.1 Cars and car parking. -The low cost of long term parking in the City Centre together with the abundance of parking spaces (65,206 spaces) and the flexibility of movement associated with car transport has made car transport the preferred means of travel in the city. 18 9

- Shortages of parking spaces outside the City Centre in locations which have reasonable access to public transport and in shop lot development. 3.3.2 Motorcycles - Represent 23% of all road users in Kuala Lumpur. - Accident cases involving motorcycles is higher than for all other forms of transport. - Motorcycles contribute significantly to noise and air pollution. 19 3.4 Road Infrastructure 3.4.1 Constraints in expanding existing routes for traffic entering or leaving the City Centre. 3.4.2 Discontinuities in the road network. 3.4.3 Traffic back up at grade junctions. 3.4.4 Lack of specific provision in toll highways for public transport. 3.4.5 Existing designation of major roads does not reflect actual usage. 3.4.6 Increased pressure on the road network due to intensive and large scale commercial development. 20 10

3.5 Non-motorised transport. 3.5.1 Pedestrian - Streets and footpaths in the city centre are narrow. - Pedestrian network is progressively being implemented in the City Centre. 3.5.2 Bicycles - Cycle ways in housing estates suffer from under usage, misuse (illegal parking) and poor maintenance. - Lack of continuity in the cycle way networks. 21 3.6 Freight Transport Illegal parking of heavy goods vehicles and construction vehicles in residential and commercial areas due to the lack of proper parking facilities and consequent enforcement difficulties. 22 11

4.0 OBJECTIVE 4.1 To create an efficient and equitable city structure for Kuala Lumpur, CHKL is promoting an environmentally sustainable transport system and aims to: -Provide a comprehensive and integrated transportation system that caters for the needs of inter and intra city travel. -Reverse the decline in public transport usage and to achieve a targeted public: private transport modal split of 60:40 by the year 2020. -Optimise the road and rail transportation infrastructure so that it operates at its full capacity and maximum efficiency. 23 -Ensure that the overall configuration of land use is integrated with road and public transportation networks to optimise the development of land. -Ensure that all areas within the City enjoy the same high quality and standard of provision of public transport services. 24 12

4.2 To enhance the city living environment, CHKL aims to: - Create a city that is highly accessible for all its occupants and users, in particular, one that is pedestrian and handicapped friendly. 25 5.0 INITIATIVES & ACHIEVEMENTS To promote an environmentally sustainable transportation system in Kuala Lumpur, the Govt. Of Malaysia and CHKL has taken various initiatives and their achievements as listed below:- 5.1 Integrated Transport Information System (ITIS) - This traffic management system completed Dec 2005 and enhanced the existing computer based area traffic signal coordination system (SCATS/ ITACA). - Involver installation of roadside equipments CCTVs, Automatic Incident Detection Cameras (AID), VMS along selected roads. 26 13

- Utilization of Advanced Traffic Management System (ATMS) and Advanced Traveler Information System (ATIS). - Data collected relayed to Transport Management Centre (TMC) = Analyse info, monitor situations, developed strategies and initiate appropriate response and relay the real time traffic information to the commuting public via the internet, call centre, VMS, radio etc. 27 28 14

5.2 Extension of rail based transportation & integration of existing terminals to provide wider coverage has been planned and scheduled for implementation soon. 5.3 Development of new and modern integrated transport terminals away from City Centre. 5.3.1 KL Central Completed & operational. Heart of rail based transportation in the Klang Valley, Putra-LRT, KTM Commuter, KLIA Express, Monorail. A self contain centre of activity supported by offices, retail malls, service apartments, condos and hotels. 5.3.2 Other integrated terminals have been proposed at Gombak, Bandar Tasik Selatan and Jalan Ipoh. 29 30 15

31 5.4 Revamping of the bus services which includes bus route changes and increasing the number of buses and improving the condition of buses. 5.5 Upgrading and refurbishment of bus stands and taxi stands through sponsorship by private bodies to provide better facilities for commuting public. 32 16

33 34 17

5.6 Pedestrianisation & Network - Dedicated pedestrian walkways are constructed for added safety and a pleasant experience. - Certain popular shopper areas converted to pedestrian only sites. - Overhead bridges constructed and allow hazard free crossing of streets and roads. - Covered walkways constructed especially around transit terminal for easier accessibility. 35 36 18

37 38 19

39 40 20

5.7 Integrated Land Use Incentives offered to Development adjacent to transit terminals such as reduction in car park requirement, higher plot ratio. 5.8 CHKL is one of the chosen Government Dept. to implement a pilot project requiring its vehicles to use biofuel. Started in early 2006 and still been monitored. 41 5.9 CHKL has recently organised workshop on the implementation of congestion levy in Kuala Lumpur. CHKL is still evaluating the feedback from various parties which includes other Govt. Dept, NGOs, Professional bodies etc. 42 21

43 THANK YOU 44 22