Torque Test Stands Series TS MODELS TST / TSTH & TSTM / TSTMH. User s Guide

Similar documents
Torque Test Stands Series TS MODELS TST / TSTH & TSTM / TSTMH. User s Guide

Force Test Stands Series ES MODELS ESM & ES30. User s Guide

Model ESMH MOTORIZED FORCE MEASUREMENT TEST STAND. User s Guide

Force Test Stands Series TS MODELS TSA750, TSA750H, TSB100, TSC1000 & TSC1000H. User s Guide

Force Test Stands Series ES MODELS ES10 & ES20. User s Guide

Force Test Stands Series ES MODEL ES05

Force Test Stands Series TS MODELS TSA750, TSA750H, TSB100, TSC1000 & TSC1000H. User s Guide

Data Sheet. Motorized Test Stand w/pc Control ESM303H. Standard Features. Page 1 of 5

GAS CYLINDER LIFTS BEFORE YOU BEGIN

ELECTRONIC MANUAL VOLTAGE CONTROL Model: MVC 300. Part Number:

CAUTION. Risk of electrical shock. Do not remove cover. No user serviceable parts inside. Refer servicing to qualified service personnel.

TUNING GUIDE. ridefox.com

MPT-250B SPECIFICATIONS AND OPERATING INSTRUCTIONS

ROSBACK PRINTERS AND BOOKBINDER S MACHINERY Quality Bindery Equipment Since 1881

Service and Parts Manual. NO LONGER IN PRODUCTION Some service parts may not be available for this product. Otolaryngology Chair.

OEM TM-50 Quick Start Guide

TUNING GUIDE. ridefox.com

SKILL ATTACK PITCHING MACHINE PATENTS APPLIED FOR INSTRUCTION MANUAL. Includes: OPERATION SETUP USE & CARE SERVICE

CALIPER BRAKE INSTALLATION AND MAINTENANCE MANUAL

HT125KM, FA3TM, FA6TE

TUNING GUIDE. ridefox.com

TUNING GUIDE. ridefox.com

THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL. WELLS ENGINE UNIT 230 VOLT Product No. U905, U906, U907, U908

OLYMPIAN MODEL 740 Operation and Service Manual

INSTRUCTION MANUAL FOR THE CLINICAL 50 CENTRIFUGE

Installation Manual TWM Performance Full replacement short shifter assembly Civic all trims and models

Installation. Installation. 12. System Diagram... 10

ALU-29CF Portable Light NSN:

Revolver Reference Manual

Model 616 Rotating Disk Electrode Instruction Manual

Twin-Column Motorized Tension, Compression & Cycle Tester (M5KNE & M10KNE) User s Manual

INSTRUCTION MANUAL Includes: OPERATION SETUP USE & CARE SERVICE

RATE CONTROLLED TORQUE WRENCH TESTER

IMPORTANT! DO NOT THROW AWAY THE SHIPPING CARTON AND PACKING MATERIAL

ASTRO. FF-14 Friction Feeder. Operator Manual

Instruction Manual. Vortex Mixers

Data Sheet. Motorized Test Stand w/pc Control ESM303

ARC 1850 LIST OF FIGURES

MODEL 7100 PORTABLE PIN WELDER OPERATOR S MANUAL

TB-690 Conveyor/Stacker

SAUTER TVO-S Version /2017 GB

Plasma Display Electric Pop-Up Lift (PUL)

2016 & Up Miata MX-5 Coilover Installation Instructions

ADHESION/RELEASE TESTER

Variable Regulated Voltage Power Supply Instruction Manual Model XP-605 / XP-752A

Always Moving Forward. Operating Manual. Please Read Before Operating Unit. Models D1, DV1, D9 Wire Strippers & Braid Combers

MC2500. Installation and Operation Manual

MPT-200A SPECIFICATIONS AND OPERATING INSTRUCTIONS

Part Number Mini Linear Lift Assembly Installation & Operator s Instruction Manual

Alternating Current Revolution per minute Protective Earth Ground. Protected from dripping water Fuse Attention, Consult Accompanying Document

INSTALLATION CONSTELLATION DRIVING LIGHTS 5009

LCR Series REVERSING ELECTRIC ACTUATORS. Installation, Maintenance and Operating Instructions

Model 116 DPI Switch Installation and Operating Instructions

INSTALLATION AND OPERATING INSTRUCTIONS

TS93 EMF T/PT/TDE. Surface applied door closer

Instruction Manual. Labnet Spectrafuge 16M Microcentrifuge

DeZURIK TEN-POSITION LEVER MANUAL ACTUATOR

ASSEMBLY INSTRUCTION MANUAL

MAGNAGLIDE AIR OPERATOR VERTICAL MOUNT

715B CONTROL SERIES. Instruction Manual Line Voltage DC Brushless Motor Control CONTROLS. Phone (317) Fax (317)

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

MODEL G300 BRAKE BLEEDER

System 1 Modular Post-Mount Supports

ESM1500 / ESM750. Data Sheet. Motorized Force Test Stands. Standard Features. Page 1 of 6

INSTALLATION AND OPERATING INSTRUCTIONS

OPERATOR S MANUAL HANDTORQUE TM MULTIPLIER WITH INTEGRAL TORQUE TRANSDUCER. Part Number Issue 1 Original Instructions (English)

INSTALLATION CONSTELLATION DRIVING LIGHTS 5009

ESM1500 / ESM750. Data Sheet. Motorized Force Test Stands. Standard Features. Page 1 of 6

RTI TECHNOLOGIES, INC.

Owner s Manual Read and keep this manual. Patents World Wide

UG-5.7, UG-8, UG10 Governor

OPERATOR'S MANUAL AND MAINTENANCE INFORMATION MODEL T-2000 TEXTURE TEST SYSTEM

Bench Top Tube Bender

Test-A-Pack Seal Strength Tester F The most important thing we build is trust. Testing Range. Key Features. Ordering Information

Series 9540 J9540. Installation Instructions Multi-Sized 1 to 6 Non-Hold Open. Regular Arm Applications. Parallel Arm Applications

SUREPOWR TM SERIES -SURE 49 FIELD INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL ELECTRIC DOUBLE OVEN RANGE

SERIES 6000 FILM OPACITY METER MODEL RT REV A.1 INSTALLATION & OPERATION MANUAL

TECHNICAL INFORMATION

Tooling Assistance Center

Meinzer II TM. Testing Sieve Shaker

POWER PINNER HAND WELDER 7200 OPERATOR S MANUAL

If You Are Experiencing This, Click Thru:

97-06 JEEP TJ REPL BODY BUSHING / 1 BODY LIFT KIT

TERMINATOR User Manual

2013 RT / 2014RT / 2015 RT - Shock Spring Adjuster Installation Instructions

Installation Manual TWM Performance Short Shift Kit Stage 1 and Stage 2 MazdaSpeed 6

Surepowr Series 100 Installation Manual

Start Up & Troubleshooting Manual. Resfab Equipment Inc. St Jean Sur Richelieu Website: resfab.com

FOR SIT-STAND WORKSTATION

Installation Instructions Rotation Control Kit

Type V Accent Light Installation

Mizer Single Pump and Starter Box

The FMM force tester can be controlled using L1 software for limit, cycling, hold and coefficient of friction testing.

Assembly Manual - Auto-Mate II For Ponsness/Warren and Spolar Gold

ATS-9600/9700 TABBER/LABELER

OPERATING INSTRUCTION MANUAL QUICK-KON AUTOMATED CRIMPING SYSTEM for Catalog Number: TNB170-ELECDIE TABLE OF CONTENTS

Roll Up Door Operator

Table of Contents. 4 Getting Started 4 About the Juice 5 Safety Terms 5 Product Registration 6 Important Notes 7 Truck Orientation

ROLLER GRILL Instruction Manual Model #8223, 8224, Part No Revised:March 2008

Transcription:

MODELS TST / TSTH & TSTM / TSTMH User s Guide

Thank you Thank you for purchasing a Mark-10 Series TS Torque Measurement Test Stand. We are confident that you will get many years of great service from this product. Mark-10 test stands are ruggedly built for many years of service in laboratory and industrial environments. This User s Guide provides unpacking, setup, and operator instructions for each model in the TS Torque Measurement Test Stand Series. Dimensions and specifications are also provided. For additional information or answers to your questions, our engineering and technical support teams are eager to help you. Thank you again for your purchase and happy testing! TABLE OF CONTENTS GENERAL...2 Unpacking and setting up.2 List of included items...2 MODELS TST & TSTH...3 Setup and Operation...3 Specifications...3 Dimensions...4 MODELS TSTM & TSTMH...5 Safety Tips...5 Setup...5 Operation...6 Specifications...7 Dimensions...8 1

1 GENERAL 1.1 Unpacking and Setting up 1. Carefully unpack the test stand from the box and inspect for any damage. Check the contents to ensure that you have received a test stand complete with all accessories see the list of included items below. 2. Remove the foam from the middle portion of the test stand and remove the plywood caps by unscrewing the pair of screws at each end. For the TST and TSTM models, install the base with four 5/16-18 x 1 screws and the top cap with two 1/4-20 x 5/8 screws. For the TSTH and TSTMH models, install the two column caps with two 1/4-20 x 5/8 screws per cap. Save all packaging materials for any future shipping. 3. Place the stand on a firm, flat and level working surface free from vibration to ensure accurate readings. It is recommended that the test stand be secured to a work bench see your model s Operation section for further details. 1.2 List of Included Items Item Torque measurement test stand Control Unit (TSTM and TSTMH, only) Power cord (TSTM and TSTMH, only) Base Column cap 5/16-18 x 1 screw for base installation 1/4-20 x 5/8 screw for column cap installation Mounting hole drill template Wrench set Quantity TST / TSTM TSTH /TSTMH 1 1 1 1 1 1 1-1 2 4-2 4 1-1 1 2

TST / TSTH 2 SETUP AND OPERATION 1. Mount the test stand to a firm, flat, and level working surface for maximum safety and accuracy using four 5/16 screws (not included). Use the included mounting hole drill template to accurately drill the holes. Testing can take place without securing the test stand in such a manner, however, it is strongly recommended that the stand be secured, especially for high torque tests. 2. Install an appropriate sensor and/or indicator onto the slider bracket (an indicator bracket that mounts onto the test stand column is available separately). 3. Install any required attachments, grips, adapters, and other items necessary for your test sample. Ensure that these items are set up in a secure and safe manner. 4. Begin the test by turning the hand wheel in either direction. To maintain smooth operation of the hand wheel, avoid overloads. The angle dial is adjustable relative to the torque plate. Position the ring by hand to the desired angle. The slider s position is adjustable along the column in order to engage and disengage the test sample. Move the slider lever clockwise to lower the slider s position closer to the torque plate. The slider may be locked into position by tightening the friction brake knob located on the opposite side of the slider. The travel stops positions can also be adjusted. Loosen the knobs, adjust to the desired positions, and retighten. 3 SPECIFICATIONS Load capacity: Maximum angular travel: Angular rate: Angle dial resolution: 2º Maximum slider travel: Slider travel rate: Weight (test stand only): 100 lbfin [11.5 Nm] No limit 12º/wheel rev 15.5 [394 mm] 1.05 [26.6 mm]/lever rev TST: 33 lb [15 kg], TSTH: 27 lb [12.3 kg] 3

3 DIMENSIONS TST TSTH 4

TSTM / TSTMH 4 SAFETY TIPS Wear eye and face protection when testing. Although the TSTM / TSTMH has relatively slow moving mechanisms, be aware of the dangers posed by potential energies that can accumulate in the sample during testing. Keep away from the moving parts of the test stand. Never operate the test stand if there is any visible damage to the power cord or the control unit. The TSTM / TSTMH is powered by 110/220 volts that are present in both the power cord and the Control Unit. Any contact with this high voltage can cause serious injury or even death. Ensure that the control unit be kept away from water or any other liquids at all times. Make sure the electrical outlet powering the test stand has local earth ground (3-hole outlet). If it is necessary to remove the cover of the Control Unit or motor drive, always disconnect power before doing so. Use Mark-10 replacement parts, only, if any repairs are needed. 5 SETUP 1. Mount the test stand to a firm, flat, and level working surface for maximum safety and accuracy using four 5/16 screws (not included). Use the included mounting hole drill template to accurately drill the holes. Testing can take place without securing the test stand in such a manner, however, it is strongly recommended that the stand be secured, especially for high torque tests. With the base or legs of the TSTM / TSTMH removed, the test stand can be easily integrated into large systems such as production lines. In general, any mounting angle is feasible. The angle dial is adjustable relative to the torque plate. Turn the dial by hand to the desired angle. The travel stops positions can also be adjusted. Loosen the wing nuts, adjust to the desired positions, and retighten. 2. Install an appropriate sensor onto the slider bracket. An indicator bracket that mounts onto the test stand column is available separately. 3. Install any required attachments, grips, adapters, and other items necessary for your test sample. Ensure that these items are set up in a secure and safe manner. 4. Plug the Control Unit cable into the 9-pin male connector located adjacent to the motor, then plug the power cord into the control unit and the other end into an electrical outlet with earth ground. 5. Turn on the power switch, located on the Control Unit beside the power cord in the rear of the unit. If applicable, connect the indicator to a computer or printer. 6. Recheck to ensure the sample is secured properly. The TSTM/TSTMH is now ready for use. 5

6 OPERATION The slider s position is adjustable along the column in order to engage and disengage the test sample. Move the slider lever clockwise to lower the slider s position closer to the torque plate. The slider may be locked into position by tightening the friction brake knob located on the opposite side of the slider. The test stand may be operated by motor or by hand. To begin a motorized test, use the Control Unit to operate the test stand (see instructions on the next page). For fine manual adjustment turn the knob on the motor drive in the desired direction. Using the Standard Control Unit CCW Press and hold for counter-clockwise motion, release button to stop. Located on the face of the Control Unit. CW Press and hold for clockwise motion, release button to stop. Located on the face of the Control Unit. SPEED CONTROL DIAL Adjust speed by turning the dial 0.3 8.6 RPM (4 52º/s). Located on the face of the Control Unit. POWER SWITCH Use this switch, in the left rear of the Control Unit, to turn on and turn off power to the test stand. Power is indicated by an amber light on the face of the Control Unit. POWER PLUG RECEPTACLE Located in the left rear of the Control Unit. Plug the power cord in here. CONTROL CABLE Plug this cable into the lower male connector on the test stand, adjacent to the motor. Using the DC4040 Control Unit This advanced control unit is supplied with the TSTM-DC test stand. Refer to the DC Controllers user s guide for complete instructions. 6

7 SPECIFICATIONS Load capacity: TSTM: 100 lbfin [11.5 Nm] TSTM-DC: 100 lbfin [11.5 Nm] TSTM-DC with SP-2496 upgrade: 200 lbfin [22 Nm] Speed range: TSTM: 0.3-8.6 RPM [4-52º/s] TSTM-DC: 0.01-15 RPM [0.05-90 /s] TSTM-DC with SP-2624 upgrade: 0.04-60 RPM [0.2-360 /s] * Speed variation with load: ±0% (Stepper motor driven) Speed accuracy: ±5% of setting Maximum angular travel: No limit Manual adjustment: 12º/knob rev Angle indicator resolution: 2º Maximum slider travel: 15.50 [394 mm] Slider travel rate: 1.05 [26.6 mm] / lever rev Line voltage: Universal input 80-240 VAC, 50/60 Hz Fuse type: 1.2 A, 250V, 3AG SLO BLO Weight (without controller): TSTM: 35.5 lb [16.1 kg], TSTMH: 29.5 lb [13.4 kg] Standard Control Unit weight: 2.7 lb [1.2 kg] * Maximum torque decreases proportionately with speed. Examples: - Maximum torque at 60 RPM = 25 lbfin [2.8 Nm] - Maximum torque at 30 RPM = 50 lbfin [5.6 Nm] 7

8 DIMENSIONS in [mm] TSTM TSTMH 8

Mark-10 Corporation has been an innovator in the force and torque measurement fields since 1979. We strive to achieve 100% customer satisfaction through excellence in product design, manufacturing and customer support. In addition to our standard line of products we can provide modifications and custom designs for OEM applications. Our engineering team is eager to satisfy any special requirements. Please contact us for further information or suggestions for improvement. We make a measurable difference in force and torque measurement Mark-10 Corporation 11 Dixon Avenue Copiague, NY 11726 USA 1-888-MARK-TEN Tel: 631-842-9200 Fax: 631-842-9201 Internet: www.mark-10.com E-mail: info@mark-10.com 32-1033 REV 4 0214 9