Sunbeam Nova. Installation guide. Universal. Symmetrical THE PROFESSIONAL PV MOUNTING SYSTEM

Similar documents
Sunbeam Nova. Installation guide. Universal. Symmetrical THE PROFESSIONAL PV MOUNTING SYSTEM

Mounting SySteMS ApplicAtionS overview version 1.2 March 2013

Roof access hatch installation instructions

panelclaw.com Polar Bear III for 10 Degree

For our present, For their future. Version 11.03

Nanometrics Solar Power System

Personal Protection Equipment (PPE) Safety Glasses Protect eyes Welding Mask Protect eyes and face

M673LD3 / M673L3. Soundshield Assembly Instructions. East Coast Branch th Avenue. 15 Aegean Dr. Northwest. Suite 4 Seattle, WA 98107

Spruce Line photovoltaic modules

Installation instructions, accessories - Rear Seat Entertainment

Photovoltaic Modules Installation Manual for Australia

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

3.0 RAIL-FREE RACKING. Utilizes EcoFasten Solar s patented technology

RH722 Instruction Manual

INSTALLATION MANUAL CRYSTALLINE SOLAR MODULES

Requirement Definition/Terms of Reference Satellite Beach City Hall - Solar Array Installation

MULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D SP PCN

English version. This Harmonization Document exists in three official versions (English, French, German).

GPS AutoSteer System Installation Manual

Report: 2018-EN-1-AERO

S:FLEX PRODUCTS Photovoltaic Mounting Systems. Product catalogue

FIST-GSS2 FIST-GSS3. Fist Generic Splicing Shelf. Contents. 1 Introduction. 2 General. 3 Installation of the shelf. 5 Termination of the pigtails

TILT KIT - POWER RAIL P8 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev E SP3436 PCN

FIST-FPS. Front Patching Shelf. Contents. 1 Introduction. 3 Installation of the shelf. 2 General. 1 Introduction

Installation Manual. Polar Bear III HD 5 Degree. Document Number Rev D March panelclaw.com

GUIDANCE NOTES. Solar Collectors. On-Roof Installation (First Fix) Please leave these instructions with the User. Baxi Heating UK Ltd 2012

Version For our present, For their future.

In area - A -, a proper seal must be made against the top of the window glass.

Electrical equipment. Hijskranen. De elektrische uitrusting. у Nederlands Normalisatie-instituut

MOUNTING INSTRUCTIONS

4.0 RAIL-FREE RACKING. Utilizes EcoFasten Solar s patented technology

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

POWER TRIPLE LOCK* Connector System

Renewable sources of electricity a brief overview

FIST-GSS2. Fist Generic Splicing Shelf MK2. Contents. 1 Introduction. 2 General. 3 Installation of the shelf. 5 Termination of the pigtails

Voorbeeld. Preview NEN Mobile cranes NETHERLANDS STANDARDS INSTITUTION NEDERLANDS NORMALISATIE-INSTITUUT

STOP---READ THIS FIRST!

Original BMW Accessories. Installation Instructions.

INTEGRATION MODULE HARNESS KIT A4, F4

INSTALLATION MANUAL.

INTERNATIONAL STANDARD 3870

Parking space border or support. Drive axis 15 L

Tensioning Winder 30. CS9160 Eco Solvent Printers

GL0098P Beta+ Septic Tanks Installation & Operation Guidelines

Solar Pack EN - Installation instructions

Parking space border or support. Drive axis 15 L

A B C D E F. Tools Required (supplied by others)

Part Number: TTU-BGB14-DRL TTU-BGP14-DRL

Installation Instructions. Vitosol 100. Vitosol 100 Type w 2.5 Flat collector for flat roofs and freestanding installation Part No.

PV on flatroofs - fast and easy. made in Germany

1 of 21 9/30/2011 3:16 PM

Installation Manual. Installation Manual. AXITEC, LLC 160 Greentree Drive, Suite 101 Dover, Delaware

INDEX CLS JADE EXPO SERIES SAFETY INFORMATION CONTENT. V1.1 - July 2018 JADE EXPO DMX VERSION JADE EXPO. Installation Global adapter 11.

Operations and Assembly Manual

Installing the Switch

ELEVATOR BELT & BELT SPLICE INSTALLATION GUIDE

POLARIS XLT-SPECIAL TRIPLE PIPE SET P.N

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Safety and Installation Instructions For Fluitecnik PV Modules

Demarcation Fuse Alarm Panel

Subaru EJ series motoren en Megasquirt Engine Management Systems

SAFETY. Read and understand all safety precautions and instructions before installing this product.

EFX Integrated LCD Screen Option. Cardio Theater Integrated Bracket Assembly Instructions

USER MANUAL SUMMARY. Tipping Device p 2. Remote Control p 4. Motorised Rollers p 6. Ramp and Board p 8. Charge and Battery p 10

2.0 RAIL FREE SOLAR ROOF MOUNT. Utilizes EcoFasten Solar s patented technology

TIDALFLUX 2300 F Quick Start

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Voorbeeld. Preview ISO INTERNATIONAL STANDARD. Wheelchairs Part 8: Requirements and test methods for static, impact and fatigue strengths

Profile series I-40. System kit Profile series I-40

Operating instructions ErgoPack 600 E

Road Standards Restraint Guidelines. Guidelines for the securing of steel products for external road transport.

Installation Manual Sectional door with rear springs (LF 70) Conform TÜV / CE EN

LEXUS IS250/350 CONVERTIBLE WIND SCREEN Preparation

Haul-Your-Might T3. Product Name: Product Code: Please read all instructions carefully before assembly, installation and/or use of this product.

SERIES A & AA ROLLER DOORS INSTALLATION GUIDE

Installation Manual AXITEC SOLAR MODULES

Tri-Spark Ignition System Installation Triple Cylinder TRI-0001

INSTALLATION MANUAL. The Solution in Black The Quadmax Solution Honey M The Aesthetic Solution The Comax Solution

PVM 220 Installation Guide

Zip Tie Domes - 3V 3/8 Assembly Manual

Product Manual. Installation Instructions for CHSM-230M Series Solar Module

Figure 35: Assembling a KARA-MINIBU/KARAMINIBUEX stacking platform


Double Scull Car Rack User s Manual

SITRANS F. Ultrasonic Flowmeters. Hi-Precision Mounts. Operating Instructions. Answers for industry.

Part Numbers: TTU-BGP14 & TTU-BGB14

JK Upper 1/2 Door Installation Instructions. Front 1/2 Door Installation

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION.MEHo(nYHAPO~HAR OPfAHM3AL&lR l-l0 CTAHAAPTM3A~MM.ORGANlSATlON INTERNATIONALE DE NORMALISATION

Models- 8105, Commercial Vacuums. Product Information Product Dimensions. Important Safety Instructions

TOYOTA VENZA HANDS FREE BLU LOGIC Preparation

POWER XPRESS TM. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN

INSTALLATION INSTRUCTIONS

Top-of-Pole Mount for 6 Modules (TPM6) For Module Type D

Installation Instructions

Installation instructions for the TriVision Car Docking Station

Installation instructions, accessories. Subwoofer

LPE C5 Battery Relocation Kit

Statik und Holzverbindung TWINLOC Statics and connector TWINLOC

INSTALLATION INSTRUCTIONS

Transcription:

THE PROFEIONAL PV MONTING YTEM Installation guide unbeam Nova niversal Page 4-5: : installation of a unbeam niversal system (solar panels facing south). ymmetrical Page 6-7: installation of a unbeam ymmetrical system ( east-west configuration). This installation guide describes the installation of unbeam Nova systems for mounting solar modules on flat roofs. Installation always needs to be based on a configuration and ballast plan generated by the unbeam Calculator software. Please keep a copy of the configuration and ballast plan and this installation guide with your project documentation. If you have any questions about the installation, please contact unbeam BV (for contact details see last page).

Main parts Base units The base units support the system. They are available in several lengths, enabling you to vary the distance between the rows. base unit M (with connector ) base unit E (without connector ) optional Carriers Attach the carriers to the base units to form a stable triangular base for mounting the solar panels. carrier niversal south-facing carrier ymmetrical east-west Ballast racks and wind plates In addition to carrying ballast and deflecting wind, these planar elements have an important secondary function: they reinforce the system s matrix configuration. ballast rack wind plate Various parts foot end clamp also in black mid clamp also in black clamp screw short screw carriers, ballast racks, wind plates cable clip rubber block for gravel roofs rubber mat

1 3 4 5 6 7 8 9 10 11 1 1 3 4 5 6 7 8 9 10 11 1 m Dakrandzones volgens Eurocode Hiernaast is aangegeven welke afstanden tot de dakrand gelden bij een rechthoekig gebouw. bent zelf verantwoordelijk voor het bepalen en aanhouden van de dakzones. De ballastwaarden die dit programma aangeeft zijn alleen geldig indien het gehele systeem in zone H staat. module + windplaat positie met 1 ballastplaat cijfer = aantal tegels @ 8 kg positie met ballastplaat zonder ballast Preparation Make sure the roof is empty and clean. Make sure the delivery is complete. Work accurately and systematically. Don t place heavy pallets directly on the roof. The local load on the roof may become very high. Beware of parts and packaging blowing away in the wind and sharp-edged parts damaging the top layer of the roof. Always observe adequate safety measures, such as placing bannisters along the roof edge (for relevant safety standards see last page). The roofing construction needs to be strong enough to carry the weight of the entire solar energy installation in addition to the regular wind, water and snow loads. The roofing material needs to be in good condition and should be able to withstand the maximum local pressure under the unbeam feet. When required, the maximum pressure can be lowered by placing additional feet under the system. Always ensure proper drainage of water under the system. When obstacles or gravel are blocking the free flow of water the system may be heightened with rubber blocks. When in doubt about any of the above points please consult a structural engineer or roofing expert. Configuration and ballast plan unbeam Calculator Nova Every unbeam project plan includes a configuration and ballast plan (for each individuel array of Project B-0013 Basisgegevens van dit veld veldnaam A sunbeam test 1 x 30 v.13 solar modules), which is prepared using the unbeam Calculator software. This picture shows the positions where ballast racks are needed. The numbers indicate the number of tiles to be placed in the racks. Boxes without numbers represent empty ballast racks used to facilitate installation. gebouwhoogte dakmaten dakbedekking met grind ballast Resultaten stuwdruk aantal modules oppervlak systeem totaalgewicht druk per voet 10 m 30 x 0 m bitumen 1 tegels 8 kg 700 N/m 7 174 m 16, kg/m 83 kg 19 kpa,0 16,0,0 6,0 0 It is possible to use several types of ballast tiles, allowing for a large range of weights. Always make sure that the actual weight of the tiles matches the weight prescribed in the configuration and ballast plan! 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11,770 1 1 1 1 1 1 1 1 1 1 Only systems that are installed according to a configuration and ballast plan generated with the current version of the unbeam Calculator at the time of ordering the system, are eligible for the unbeam product warranty. For more information about the warranty terms and conditions: see last page. 1 1 1 1 nn 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16,640 m izing tool longest side L The sizing tool enables you to place the base units at exactly the required distance from each other. Adjust the sizing tool by sliding the flanges protruding form the plastic sliders up against the side edges of the solar panels and firmly tightening the screws at the bottom of the slider. If you don t have a solar panel at hand, you can adjust the sizing tool using a measuring tape. 3

1. Placing the feet and the base units niversal M or E M M Attach one foot per base unit by clicking it into place at the end without connector. The holes in the base unit line up with the ribs of the feet. Place the base units on the roof in the order indicated in the configuration and ballast plan. Each row is terminated (at the northern end) with an additional foot. Caution: Do not assemble the base units yet!. Placing the carriers 3 1 1. Insert the connector into the next base unit until it is up against the stop.. Insert the yellow end block into the slit. 3. Push outwards to align the screw holes. Repeat this with the end block at the opposite side. When assembling a niversal system, you must first carefully bend the carrier until it assumes the correct angle. Attach the end blocks to the base units with the short screws. Make sure that the base units are inserted all the way, and that all the holes are aligned properly! 3. Aligning, squaring and placing the ballast racks 4 m < 5 Nm 3 m N 5 m A triangle with sides of 3, 4 and 5 metres always has a square angle. Ensure that the entire system is straight and squared, using tools such as a folding square or a laser, or by drawing a 3-4-5 triangle. Always use the sizing tool to make sure the base units are at the correct distance from each other. Attach the ballast racks using the short screws. Tighten the screws firmly, but take care not to strip the thread. 4

4. Ballast niversal 30 cm 1 cm 1000 N/m 30 cm 15 cm position with ballast (number = number of tiles) Place the ballast. Pavements slabs of 30 cm wide can be placed on top. This is allowed up to a peak pressure of 1000 N/m. Ballast needs to rest stable on top and may not cover the bottom of the ballast plate. The use of gravel as ballasting material is not allowed. The small black squares without a number indicate positions with empty ballast plates. These are used to ensure a higher system connectivity. 5. Placing solar panels When placing a solar panel, pay attention to the lip at the end of the carrier, which prevents the solar panels from falling down between the carriers. unbeam Nova end clamps can be used universally for panels ranging from 30 to 50 mm in thickness. Fit the clamps using the long clamp screws. The mid clamps ensure a 10 mm gap between the panels. Fit them with the long clamp screws as well. 6. Finishing < 5 Nm Tie cables running between panels with the cable clips. Additional cable clips can be ordered separately. Mount the wind plates at the backside of the carriers. Wind plates may overlap. Fix them in place with the short screws. The small hole above the central rib in the foot can be used for grounding the system or for attaching cable conduits. 5

1. Placing the feet and the base units ymmetrical 1 Attach one foot per base unit by clicking it into place at the end without connector. The holes in the base unit line up with the ribs of the feet. Place the base units on the roof in the order indicated in the configuration and ballast plan. Add feet underneath the base units at positions where ballast is needed (1). Each row is terminated with an additional foot (). Caution: do not assemble the base units yet!. Placing the carriers 3 1 1. Insert the connector into the next base unit until it is up against the stop.. Insert the yellow end block into the slit. 3. Push outwards to align the screw holes. Repeat this with the end block at the opposite side. Caution: makes sure that the knee plate stays in position. Attach the end blocks to the base units with the short screws. Make sure that the base units are inserted all the way, and that all the holes are aligned properly! 3. Aligning, squaring and placing the ballast racks 4 m N < 5 Nm 3 m 5 m A triangle with sides of 3, 4 and 5 metres always has a square angle. Ensure that the entire system is straight and squared, using tools such as a folding square or a laser, or by drawing a 3-4-5 triangle. Always use the size tool to make sure the base units are at the correct distance from each other. Attach the ballast racks using the short screws. Tighten the screws firmly, but take care not to strip the thread. 6

4. Ballast ymmetrical 30 cm 1 cm 1000 N/m 30 cm 15 cm position with ballast (number = number of tiles) Place the ballast. Pavements slabs of 30 cm wide can be placed on top. This is allowed up to a peak pressure of 1000 N/m. Ballast needs to rest stable on top and may not cover the bottom of the ballast plate. The use of gravel as ballasting material is not allowed. The small black squares without a number indicate positions with empty ballast plates. These are used to ensure a higher system connectivity. 5. Placing solar panels When placing a solar panel, pay attention to the lip at the end of the carrier, which prevents the solar panels from falling down between the carriers. unbeam Nova end clamps can be used universally for panels ranging from 30 to 50 mm in thickness. Fit the clamps using the long clamp screws. The mid clamps ensure a 10 mm gap between the panels. Fit them with the long clamp screws as well. 6. Finishing Tie cables running between panels with the cable clips. Additional cable clips can be ordered separately. The small hole above the central rib in the foot can be used for grounding the system or for attaching cable conduits. 7

tandards and regulations Health and safety Depending on the country in which the system is installed, national health and safety regulations may apply. You must follow these strictly. For the Netherlands: Arbobesluit artikel 3.16 : Voorkomen valgevaar / artikel 7.3: Gebruik van arbeidsmiddelen voor werken op hoogte / artikel 8.1 tot 8.3: Persoonlijke beschermingsmiddelen. For Belgium: Algemeen Reglement voor de Arbeidsbescherming (ARAB). Electrical installation Depending on the country in which the system is installed, national regulations may apply. You must follow these strictly. For the Netherlands: NEN 1010. Chapter 7.1 deals specifically with solar power installations. For the Netherlands: NPR 5310. Chapter 7.1 is linked to NEN 1010 providing practical guidelines. For the Netherlands: NEN 3140 voor het veilig werken aan laagspanningsinstallaties (tot 1000 V AC of 1500V DC). For Belgium: Algemeen Reglement op de Elektrische Installaties (AREI). Roof constructions and various loads EN 1990: Basis of structural design (including National Annexes e.g. for the Netherlands, Belgium, K and Ireland). EN 1991-1-3: Actions on structures - Part 1-4: General actions now Loads (including National Annexes). EN 1991-1-4: Actions on structures - Part 1-4: General actions Wind actions (including National Annexes). For the Netherlands: NEN 750 Zonne-energiesystemen Integratie in daken en gevels Bouwkundige aspecten. For witzerland: IA 60 Grundlagen der Projektierung von Tragwerken / IA 61 Actions on structures. Warranty Provided NBEAM Nova is installed and maintained according to the instructions, NBEAM BV guarantees the system s mechanical stability as well as its capability to withstand wind and snow loads conform the relevant Eurocodes. The default warranty period is 10 years. For the specific warranty conditions, see www.sunbeam-pv.com/eng/downloads All deliveries made by NBEAM BV are subject to the default terms and conditions, see www.sunbeam-pv.com/eng/downloads Manufacturer unbeam BV Kwikstaartlaan 18 NL-3704 G Zeist The Netherlands unbeam is a registered trademark. The unbeam design is protected by several international patents. The unbeam Nova mounting system is tested and approved by TüV. E info@sunbeam-pv.com T +31 (0)30-43 00 333 www.sunbeam-pv.com NBEAM Nova Installation guide 5 October 017