EAL 573/4 Kejuruteraan Lalu Lintas

Similar documents
EAL 574/4 Perancangan & Dasar Pengangkutan

PEPERIKSAAN JULAI 2010

INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

JA606: VEHICLE DYNAMICS. INSTRUCTION: This section consists of SIX (6) structured questions. Answer FOUR (4) questions only.

ARAHAN: Kertas soalan ini mengandungi ENAM (6) soalan esei. Jawab EMPAT (4) soalan sahaja.

INSTRUCTION: This section consists of SIX (6) structures questions. Answer FOUR (4) questions only.

UNIVERSITI SAINS MALAYSIA EEM 253 REKABENTUK MEKATRONIK I

EEK 470 ELECTRICAL POWER DISTRIBUTION SYSTEM [SISTEM PENGAGIHAN ELEKTRIK KUASA]

SECTION A : 100 MARKS BAHAGIAN A : 100 MARKAH INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

INSTRUCTION: This paper consists of SIX (6) structured questions. Answer any FOUR (4) questions.

EEK 468 ELECTRICAL MACHINES AND DRIVES

STRUCTURE : 100 MARKS STRUKTUR : 100 MARKAH. INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

INSTRUCTION: This paper consists of SIX (6) structure questions. Answer any FOUR (4) questions.

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG & JALAN KUCHING 08 JUN 2018

PB604 : BUSINESS FINANCE

EEK 475 ECONOMY AND MANAGEMENT ON POWER SYSTEM

MyBot Bridge. 2 pasukan 4 peserta (2 wakil politeknik, 2 wakil sekolah) TEAM PELAJAR MyBot Operator Mentor 2

INSTRUCTION: This section consists of SIX (6) structure questions. Answer FOUR (4) questions only.

KUCHING. MEKANlKAL SULIT POLITEKNIK SULIT 8.30PG PG (2 JAM) TARIKH: 08 NOVEMBER 2010 (ISNIN) Jangan buka kertas soalan ini sehingga diberitahu.

INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

EEK 466 REKABENTUK MESIN ELEKTRIK

INSTRUCTION : This section consists of SIX (6) structured questions. Answer any FOUR (4) only.

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR DAN JALAN IPOH 15 JANUARI 2019

Item Bil Description of Works Remarks Main Switch Board

UNIVERSITI SAINS MALAYSIA

$'11,n n, Lffi MALAYSIA. PEPERIKSAAI\ AKHIR SEMESTER II sesr PERALATAN BINAAN BPD BPC APRIL 2OO9 2 JAM 30 MINIT

EMH 332 Applied Thermodynamics [Termodinamik Gunaan]

INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

INSTRUCTION: This section consists of FOUR (4) questions. Answer ALL questions. ARAHAN: Bahagian ini mengandungi EMPAT (4) soalan. Jawab SEMUA soalan.

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR & JALAN KEPONG 30 DISEMBER 2018

INSTRUCTION: This section consists of THREE (3) structured questions. Answer ALL questions.

EEK 260 Mesin Elektrik

Line detector robot / Robot garisan

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG DAN JALAN IPOH 13 JUN 2018

(a) Sketch and explain the operation of four stroke petrol engine. Lakar dan terangkan operasi enjin empat lejang. [12 marks] [12 markah]

1. SAMBUNGAN PENUTUPAN PENUH JALAN JANGKA PENDEK SECARA DUA PERINGKAT DI JALAN RAYA SATU (MALAM)

Frequently Asked Questions (FAQ)

SULIT JA201: AUTOMOTIVE TECHNOLOGY 2

(Kertas soalan ini mengandungi 6 soalan dalam 7 halaman yang dicetak) (This question paper consists of 6 questions on 7 printed pages)

INSTRUCTION: This section consists of SIX (6) essay questions. Answer FOUR (4) questions only.

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG LEBUHRAYA DUKE 2, LAMAN RIMBUNAN KEPONG DAN JALAN IPOH

INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

EEK 474 REKABENTUK MESIN ELEKTRIK

MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR, JALAN KEPONG DAN JALAN JINJANG PERMAI 2 21 JUN 2018

Get rewarded, download the Touch n Go e-wallet. Get standard or preferred TGV seats for RM7 before 7pm on 7 July.

Book your flight for the upcoming election and your flight could be on us. 100 lucky winners will receive a cashback up to RM300.

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD. QUOTATION NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

Free ebook. Cara penggunaan product

MALAYSIA AIRPORTS HOLDINGS BERHAD

PANDUAN ASAS METATRADER 4

MALAYSIA AIRPORTS HOLDINGS BERHAD

LIVING CARE. Critical Illness Insurance

1. SAMBUNGAN PENUTUPAN JALAN BERKALA DI LEBUHRAYA KL-SEREMBAN, KM310.5 ARAH SELATAN

1. PENUTUPAN JALAN JANGKA PANJANG DI LEBUHRAYA KL-SEREMBAN (ARAH KL)

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

KAEDAH-KAEDAH LALU LINTAS JALAN (LARANGAN PEMANDUAN KENDERAAN BARANGAN) (NO. 2) 2017

APLIKASI MUDAH ALIH SISTEM PEMANTAUAN GILIRAN DI HOSPITAL CANSELLOR TUANKU MUKHRIZ. Nursyakirah Hamimah Binti Mohamad Halim Prof. Dr.

APLIKASI PENGESANAN BAS PRINCE OF SONGKHLA UNIVERSITY

MODELLING OF THROUGH-THE-ROAD HYBRID ELECTRIC VEHICLE OKE PAUL OMEIZA

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

MALAYSIA AIRPORTS HOLDINGS BERHAD

OPTIMAL LOCATION OF THYRISTOR CONTROLLED SERIES COMPENSATOR USING SENSITIVITY APPROACH NEW HUANG CHIN UNIVERSITI TEKNOLOGI MALAYSIA

INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL questions.

SMART METER-TNB DUAL TARIFF FOR DOMESTIC APPLICATION NASYRAH BT ABDUL RAHIM

SISTEM PEMANTAUAN PRESTASI BAS SHAUN LOH CHIA CHIEH ASSOC. PROF. DR. MOHAMMAD FAIDZUL NASRUDIN

FINITE ELEMENT (FE) MODEL OF BRAKE INSULATOR IN REDUCING BRAKE SQUEAL NOISE FOR MOTORCYCLES MUNDHER FADHIL ABDULRIDHA UNIVERSITI TEKNOLOGI MALAYSIA

NUMERICAL ANALYSIS OF ELASTOHYDRODYNAMIC LUBRICATION WITH BIO-BASED FLUIDS DEDI ROSA PUTRA CUPU UNIVERSITI TEKNOLOGI MALAYSIA

MALAYSIA AIRPORTS HOLDINGS BERHAD

SKR 3102: ROMBAK RAWAT SISTEM KLAC

INDEKS PERDAGANGAN LUAR NEGERI

APPLICATION OF DEMAND SIDE MANAGEMENT STRATEGIES TO REDUCE ENERGY CONSUMPTION IN UNIVERSITY BUILDINGS NAJAATUL FARIHAH BINTI HAMIDI

MALAYSIA AIRPORTS HOLDINGS BERHAD

CONTROL OF INVERTED PENDULUM-CART SYSTEM BASED ON FUZZY LOGIC APPROACH HASRULNIZAM BIN HASHIM

SKR 3102: ROMBAK RAWAT SISTEM KLAC

PAY WITH YOUR PIN BAYAR DENGAN PIN ANDA

MALAYSIA AIRPORTS HOLDINGS BERHAD

AN AUTONOMOUS VEHICLE USING WALL FOLLOWING DETECTION MOHD AFFI BIN MOHD ALI

Enjoy 30% off when you book a Touch 'n Go ewallet-branded SOCAR at selected special zones!

OPTIMAL LOCATION OF FACTS FOR ATC ENHANCEMENT BY USING SENSITIVITY ANALYSIS RAIMON OMAR AL SHAIKH SALEM

SISTEM PENJEJAK PESAKIT DI HOSPITAL PUSAT PERUBATAN UKM (PPUKM) MENGGUNAKAN PERANTI MATA ARAH (BEACON) Mohamad Norizal Bin Abdullah Dr.

GARNIER MALAYSIA Peraduan Menangi BMW Ice Watch bernilai RM500 setiap satu untuk. 20 pemenang bersama Watsons Malaysia

This item is protected by original copyright

APLIKASI GO AMBULANCE

FREQUENCY RESPONSE ON THE EFFECT OF COMBINE CYCLE LOAD REJECTION TEST NORAZIAH BINTI HUSSIN

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

INDEKS PERDAGANGAN LUAR NEGERI

MALAYSIA AIRPORTS HOLDINGS BERHAD. QUOTATION NOTICE (Via eprocurement)

ALAT PRAPEMPROSESAN DATA UNTUK SISTEM SOKONGAN EKSEKUTIF UNIVERSITI. Muhammad Faiz Bin Abdullah Prof. Madya Dr. Mohd Zakree Ahmad Nazri

INDEKS PERDAGANGAN LUAR NEGERI

INDEKS PERDAGANGAN LUAR NEGERI

Sustainable Consumption

APLIKASI PENGURUSAN TELE-REHABILITASI. Nursuhaila Laily binti Abd Jamil Prof Madya Dr Jamaiah binti Yahaya

SISTEM PENGURUSAN KOLEJ KEDIAMAN

UNIVERSITI MALAYSIA PAHANG BORANG PENGESAHAN STATUS TESIS

PERMOHONAN BEKALAN ELEKTRIK

Transcription:

UNIVERSITI SAINS MALAYSIA Peperiksaan Semester Tambahan (KSCP) Sidang Akademik 2002/2003 April 2003 EAL 573/4 Kejuruteraan Lalu Lintas Masa : 3 jam Arahan Kepada Calon: 1. Sila pastikan kertas peperiksaan ini mengandungi LAPAN (8) muka surat bercetak termasuk lampiran sebelum anda memulakan peperiksaan ini. 2. Kertas ini mengandungi LIMA (5) soalan. Jawab EMPAT (4) soalan sahaja. Markah hanya akan dikira bagi EMPAT (4) jawapan PERTAMA yang dimasukkan di dalam buku mengikut susunan dan bukannya EMPAT (4) jawapan terbaik. 3. Semua soalan mempunyai markah yang sama. 4. Semua soalan MESTILAH dijawab dalam Bahasa Malaysia. 5. Semua soalan MESTILAH dimulakan pada muka surat yang baru. 6. Tuliskan nombor soalan yang dijawab di luar kulit buku jawapan anda. 2/-

- 2 - [EAL 573/4] 1. Satu inventori masalah kesesakan untuk sebuah kawasan telah dilakukan, dan pakar pengangkutan telah mengumpulkan maklumat berikut: i. Semua persimpangan beroperasi pada aras perkhidmatan D dan F. ii. Semua persimpangan adalah jenis persimpangan keutamaan (priority junction). iii. Perkhidmatan bas tidak memuaskan. iv. Kereta-kereta dibenarkan letak di tepian jalan, kerana tiada tempat letak kereta khas. v. Ruang jalan pada jalanraya utama diguna kenderaan pelbagai saiz dan kelajuan. vi. Harga minyak tetap pada kadar RM 1.20/liter untuk empat tahun berturutturut. vii. Rekabentuk perhentian bas melibatkan ruang berhenti bas yang mengambil satu lorong laluan dari jalan utama. viii. Polisi kerajaan yang menggalakkan pemilikan kenderaan. ix. Pusat bandar mempunyai guna tanah yang pelbagai. a. Sebagai seorang pakar pengangkutan yang dilantik untuk menyelesaikan masalah di kawasan ini, nyatakan pendapat anda mengenai maklumat sekunder yang diberi kepada anda. Bincangkan langkah berikut yang anda perlu ambil untuk tujuan dapatan maklumat mengenai kawasan ini. (10 markah) b. Berdasarkan maklumat ini dan dengan menggunakan pengetahuan anda dari "Congestion toolbox", cadangkan penyelesaian kepada masalah kesesakan di kawasan ini. Bahagikan cadangan anda kepada penambahbaikan yang memerlukan penambahan prasarana dan penambahbaikan yang menggunakan kemudahan sedia ada. (15 markah) 2. Terangkan fungsi Sistem Pengangkutan Pintar dalam pengurusan trafik. Anda perlu memberikan contoh aplikasi yang boleh digunakan. Terangkan kebaikannya dan kebarangkalian ia dilaksanakan di Malaysia. (25 markah) 3/-

- 3 - [EAL 573/4] 3. Kenderaan-kenderaan tiba di sebuah lorong di persimpangan berlampu isyarat pada kadar aliran 1500 kenderaan sejam. Aliran tepu untuk lorong tersebut ialah 1880 kenderaan sejam. Masa merah ialah 45 saat manakala masa kitar ialah 78 saat. Andaikan masa kuning ialah 4 saat. Lakarkan rajah baris gilir bagi menggambarkan operasi untuk dua masa kitar. Tentukan ciri-ciri operasi seperti yang disenaraikan di bawah untuk lorong tersebut. (a) Jumlah masa baris gilir setiap kitar. (b) Panjang maksima baris gilir bagi mana-mana kitar. (c) Jumlah kelengahan bagi setiap kitar. (d) Purata kelengahan bagi setiap kitar. (e) Purata kelengahan untuk jangkamasa satu jam. ( 5 markah) (f) Purata kelengahan bagi setiap kitar dikenakan ke atas kenderaan yang berbaris gilir. 4. (a) Merujuk Rajah 1, sebuah jambatan sedia ada tidak dapat dilebarkan atas sebabsebab tertentu. Lebuh raya tersebut telah dinaiktarafkan kepada tiga lorong sehala manakala jambatan cuma ada dua lorong sehala sahaja. Pada pukul 8.30 pagi permintaan lalu lintas ialah 1.7 lorong, 45 minit kemudian permintaan lalu lintas ialah 2.4 lorong dan berlarutan selama 45 minit. Seterusnya, permintaan menurun kepada 1.5 lorong. Andaikan kapasiti untuk lebuh raya tersebut ialah 2000 kend/jam/lorong. i. Lakarkan rajah baris gilir untuk kawasan genting. ( 3 markah) ii. Label semua ciri-ciri penting pada rajah baris-gilir tersebut. ( 3 markah) iii. Nyatakan andaian-andaian yang dibuat untuk menyediakan rajah baris gilir tersebut. (3 markah) Bridge Highway Rajah 1 4/-

- 4 - [EAL 573/4] 4. (b) Tentukan aras perkhidmatan untuk satu bahagian lebuh raya sekiranya isipadu waktu puncak ialah 2200 kend sejam. Ciri-ciri lebuh raya tersebut adalah seperti berikut : 4 lorong (2 hala) 13 kaki lebar lorong Jarak antara tepian jalan dan objek tegar terdekat ialah 3 kaki Jarak antara tepian jalan dengan pembahagi jalan ialah 2 kaki Dataran Datar Lori/Bas = 7% Persilangan jalan diletakkan pada jarak purata 1 batu FWP ialah 0.90 Sila rujuk Lampiran untuk Rajah dan Jadual. (16 markah) 5. (a) Isipadu lalu lintas untuk satu bahagian jalan raya dua lorong dua hala ialah 1700 kend sejam satu hala, dan ketumpatan lalu lintas ialah 35 kend/km. Sebuah lori sampah yang sarat dengan muatan dari tapak pembangunan berdekatan memasuki jalan raya tersebut pada kelajuan 40 km/jam. Lori sampah tersebut bergerak sejauh 4.5 km sebelum membelok memasuki kawasan pelupusan sampah. Kenderaan-kenderaan tidak dapat memotong lori sampah berkenaan kerana isipadu lalu lintas yang tinggi pada arah yang bertentangan. Ciri-ciri lalu lintas bagi kenderaan yang mengikuti lori sampah tersebut adalah seperti berikut: Ketumpatan lalu lintas = 65 kend/km Aliran lalu lintas = 1250 kend/jam Tentukan bilangan kenderaan yang mengkuti lori sampah berkenaan sehingga lori tersebut keluar daripada lebuh raya tersebut. (15 markah) (b) Ciri-ciri aliran lalu lintas untuk satu lorong di persimpangan berlampu isyarat boleh ditunjukkan oleh model Greenshield. Sekiranya jarak antara dua kenderaan berturutan dalam keadaan hampir-hampir berhenti ialah 11 m, berapakah laju gelombang berhenti apabila lampu isyarat bertukar warna dari kuning ke merah. Sekiranya ketumpatan lalu lintas ialah 35 kend/km dan kelajuan ialah 65 km/jam, berapakah panjang baris gilir apabila masa hijau ialah 30 saat manakala masa kitar ialah 65 saat? (10 markah) - ooo O ooo -

- 5 - [EAL 573/4] LAMPIRAN Table 1: Adjustment Factor for Restricted Lane Width and Lateral Clearance Distance From Adjustment Factor Travelled Way to Obstructions Obstructions on One Side Obstructions on Two Sides (ft) Lane Width (ft) 12 11 10 12 11 10 6 1.00 0.9 0.90 1.00 0.95 0.90 5 4 0.99 0.9 0.89 0.98 0.93 0.88 4 2 0.97 0.9 0.88 0.95 0.90 0.86 2 0 0.92 0.8 8 0.84 0.86 0.82 0.78 Table 2: Passenger Car Equivalents on Extended General Freeway Segments Category Type of Terrain Level Rolling Mountainous E T for Trucks & Buses 1.5 3.0 6.0 E R for Recreational Vehicles 1.2 2.0 4.0 Table 3: Adjustment Factors to Free-Flow Speed for Freeways Lane Width Adjustments 12 ft 0.0 mph 11 ft 2.0 mph 10 ft 6.5 mph Table 4: Adjustment for Right-Shoulder Lateral Clearance Right-Side Adjustments Lateral Lanes in One Direction Clearance 2 3 4 6 ft 0.0 mph 0.0 mph 0.0 mph 5 ft 0.6 mph 0.4 mph 0.2 mph 4 ft 1.2 mph 0.8 mph 0.4 mph 3 ft 1.8 mph 1.2 mph 0.6 mph 2 ft 2.4 mph 1.6 mph 0.8 mph 1 ft 3.0 mph 2.0 mph 1.0 mph 0 ft 3.6 mph 2.4 mph 1.2 mph

6/- - 6 - [EAL 573/4] LAMPIRAN Table 5: Adjustment for Number of Lane Number of Adjustments Lanes (One Directions) 5 0.0 mph 4 1.5 mph 3 3.0 mph 2 4.5 mph Table 6: Adjustment for Interchange Density Interchange per Mile Adjustments 0.50 0.0 mph 0.75 1.3 mph 1.00 2.5 mph 1.25 3.7 mph 1.50 5.0 mph 1.75 6.3 mph 2.00 7.5 mph