Market Efficiency RTEP Proposal Window

Similar documents
Market Efficiency RTEP Proposal Window

Transmission Expansion Advisory Committee

Market Efficiency Update

Market Efficiency Update

Transmission Expansion Advisory Committee

Market Efficiency Update

Reliability Analysis Update

Sub Regional RTEP Committee Mid-Atlantic

Transmission Expansion Advisory Committee

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

Generation Deactivation Notification Update

Transmission Expansion Advisory Committee

Sub Regional RTEP Committee Mid-Atlantic

Transmission Expansion Advisory Committee Meeting 2014 Market Efficiency Analysis

Market Efficiency Update

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic

Illinois State Report

Sub Regional RTEP Committee Western Region ATSI

Cromby Units 1 and 2 and Eddystone Units 1 and 2. Deactivation Study

Sub Regional RTEP Committee - Southern. August 19, 2011

Reliability Analysis Update

Manual 3: Transmission Operations Updates Version 52

Sub Regional RTEP Committee Mid-Atlantic

Manual 3: Transmission Operations Updates Version 52

Sub Regional RTEP Committee South

Energy Policy Implications: PJM Planning

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC Solution Meeting

MTEP14 South SPM #2. MISO Texas Project Information. April 7, 2014

Sub Regional RTEP Committee - Western. October 21, 2009

Sub-Regional RTEP Committee PJM South

Designated Entity Pre-Qualification Materials. Exelon Corporation

Transmission Expansion Advisory Committee. Reliability Analysis Update

Reliability Analysis Update

MTEP13 SPM #2- Central Region. March 25, 2013

PJM SRTEP Meeting Questions Pertaining to Proposed Projects & Scopes AEP: Ambler Ridge:

PJM Regional Transmission Expansion Planning (RTEP) Process

Reliability Analysis Update

Transmission Expansion Advisory Committee

Western Area Power Administration

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Supplemental Report on the NCTPC Collaborative Transmission Plan

Subregional RTEP Committee Mid-Atlantic Area. September 9, 2008

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

FTR Modeling Enhancements for Future Transmission Expansions

Reliability Analysis Update

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities

Sub Regional RTEP Committee - Southern

The AEP Interstate Project Proposal A 765 kv Transmission Line From West Virginia to New Jersey

New Jersey State Report

Distributed Solar Generation in the Long-Term Load Forecast

BC Hydro System 2016 Annual Progress Report

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

100 MW Wind Generation Project

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

Sub Regional RTEP Committee Mid-Atlantic

Brad Roberts. & Jeff Palermo KEMA High Plains Transmission Summit Topeka Lawrence, Kansas November 3, 2009

Reliability Analysis Update

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

2017 Indiana State Infrastructure Report (January 1, 2017 December 31, 2017)

Black Hills Project Summary

Sub Regional RTEP Committee South

SPP Notification to Construct

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Transmission Expansion Advisory Committee Meeting. April 23, 2008

Queue Posting. PJM

On July 18, 2018, PJM submitted a historical clean-up filing to revise Schedule 12

Key to Status Fields in the Project List

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

Appendix B. Summary of Changes to the Year Assessment

2013 ANNUAL PROGRESS REPORT

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Pennsylvania State Report

BC Hydro System 2011 Annual Progress Report

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016

ATTACHMENT Y STUDY REPORT

Western NY Public Policy Transmission Report

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

APPENDIX E: Project Need and Description

The Transmission Lay of the Land

Sub Regional RTEP Committee PJM West

SERTP rd Quarter Meeting

Feasibility Study Report

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board

XXXXX. Kokish River Hydroelectric Project. Interconnection Facilities Study and Project Plan

Appendix D Black Hills Project Summary

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

2018 PJM BASELINE RELIABILITY ASSESSMENT

New Services Queue Network Upgrades

4.7: New Jersey RTEP Overview

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Interconnection Feasibility Study Report GIP-369-FEAS-R1

Relative Power Factor Correction costs

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- --

Distributed Solar Generation Update

Merchant Transmission Interconnection PJM Impact Study Report. PJM Merchant Transmission Request Queue Position X3-028.

Agility in energy Ahead of the challenge, ahead of the change

Transcription:

Market Efficiency RTEP Proposal Window

Market Efficiency RTEP Proposal Window Status Window opened on 8/12/2013 Closed on 9/26/2013 17 individual proposals addressing congestion from Market Efficiency Analysis 6 entities Project Naming Convention Project Identification Taxonomy: 2013_1-1A RTEP Year RTEP Window Index (within the current year) Project Sponsor index for this window Proposal Index (for multiple proposals from the same Sponsor) 2

2013 Regional Market Efficiency Proposals: Page 1 of 2 3

2013 Regional Market Efficiency Proposals: Page 2 of 2 4

Market Efficiency Next Steps Post Redacted Proposals: November 2013 Review Results: December 2013 January 2014 Recommendations to PJM Board: February 2014 Begin 2014/2015 Market Efficiency Cycle: February 2014 5

Appendix A: Market Efficiency Proposal Descriptions 6

ComEd Zone Re-sag transmission line:zion Energy Center 345 kv to Zion 345 kv Proposed by: Exelon Expected ISD: 2015 Estimated Project Cost: $0.915 M Zion 345 kv to Zion 345 kv Market Efficiency Proposal 2013_2-1A 7

ComEd Zone Upgrade switch on L11323 between Haumesser Rd 138 kv and West Dekalb Tap 138 kv Proposed by: Exelon Expected ISD: 2015 Estimated Project Cost: $0.19 M Haumesser Road 138 kv to West Dekalb Tap 138 kv Market Efficiency Proposal 2013_2-1B 8

Market Efficiency Proposal 2013_2-1C Description ComEd Zone Re-sag transmission line: Loretto 345 kv to Wilton Center 345 kv Proposed by: Exelon Expected ISD: 2015 Estimated Project Cost: $6.1 M Streator Cayuga Ridge Wind Farm 345 kv to Wilton Center 345 kv 9

Dominion Zone Install a Thyrister-controlled series capacitor on Loudoun 500 kv to Meadow Brook 500 kv Line at Loudoun Proposed by: Dominion Virginia Power Expected ISD: 2017 Estimated Project Cost: $24.57 M ApSouth Market Efficiency Proposal 2013_2-2A 10

Dominion Zone Install a Thyrister-controlled series capacitor on Morrisville 500 kv to Front Royal 500 kv at Morrisville Proposed by: Dominion Virginia Power Expected ISD: 2017 Estimated Project Cost: $20.07 M ApSouth Market Efficiency Proposal 2013_2-2B 11

Dominion Zone Install a Thyrister-controlled series capacitor on Mt. Storm 500 kv to Meadow Brook 500 kv at Mt. Storm Proposed by: Dominion Virginia Power Expected ISD: 2017 Estimated Project Cost: $24.73 M ApSouth Market Efficiency Proposal 2013_2-2C 12

DEOK Zone Install a new DATC 8 345 kv substation; Install a new DATC 8 to Woodsdale 345 kv line Proposed by: Duke-ATC Expected ISD: 2020 Estimated Project Cost: $25 M Miami Fort 345/138 kv transformer; Pierce Beckjord 138 kv; Miami Fort Hebron 138 kv Market Efficiency Proposal 2013_2-3A 13

PENELEC Zone Install 600 MVAR series capacitors on Jacks Mtn - Keystone 500 kv & Jacks Mtn - Conemaugh 500 kv; and 400 MVAR series capacitors on each (2) Jacks Mtn - Juniata 500 kv lines Proposed by: First Energy Expected ISD: 2017 Estimated Project Cost: $54.28 M AP South; Hunterstown 230/115 kv; Pruntytown to Mt Storm 500 kv Market Efficiency Proposal 2013_2-4A 14

METED Zone Install 2nd Hunterstown 230/115 kv transformer; Reconductor Hunterstown - Oxford 115 kv line Proposed by: First Energy Expected ISD: 2017 Estimated Project Cost: $8 M Hunterstown 230/115 kv Market Efficiency Proposal 2013_2-4B 15

Market Efficiency Proposal 2013_2-4C Description ATSI Zone Install +240/-150 MVAR SVC designed with 100 MVAR static capacitor bank at Lakeshore substation Proposed by: First Energy Expected ISD: 2017 Estimated Project Cost: $61.7 M Cleveland Interface 16

Market Efficiency Proposal 2013_2-6A Description PENELEC/ATSI Zone Install new Erie West - Ashtabula 345 kv line and new 345/138 kv transformer at Ashtabula Proposed by: Northeast Transmission Development (LS Power) Expected ISD: 2018 Estimated Project Cost: $44.9 M Cleveland Interface 17

Market Efficiency Proposal 2013_2-6B Description METED/PPL Zone Install new Hunterstown - Cumberland 230 kv line and substation improvements Proposed by: Northeast Transmission Development (LS Power) Expected ISD: 2018 Estimated Project Cost: $63.9 M Hunterstown 230/115 kv Transformer; Three Mile Island Jackson 230 kv Line 18

DPL Zone Install new series compensation station on the existing Steele Vienna 230 kv transmission line Proposed by: Northeast Transmission Development (LS Power) Expected ISD: 2016 Estimated Project Cost: $10.6 M Wye Mills Longwoods 69 kv Line; Milford Cool Springs 230 kv Line Market Efficiency Proposal 2013_2-6C 19

PENELEC/METED/APS Zones Install a new 500/138 kv substation on the existing Conemaugh Hunterstown 500 kv line; Install a new 138 kv substation: Install a new approximately 6 mile double circuit transmission line connecting these two new substations Proposed by: Northeast Transmission Development (LS Power) Expected ISD: 2018 Estimated Project Cost: $61.7 M AP South; Hunterstown 230/115 kv Transformer Market Efficiency Proposal 2013_2-6D 20

AEP Zone Install a new 500 kv substation in with series capacitors to compensate the Mt. Storm Doubs 500 kv line. Upgrade of control systems for the series capacitors at the Kanawha River station on the Kanawha River Matt Funk 345 kv line Proposed by: TRANSOURCE Expected ISD: 2018 Estimated Project Cost: $39.3 M AP South; AEP-DOM Interface Market Efficiency Proposal 2013_2-9A 21

AEP Zone Same as project 2013_2-9A but with additional series compensation for Mt. Storm-Meadowbrook 500 kv Line. Proposed by: TRANSOURCE Expected ISD: 2018 Estimated Project Cost: $63.3 M AP South; AEP-DOM Interface Market Efficiency Proposal 2013_2-9C 22

AEP Zone Install a new 138 kv substation in the vicinity of Pleasant Valley substation that connects two of the four 138 kv lines between the Pleasant Valley and Juniper substations. This substation would include a 100 MVAr capacitor bank and a +350 / -0 MVAr SVC Proposed by: TRANSOURCE Expected ISD: 2018 Estimated Project Cost: $32.87 M Cleveland Interface Market Efficiency Proposal 2013_2-9B 23