Alstom Geothermal capability January 20, 2014 Alstom Geothermal Capability - WFES - 29/01/2014 P 1 1
Three main activities in four sectors Equipment & services for power generation Equipment & services for power transmission Alstom Thermal Power FY13 Sales 20bn Alstom Grid Equipment & services for rail transport Alstom Renewable Power Alstom Transport Alstom Geothermal Capability - WFES - 29/01/2014 P 2
Alstom Renewable Power Technologies adapted to all renewable energy sources HYDRO WIND SOLAR THERMAL GEOTHERMAL BIOMASS INDUSTRIAL STEAM TURBINES OCEAN for new plants and the installed base Alstom Geothermal Capability - WFES - 29/01/2014 P 3
Alstom Renewable Power Technologies adapted to all renewable energy sources HYDRO WIND SOLAR THERMAL GEOTHERMAL BIOMASS INDUSTRIAL STEAM TURBINES OCEAN for new plants and the installed base Alstom Geothermal Capability - WFES - 29/01/2014 P 4
Snapshot of Alstom geothermal Active in Geothermal since 1950 s with the Wairakei project in New Zealand, the first largescale geothermal plant in the world Execution Center established in strategic locations to serve high priority regional markets: Los Humeros Units 9&10 - Belfort, France - Kuala Lumpur, Malaysia - Mexico City, Mexico Modular and adaptable solutions from components to turnkey delivery Alstom Geothermal Capability - WFES - 29/01/2014 P 5
Worldwide Footprint for Geothermal United Kingdom, Rugby Engineering and R & D Poland, Elblag Turbines, Foundry, Engineering Mexico, Mexico City Engineering Services Switzerland, Baden Headquarter, R&D France Paris Pumps, Control systems Belfort Engineering Services, Turbogenerator Malaysia, Kuala Lumpur Engineering Services Drawing on the global alstom network Alstom Geothermal Capability - WFES - 29/01/2014 P 6
Alstom Power offering: Clean Power, Clear Solutions Reducing cost of electricity Increasing flexibility & reliability Lowering environmental footprint Alstom Geothermal Capability - WFES - 29/01/2014 P 7
Basic product scope ALSTOM + PARTNER Steam Gathering System CORE ALSTOM POWER SCOPE Inside the Fence ALSTOM GRID Power Export an EPC wrap for full power plant Alstom Geothermal Capability - WFES - 29/01/2014 P 8
Geothermal Power Plant package Equipment scope (GST) Alstom Geothermal Capability - WFES - 29/01/2014 P 9
Geothermal Power Plant package Equipment scope (GPT) Alstom Geothermal Capability - WFES - 29/01/2014 P 10
Geothermal Power Plant package Equipment scope (GPI) Alstom Geothermal Capability - WFES - 29/01/2014 P 11
Geothermal Power Plant package Equipment Scope (GST, GPT, GPI) or turnkey scope available (GPP) Alstom Geothermal Capability - WFES - 29/01/2014 P 12
References Los Humeros II & III MX, CFE, 3x25MW COD: 2013, 2016 Los Azufres MX, CFE, 4x25MW COD: 2003 Lahendong ID, PLN, 1x20MW COD: 2001 Wairakei NZ, Contact Energy, 2x5.5MW, 8x11MW, 3x30MW; COD: 1958 Preventing 1.74 tonnes of CO2 per MWh from being emitted Alstom Geothermal Capability - WFES - 29/01/2014 P 13
Alstom Geothermal capability January 20, 2014 Alstom Geothermal Capability - WFES - 29/01/2014 P 14 14
Alstom Geothermal capability Ghislain Nicolas WFES, Abu Dhabi 20/01/2014