THREE WAY CATALYTIC CONVERTER (TWC) SYSTEM

Similar documents
THREE WAY CATALYST (TWC) SYSTEM

TURBOCHARGER ON VEHICLE INSPECTION TC 7

EG1 485 OIL PUMP COMPONENTS FOR REMOVAL AND INSTALLATION

GENERATOR REMOVAL OF GENERATOR (4A FE) CH 6

REMOVAL AND INSTALLATION OF TRANSAXLE (4WD)

EMISSION CONTROL SYSTEMS

EMISSION CONTROL SYSTEMS (2JZ GE) SYSTEM PURPOSE

CH 10 ALTERNATOR COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

FI 135. Fuel Pump (3S GTE)

TURBOCHARGER SYSTEM TURBOCHARGER TC 1

EG1 509 OIL COOLER COMPONENTS FOR REMOVAL AND INSTALLATION

EM 97 2TR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSTALLATION

TIMING BELT COMPONENTS

Throttle Body (3S GTE)

TIMING BELT (5S FE) COMPONENTS

GENERATOR CH-9 COMPONENTS FOR REMOVAL AND INSTALLATION

EG-37 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION 2JZ-GE

TIMING BELT (1MZ FE Jan., 2003)

EM 92 2TR-FE ENGINE MECHANICAL ENGINE ASSEMBLY REMOVAL

REPLACEMENT. 12. REMOVE ENGINE MOVING CONTROL ROD (a) Remove the 5 bolts, the engine moving control rod and the engine mounting stay.

FUEL PRESSURE REGULATOR

EM 27 2UZ-FE ENGINE MECHANICAL CAMSHAFT REMOVAL

Throttle Body (4A FE)

CYLINDER HEAD COMPONENTS FOR REMOVAL AND INSTALLATION

CHARGING SYSTEM PRECAUTION CH 1

12. REMOVE ENGINE MOVING CONTROL ROD (a) Remove the 4 bolts, the engine moving control rod and the bracket.

2003 Toyota Truck Highlander 2WD V6-3.0L (1MZ-FE) Copyright 2013, ALLDATA Page 1

COMPONENTS Toyota RAV ACCESSORIES & EQUIPMENT Front Seat - RAV4

COMPRESSOR REMOVAL OF MANIFOLD GAUGE SET ON VEHICLE INSPECTION AC 18 AIR CONDITIONING SYSTEM

Mazda3 - Workshop Manual - Engine

INSTALLATION EM 21. Inward. Sensor. Plate Washer. 10 mm Hexagon Wrench SST. Fulcrum Length SST TIMING BELT ENGINE MECHANICAL 2002 AVALON (RM872U)

8/14/2016 8:12 PM. Bolt: Part No for Type B

EG2 173 EXHAUST GAS RECIRCULATION (EGR) SYSTEM

TIMING BELT (3S FE) COMPONENTS

EXHAUST GAS RECIRCULATION (EGR) SYSTEM

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

FUEL PUMP SYSTEM CIRCUIT

TIMING BELT COMPONENTS EM 15

INSTALLATION. Check that the idler pulley moves smoothly.

INSTALLATION. 6. SET NO.1 CYLINDER TO TDC/COMPRESSION (a) Temporarily install the crankshaft pulley bolt to the crankshaft.

TIMING BELT (4A FE) COMPONENTS

REMOVAL & INSTALLATION

Injectors (4A FE) FI 155. (b) If you have no sound scope, you can check the injector transmission operation with your finger.

INTEGRATED IGNITION ASSEMBLY (IIA) (4A FE)

ALLDATA Online Toyota Truck Tacoma 4WD V6-4.0L (1GR-FE) - Service and... Service and Repair 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

IN-VEHICLE REPAIR. Oil Pan Lower. Removal. 2. Disconnect the LH and RH battery ground cables. For additional information, refer to Section

FUEL SYSTEM PRECAUTION FU 1

RADIATOR CLEANING OF RADIATOR

EM 112 1GR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSPECTION. Intake Air Surge Tank Side

REPLACEMENT HINT: 11. REMOVE V RIBBED BELT TENSIONER ASSY (a) Remove the 5 bolts and V ribbed belt tensioner.

EM 6 VALVE CLEARANCE ENGINE MECHANICAL EM11I 01 ADJUSTMENT HINT:

TIMING CHAIN COMPONENTS

2005 Hyundai Tucson LX. On some models, engine is equipped with a timing belt and timing chain. Inspect timing chain when replacing timing belt.

PRECAUTION. MAINTENANCE PRECAUTIONS 1. CHECK CORRECT ENGINE TUNE UP (See Tune Up under Engine Mechanical) EG2 197

Timing Belt: Service and Repair. Toyota Truck Sienna LE V6-3.0L (1MZ-FE) 2002

Timing Belt: Service and Repair Timing Belt Replace. Timing Belt Removal

REMOVAL. 16. LOOSEN CRANKSHAFT PULLEY BOLT Using SST, loosen the pulley bolt. SST ( ), EM 20 SST TIMING BELT

25. REMOVE OIL PIPE NO.1 (a) Remove the 2 oil pipe unions, and oil pipe No.1. (b) Remove the oil control valve filter LH and gaskets.

INSTALLATION. NOTICE: Do not scratch the angle sensor of the timing pulley.

3/15/2015 1:10 PM TIMING CHAIN REMOVAL/INSTALLATION [L3 WITH TC]

REMOVAL 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL 2. REMOVE FRONT WHEEL RH. 3. REMOVE REAR WHEEL (for 4WD) (a) Move the select lever to N.

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

Service and Repair. a. Remove the 2 nuts and 2 upper radiator support. b. Lift out the radiator and cooling fan assembly.

ENGINE AND EMISSION CONTROL

POWER STEERING PUMP (3VZ FE) POWER STEERING PUMP REMOVAL AND INSTALLATION Remove and install the parts as shown.

REMOVAL. Engine removal is not required for this procedure. Remove the engine cover(a).

CHARGING SYSTEM PRECAUTION CH 1

DTC P0420 or P0430. Circuit Description. DTC Descriptors. Conditions for Running the DTC

REMOVAL 7. DISCONNECT ACCELERATOR CABLE FROM THROTTLE BODY. 8. DISCONNECT HOSES (a) Remove the 2 bolts from the air intake chamber assembly.

REMOVAL AND REPLACEMENT

ED 42. ENGINE HOOD / DOOR FRONT DOOR (w/o Power Window)

TIMING CHAIN COMPONENTS

REMOVAL EM SEPARATE COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) (a) Remove the bolt shown in the illustration.

EG 18 ENGINE MECHANICAL TIMING BELT EG5EK 01 COMPONENTS FOR REMOVAL AND INSTALLATION

IG 1 2GR-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM ENGINE ROOM R/B - IG2 FUSE - ST/AM FUSE IGNITION COIL NOISE FILTER NOISE FILTER A137458E01

Telescopic Lever Detent Clip Replacement

ALLDATA Online Toyota Camry Wagon L4-2.0L (3S-FE) - Timing Belt Installat... Page 1 of 15. Timing Belt Installation. Timing Belt (3S-FE)

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

2000 Toyota Celica GT-S L4-1762cc 1.8L DOHC MFI - Removal and Installation

FRONT DRIVE SHAFT COMPONENTS DS 1 DRIVE SHAFT FRONT DRIVE SHAFT FRONT DRIVE SHAFT HOLE SNAP RING. w/o ABS: AUTOMATIC TRANSMISSION CASE PROTECTOR

REMOVAL OF ALTERNATOR

SUSPENSION SYSTEM PROBLEM SYMPTOMS TABLE SP 1

FUEL PUMP SYSTEM CIRCUIT

REMOVAL AC 67. Using a clip remover, disengage the 6 clips and remove the front fender apron seal upper. (2WD)

Rear Door: Service and Repair REAR DOOR

1 of 12 11/20/2016 9:32 PM

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

OIL PUMP (for 4WD and Pre-Runner)

2000 Toyota Truck Tundra. Timing Belt: Service and Repair

2008 Toyota RAV ELECTRICAL Charging (2AZ-FE) - RAV4

2001 Mitsubishi Truck Montero LTD 4WD V6-3.5L SOHC Copyright 2006, ALLDATA 8.80 Page 1. Timing Belt: Service and Repair

SUSPENSION SYSTEM PROBLEM SYMPTOMS TABLE SP 1

ENGINE MECHANICAL (4A FE)

1992 Mitsubishi 3000GT VR-4

VALVE CLEARANCE ADJUSTMENT EM 7

REMOVAL 1. DRAIN ENGINE COOLANT 2. REMOVE THROTTLE BODY COVER 3. DISCONNECT TIMING BELT FROM CAMSHAFT TIM- ING PULLEYS (See page EM 14)

ENGINE AND EMISSION CONTROL

MAINTENANCE PRECAUTIONS CHECK CORRECT ENGINE TUNE UP 2. PRECAUTION WHEN CONNECTING GAUGE

10. SEPARATE COMPRESSOR (a) Remove the nut, 3 bolts compressor stay and compressor. HINT: Hang up the hoses instead of detaching.

REMOVE FRONT WHEEL RH

Transcription:

EC26 THREEWAY CATALYTIC CONVERTER (TWC) SYSTEM To reduce C0, HC and NOx emissions, they are oxidized, reduced and converted to carbon dioxide (C02), water 1H20Y and nitrogen (NO by the threeway catalytic converter. INSPECTION OF EXHAUST PIPE ASSEMBLY 1. INSPECT CONNECTIONS FOR LOOSENESS OR DAMAGE 2. INSPECT CLAMPS FOR WEAKNESS, CRACKS OR DAMAGE INSPECTION OF THREEWAY CATALYTIC CONVERTER (ThreeWay Catalytic ConverterRear) INSPECT FOR DENTS OR DAMAGE If any part of protector is damaged or dented to the extent that it contacts the threeway catalytic converter, repair or replace it.

EC27 INSPECTION OF HEAT INSULATOR (ThreeWay Catalytic ConverterRear) 1. INSPECT HEAT INSULATOR FOR DAMAGE 2. INSPECT FOR ADEQUATE CLEARANCE BETWEEN THREEWAY CATALYTIC CONVERTER AND HEAT INSULATOR REPLACEMENT OF THREEWAY CATALYTIC CONVERTER (ThreeWay Catalytic ConverterFront) 1. DISCONNECT CABLE FROM NEGATIVE TERMINAL OF BATTERY CAUTION: Work must be started after approx. 20 seconds or longer from the time the ignition switch is turned to the LOCK position and the negative () ter minal cable is disconnected from the battery. 2. REMOVE ENGINE UNDER COVERS 3. REMOVE FRONT EXHAUST PIPE (See step 2 on page EC30) 4. REMOVE GENERATOR (See page CH7) 5. REMOVE IDLER PULLEY BRACKET AND A/C COMPRESSOR WITHOUT DISCONNECTING HOSES (See step 40 on page EM229) 6. REMOVE THREEWAY CATALYTIC CONVERTER (Front) (a) Check that the threeway catalytic converter is cool. (b) Remove the four bolts and RH threeway catalytic converter stay. (c) Remove the three bolts and LH threeway catalytic converter stay.

EC28 (d) Remove the three bolts, two nuts, the threeway catalytic converter, gasket, retainer and cushion. (e) Remove the nine bolts and two heat insulators from the threeway catalytic converter. 7. REINSTALL THREEWAY CATALYTIC CONVERTER (FRONT) (a) Install the two heat insulators to a new threeway catalytic converter with the nine bolts. (b) Place the cushion, retainer and a new gasket or the threeway catalytic converter. (c) Install the threeway catalytic converter with the three bolts and two new nuts. Torque: 29 Nm (300 kgfcm, 21 ftlbf) (d) Install the RH threeway catalytic converter stay with the four bolts. Torque: 59 Nm (600 kgfcm, 43 ftibf)

EC29 (e) Install the LH threeway catalytic converter stay with the three bolts. Torque: 59 Nm (600 kgfcm, 43 ftibf) 8. REINSTALL IDLER PULLEY BRACKET AND A/C COMPRESSOR WITHOUT DISCONNECTING HOSES (See step 12 on page EM261) 9. REINSTALL GENERATOR (See page CH23) 10. REINSTALL FRONT EXHAUST PIPE (See step 3 on page EC30) 11. REINSTALL ENGINE UNDER COVERS 12. CONNECT CABLE TO NEGATIVE TERMINAL OF BATTERY

EC30 (ThreeWay Catalytic ConverterRear) 1. REMOVE RH ENGINE UNDER COVER 2. REMOVE FRONT EXHAUST PIPE (THREEWAY CATALYTIC CONVERTERREAR) (a) Loosen the bolt, and disconnect the clamp from the bracket. (b) Remove the two bolts and nuts holding the front exhaust pipe to the center exhaust pipe. (c) Using a 14 mm deep socket wrench, remove the three nuts holding the front exhaust pipe to the threeway catalytic converter (front). (d) Disconnect the support hook on the front exhaust pipe from the support bracket, and remove the front exhaust pipe and two gaskets. 3. REINSTALL FRONT EXHAUST PIPE (THREEWAY CATALYTIC CONVERTERREAR) (a) Install the support hook on the front exhaust pipe to the support bracket (b) Place the two new gaskets on the front and rear of the front exhaust pipe. (c) Temporarily install the two bolts and two new nuts holding the front exhaust pipe to the center exhaust pipe. (d) Using a 14 mm deep socket wrench, install the three nuts holding the front exhaust pipe to the threeway catalytic converter (front). Torque: 62 Nm (630 kgfcm, 46 ftlbf) (e) Tighten the two bolts and nuts holding the front exhaust pipe to the center exhaust pipe. Torque: 43 Nm (440 kgfcm, 32 ftlbf) (f) Install the clamp with the bolt. 4. REINSTALL RH ENGINE UNDER COVER