SIDNEY MANUFACTURING

Similar documents
ANSI Z50.1. Safety Standards

OPERATOR MANUAL Combo Belt Conveyor

Incline Drag Conveyor Manual

Safety, Operation, & Maintenance Manual Douglas CBM Cross Belt Magnetic Separator

Installation and Operation Manual. Manufacturers of Innovative Materials Handling Equipment since 1957.

Safety, Operation & Maintenance Manual

ASSEMBLY INSTRUCTIONS L-LINE KTG ZMA0304GB

INSTALLATION AND MAINTENANCE MANUAL DRAG CHAIN CONVEYOR MODEL DC-60

Flip - Up Conveyor. for 10" BeltVeyors OWNER'S MANUAL (12/00)

Polypropylene Piston Drum Pumps

Entanglement Hazards Guarding and Lockout

Outload Trough Roller Conveyor

Horizontal Flat Bottom Drag Conveyors 17 Series 26 Series 33 Series

NYL Resilient Seated Butterfly Valves Operation and Maintenance Instructions

Elevators & Conveyors

SECTION TWO MOUNTING INSTRUCTIONS

Twin Screw Undercar Conveyor

Slide Gates INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS. 295-E-002 Effective

MARTIN Air-Supported Conveyor System

GENERAL INFORMATION SERIES 4204 LABORATORY ROTARY DIVIDER

Richmond Conveyor. Hydraulic Ultimate Manual. January 2013

Low Profile Tailgate Spreaders SWING AWAY Mount

En-Masse Conveyor. Installation and Operation Manual PNEG Date: Version: 1.0 PNEG-2110

COYOTE ENTERPRISES, INC. 9/10 BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL

INSTALLATION AND MAINTENANCE MANUAL TROUGH BELT CONVEYOR MODEL TBOH

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

A1062 & A1072 AUGER ASSEMBLY MANUAL. Read & understand all instructions pertaining to this auger prior to use!

P239-1 Supply Pumper Instructions

UTS 696 Under Tailgate Spreader Owner s Manual

Mixer Discharge Door Adjustment on models; 30, 42, 54, 81, 108, 135 mixers.

PROJ. NO SECTION HYDRONIC PUMPS

Best Diversified Products, Inc. Product Manual. BestReach Rigid Belt. Models BRB 230 OS BRB 230 SS BRB 460 OS BRB 460 SS

Power Heads. Standard Unload. Power Sweep. Commercial Unload. Bin Systems. Unloading

75918 Heavy Duty 3-Point Mount

Heavy-Duty Welding Fabrication Table

Grain Cannon. Installation and Operation Manual. LAMBTON CONVEYOR LIMITED 102 Arnold Street Wallaceburg, ON N8A 3P4 Canada ONE SOURCE ONE SOLUTION

ATMOSPHERIC RELIEF VALVE

Installation, Operation and Maintenance Manual Stancor SSD & SL Series Pumps

ASSEMBLY, OPERATION & MAINTENANCE INSTRUCTION MANUAL TRAMCO MODEL G TM, MODEL RB TM, & BULK-FLO TM EN-MASSE CHAIN CONVEYORS

TECH HANDBOOK CHAIN DRIVEN LIVE ROLLERS 192CDLR.251CDLR.297CDLR.3530CDLR

Installation and Main te nance Manual. Model RB190, SB350, RBI190, & SBI350 Effective June, 2005

TIN KNOCKER FOURPLEX CLEAT FORMER INSTRUCTIONS & PARTS DIAGRAM

Hydraulic Bead Breaker Kit

Operator s Manual and Assembly

// COMPACT LIFT. The Original Compact Lift Table. Features and Benefits

Operating Instructions. High Energy Vibratory Finishing Bowl. Model FSV-25/50. Vibra Finish Company

ALUMINUM JACK. 3,000 lb. Jack Capacity & JACK STAND COMBO. Model ASSEMBLY AND OPERATING INSTRUCTIONS

TABLE OF CONTENTS PART 7 - MACHINERY AND MACHINERY GUARDING

750 Series Press Conveyor Installation and Maintenance Manual

Geared Drives 200Z PSRU Zero Offset Gearbox with Centrifugal Clutch Assembly

INSTALLATION AND MAINTENANCE MANUAL BELT CONVEYOR MODEL BS100B

SUPERIOR PERFORMANCE

Model 1000 Low Profile Tailgate Spreader Receiver Mount

Introduction... Pg. 3. Safety Guidelines... Pg. 4. Level Drag Parts... Pg. 6. Assembly... Pg Chain Installation... Pg. 9. Return Cups... Pg.

30,000 lb. HEAVY DUTY PPF 195 POST PULLER

SECTION CENTRIFUGAL HVAC FANS

ClariMax Inclined Plate Clarifier. Installation, Operation & Maintenance Manual

Cougar B Series Electric Vibrators 3 Frame

610 BUSHEL MANURE SPREADER

Hytrol's ABC Conveyor Book

TRUSS KITS FOR SPOUTING Installation Manual

STEEL, ¾ DIAMETER HEADED STUB PIN ENDS ARE MILLED FLAT TO -BELT PANS

ELECTRICAL WINCH 60SPS12 60SPS24

Waste Master OWNER'S MANUAL. Rev: Page 1 Waste Master Owner's Manual

Change Your Tail Wheel Bearings (and Races)

2014-Current. Adjustable wrench (that opens to about 1 ), 1/2 open end wrench, Phillips screwdriver, 3/8 socket, 7/16 socket, 7/32 Allen wrench

Installation Manual. For. Trident Boat Lifts

Cargill World Wide Grain Equipment & Engineering Specifications. DRAG CHAIN CONVEYORS GRAIN SECTION Page 1 of 16.

Installation, Operation & Service Manual. PPL Bag Filter Housings. Table of Contents Page No. Eaton Filtration, LLC

PFadvantage MF 6850/6855; Ideal 9080/9090

FORAGE WAGONS STRENGTH / QUALITY / PERFORMANCE

NBC, TGW Nitta Belt Welding Instructions. NBC Full Welding Instruction with Nitta Blue Urethane Belt

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Turning Air Into Solutions. PLUG FANS TYPE BCPL

Service Manual. Bolens 683 Series Box Frame Tractor IMPORTANT: READ SAFETY RULES AND INSTRUCTIONS CAREFULLY

PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...

RED23305 Owner s Manual

INSTALLATION INSTRUCTIONS AMBASSADOR DRUM OVERHEAD SERIES 100 DUMBWAITER

MOUNT KIT PERSONAL PLOW

Wrestling Mat Lifters Installation Instructions

OPERATOR MANUAL Magnetic Conveyor

Series 550 Meyer Insulation Blower

Hydraulic Jack Training

belt drive utility sets vent-pak series models vp-bi & fc january 2007 vp 1.07

Batch Plant Maintenance

WOOD CHIPPER WC1103 5PQ (8/02/12)

Tooling Assistance Center

EXPRESS/SAVANNA 155 WHEELBASE. Installation Instructions Van: VNGM96EXSV65 TOOLS REQUIRED 1996-CURRENT. follow us : CHEVROLET & GMC

UNPACKING SAFETY GUIDELINES GENERAL SAFETY INFORMATION. Operating Instructions & Maintenance Manual

IMPORTANT! READ BEFORE PROCEEDING! PHR Axial Flow Hooded Roof Ventilators

Solutions beyond products...

DIRECT GEAR DRIVE / CARRY-IN / U-TROUGH / LEAVE-IN / PADDLE SWEEP BIN UNLOADING SYSTEMS PROVEN & DEPENDABLE

Commercial Systems. Unloading

READ AND SAVE THESE INSTRUCTIONS. High Velocity Restaurant-Duty Utility Set Belt Driven for Roof Mounting

Felco Industries, Ltd Grant Creek Road P O Box Missoula, Montana (406) Fax (406)

Owner s Manual. ELECTRIC WIRE ROPE HOIST and TROLLEY RH SERIES

Razor Oil Sac Cutter 2007

COBB 3 SF INTAKE SYSTEM

HUTCHINSON Chain & paddle conveyors

RolsplicerTM. Maintenance Manual And Illustrated Parts List

Transcription:

SIDNEY MANUFACTURING SIDE WALL RETURNTM DRAG CONVEYOR INSTALLATION INSTRUCTIONS NOTICE BEFORE ANY MAINTENANCE OR SERVICE IS PERFORMED ON THIS DRAG CONVEYOR, IT MUST BE LOCKED OUT IN ACCORDANCE WITH CURRENT OSHA AND NEC REQUIREMENTS! Sidney Manufacturing Company 405 North Main Street Sidney, Ohio 45365 PH# : (937) 492-4154 FAX# : (937) 492-0919 Toll Free 1-800-482-3535 1

SAFETY RESPONSIBILITY It is the responsibility of the contractor, installer, owner and user to supplement the materials and services furnished by The Sidney Manufacturing Company with the necessary items to make the conveyor installation comply with all laws. Electrical controls, machinery guards, inspection doors guards and conveyor lids, clear walkways and proper railings are some of the necessary items for a safe work site. The Side Wall Return Drag Conveyors are not normally designed to handle hazardous materials or operate in a hazardous environment. Hazardous materials can be those that are explosive, flammable or toxic. Special designs and constructions must be fabricated for these situations. Sidney Manufacturing Co. should be consulted for all such installations. SAFETY 1. Side Wall Return Drag Conveyors should be completely enclosed and all safety guards in place before powering up the conveyor. If the conveyor needs to be opened for inspection, cleaning or observation, the motor driving units needs to be locked out electrically in accordance to OSHA standards. This needs to be done in such a manner that the conveyor cannot be restarted by anyone, however remote the location from the area without the conveyor housing being put back into position and all guards put into proper place. 2. The conveyor is designed for specific purposes. Do not use the conveyor for anything but what it was designed to handle and do not overload the conveyor beyond its capacity. Do not walk on the top of the conveyor, do not remove any safety guards, do not place hands or feet in any of the conveyor openings. 3. The warning label shown below is secured to all Side Wall Return Drag Conveyor covers, inspection doors, end relief doors, and all head and tail sections of the conveyor. WARNING EXPOSED CONVEYORS AND MOVING PARTS CAN CAUSE SEVERE INJURY LOCK OUT POWER BEFORE REMOVING COVER OR INSPECTION DOOR 4. Always keep the areas around the conveyor and drive units free and clear at all times. 5. If the owner or installer needs help designing a safe installation or a safe work place, Sidney Manufacturing Company will be glad to assist in the selection of special devices or special equipment. 2

SIDNEY MANUFACTURING S SWR DRAG CONVEYOR Installation Instructions Drag type conveyors unlike screw type conveyors must be perfectly aligned at the flanges during the assembly process. Misalignment at the flange connection will cause the paddles to catch and jump, multiplied by every paddle and every bolted flange connection, resulting in tremendous noise and vibration. Damaged paddles could result effecting the final clean out of product in the conveyor. Each trough section must be perfectly matched at each flange location, to insure a smooth travel surface for paddles. End flanges are fabricated on a computer controlled high definition plasma machine. This results in a proper part of exact quality. Flanges are welded to trough in a flanging machine that squares each trough exactly to its flanges. With this process of precision flanges being welded on square conveyor troughs, the installer will be able to align the troughs at the job site. Use the following instructions to install the conveyor properly. Please feel free to contact Sidney Manufacturing Company if you have any questions about the installation, operation or maintenance of your Side Wall Return Drag Conveyor. Phone Numbers: (800) 482-3535 Fax Number: (937) 492-0919 (937) 492-4154 Installation of this drag conveyor must be done by personnel experienced in the installation of drag conveyors and familiar with general safety practices and State and Federal (OSHA) regulations pertaining to the construction industry that must be followed. 1.) Start by looking over the assembly print. This will show you the placement and proper sequence the trough sections will need to be installed in. It will also show you proper location of all inlets and discharges and any special items on the conveyor. 2.) Bolt trough sections together. There are 5 critical surfaces that must be perfectly aligned. See diagram below. To assist in this process use a drift punch to help align these surfaces. Start by aligning the bottom of the trough and working your way up each side of the flange. See surfaces marked A,B & C. These surfaces aligned first and secured with tightened bolts will help the remainder of the trough sides to line up easier. Continue this process until all trough sections are bolted together. Be sure to support the conveyor at a flange location every 20 or less. Support feet are supplied and manufacturers recommended locations are shown on the assembly prints. Be sure to use silicone caulking between all bolted conveyor connections. E D C A B 3

3.) Repeat step (2) when connecting the trough to the head section and to the tail section. Being sure to watch the five critical surfaces. When applicable the same process needs to be followed when bolting on by-pass inlet sections. 4.) Assemble paddles to chain. Use drawing D010-01 for proper placement of paddle on chain attachments. Be sure not to fully tighten bolts at paddle connection at this time. The bolts should only be finger tight so the paddles remain loose on the chain attachments. 5.) Feed chain into the lower trough of the conveyor through the head discharge. Be sure you are placing the trough chain into the conveyor so the paddles will be in proper placement in relation to the product flow. (See drawing D010-01) Feed the chain into the trough working it toward the tail section. Connecting chain sections as you proceed. 6.) Feed chain around tail sprocket so paddles start to appear in the return area of trough. Fill the return area with assembled chain. Be sure to turn chain over so paddles are in an upside down position. 7.) Connect chain and let take-up out to desired chain tightness. See drawing D011-01 on take-up detail for instructions and proper operation of take-up. 8.) Let paddles settle to the bottom of trough. Tighten paddles inside the lower portion of the trough along the whole bottom of the conveyor. (or at least most of this area) Mark the first and last paddles tightened. This may be done by leaving the next paddle off the next attachment. Rotate the conveyor to allow another group of paddles to fall into the lower trough area and tighten these. If it is not possible to manually rotate the tight paddles to return area and loose paddles to bottom trough area, it will have to be done under power. It is absolutely necessary to put all covers and guards in place prior to operating. Following this procedure, power must be locked out in accordance to OSHA lock out / tag out regulations before removing lids and guards. Mark last paddle done. Repeat sequence until all paddles are tight. This process is very important. Unlike round bottom drag conveyors, the Side Wall Return Drag Conveyors paddles must all be aligned with each other before they are tightened to the chain. This is necessary for proper return of the paddles on the side wall. For this reason do not tighten paddles to chain attachments outside the conveyor trough and always use the bottom of the conveyor trough as the alignment area. Proper positions of the paddles in the trough also ensures full clean out of the conveyor. 9.) Place lids on the conveyor. Reference the assembly print for proper inlet locations and joint cover locations. MAINTENANCE 4

After the conveyor is in operation and performing properly, only periodic inspections are necessary to ensure against unexpected failures or problem areas. Bearing lubrication, flight wear, chain and sprocket wear should be checked at these times. Tightness of the chain should be checked every 24 hours of operation until the initial stretch has been eliminated. Conduct periodic inspections of the entire conveyor and make a written maintenance schedule log for the conveyor. 5

Gate Mounting Instructions Gates must be mounted on the trough per these instructions to ensure a proper fit. Gates must be mounted before installing the drag conveyor. All gates are match marked to a trough section, mount the proper gate to the proper trough The trough is stamped on the trough gate mounting flange The gate is stamped on the lower gate side flange toward the rear of the gate. 1.) Turn trough over so that cutout opening in trough is facing up. Remove the factory mounted rubber wiper seal. Place gate on trough ensuring that the side of trough with bolts in and the extended portion of gate are on the same side. GATE OPENING IS FACING UP SIDE OF TROUGH WITH BOLTS 2.) Use C-clamps to draw the gate down to conform to the trough. These clamps are positioned in the actual gate trough opening. See sketch. C-CLAMPS DRAWS GATE DOWN TO CONFORM TO TROUGH PUT BOLTS IN FLANGE FLANGE WELDED TO TROUGH

3.) While clamps are in position, bolt the gate to the flange that is welded to the trough. Use 3/8 X 1 ¼ bolts with flat washers and lock washers on each gate. 4.) Mount the rubber wiper seals. The bolts were secured with temporary thread lock so that the bolts would not vibrate loose in shipment. This bond can be broken. The prepunched rubber seal gets mounted in the position shown below. Upper seal bolts are threaded into the trough piece. The lower bolts extend through the gate and require washers, lock washers and nuts. There is a wiper seal retainer supplied. This acts as a stiffener to the rubber to keep the bolt from sinking into the rubber seal. Be sure to install the top and bottom seal. This seals the gate from leaking back into the gate housing. METAL RETAINER FOR TOP SEAL METAL RETAINER FOR BOTTOM SEAL 5.) Mount air cylinder to gate and connect it to the slide. Run the gate with air to make sure everything lines up properly. MOUNT AIR CYLINDER TO CHANNEL CONNECT CLEVIS TO SLIDE 6.) The connection point where the gate meets up to the tough, needs caulked. This finishes sealing the gate area. A weld of permanent connection of some sort is not recommended. The gate may need to be removed or replaced in the future. Caulking the area would allow for this. Any connecting line between the trough and gate needs to be caulked with silicone. The clear silicone was supplied with the trough and gate shipment. CAULK ALONG THIS SEAM WHERE THE GATE AND TROUGH MEET