RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

Similar documents
Residential Application for New Electric Service

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

Application for Service Residential Subdivision / Development

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

TEMPORARY ELECTRICAL SERVICE

Installing or Rebuilding Your Electric Service

PASCO COUNTY UTILITIES SERVICE CONNECTION APPLICATION Single Residential or Commercial

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

Please Refer to Attached Sample Form

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

For Conduit Inspections

Please Refer to Attached Sample Form

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

BGE Service Application Guidelines Residential Single Projects

New Commercial Service Request-Job Process

Approved Contractor Construction e-guide Residential Commercial

GUIDELINES FOR RESIDENTIAL ELECTRIC SERVICE HOOKUP

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

Customer Guide to Electric Service Requirements

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

Electric Service Guide. Residential

Engineering Rules and Regulations for Electric Service Platte-Clay Electric Cooperative, Inc.

GUIDELINES FOR RESIDENTIAL ELECTRIC SERVICE HOOKUP

GENERAL INFORMATION 1.01 PURPOSE

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Commercial Electric Policy

Electric Service Guides 2017

Associated equipment As related to metering equipment: such as the current transformers, CT wiring and test switches.

Commercial Plan Submittal Form Utility Service Requirements

ELECTRIC LINE EXTENSION POLICY

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

INTERMOUNTAIN RURAL ELECTRIC ASSOCIATION. Builder/Developer Information

Regarding: North Industrial Park/Infrastructure Build Project - Contractor Payments

Table of Contents. Electrical Service Requirements. 1. General Requirements

New Service. From... BARRON. Spooner Office: P.O. Box 261 Spooner, WI Barron Office: P.O. Box 40 Barron, WI

*Remember advance payment orders will save you money off the floor order price!

All territory within the incorporated limits of the City and land owned or leased by the City.

See NT POWERCOS , Classification Based On Service Size.

One City Plaza, Suite B P.O. BOX 1287 Cabot, Arkansas Phone Revised: April 2, 2019

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

ELECTRIC LINE EXTENSION POLICY

7. Residential Single-Family and Duplex Buildings (Dwellings)

TABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet

ELECTRIC DIVISION RULES AND PROCEDURES FOR ELECTRIC SERVICE

57. Line Extensions Policy 1: Individual Residential Customers

Hollywood Lights, Inc. is now offering AV Services at the Portland Expo Center! **PRE-ORDER DISCOUNT DEADLINE IS: March 28th, 2018**

One City Plaza, Suite B P.O. BOX 1287 Cabot, Arkansas Phone Revised: May 06, 2016

SALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

SPRINGVILLE CITY ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

Parkland Light & Water Co. ELECTRIC SERVICE REQUEST AND METER STANDARDS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

Indianapolis Power & Light Company

Electric Service Requirements

SPRINGVILLE CITY ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

5. NOTE: ALL VENDORS PAID IN FULL BY 12/30/18 WILL BE INCLUDED ON THE VENDORS LIST AT OUR GUEST SERVICES BOOTHS LOCATED THROUGHOUT THE FAIRGROUNDS.

Q. Are you familiar with the matter which is the subject of this petition? A. Yes, I am.

JACKSON ENERGY AUTHORITY ELECTRIC SERVICE POLICY EFFECTIVE SEPTEMBER 26 th, 2005 *REVISED JULY 12 th, 2017

$ homes in a subdivision. The Fee includes an S-1 Pedestal. $ homes in a subdivision. The Fee includes an S-2 Pedestal.

7 Single Family Service

Customer Guide to Electric Service Requirements

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

Electrical Design of Residential Services

A Homeowner s Guide to Natural Gas Service

COMMERCIAL HANDBOOK 2013 EDITION MATANUSKA ELECTRIC ASSOCIATION, INC. PALMER, ALASKA

IID. Customer Project Development Services. Customer Project Application. A century of service.

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

Attention Exhibitors Electrical Service Installation Notice

CHAPTER 2 TYPES OF SERVICE AND VOLTAGES AVAILABLE 8 Types of Service and Nominal Voltage Furnished

BRYAN ELECTRIC DEPARTMENT General Rules and Regulations. Bryan Municipal Utilities 841 E. Edgerton St. Bryan, OH (419)

ROCHESTER PUBLIC UTILITIES

Address City State Zip. Contact at Show Authorized Signature Date

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

*Remember advance payment orders will save you money off the floor order price!

CONTENTS BY CHAPTER. Chapter 2: COMPANY EQUIPMENT ON CUSTOMER PREMISES

HARDEE COUNTY ROAD AND BRIDGE DEPARTMENT Driveway-Culvert Installation Permit

Electric Service Requirements & Guidelines

Commercial Service Workbook

SALEM CITY FEE SCHEDULE AS OF

PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY METERING SPECIFICATIONS

Instructions for Submittal of a Request to Close a Public Street for Community Purposes (Not for Construction Projects)

City of Westerville Electric Division

Commercial Electric Service Handbook

FOR SALE Acres Improved Agricultural Land Former Aquaculture Facility in Martin County, Florida SW Martin Highway, Indiantown, FL 34956

Lake County Building Department

ELECTRICAL ORDER FORM

Mobilehome Park Utility Upgrade Program

CITY OF LOVELAND, COLORADO

2008 Guidebook of Requirements. for Electric Service

County Council Of Howard County, Maryland

RIVER FALLS MUNICIPAL UTILITIES ELECTRIC SERVICE MANUAL

Approved Meter Sockets and Cabinets

Show Name: Anaheim Home & Garden Show 2018 ELECTRICAL

ELECTRIC SERVICE HANDBOOK INFORMATION & REQUIREMENTS

5. Underground Requirements

Marshfield Utilities Rules for Electric Service Installations. Table of Contents

New Jersey Motor Vehicle Commission

LCWSD Fax Number - (803) Hydrant Use Policy

Deadline for advance rate is 15 days prior to show opening.

Transcription:

1036 20 TH ST. PO BOX 1389 VERO BEACH, FLORIDA 32961-1389 TELEPHONE: (772) 978-5100 FAX: (772) 978-5125 Important Notice to Builders/Contractors/Developers From Electrical Engineering You must contact the City of Vero Beach Electrical Engineering Department at 772-978-5460 for project approval and to establish a project schedule prior to making an appointment with the Customer Service Department. In addition to verbal contact, the following deliverables to Electrical Engineering are required, by mail or delivery, prior to initiation of the electrical design of your project: 1. Electronic file of site plan, AutoCad 2004 compatible, to include at a minimum: a. All undergrounds - water and sewer locations b. All utility easements 2. Main panel/ disconnect data 3. Cover letter with formal contact of project responsibility, no subcontractors Provide comments on timeline of project in this cover letter. If your project requires City installed lighting, note intent in this cover letter. Lighting is initiated through this department. A signed lighting contract through Customer Service is required prior to procurement of the lighting. A four (4) month lead-time is required. This package should be addressed to: City of Vero Beach C/o Director of Electrical Engineering and New Construction 3455 Airport Drive West Vero Beach, FL 32960 The design phase will require a minimum of 6 weeks to complete. In addition, upon completion of the design, a Letter of Intent, along with copies of the design, will be sent to you by Electrical Engineering for approval by the contact specified in line 3 above. This letter defines the responsibilities of the developer and those of the City of Vero Beach. The letter requires a date of completion of the developer s construction and signature. The project will not be turned over for construction until this signed letter has been returned. Note that service will require a minimum of 6 weeks to complete from the date of receipt of the Letter of Intent. Effective April 2007 Page 1 of 9

Construction Application Requirements Please read all documents carefully and include the documentation with your application Building Permit Actual Permit or Copy * Permit numbers NOT acceptable * Electrician s name and telephone number Electrical Main size (Amps)--Type of service (Single or Three Phase) Service Voltage Irrigation Service The flow per minute of the largest irrigation zone (25 or 30 gpm for example) must be provided on the application All fees are to be paid at the time of application for service. All water meters applied for in the Moorings must have a letter from Collins, Brown and Caldwell. Before an electric meter can be set, an approval is needed from the following departments. Indian River County Building Dept., Indian River Shores Building Dept., (Only if construction is in I.R. Shores), City of Vero Beach Electrical Engineering Dept., City of Vero Beach Electrical Metering Dept., City of Vero Beach Transmission & Distribution Dept. If there is Temporary Electric Service for Construction, it is still necessary to make an application for the permanent service. If it is not noted, the service will be cut when the permanent service is connected. The City must be informed whether or not the temporary service is to be cut once the permanent service is set. ELECTRIC SERVICE - TEMPORARY and/or PERMANENT SERVICES OVERHEAD SERVICE TEMPORARY OR PERMANENT The Customer must complete a service application in the Customer Service Office located at the address shown above. Commercial and Multi-living must schedule an appointment to make an application. The Service Order will be routed to Electrical Engineering. An Electric meter base may be picked up at the Electric Meter Shop, located at 3455 Airport West Drive between the hours of 7:30 am and 4:00 pm, Monday through Friday. CITY INSTALLED UNDERGROUND ELECTRIC SERVICE Residential only 400 amps or less Installation must comply with City of Vero Beach specification 67 and drawing 901 The Customer must fill out the City Installed Underground Service Application. The Service Application will be e-mailed to the Electrical Engineering division Electrical Engineering will inspect the site to determine if a City installed underground is possible. The customer must pay the applicable fee. An electric meter base may be picked up at the Electric Meter Shop, located at 3455 Airport West Drive between the hours of 7:30 am and 4:00 pm, Monday through Friday. Customer must contact T&D at 978-5000 for opening of pad mount transformer or pedestal to install conduit or wiring. WATER OR IRRIGATION SERVICE - TEMPORARY & PERMANENT SERVICE The customer must complete a service application at the address shown above. A service order will be routed to Water & Sewer Department Water & Sewer Department will schedule date and time meter will be set *For specific information, please call Water & Sewer (772) 978-5220 The Customer Service staff CANNOT provide a date or time for the installation of any meter and/or utility service. Effective April 2007 Page 2 of 9

New Construction Account Information Sheet Residential If this application is for a rebuild / remodel please complete the Residential Tear APPLICANT S NAME: Down / Rebuild form. CONTACT PERSON: TEL. NO.: E-MAIL ADDRESS: CELL NO.: ACCOUNT HOLDERS NAME: BILLING ADDRESS: _(Street) (City) (State) (Zip) TELEPHONE NO: FAX NO: ACCOUNT CONTACT PERSON: TEL. NO.: E-MAIL ADDRESS: CELL NO.: NEW SERVICE INFORMATION NO. BLDGS SERVICE ADDRESS: OWNER: TEL. NO.: Temporary Power Permanent Power Overhead Service Temporary Water Permanent Water Underground Service Main/Electric Panel: Amps Phase Volts Main/Electric Panel: Amps Phase Volts Electrician Name: Phone: Total Square Air Conditioned Footage: Square Footage: Job Description: (i.e. Temporary Service Pole to build Single Family Residence Temporary Service for Construction Trailer Permanent Service for - Temporary to Permanent Service for etc. -- Please note if there is temporary service that must be disconnected at the time of permanent service) ----------------------------------------------------------------------------------------------------------------------------- ------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------- -------------------------- Customer Signature: Date: Effective April 2007 Page 3 of 9

City Of Vero Beach Utilities New Construction Account Information Sheet Residential Tear Down / Rebuild Please provide all service information for the structure(s) that have been or will be torn down. This information will be used to calculate any credit(s) that may be due. APPLICANT S NAME: CONTACT PERSON: TEL. NO.: E-MAIL ADDRESS: CELL NO.: ACCOUNT HOLDERS NAME: EXISTING SERVICE INFORMATION (For rebuild / remodel on an existing building) Overhead Service Underground Service NO. BLDGS SERVICE ADDRESS: SERVICE ADDRESS: SERVICE ADDRESS: Main/Electric Panel: Amps Phase Volts Main/Electric Panel: Amps Phase Volts Water Meter Size: Irrigation Meter Size: Water Meter Size: Irrigation Meter Size: Water Meter Size: Irrigation Meter Size: Sewer Service: Yes No Customer Signature: Date: Effective April 2007 Page 4 of 9

Water Meter Sizing and Sewer Connection Information For Residential and Multi-Dwelling Service Applications DATE: CONTRACTOR: ACCOUNT NO. OWNER: SERVICE ADDRESS: LOT: BLOCK: SUBDIVISION: SERVICE LOCATION: CITY COUNTY INDIAN RIVER SHORES SINGLE LIVING UNIT MULTI-DWELLING HOUSE MTR NUMBER OF UNITS PRIVATE FIRE LINE: NO YES SIZE CITY SEWER SEPTIC TANK PRIVATE LIFT STATION IRRIGATION SYSTEM: NO CITY WELL NON POTABLE DEMAND FOR LARGEST IRRIGATION ZONE: Gallons Per Minute Please enter the number of fixtures in the spaces provided Bathtub Toilet Tank Kitchen / Veg Sink Washing Machine Shower Urinal Dish-washer Laundry Tub Bidet Wet Bar Hose Bib Shower & Bathtub Combo Lavatory Comments: I certify that the information contained on this form is complete and accurate. I understand that if the information furnished is incomplete or inaccurate, the City may withhold or discontinue service until the correct information is furnished and the correct size meter is installed. Name Printed Signature Effective April 2007 Page 5 of 9

City Installed Underground Service Application Construction Address Lot # Subdivision Account # Electrician Phone: General Contractor Phone: Owner Phone: Service Type: New Service Change Service Type: Overhead Underground Date Needed: ASAP Within 1 month Unknown Size of Main (Example: 150, 200, 225, 300, or 400 Amps) Date Application was taken By: Amount pd: Date Paid Copy of application given to customer? Above must be completely filled out before faxing to EE. Existing Residential Building - $ 225.00 CVB URD (wire only) Customer Responsibility: 1) If Service is over 200 amps or over 150 feet, insall 3 gray sch 40 pvc, else 2. Anything above ground should be gray sch 80 pvc; 1/4 mule tape pullstring must be installed; trench must be at least 24 deep, conduit must have at least 18 cover 2) Call Sunshine 48 hours before you dig at 1-800-432-4770 3) Call T&D Dispatch for equipment opening and scheduling at 772-978-5000 4) Call EE for conduit (uncovered inspection 48 hours in advance at 772-978-5460 5) Call Metering for meter can specifications and pick up at 772-978-5486 6) Refer to City of Vero Beach Spec 67 and drawing 901 for additional requirements EE Inspection: T&D to install: Date trench/pvc/string inspection feet of tpx urd Date sticker on meter can refer to job # New Residential Building - $ 375.00 CVB URD (PVC & wire) Customer Responsibility 1) If service is over 200 amps or over 150 feet, install 3: sch 80 gray PVC to wall. 2) When meter can, sch 80 and 90 degree elbow are attached, call EE 772-978-5460. EE must be notified 3 weeks prior to installation of driveway, landscaping, etc. 3) Call metering for meter can specifications and pick up at 772-978-5486 4) Refer to City of Vero Beach Spec 67 and drawing 901 for additional requirements EE Inspection: Date released to contractor Date Completed by Contractor Notes: Sketch of Site Plan Effective April 2007 Page 6 of 9

1.0 General: RESIDENTIAL NEW CONSTRUCTION PACKET SPEC 67 CITY OF VERO BEACH SPECIFICATION REQUIRMENTS FOR CITY INSTALLED RESIDENTIAL UNDERGROUND SERVICE CABLE 1.1 This program is voluntary and the customer may chose to participate or not. 1.2 This program applies only to residential electric services as indicated below (3.0) and covers singlephase 120/240-volt services only. This program does not cover other service voltages. 1.3 The purpose of these requirements is to inform the customer what the city will do and what the customer responsibilities will be. 1.4 The City may decline the electric service installation and refund the customers money; if the City determines that the installation is not in the City s best interest or fails to comply with the City s requirements. 2.0 Ownership: 2.1 Electric services installed by the City will be part of the City s electric distribution system and owned by the City. 2.2 Maintenance and repair of these services will be the responsibility of the City. 2.3 The cost to repair damages caused by others will be billed to the responsible party. 2.4 Requests by the customer to relocate services, if acceptable to the City, will be at the customer s expense. 3.0 Availability: 3.1 Upon application and payment of applicable charges, the City will provide and install an underground service to the following types of freestanding residences: 3.11 Single family residences up to 400 amperes utilizing the City s self-contained meter sockets. 3.12 Duplex residences up to 200 amperes each unit utilizing the City s two ganged meter sockets. 3.13 Triplex residences up to 150 amperes each unit utilizing the City s three ganged meter sockets. 3.2 The city s underground service for the above residences will be restricted to one cable per building to a single location on the building. 3.3 The City s Electrical Engineering Department must approve the meter location. 3.4 Freestanding will mean, a building that has no physical attachment to another building. Effective April 2007 Page 7 of 9

4.0 Application for Service RESIDENTIAL NEW CONSTRUCTION PACKET 4.1 Customers wishing to apply to the City for the installation of underground electric service should make application at the City s Customer Service Department located at 1053 20 th Place phone number 772-978-5100. 4.2 Upon receipt of the customers paid application, the City s Electrical Engineering Department will arrange for the installation of the underground electric service. 5.0 New Residence 5.1 The location of the meter or meters on a building shall be determined by the City s Electrical Engineering Department. The customer, prior to the pouring of foundations or slab, should obtain a meter location by contacting the City s Electrical Engineering Department at 772-978-5460. 5.2 The customer will be responsible for the installation of the meter base and the associated riser conduit as shown on City of Vero Beach drawing number 901 Service Entrance Requirements for City Installed Service Cable. The service riser will be sized as specified be the City. 5.3 The city will install the conduit from the City s service point to the customer s service riser and install the cable. The City will use trenching equipment to install conduit. No driveways, sod, irrigation pipes, or other obstructions will be allowed along the trenching route. Service cables will not be installed through septic drain fields; care should be taken in locating the drain field away from the service cable route. 5.4 The customer will notify the City s Electrical Engineering Department when the meter base and conduit riser is ready for inspection, 48-hour notice required. After inspection the city will schedule the cable and conduit installation. Two weeks must be allowed for this installation. The City reserves the right to reschedule the installation due to weather or emergencies beyond its control. 5.6 In addition to completing this application, the customer must also make application, pay fees, and pay deposits, for new electric service at the City s Customer Service Department prior to energizing the electric service. 6.0 Existing Residence 6.1 The customer will be required to meet with a representative of the City s Electrical Engineering Department for an on site inspection to determine the feasibility of the installation, cable routing, meter location, and any unusual conditions that may exist. 6.2 The customer will be responsible for the installation of the meter base and riser conduit as shown on the City of Vero Beach s drawing number 901 Service Entrance Requirements for City Installed Service Cable. 6.3 The customer will be required to provide and install conduit from the City s electric service point to the meter base riser conduit. The conduit will be routed and sized as specified by the Electrical Engineering Department. The customer will provide all trenching and backfill for the conduit. The conduit must have a minimum cover of 18 inches. 6.4 The conduit must be inspected prior to backfilling. Call 772-978-5460 for inspection, a 48-hour notice is required. The trench will be backfilled, as soon as possible, upon the completion of the conduit inspection. 6.5 In addition to completing this application, the customer must make application for a service change at the City s Customer Service Department prior to the electric service being energized. Effective April 2007 Page 8 of 9

Drawing 901 Effective April 2007 Page 9 of 9