Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Similar documents
Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

PSNH INTERCONNECTION REQUEST

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION

Electric Utility Contact Information Indiana Michigan Power

GENERATOR INTERCONNECTION APPLICATION

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

CUSTOMER / ACCOUNT INFORMATION Electric Utility Customer Information (As shown on utility bill)

Section 6. Generation Interconnection

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 25 kw)

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

If any further information is required for CHELCO to fulfill its reporting requirements, please let us know.

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

Please Refer to Attached Sample Form

TERMS AND CONDITIONS

Request for Payment Instructions form. Rule 21 Non-Exporting Generators Submittal Instructions

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Request for Payment Instructions Rule 21 Export Submittal Instructions

Please Refer to Attached Sample Form

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

August 2, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Louisville Gas and Electric Company

To complete the process for a net metering interconnection, please follow the steps below:

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

Request for Payment Instructions Rule 21 Non-Exporting Generators Submittal Instructions

To complete the process for a net metering interconnection, please follow the steps below:

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Umatilla Electric Cooperative Net Metering Rules

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

APPLICATION ELECTRICITY SERVICES. APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

MICHIGAN ELECTRIC UTILITY

Overview of State Distributed Generation Interconnection Rules

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

To complete the process for a net metering interconnection, please follow the steps below:

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Municipality Generator Interconnection Application Single Meter Application Part I

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

Form G5-1 PACIFIC GAS AND ELECTRIC COMPANY GENERATION PRE-PARALLEL INSPECTION

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

MICHIGAN ELECTRIC UTILITY

Oncor Application for Interconnection of Distributed Generation

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Louisiana Net Metering Service. Customer Information Package

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488

West Virginia Net Metering Service. Customer Information Package

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Net Metering Interconnection Requirements

MICHIGAN ELECTRIC UTILITY

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

MICHIGAN ELECTRIC UTILITY

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Interconnection Process for Customer-Owned Generation (QFs)

Form C Renewable Energy Micro-Generation Connection Application Distribution System

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Net Metering Service. Customer Information Package

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

California PUC Rule 21 Generating. Facility Interconnection Application Guide. Technical Note

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

Net Metering Interconnection Requirements. Customer Generation Capacity Not Exceeding 100 kw. Date: Version: 1

ARKANSAS PUBLIC SERVICE COMMISSION

Noble County Rural Electric Membership Corporation

GENERATOR DATA MAY 10, 2018

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

ELECTRICAL DISTRICT # 2

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

GENERATOR DATA SEPTEMBER 29, 2015

INTERCONNECTION REQUIREMENTS POLICY

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

BHARAT ALUMINIUM COMPANY LTD. SPECIFICATIONS FOR SYNCHRONOUS GENERATOR GENERAL Make : Jinan Power Equipment Factory Type : WX2

Micro-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Solar Power Installation Application

ARKANSAS PUBLIC SERVICE COMMISSION NET-METERING RULES

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

SCHEDULE NO. ACG33 NET METERING SERVICE

Transcription:

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Interconnection Customer Contact Information Name: Address: City: Telephone (aytime): State: Zip Code: Is the applicant the property owner at the system address? Yes No Alternative Contact Information (if different from Customer Contact Information) Name: Mailing Address: City: Telephone (aytime): State: Zip Code: Facility Address (if different from above): City: State: Zip Code: Electric istribution Company (EC) serving Facility site: Electric Supplier (if different from EC): Account Number of Facility site (existing EC customers): Inverter Manufacturer: Model Equipment Contractor Name: Address: City: Telephone (aytime): State: Zip Code: Maryland Level 2 to 4 Interconnection Agreement Application 4-06-2011 Page 1 of 8

Electrical Contractor (if different from Equipment Contractor): Name: Address: City: State: Zip Code: Telephone (aytime): License number: Electric Service Information for Customer Facility Where Generator Will Be Interconnected Capacity: (Amps) Voltage: (Volts) Type of Service: Single Phase Three Phase If 3 Phase Transformer, Indicate Type Primary Winding Wye elta Secondary Winding Wye elta Transformer Size: Intent of Generation Impedance: Offset Load (Unit will operate in parallel, but will not export power to EC) Net Meter (Unit will operate in parallel and will export power pursuant to Maryland Net Metering or other filed tariff(s) Wholesale Market Transaction (Unit will operate in parallel and participate in PJM market(s) pursuant to a PJM Wholesale Market Participation Agreement) Back-up Generation (Units that temporarily parallel for more than 100 milliseconds) Note: Backup units that do not operate in parallel for more than 100 milliseconds do not need an interconnection agreement. Maryland Level 2 to 4 Interconnection Agreement Application 4-06-2011 Page 2 of 8

Generator & Prime Mover ata Type of Application Initial Addition Initial Rating: C System esign Capacity: (kw) (kva), Inverter Capacity (maximum AC kw), AC System esign Capacity: (kw) (kva) Added Rating: C System esign Capacity: (kw) (kva), Inverter Capacity (maximum AC kw), AC System esign Capacity: (kw) (kva) Total Rating: C System esign Capacity: (kw) (kva), Inverter Capacity (maximum AC kw), AC System esign Capacity: (kw) (kva) 1 ENERGY GENERATOR IZE kw or kva kw or kva Induction Inverter Synchronous Other 1 If this application is for an initial system please fill out both the Initial and Total Nameplate rating data, but if it is for an addition, please fill out the Initial, Added and Total Nameplate rating data. Maryland Level 2 to 4 Interconnection Agreement Application 4-06-2011 Page 3 of 8

Requested Procedure Under Which to Evaluate Interconnection Request 1 Please indicate below which review procedure applies to the interconnection request. Level 2 - Certified interconnection equipment with an aggregate electric nameplate capacity less than or equal to 2 MW. Indicate type of certification below. (Application fee amount is $50 plus $1 per KW). o o Lab certified - tested to IEEE 1547.1 and other specified standards by a nationally recognized testing laboratory and is appropriately labeled. Field approved identical interconnection has been approved by an EC under a Level 4 study review process within the prior 36 months of the date of this interconnection request. Level 3 Small generator facility does not export power. Nameplate capacity rating is equal to less than 50KW if connecting to area network or equal to or less than 10 MW if connecting to a radial distribution feeder. (Application fee amount is $100 plus $2 per KW). Level 4 Nameplate capacity rating is less than or equal to 10 MW and the small generator facility does not qualify for a Level 1, Level 2 or Level 3 review or, the small generator facility has been reviewed but not approved under a Level 1, Level 2 or Level 3 review. (Application fee amount is $100 plus $2 per KW, to be applied toward any subsequent studies related to this application). 1 Note: escriptions for interconnection review categories do not list all criteria that must be satisfied. For a complete list of criteria, please refer to the Maryland Standard Small Generator Interconnection Procedures under the heading of Small Generator Interconnection at the following link: http://webapp.psc.state.md.us/intranet/electricinfo/home_new.cfm Field Approved Equipment If the field approved equipment box is checked above, please provide the estimated completion date in the section that follows, then sign the application and return it with the following information that is required for review of Level 2 field approved small generator facilities: A copy of the certificate of completion for the previously approved small generator facility, A written statement indicating that the interconnection equipment being proposed is identical, except for minor equipment modification, to the one previously approved. You do not have to complete the rest of the application if field approved equipment is being proposed. Maryland Level 2 to 4 Interconnection Agreement Application 4-06-2011 Page 4 of 8

Small Generator Facility Information Estimated Commissioning ate: List interconnection components/system(s) to be used in the Small Generation Facility that are lab certified (required for Level 2 Interconnection requests only). Component/System NRTL Providing Label & Listing 1. 2. 3. 4. 5. Please provide copies of manufacturer brochures or technical specifications Energy Production Equipment/Inverter Information: Synchronous Induction Inverter Other Rating: kw Rating: kva Rated Voltage: Volts Rated Current: Amps System Type Tested (Total System): Yes No; attach product literature Will the inverter disconnect switch be located external to the premise, easily accessible to utility personnel, and within 10 feet of the electric meter or service entrance cable (for an inside electric meter)? Yes No (If no, the interconnection application will require additional review by BGE) For Synchronous Machines: Note: Contact EC to determine if all the information requested in this section is required for the proposed small generator facility. Manufacturer: Model No. Version No. Submit copies of the Saturation Curve and the Vee Curve Salient Non-Salient Torque: lb-ft Rated RPM: Field Amperes: at rated generator voltage and current and % PF over-excited Type of Exciter: Output Power of Exciter: Maryland Level 2 to 4 Interconnection Agreement Application 4-06-2011 Page 5 of 8

Type of Voltage Regulator: Locked Rotor Current: Amps Synchronous Speed: RPM Winding Connection: Min. Operating Freq./Time: Generator Connection: elta Wye Wye Grounded irect-axis Synchronous Reactance: (Xd) ohms irect-axis Transient Reactance: (X'd) ohms irect-axis Sub-transient Reactance: (X"d) ohms Negative Sequence Reactance: ohms Zere Sequence Reactance: ohms Neutral Impedance or Grounding Resister (if any): ohms For Induction Machines: Note: Contact EC to determine if all the information requested in this section is required for the proposed small generator facility. Manufacturer: Model No. Version No. Locked Rotor Current: Amps Rotor Resistance (Rr) ohms Exciting Current Amps Rotor Reactance (Xr) ohms Reactive Power Required: Magnetizing Reactance (Xm) ohms VARs (No Load) Stator Resistance (Rs) ohms VARs (Full Load) Stator Reactance (Xs) ohms Short Circuit Reactance (X"d) ohms Phases: Single Three-Phase Frame Size: esign Letter: Temp. Rise: O C. Reverse Power Relay Information (Level 3 Review Only) Manufacturer: Relay Type: Model Number: Reverse Power Setting: Reverse Power Time elay (if any): Additional Information For Inverter Based Facilities Inverter Information: Manufacturer: Model: Type: Forced Commutated Line Commutated Rated Output Watts Volts Efficiency % Power Factor % Inverter UL1547 Listed: : Yes No Maryland Level 2 to 4 Interconnection Agreement Application 4-06-2011 Page 6 of 8

C Source / Prime Mover: Rating: kw Rating: kva Rated Voltage: Volts Open Circuit Voltage (If applicable): Volts Rated Current: Amps Short Circuit Current (If applicable): Amps Other Facility Information: One Line iagram attached: Yes No Plot Plan attached: Yes No *For PV systems, a PVWatts solar calculation must be submitted with the application Customer Signature I hereby certify that all of the information provided in this application request form is true. I consent to permit the PSC and interconnecting utility to exchange information regarding the generating system to which this application applies. Interconnection Customer Signature: Title: ate: An application fee is required before the application can be processed. Please verify that the appropriate fee is included with the application: Application fee included Amount EC Acknowledgement Receipt of the application fee is acknowledged and the interconnection request is complete. EC Signature: ate: Printed Name: Title: Maryland Level 2 to 4 Interconnection Agreement Application 4-06-2011 Page 7 of 8

Maryland Level 2, 3 and 4 Interconnection Agreement Certificate of Completion (To be completed and returned to the EC with the Application for Interconnection and the Interconnection Agreement signed by the customer 2 ) Interconnection Customer Information Name: Facility Address: City: State: Zip Code: Mailing Address: City: State: Zip Code: Telephone (aytime): Installer Check if owner-installed Name: Mailing Address: City: State: Zip Code: Telephone (aytime): Final Electric Inspection and Interconnection Customer Signature The Small Generator Facility is complete and has been approved by the local electric inspector having jurisdiction. A signed copy of the electric inspector s form indicating final approval is attached or will be provided when available. The Interconnection Customer acknowledges that it shall not operate the Small Generator Facility until receipt of the final acceptance and approval by the EC as provided below. Signed ate (Signature of interconnection customer) Printed Name: Type of Application New/Initial Growth/Increase System Capacity KW (C) Check if copy of signed electric inspection form is attached Check if copy of as built documents is attached (projects larger than 10 kw only).. Acceptance and Final Approval for Interconnection (for EC use only) The interconnection agreement is approved and the Small Generator Facility is approved for interconnected operation upon the signing and return of this Certificate of Completion by EC: Electric istribution Company waives Witness Test? (Initial) Yes ( ) No ( ) If not waived, date of successful Witness Test: Passed: (Initial) ( ) EC Signature: ate: Printed Name: Title: 2 Prior to interconnected operation, the interconnection customer is required to complete this form and return it to the EC. Use contact information provided on the EC s web page for small generator interconnection to obtain mailing address/fax number/e-mail address Maryland Level 2 to 4 Interconnection Agreement Application 4-06-2011 Page 8 of 8