Vission 20/20 Retrofit Instructions
Table of Contents Sections Page.0 General Information... 3 2.0 Vission 20/20 Retrofit Instructions... 4 2. Removal... 4 2.2 Installation... 5 3.0 Field Wiring Instructions... 9 Table/Figures Page Table. Torque Specifications... 2 Figure. VSS Compressor Unit with Keypad Microprocessor... 4 Figure 2. Block and Bleed Assembly...5 Figure 3. Vission 20/20 with Vibration Isolators... 6 Figure 4. Block and Bleed Assembly with Transducers... 6 Figure 5. Compressor Unit RTD Locations... 7 Figure 6. Block and Bleed Assembly with Transducers and Cables... 8 Figure 7. RTD and Transducer Cable Routing... 8 Figure 8. Solenoid Cable Routing... 9 Figure 9. MCC and Customer Control Center Interconnect Wiring... 0 Figure 0. Vission 20/20 Mircocontroller Diagram... 0 Figure. Vission 20/20 Terminal Blocks....0 General Information This procedure defines the steps required to replace a Vilter Keypad Microcontroller with the Vission 20/20 Microcontroller. It is highly recommended that the instructions be reviewed prior to retrofitting. Figures and tables are included to illustrate key concepts. Safety precautions are shown throughout the manual. They are defined as the following: WARIG - Warning statements are shown when there are hazardous situations, if not avoided, will result in serious injury or death. CAUTIO - Caution statements are shown when there are potentially hazardous situations, if not avoided, will result in damage to equipment. OTE - otes are shown when there are additional information pertaining to the instructions explained. ViSSion 20/20 Retrofit Instructions 3539SCRF 3
2.0 Vission 20/20 Retrofit Instructions This procedure defines the steps required to replace a Vilter Keypad Microcontroller with the Vission 20/20 Microcontroller. 2. Removal Step. Safely shutdown and de-energize the compressor unit () and keypad microcontroller (2) adhering to safe practices including lock-out/tag-out procedures. Figure. VSS Compressor Unit with Keypad Microprocessor Step 2. Disconnect wiring from transducers. WARIG When handling microcontroller, use additional personnel or lifting device as required. Failure to comply may result in serious injury and/or damage to equipment. Step 3. With additional personnel or lifting device, remove hardware securing keypad microcontroller (2) to rails (4). Remove keypad mirocontroller. Step 4. OTE Some compressor units are equipped with transducers and RTDs, if equipped, continue to step 3. If not, continue to installation. Disconnect all associated pressure and temperature sensors from compressor unit () and existing block and bleed assembly (3), if present. Step 5. Remove the existing block and bleed assembly (3), if present. 4 ViSSion 20/20 Retrofit Instructions 3539SCRF
2.2 Installation OTE Torque all hardware according to torque table specifications, see Table. OTE Modification to rails may be required to support and properly align Vission 20/20 microcontroller and block and bleed assembly. Follow standard practices for weldment and fabrication procedures. Step 5. Install new block and bleed assembly (4) on rails (3). Figure 2. Block and Bleed Assembly WARIG When handling microcontroller, use additional personnel or lifting device as required. Failure to comply may result in serious injury and/or damage to equipment. Step 6. Step 7. OTE On smaller compressor units, ensure there is adequate clearance between Vission 20/20 microcontroller and volume slide actuator. Adjust location of microcontroller as required by modifying support structure. Make sure Vission 20/20 microcontroller will install onto existing rails. Measure mounting holes on rails (3) and Vission 20/20 microcontroller (6), taking into consideration dimension of mounting holes of vibration isolators (5). Modify structure of rails (3) if required. Follow standard welding and fabrication procedures. ViSSion 20/20 Retrofit Instructions 3539SCRF 5
Step 8. Install hardware to secure new vibration isolators (5) to mounting holes of Vission 20/20 microcontroller (6). Figure 3. Vission 20/20 with Vibration Isolators Step 0. With additional personnel or lifting device, install hardware to secure Vission 20/20 microcontroller (6) with vibration isolators (5) to rails (3). OTE Ensure to use correct transducers because transducers have different pressure ranges. Suction manifold uses 0-200 psia transducer, discharge manifold and oil filter inlet uses 0-44.5 psia transducer. Step 9. Install transducers (7) on block and bleed assembly (4). Figure 4. Block and Bleed Assembly with Transducers 6 ViSSion 20/20 Retrofit Instructions 3539SCRF
OTE Stainless steel tubing is not provided in a retrofit kit. Step 0. Route stainless steel tubing from suction manifold, discharge manifold and oil filter inlet lines. If existing tubing is not reusable then cables can be secured to block and bleed assembly (4). OTE Wells are also provided in retrofit kit. Install new wells as required. Step. Install RTDs (8) on suction manifold (9), discharge manifold (), oil separator (2) and inlet oil line (4) or oil manifold (3), if equipped. Step 2. Connect cables (0) to RTDs (8). Figure 5. Compressor Unit RTD Locations ViSSion 20/20 Retrofit Instructions 3539SCRF 7
Step 2. Connect cables (0) to transducers (7). Figure 6. Block and Bleed Assembly with Transducers and Cables Step 3. Route cables (0) from RTDs (8) and transducers (7) through bottom right side of Vission 20/20 microcontroller (6). Figure 7. RTD and Transducer Cable Routing 8 ViSSion 20/20 Retrofit Instructions 3539SCRF
CAUTIO Do not route A/C and D/C wires together, this will cause Electromagnetic Interferance. Failure to comply may result in damage to equipment. Step 4. If equipped with solenoids (5) (i.e. Danfoss Motorized Valve), route cables (6) from solenoids through bottom left side of Vission 20/20 microcontroller (6). Figure 8. Solenoid Cable Routing Step 5. To make following connections according to supplied wiring diagram, refer to Section 3.0 Field Wiring Instructions. 3.0 Field Wiring Instructions OTE This procedure defines steps required to wire Vission 20/20 microcontroller for the following items: Compressor Motor Starter Auxiliary Contact, High Level Shutdown, Oil Separator Heater(s), Oil Pump Start and Compressor Starter. General figures, Figures 9, 0 and are used for purposes of explanation, follow supplied wiring diagram for detailed wiring. Step. Control power of 5 VAC 50/60 HZ must be wired to left side of terminal blocks inside the Vission 20/20 cabinet. Line power (A) shall be connected to 5-amp circuit breaker, CB. eutral () is connected to any terminal blocks. umber of line power feeds required to panel is dependent upon number supplied on compressor. Line power feeds for oil heaters are brought to additional 5-amp circuit breakers, CB2A, CB2B, CB2C and CB2D. eutrals for circuits (2, 3, 4, and 5) are connected to terminal blocks labeled HT2, HT3, HT4, and HT5. Units with V-PLUS oil cooling, L must connected to fuse in V-PLUS panel, and LA must be connected to terminal 2B. ViSSion 20/20 Retrofit Instructions 3539SCRF 9
VISSIO 2020 O COMPRESSOR SKID CB #2AWG THH (MIIMUM) CUSTOMER MCC PAEL (REFERECE MCC OR STARTER DRAWIG FOR DETAILED WIRIG) CUSTOMER SUPPLIED VISSIO POWER CIRCUIT TB-A TB- VISSIO 20/20 POWER AUX MS COMPRESSOR MOTOR STARTER AUX COTACT TB- TB-3 TB-8 TB-4 COMPRESSOR MOTOR STARTER AUX COTACT COMPRESSOR START TB- TB- COMPRESSOR START COMMAD OIL PUMP START TB-2 TB-2 OIL PUMP START COMMAD OIL SEPARATOR HEATER START TB-7 TB-7 OIL SEPARATOR HEATER START COMMAD Figure 9. MCC and Customer Control Center Interconnect Wiring Step 2. An auxiliary contact from compressor motor starter is required. Connect isolated contact to terminal blocks and 3. CB 2 5 AMPS 3 4 5 A SW E-STOP EMI FILTER COTROL POWER DISCOECT AD BRACH CIRCUIT PROTECTIO TO BE SIZED PER THE ATIOAL ELECTRIC CODE. ICOMIG POWER SUPPLIED FROM REMOTE CUSTOMER SUPPLIED UL LISTED FUSED DISCOECT OR BREAKER B LIE LOAD C 2 5VAC / 60HZ GD IPUT RD- 35-A OUTPUT +5VDC +2VDC 5/2 COM TO CPU BASEBOARD GD DC POWER SUPPLIES GD DOOR GD LUG 32 33 34 35 36 37 FROM LIE 3 FROM LIE 3 AUX MS HL SHUTDOW AUX LOW OIL LEVEL LS 3 32 33 34 IPUTS 2 3 4 DIGITAL IPUT: BOARD #3 PLUG X COMPRESSOR MOTOR STARTER AUXILIARY COTACT HIGH LEVEL SHUTDOW OPTIOAL OIL LEVEL FLOAT SWITCH # OPTIOAL OIL LEVEL FLOAT SWITCH #2 6 IPUT RS- 50-24 OUTPUT +24VDC 24 COM 38 7 39 IPUTS 8 9 0 2 3 DIGITAL OUTPUT: BOARD # PLUG X OUTPUTS 2 3 4 H A 2A 3 4 CR CMP CR OP A BLUE *SEE OTE 0 BLACK BROW COMPRESSOR STARTER 70 OIL PUMP STARTER 73 CAPACITY ICREASE/DECREASE ACTUATOR 40 4 42 43 44 45 46 35 36 37 38 5 6 7 8 DIGITAL IPUT: BOARD #3 PLUG X2 OPTIOAL CAPACITY COTROL SELECT /2 OPTIOAL REMOTE START/STOP OPTIOAL REMOTE CAPACITY ICREASE OPTIOAL REMOTE CAPAPCITY DECREASE 4 OUTPUTS 47 5 H 48 6 7 8 9 DIGITAL OUTPUT: BOARD # PLUG X2 5 6 7 8 5 6 7 8 BLUE A2 *SEE OTE 0 BLACK A CRH A2 OUTPUT CA ALSO BE USED WITH A IDICATIG LIGHT, HOR, OR PLC IPUT (CUSTOMER SUPPLIED) H BROW VOLUME ICREASE/DECREASE ACTUATOR OIL SEPARATOR HEATER START 74, 78 OPTIOAL TRIP IDICATIO 49 50 5 52 53 54 Figure 0. Vission 20/20 Mircocontroller Diagram Step 3. A dry contact from control relay CR must be wired to compressor motor starter coil. This dry contact is wired to terminal blocks according to supplied drawing. Control power for this coil should come from a source, which will be de-energized with compressor disconnect. 0 ViSSion 20/20 Retrofit Instructions 3539SCRF
GD GD GD HT- HT-2 B 2 3 4 5 6 7 8 22 2 24 23 26 25 27 28 3 32 33 34 35 36 37 38 45 46 47 48 CB 5A 5A C4 OPE C5 2 3 4 5 X X2 X3 X4 X5 X X2 X3 X4 X5 Step 4. Step 5. A dry contact from control relay CR2 must be wired to oil pump motor starter coil. This dry contact is wired to two terminal blocks according to supplied drawing. Control power for this coil should come from a source, which will be de-energized with compressor disconnect. An auxiliary safety cutout is available to shut down compressor package. A dry contact must be supplied and wired to terminal blocks and 32. The jumper installed on terminal blocks must be removed to use this cutout. If contact is closed, it will allow compressor to run. If contact opens at any time, compressor will shut down. CB 2C 5A GD GD GD HT- HT-2 B CB 5A 2C CB CB 2C 5A 5A CUSTOMER DIGITAL WIRIG CB 2C 5A 2C CB CB 2C 5A DIGITAL WIRIG DIGITAL IPUT BOARD #3 DIGITAL OUTPUT BOARD #2 DIGITAL OUTPUT BOARD # AALOG IPUT BOARD #7 AALOG IPUT BOARD #6 AALOG OUTPUT BOARD #0 CUSTOMER AALOG WIRIG Figure. Vission 20/20 Terminal Blocks Step 6. Step 7. Indication of compressor shutdown status is also available. There is an output on terminal blocks 8 and where a relay coil can be wired. For output, an energized state represents a safe condition. A deenergized state indicates a loss of voltage to relay coil or a failure has occurred. Current transformer supplied in compressor motor conduit box should be checked to insure that motor leads of one leg are pulled through the transformer. ote, there is a dot on one side of the current transformer. This dot must face away from the motor. Typically, a wye delta started motor should have leads and 6 pulled through this transformer for a 6 lead motor. However, this should always be checked as different motors and starting methods will require different leads to be used. ViSSion 20/20 Retrofit Instructions 3539SCRF
Type Bolt SAE Grade 2 Coarse (UC) Head Markings Table. Torque Specifications Torque Specifications (ft-lbs) ominal Size umbers or Inches #0 /4 5/6 3/8 7/6 /2 9/6 5/8 3/4 7/8-5 0 8 29 44 63 87 55 50* SAE Grade 5 Coarse (UC) - 8 6 28 44 68 98 35 240 387 SAE Grade 5 Coarse (UC) - - 8 - - - - - - - SAE Grade 8 Coarse (UF) - 22 39 63 96 38 9 338 546 Socket Head Cap Screw (ASTM A574) Coarse (UC) 5 3 26 46 73 2 5 25 380 64 ) Torque values in this table are not to override other specific torque specifications when supplied. 2) When using loctite, torque values in this table are only accurate if bolts are tightened immediately after loctite is applied. * The proof strength of Grade 2 bolts is less for sizes 7/8 and above and therefore the torque values are less than smaller sizes of the same grade. Torque Specifications for 7-4 Stainless Steel Fasteners (ft-lbs) Type Bolt/ut Head Markings ominal Size umbers or Inches #0 /4 5/6 3/8 7/6 /2 9/6 5/8 3/4 Hex & Socket Head Cap Screws 3 8 4 25 40 60 0 37 245 ut - 8-25 - - - - - OTE: Continue use of red loctite #27 (VP 2205E) on currently applied locations. Use blue loctite #243 (VP 2205F or 2205G) on all remaining locations. 2 ViSSion 20/20 Retrofit Instructions 3539SCRF
3539SCRF Rev. (4/3) Emerson and Vilter are trademarks of Emerson Electric Co. or one of its affiliated companies. 202 Emerson Climate Technologies, Inc. All rights reserved. Printed in the USA.