DEPARTMENT OF THE NAVY NAVAL ORDNANCE SAFETY AND SECURITY ACTIVITY FARRAGUT HALL 3817 STRAUSS AVENUE, SUITE 108 INDIAN HEAD, MD

Similar documents
DEPARTMENT OF THE NAVY NAVAL ORDNANCE SAFETY AND SECURITY ACTIVITY FARRAGUT HALL 3817 STRAUSS AVENUE, SUITE 108 INDIAN HEAD, MD

Lithium-Ion Battery Storage, Handling, and Charging Procedures For Non- PoR suas

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

LITHIUM BATTERY SAFETY IN SUPPORT OF OPERATIONAL FIELDING OF UNMANNED UNDERWATER VEHICLES

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Safety & Usage Procedure for Lithium Polymer Batteries

QUALIFIED PRODUCTS LIST PRODUCTS QUALIFIED UNDER MILITARY SPECIFICATION MIL-DTL FASTENER ELEMENT, SELF-LOCKING, THREADED FASTENER, 250 F MAXIMUM

Focus Areas Power and Energy Operational Environments

Amendment Is the power section the only source of power at 300V on the vehicle, and hence will be responsible for regulating this voltage?

Sprinkler System Waiver Application Packet

One Behavioral Switch At a Time

Facilitated Discussion on the Future of the Power Grid

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239

Mr. John Aitken June 6, 2017 Page 2

Lockheed SR-71B ( / NASA 831) Flight Log

ANCR CRU Statistics February 2007 to December 2007

Up and Down Months of the Stock Market

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

Development of Man Portable Auxiliary Power Unit using Advanced Large Format Lithium-Ion Cells

SAFETY DATA SHEET Spright Recharge LED Lantern

Naval Surface Warfare Center. METHOD AND SYSTEM FOR DETECTING LEAKAGE OF ENERGY STORAGE STRUCTURE LIQUID Patent Application # 12/023,218

SAFETY DATA SHEET Brila Recharge Lantern

SAFETY DATA SHEET See-Me Recharge LED Light

Industry Overview. Powersports Market Update

Cranes and Monorails (With Underhung Trolley or Bridge)

Innovation for Transportation Systems

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Development of a Safe, Lightweight 28V/25Ah Li-ion Battery for Navy Aircraft F/A-18E/F Super Hornet

December 2018 RenewableGenerations Monthly Report

Design Development and Testing of the Ground Renewable Expeditionary ENergy System

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017

Revision Transmittal Sheet

APPROVE ESE OFFICE WORK INSTRUCTIONS

Attention : Ms. G. Cheryl Blundon, Director of Corporate Services & Board Secretary

Mobile and Locomotive Cranes

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

IAH Terminal Redevelopment Program and HAS Infrastructure Division. Industry Day. December 6 th, 2016

NASA-DoD Lead-Free Electronics Project

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2

INFORMATION & ENROLLMENT

Cutting Demand Charges with Battery Storage. June 5, 2018

JOSEPH A. KEOUGH JR.* JEROME V. SWEENEY III* SEAN P. KEOUGH* STACI L. KOLB JEROME V. SWEENEY II OF COUNSEL

Highway Safety Update

METROPOLITAN COAL ENVIRONMENTAL PROTECTION LICENCE MONITORING SUMMARY

Electrical Power Analysis of the Cal Poly Organic Farm for the Cal Poly SuPER Project

Montgomery County Community College Document Number: QCM DeKalb Pike Revision Number: 3. Page 1 of 5 SOP: M Air T Millipore Air Tester

U.S. Army s Ground Vehicle Programs & Goals

NDIA 48th Annual Fuze Conference. Navy Overview

DEPARTMENT of OCEANOGRAPHY

TARDEC OVERVIEW. Tank Automotive Research, Development and Engineering Center. APTAC Spring Conference Detroit 27 March, 2007

Englewood Area Board of Realtors Monthly Sales Trend Indicator 2017 Sales by Price Range - Single Family Homes & Villa s

REPORT NO INSPECTION, TEST AND EVALUATION OF. Interlock Kits SUBMITTED TO MASTER ELECTRICAL SERVICES 3107 LANVALE AVENUE RICHMOND, VA 23230

PERFORMANCE SPECIFICATION SHEET BATTERY, STORAGE, AIRCRAFT, MAINTENANCE-FREE, 24-VOLT, 1.5-AMPERE-HOUR

Efforts to Preclude a 'Dry Aircraft' Designation

ANCR CRU Statistics Februa.. to December 2007

Hybrid Electric Solution for OEM Commercial Vans and Trucks Dr. Edward Lovelace

CAD/PAD Laser Ignitability Programs at the Indian Head Division, Naval Surface Warfare Center

INFORMATION FOR RACING VEHICLE EXCLUSIONS

Batteries & EV`s Seminar

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

NJ Solar Market Update As of 2/29/16

Slings ASME B Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings. (Revision of ASME B30.

SURFACE SHIP FIREFIGHTING

Informal Document ACSF Automatically Commanded Steering Function

The International Cost Estimating and Analysis Association (ICEAA) Southern California Chapter September 9, 2015

Batteries & Fuel Cells Seminar. Seminar Program Topics. Seminar Schedule - April 7-8, full days. Seminar Location. In partnership with:

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

National Routing Number Administration p-ani Activity and Projected Exhaust Report

Batteries & Fuel Cells Seminar

USMC Vehicle Power Prototype Joint Service Power Expo Brief

TECHNICAL MANUAL FOR BATTERIES, NAVY LITHIUM SAFETY PROGRAM RESPONSIBILITIES AND PROCEDURES

NJ Solar Market Update As of 6/30/15

2019 Show Dates. RETAIL SALES ANALYSIS For April, 2018 MMIC / COHV AFFINITY PARTNERS

New McNicoll Bus Garage Public Open House

DRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E

Military Batteries. (Rechargeable)

SunRay Triangular. SunRay Triangular comes with tailored Smart City solutions, and is an ideal energy provider for streets and highways.

Paratransit Overview O & O Presentation January 11, 2018

OCEANOGRAPHY MINE WARFARE PDF

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

AFRL-RX-TY-TM

INTECH JUNE QHSE PERFORMANCE

Power Distribution System for a Small Unmanned Rotorcraft

AAA ON THE ISSUES

OCEANOGRAPHY. Department of SCHOOL OF SCIENCE OREGON STATE UNIVERSITY 0/17. LIBRARY Marine Science Laboratory Oregon State University

Nickel Zinc Battery Evaluation at Crane

UNCLASSIFIED UNCLASSIFIED

NEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT)

Status Report on Bridges and Roads Repair/Renovations

AEP Utilities Presentation

Harris County Tow Truck Permit Application

Outside of the Walls. Protocol & SOP Changes & Audit Checklists. Outside The Walls - Section 5 1

DHL ecommerce BATTERY SHIPPING POLICY

November 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

INTECH AUGUST QHSE PERFORMANCE

SIP-adus Workshop A Traffic-based Method for Safety Impact Assessment of Road Vehicle Automation. Tokyo, 14 th November 2018

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

Transcription:

= ' DEPARTMENT OF THE NAVY NAVAL ORDNANCE SAFETY AND SECURITY ACTIVITY FARRAGUT HALL 3817 STRAUSS AVENUE, SUITE 108 INDIAN HEAD, MD 20640-5151 8020 Ser N841/1239 11 Aug 14 From: To: Subj: Ref: Encl: Commanding Officer, Naval Ordnance Safety and Security Activity President, Naval Postgraduate School, Monterey (MAE/K. Jones) CAPACITY LIMITED LITHIUM BATTERY SITE CLEARANCE FOR NPS (a) NAVPGSCOL Monterey ltr 9310 Ser OOAA/623 of 16 Jul 14 (1) NAVSURFWARCENDIV Crane ltr 8020 Ser GXSM/14043 of 6 Aug 14 1. In response to your request of reference (a), the Naval Ordnance Safety and Security Activity (NOSSA) concurs with a capacity-limited site clearance for lithium ion polymer batteries of less than 300 watt-hours energy capacity in various unmanned aerial systems (UAS), unmanned underwater vehicles (UUV), and robotics during research efforts at the Naval Postgraduate School (NPS). 2. This recommendation for your approval for use of these batteries is based on the safety evaluation of enclosure (1), and is limited to the NPS and research operations under their supervision conducted at controlled ranges and airspace at shore facilities. 3. Naval Air Warfare Center (Code 4.4.5.2) has reviewed the documentation and concurs with use of lithium ion batteries limited to less than 300 watt-hours during research efforts at the NPS and research operations under their supervision conducted at controlled airspace at shore facilities, as documented in enclosure (1). 4. The NOSSA point of contact is John Dow (N841), phone (301) 744-5640, or email: john.dow navy.mil. C--0 C. A. By direction Copy to: NAVSURFWARCEN CARDEROCKDIV (Code 616/J. Simmons) NAVSURFWARCENDIV Crane (GXS/M. Tisher) COMNAVAIRSYSCOM (Code 4.4.5.2/M. Hurley)

DEPARTMENT OF THE NAVY NAVAL SURFACE WARFARE CENTER CRANE DIVISION 300 HIGHWAY 361 CRANE INDIANA 47522-5001 IN REPLY REFER TO: 8020 GXSM/14043 6 Aug 14 FIRST ENDORSEMENT OF NPS ltr 9310 Ser 00AA/623 of 16 Jul 14 From: Commander, Naval Surface Warfare Center, Crane Division To: Commanding Officer, Naval Ordnance Safety and Security Activity (N841) Subj: CAPACITY LIMITED LITHIUM BATTERY SITE CLEARANCE FOR Ref: (c) NOSSA ltr 8020 Ser N841/1273 of 16 Jul 12 (d) NOSSA ltr 8020 Ser N841/1378 of 1 Aug 12 (e) NOSSA ltr 8020 Ser N841/1889 of 20 Oct 12 (f) NOSSA ltr 8020 Ser N841/2012 of 8 Nov 12 (g) NOSSA ltr 8020 Ser N841/157 of 29 Jan 13 (h) NOSSA ltr 8020 Ser N841/1185 of 29 Jul 13 (i) NOSSA ltr 8020 Ser N841/526 of 8 Apr 14 (j) NAVAIR 4.4.5.2 (Mr. M. Hurley)/NSWC Crane (Mr. M. Tisher) E-mail of 29 Jul 14 1. As requested in the basic submission, the Naval Surface Warfare Center, Crane Division (NSWC Crane), Energy, Power and Interconnect Technologies Division, GXS, has conducted a safety review of the capacity limited site clearance for lithium ion batteries of less than 300 watt-hours energy capacity used in various unmanned aerial systems (UAS), unmanned underwater vehicles (UUV), and robotics during research efforts at the Naval Postgraduate School (NPS) located in Monterey, CA. This review was conducted in accordance with references (a) and (b). This letter conveys our recommendation to provide concurrence with use of the capacity limited site clearance at the NPS and research operations under their supervision conducted at controlled ranges and airspace at shore facilities such as McMillan Airfield at Camp Roberts. 2. NPS personnel conduct diverse research efforts using a variety of small UAS, UUV and robotics systems. These systems typically use lithium ion polymer batteries that are common commercially for use in radio control (RC) hobby vehicles such as Thunder Power. References (c) through (i) are previous approvals and extensions issued to NPS for various UAS applications used in flight testing. NPS has established a Standard Operating Procedure (SOP) based on the commonality of

Subj: CAPACITY LIMITED LITHIUM BATTERY SITE CLEARANCE FOR lithium polymer batteries used across these and other applications within the scope of their research activities and the hazards associated with their use. The SOP establishes safety guidelines for the selection, design, testing, evaluation, use, packaging, storage, transportation and disposal of Lithium batteries at the activity. NSWC Crane has reviewed this SOP and concurs with the documented approaches for mitigating potential battery failures. These approaches include the use of a lithium ion specific charger with individual cell voltage monitoring and balancing, attended charging operations, segregation of batteries, detailed inspection procedures, use of a flammable locker for storage and charging, and emergency response. The 300 watt-hour limit is based on the definition of a medium size battery as defined in special provision 189 in section 172.102 of 49 Code of Federal Regulations issued by the Department of Transportation. 3. NSWC Crane recommends concurrence with the use of various lithium ion polymer batteries limited to less than 300 watthours of energy capacity in various UAS, UUV, and robotics systems during research efforts at the NPS and research operations under their supervision conducted at controlled ranges and airspace at shore facilities such as McMillan Airfield at Camp Roberts. This recommendation is based on the reasonable battery size limit, use of a standardized procedure with appropriate mitigations against typical lithium ion polymer battery failure modes and behaviors and operator training to that procedure, and history of safe operations under previous concurrences. 4. Naval Air Systems Command (NAVAIR-4.4.5.2) has reviewed the documentation and concurs with the recommendation for use of various lithium ion polymer batteries limited to less than 300 watt-hours of energy capacity in various UAS systems during research efforts at the NPS and research operations under their supervision conducted at controlled airspace at shore facilities such as McMillan Airfield at Camp Roberts. Concurrence was provided via electronic mail given as reference (j). 2

DEPARTMENT OF THE NAVY 1 UNIVERSITY CIA MONTEREY, CA 93943-5000 IN REPLY REFER TO: 9310 Ser OOAA/623 16 Jul 14 From : To : Via : Subj : President, Naval Postgraduate School Commanding Officer, Naval Ordnanc e Safety and Security Activity (N841) Commander, Crane Division, Naval Surface Warfare Center (GXS ) CAPACITY LIMITED LITHIUM BATTERY SITE CLEARANCE FOR NPS Ref : (a) NAVSEA Technical Manual S931 0-AQ-SAF-010 of 15 Jul 10 (b) NAVSEA Instruction 9310. 1B Ser 06/487 of 13 Jun 91 Encl : (1) NPS Lithium Battery SOP, Jun 14 1. In accordance with reference (a) as required by reference (b), the Naval Postgraduate School (NPS) requests that the Naval Ordnance Safety and Security Activity (NOSSA) provide concurrence and approval documentation for use of lithium battery cells of less than 300 watt-hours capacity during research activities conducted by NPS researchers. 2. This clearance should cover usage in unmanned aerial systems, unmanned underwater vehicles, robotics, and diverse research efforts. A detailed safety and usage document covering all aspects of use, storage, and disposal is provided as enclosure (1). Participating researchers will receive training on enclosure (1) and will be accountable for procedures in that document as well as restrictions delineated in requested clearance document. This program will be managed through NPS ' OSHE directorate. 3. We appreciate your assistance and your expedited technical review. Any questions concerning this letter should be addressed to Dr. Kevin Jones, (831) 656-7711 or Mrs. Debora Waxer, (831)656-1072. ~\ 1---"'-----sr J. F. HYINK By direction