RAFAKO s proecological investments boilers and biomass installations

Similar documents
13. Holzenergie-Symposium!

Power Generation Flexibilisation Case Studies from Germany. By Ronald Rost & Arun Kumar Sarna

Steinmüller Engineering GmbH POWER-GEN Europe, Vienna

HP14/20/28 P50 P75 P100/120 P150/170/200 P500

Froling Biomass boilers & technologies

OPERATING EXPERIENCES FROM COMBUSTION OF WITH THE FOCUS ON CHALLENGING BIOMASS

Alstom CFB boilers achieve high combustion efficiency with challenging discarded coal. Hugh Kennedy 16 th July 2013

Towerpak Boiler. The versatile boiler to burn virtually any fuel economically

Practical Application of Bio-based Pyrolysis Oil Paula Flowers Hassett Lance Baird

MixBioPells - IEE/09/758 Market Implementation of Extraordinary Biomass Pellets

"Modern standards (ISO EN 17225) and quality classes of solid biofuels from oilseed and crop residues" September 2014 JRC Workshop, Kyiv, Ukraine

it warms us up! PRICE LIST

Automatic CFD optimisation of biomass combustion plants. Ali Shiehnejadhesar

Gheorghe LAZAROIU. Lucian MIHAESCU, Gabriel NEGREANU, Constantin PANA, Ionel PISA, Elena POP UNIVERSITY POLITEHNICA OF BUCHAREST

COMMERCIAL BOILERS Eco-HK / Eco-PK KW

23 years of trouble-free use! A Moderator boiler operating in Sokołów Podlaski.

Complete firing plants with silo, dosing machine, assembly and the commissioning. Reliable customer service. Service and assembly from one hand

GLASSMAN EUROP CERCAT : A Technology for Air Pollution Control. Process, Construction & Performances

Standards for solid biofuels - Status and prospects

and Feed Water System and Ash Steam Boiler Design Data: 35 tons per hour, 53 bar(a), 450 C Handling System Generator Capacity: 7 MW el

TECHNICAL INFORMATION. performance max. cons. part cons. range load at max. ** load at part ** efficiency kw kw kg/h kw kg/h % Wood chip units:

Thermal Exploitation of Wastes in Lignite Combustion Facilities

PRAKRUTI MACHINES. Prakruti Machines. Contact:

TECHNICAL INFORMATION BIOMASS SOLUTIONS FOR A MORE ECOLOGICAL AND ECONOMICAL WORLD

Combustion and Boiler Performance Assessment of Kardia Power Plant

TECHNICAL PUBLICATION

POLISH POTENTIAL TO SUPPORT AUSTRALIAN MINING AND ENERGY PROJECTS

European new pellets standards Case non-woody pellets, 4 May 2010, Lyon

and wherein the combustion does not involve liquid or gaseous fuels, or pulverulent fuel burned in suspension.

The bereal Project - Scientific Highlights

Regional Woody Biomass Feedstock Assessments. Woody Biomass Utilization Workshop Quincy, California May 25, 2010

Microwave supported thermo catalytic depolymerisation of hydrocarbon based materials into usable light oil. microfuel.

Technology Options for the Cement Industry with the Use of Alternative Fuels

HEATING WITH BIOMASS IN THE TERTIARY SECTOR. Results of the demo plants in Spain

Hydraulic Briqetting Machine Absolutely low Maintenance

WRBA 45 th Annual Meeting

IED RELATING TO OIL AND GAS BURNERS FOR INDUSTRIAL USE

Biofuel systems for quality-conscious customers

Retrofitting of Mitsubishi Low NOx System

BF2RA. Low Temperature Ignition of Biomass Jenny Jones, Alan Williams, Abby Saddawi Ben Dooley, Eddie Mitchell, Joanna Werner, Steve Chilton

Vasilikos Power Station

W W W. A T T A C K. S K

The complete technical guide for free 1

Fuel Conveying System Steam Boiler Design Data: 45 tons per hour, 68 bar(a), 485 C Generator Capacity: 11 MW el

Session IV: Value chains, sustainability, standardisation Part 3: Standardisation

Fuels are materials that are used to create energy. They may be

IMPROVEMENT OF SERBIAN POWER PLANTS TE NT A AND TE NT B BASED ON ALSTOM ECO RAM TM STUDY PERFORMED

Case studies on adoption of advanced coal-fired power technology in emerging economies

Retrofit von Industriekesseln zur Brennstoffänderung und NOx- Reduzierung. Dr.-Ing. Marco Derksen


New or substantially changed installations 1

Conveyor belt wagon. Aperion

Vacuum Pumps and Compressors for Ethanol & Biodiesel Production

Biofuel systems for quality-conscious customers


Coal Fired Boilers. Technologies for Improved Efficiency & Reduced Emissions. C.Jayadevan Bharat Heavy Electriclas Ltd. Tiruchirappalli, India

Emission Reduction Program (ERP) For Existing Pulverized Fuel Fired Thermal Power Plants

High SO 2 Removal Performance using Limestone FGD at Tusimice Power Plant

Mercury Emissions during Fluidised Bed Combustion of different fuels

GOTECH Sp. z o. o.

Acquisition of Circulating Fluidized Bed Boiler Business

THERMAL GENERATION PROJECTS

Co-firing Black Pellets with Coal in Japan

P. MANARA, D. ROVAS, A. ZABANIOTOY

Combustion Optimization of Panshan Unit 4 for Energy Savings & NO x Emissions Reduction

Emissions Legislation

Conversion of Stoker fired Boiler Plants into CoFiring FBC Boiler systems

Experiences with the improvement of minimum load in coal fired power stations. Manfred Schesack

Mitsubishi Hitachi Power Systems America. Coal to Gas Conversions

BIOMASS DENSIFICATION DOCUMENT OF EVALUATION

Latest Developments for Black Pellets: Benefits for Heat & Power Plants in Europe and Asia

Boiler Operation, Maintenance, and Settings. Matthew Baxter Technical Director, Core Biomass

Design Features and Commissioning of the 700 MW Coal-Fired Boiler at the Tsuruga Thermal Power Station No. 2

Steam Turbine performance improvement solutions for Indian fleets

Bio Energy in the Industry

MFKG Single-Shaft Continuous Mixer. Intensive mixing of fine materials

USDA Agricultural Outlook Forum 2007

Industry Product Siloheight Status Chemical ABS pellet 3m good Chemical ABS Powder, PP & PE Pellet etc good Chemical Activated carbon 3m watch out

CO-COMBUSTION OF PULP- AND PAPER SLUDGE WITH WOOD EMISSIONS OF NITROGEN, SULPHUR AND CHLORINE COMPOUNDS

Experimental study on combustion of liquid renewable fuels

Bioenergy Raw material prices

PORTISHEAD B POWER STATION

SMARTWOOD SRL Via Caduti sul don, Villar San Costanzo (CN) Tel

Lecture 7a: Large Scale Oxyfuel Demonstrations. G Hesselmann APP OFWG Capacity Building Course 5 th & 6 th February 2009, Daejeon, Korea

ABEL SH Solids Handling Pumps for fully automatic transfer, disposal and feed processes

B. Sc., Mechanical power science Engineering, May 1987, Monofia University. - Construction Safety Health 30 hours Administration Training by (OSHA).

The influence of Air Nozzles Shape on the NOx Emission in the Large-Scale 670 MWT CFB Boiler

Furnace-based optimisation of a lignite-fired steam generator

Doing more for clean environment and energy saving

Fuel Pellets Production from Biodiesel Waste. Kawalin Chaiyaomporn and Orathai Chavalparit

Sustainable Biofuels: Environmental Considerations

Ferrostaal Industrieanlagen GmbH - Germany

International Journal of Material Science Innovations Volume 03, Issue 02, Pages 60-67, 2015

Loesche Group. Image Presentation. Johannes Wallis Sofia,

DE SMET Prescalder PRESCALDER

woodco Think BIG Commercial Boiler Range

Combustion Equipment. Combustion equipment for. Solid fuels Liquid fuels Gaseous fuels

OPTIMIZING THE BOILER COMBUSTION PROCESS IN A COAL FIRED POWER PLANT UTILIZING FUZZY NEURAL MODEL TECHNOLOGY

Perfect Solutions for FPSO and LNGC

MANUFACTURER OF INDUSTRIAL STEAM BOILER

Transcription:

RAFAKO s proecological investments boilers and biomass installations Presented: Krzysztof JANECZEK 22 23 March 2017 r.

Content: 1. Introduction. 2. Biomass boilers. 3. Modernization of PC boiler at Stalowa Wola Power Plant. 4. CFB boilers for biomass. 2

Introduction RAFAKO S.A. offers, design works, manufacturing and delivery of boilers for combustion of wood and agricultural biomass. Conditions for the new plant arise from the type of biomass and its physicochemical properties. A number of completed objects is in operation and meets the design parameters. In the designing and execution of biomass fired boilers and biomass handling installations RAFAKO S.A. cooperates with external companies. 3

Biomass boilers parameters Thermal capacity: -from 20 (15) MW -up to 170 (*) MW (*) depending on the grate capability and steam parameters Steam capacity: -from 20 (15) t/h -up to 100 (*1) 230 (*2) t/h (*1) reciprocating grate capability (*2) vibrating grate capability Grate type biomass boilers 4 Steam pressure: -from 20 (bar(g) -up to 100 (120) bar(g) Steam temperature: - from saturation temp. -up to 500 (520) C

Biomass boilers grate types Kablitzair cooled reciprocating grate DCS travelling grate DSC water cooled vibrating grate 5 PETRO ETT AB combustion furnace DSC air cooled vibrating grate

Biomass grate boilers reference list Operator: BHKW Saalfelden, Austria Client: Richard Kablitz& Mitthof Gmbh, Germany Boiler parameters: 26.5 t/h; 6.6 MPa ; 485 C in operation from 2006 Operator: Erda, Belgium Client: Vyncke N.V., Belgium Boiler parameters: 40 t/h; 6.6 MPa ; 455 C in operation from 2006 Operator: Stadtwerke Düsseldorf, Germany Client: Richard Kablitz& Mitthof Gmbh, Germany Boiler parameters: 21 t/h; 6.5 MPa; 430 C in operation from 2006 6 Operator: HKW Unterbernbach, Heggenstaller Germany Client: Richard Kablitz& Mitthof Gmbh, Germany Boiler parameters: 55 t/h; 6.7 MPa; 485 C in operation from 2007/2008

Biomass grate boilers reference list Operator: CHP Kielce, Poland RAFAKO S.A. was the EPC contractor Boiler parameters: 20 t/h; 5.6 MPa ; 485 C in operation from 2008 Operator: BHKW Goch, Germany Client: Richard Kablitz& MitthofGmbh, Germany Boiler parameters: 30 t/h; 6.5 MPa ; 485 C in operation from 2011 ESWE Bioenergie, Wiesbaden, Germany Client: Richard Kablitz& MitthofGmbh, Germany Boiler parameters: 49 t/h; 4.2 MPa; 425 C in operation from 2015 7 Operator: Orafti, Chile Client: Richard Kablitz& Mitthof Gmbh, Germany Boiler parameters: 60 t/h; 7.5 MPa; 485 C - in operation from 2015

Biomass grate boilers OSr-26.5 SAALFELDEN OSr-26.5 Main boiler parameters: Steam capacity: 26.5 t/h Steam temperature: 485 C Steam pressure: 65 bar(g) Fuel: raw wood; LHV 5-10.8 MJ/kg Furnace: KABLITZ Turbo-System Primary air heated up to 250 C 8 Main dates: Contract signing 04 2005 Start activities on site 10 2005 Drum lifting 11 2005 Test run 052006 Take over into operation 102006

Biomass grate boilers OSr-26.5 SAALFELDEN OSr-26.5 9

Biomass grate boilers OSr-40 Main dates: Contract signing 09 2005 Drum lifting 04 2006 Test run 12 2006 Take over into operation 07 2007 ERDA, BELGIUM OSr-40 Main boiler parameters: Steam capacity: 37 (40) t/h Steam temperature: 455 C Steam pressure: 65 bar(g) Fuel: raw wood; LHV 8-13.1 MJ/kg Furnace: VYNCKE reciprocating grate 10

Biomass grate boilers OSr-21 Main dates: DÜSSELDORF OSr-21 Contract signing 08 2006 Pressure test 08 2007 Take over into operation 11 2007 11 Main boiler parameters: Steam capacity: 21 (22) t/h Steam temperature: 430 C Steam pressure: 65 bar(g) Fuel: raw wood; LHV 10,8-15,1 MJ/kg Furnace: KABLITZ Reciprocating grate

Biomass grate boilers OSr-55 UNTERBERNBACH OSr-55 Main boiler parameters: Steam capacity: 55 (70) t/h Steam temperature: 485 C Steam pressure: 66 bar(g) Fuel: raw wood; LHV 5-14.4 MJ/kg Furnace: KABLITZ Turbo-System Primary air heated up to 250 C 12

Biomass grate boilers OSr-55 UNTERBERNBACH OSr-55 13 Main dates: Contract signing 04 2006 Start activities on site 10 2006 Drum lifting 11 2006 Test run 06 2007 Take over into operation 09 2007

Biomass grate boilers OSr-55 14 UNTERBERNBACH OSr-55

Biomass grate boilers OSr-20 CHP KIELCE OSr-20 Main boiler parameters: Steam capacity: 20 (25) t/h Steam temperature: 485 C Steam pressure: 56 bar(g) Fuel: raw wood chips and willow; LHV 7-12 MJ/kg Furnace: PETRO ETT 15

Biomass grate boilers OSr-20 CHP KIELCE OSr-20 Main dates: Contract signing 06 2007 Drum lifting 07 2008 Test run 01 2009 Take over into operation 02 2009 16

Biomass grate boilers OSr-20 17 CHP KIELCE OSr-20

Biomass grate boilers OSr-32 GOCH OSr-32 Main boiler parameters: Steam capacity: 30.6 (32) t/h Steam temperature: 485 C Steam pressure: 65 bar(g) Fuel: raw wood; LHV 6.5-11.5 MJ/kg Furnace: KABLITZ Reciprocating Grate 18

Biomass grate boilers OSr-32 Main dates: GOCH OSr-32 Contract signing 01 2011 Drum lifting 10 2011 Test run 08 2012 Take over into operation 09 2012 19

Biomass grate boilers OSr-32 20 GOCH OSr-32

Biomass grate boilers OSr-49 WIESBADEN OSr-49 Main boiler parameters: Steam capacity: 49 (52) t/h Steam temperature: 425 C Steam pressure: 42 bar(g) Fuel: Altholz AI-AIV; LHV 10-18 MJ/kg Furnace: KABLITZ Reciprocating Grate 21

Biomass grate boilers OSr-49 WIESBADEN OSr-49 22 Main dates: Contract signing 09 2011 Start activities on site 10 2012 Drum lifting 12 2012 Test run 12 2014 Take over into operation 06 2015

Biomass grate boilers OSr-49 23 WIESBADEN OSr-49

Biomass grate boilers OSr-60 ORAFTI CHILE OSr-60 Main boiler parameters: Steam capacity: 60 (70) t/h Steam temperature: 485 (505) C Steam pressure: 75 bar(g) Fuel: wood chips, eukaliptus, pine, poplar, biogas, coal (up to 20% 24

Biomass grate boilers OSr-60 Main dates: Contract signing 02 2013 Drum lifting 05 2014 Test run 07 2015 Take over into operation 08 2015 ORAFTI CHILE OSr-60 25

Modernization of coal fired PC boiler OP-150 for burning of biomass fuel in Stalowa Wola Power Plant 26

Stalowa Wola Power Plant modernization Scope of modernization works on PC boiler - Installation of preparation, storage and transport of the biomass - Installation of biomass drying - Installation of biomass dust preparation milling plant - Biomass fired installation - Modernization of pressure parts of the boiler - Installing dosing of additives - Flue gas recirculation installation 27

Modernization of water steam cycle and furnace Furnace chamber II pass SH3 λ=1,3 SOFA SOFA λ=1,3 λ=1,1 REC. SP. OFA OFA λ=1,1 REC. SP. SH2 REC. SP. λ <1 REC. SP. ECO3 SH2 28 ECO2

Stalowa Wola Power Plant modernization Lp PARAMETR before modernization after modernization 1 TYPE OF FUEL HARD COAL BIOMASS 2 TYP OF BURNERS JET BURNER VORTEX BURNER 3 NUMBER OF BURNES 12 8x16.5MWth 4 BOILER CAPACITY 150 t/h 120 t/h 5 BOILER OFFICENCY ca. 89.0% >90% 6 FUEL CONSUMPTION ca. 21.1 t/h ca. 20.8 t/h 7 MOC CIEPLNA ca. 123 MWth ca. 98 MWth 8 LIVE STEAM PRESSURE 7.6 MPa 7.6 MPa 9 LIVE STEAM TEMPERATURE 500 C 500 C 10 FLUE GAS TEMPARATURE 190 C 150 170 C 11 EMMISION OF SO 2 >> 400 mg/nm 3 < 400 mg/nm 3 12 EMMISION OF NO x >> 400 mg/nm 3 < 400 mg/nm 3 29 29

30 CFB boilers for biomass

31 CFB OFz-201 Jaworzno

CFB OFz-201 Jaworzno Boiler design data: Thermal load - 139,7 MW th Electrical power - 50 MW e Live steam flow - 201 t/h Live steam temperature - 510 o C Live steam pressure - 9,7 MPa Feed water temperature - 210 o C Boiler efficiency - >=91,5 % Fuel consumption - 14 kg/s NO X, SO 2 emission - <=200 mg/nm 3 Dust emission - <=20 mg/nm 3 32 Fuel data: guarantee mixture 80% + 20% Low heating value - 10800 kj/kg range 7500 17700 kj/kg Ash content - 5.5 % range 1,1 6 % Moisture - 37 % range 5,5 50 % Sulphur content - 0.12 % range 0,02 0,15 % Alkali content - 0.3 % max. 0.303 % Chlorine content - 0.1 % max. 0.166%

CFB OFz-201 Jaworzno fuel characteristic Wood pellets Wood chips Rape straw pellets Corn and bran pellets Rape mill cake pellets Sunflower hull pellets Bran corns Ground grain Rape grain LHV kj/kg 16715 17964 7500 15112 14781 15037 15135 15202 11946 18653 16893 15216 15770 17313 20732 Ash % 1 2 0.7 4.6 6,4 7,6 3,3 6 4,6 39,8 3 4,8 4,8 2,2 9,3 Moisture % 6,3 8,3 17 51,3 8,3 11,1 13 2,9 6,7 9,4 13,7 10,6 6,6 8,6 Sulphur % 0 0,03 0,01 0,26 0,29 0,1 0,19 0,2 1,31 0,1 0,18 0,18 0,01 0,42 Chlorine % 0,02 0,112 0,011 0,047 0,138 0,074 0,087 0,067 0,085 0,085 0,083 0,11 0,009 0,081 Olives waste Blackcurrant waste Strawberry waste Cotton stones LHV kj/kg 17389 18819 18569 19872 Ash % 7,7 3,6 5,5 3,7 Moisture % 6,3 11,6 7 7,7 Sulphur % 0,1 0,14 0,16 0,22 Chlorine % 0,22 0,02 0,013 0,037 33

CFB OFz-201 Jaworzno Main dates: Contract signature - 10.05.2010 Site hand over - 01.09.2010 Drum lifting - 25.05.2011 Hydrostatic pressure test - 05.12.2011 Finish of boiler assembly - 30.09.2012 Start of trial run - 08.11.2012 PAC - 31.12.2012 34

35 CFB OFz-201 Jaworzno plant location

CFB OFz-201 Jaworzno Fuel preparation and delivery to the boiler skew scraper feeder weigher closed tubular feeder collecting biomass feeder skew scraper feeders 36 skew scraper feeder closed tubular feeder Main collecting biomass feeder weigher scraper feeder belt conveyor collecting agrobiomass feeder skew scraper feeders

CFB OFz-201 Jaworzno Erection of the agrobiomass silos 37

CFB OFz-201 Jaworzno Agromass storage silos 4x1000 m 3. Wood chips storage silos 3x3000 m 3. Wood chips storage area 3900 m 2. 38

39 CFB OFz-201 Jaworzno operation experience

CFB OFz-135 Vilnius 40 Contract signed on 28.09.2017. Contract duration 28 months after Notice to Proceed.

41 CFB OFz-135 Vilnius

CFB OFz-135 Vilnius Boiler design data: Thermal load - 95.3 MW th Live steam flow - 135 t/h Live steam temperature - 540 o C Live steam pressure - 13 MPa Feed water temperature - 210 o C Boiler efficiency - >=91 % Fuel consumption - 58.5 t/h NO X emission - <=140 mg/nm 3 SO 2 emission - <=50 mg/nm 3 Dust emission - <=5 mg/nm 3 42

CFB OFz-135 Vilnius Fuel intended for use: Biomass wood chips 40 100% Willow and other energy crops, forestry residues, bark 30 60% Straw 0 10% Lignin 0 10% Fuel data: guarantee mixture range 70% + 30% Low heating value 9000 kj/kg range 6600 12300 kj/kg Ash content 1.3 % range 0.1 4.8 % Humidity 40 50 % range 28 60 % Sulphur content 0.02 % max 0.08 % Alkali content 0.2 % range 0.1 0.6 % Chlorine content 0.02 % max. 0.11% 43

CFB OFz-135 Vilnius Wood chips Wood waste Straw Willow Lignin LHV kj/kg 9.25-11.3 6.2-11.6 11.6-15.6 av. 10.05 10.26-16.4 Ash % 0.1-1 1-10 2-10 11-23 Humidity % 30-55 35-60 10-30 25-55 20-61 Sulphur % 0.01-0.05 0.02-0.08 0.05-0.2 0.03-0.06 0.15-0.33 Sodium mg/kg 10-200 20-300 100-3000 Potassium mg/kg 200-1500 1000-4000 2000-25000 180-272 Chlorine % 0.01-0.03 0.01-0.04 0.1-2.4 0.02-0.2 0.017-0.058 44

45 CFB OFz-135 Vilnius plant location

46 CFB OFz-135 Vilnius plant location

47 CFB OFz-135 Vilnius Fuel preparation and delivery to the boiler

48 Thank You very much for Your attention