OPERATING INSTRUCTIONS (Translation) Hoisting crane

Similar documents
Operation Instructions (Translation)

Lifting device for standard removable versions

Single Sluice Gate Drive Type 1211/ / / ,5 1211/

Hand winch with worm gear Type WH 7 S in accordance with DIN EN 13157

Operating and Maintenance Manual. for. HADEF overhead crane. as jointed crane TA

ON SAFEGUARD S ON SAFEGUARD M

IP 900 W/KS & IP 900 D/KS

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

Product Information Overspeed governor GB 260

Translation of the Original operating instructions Lifting device Z 70 /...

BPW Stützvorrichtungen BPW Landing Gear. BPW Bergische Achsen MONTAGE- UND BEDIENUNGSANLEITUNG INSTALLATION AND OPERATING INSTRUCTIONS

Operating Instructions. Globoidal cam gear

ELECTRIC CHAIN HOIST. O p e r a t i n g i n s t r u c t i o n s. Issue April 2011

Instruction manual and installation guide Traction sheave brake TSB TSB

Adjustable Speaker Mount GRAVIS 12

Adjustable Speaker Mount GRAVIS 8

HST -LS Interlocking device (Translation of Original Manual)

MECHANICAL CYLINDERS Operating Instructions

Quick-Disconnect Coupling one-hand operation Push Pull ND 5, connecting thread G 1/4,max. operating pressure 500 bar

Instructions for Fitting, Operating and Maintenance Canopy Door RE / (St.: )

Hook-in coupling n.b EH EH Operating Instruction English

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

STÜTZVORRICHTUNG MODUL

Operating Instruction for Liquid-Ring Vacuum Pumps

Installation and Operating Instructions Magnetic Vibrator MR 1

K&F Rotation Clamp 450

Turbocharger / VTR..0, VTR..1 Original assembly instructions English

Pressure relief valve

Instructions for Use Plain Trolley ULK Geared Trolley UHK

Operating instructions LIFTKET Electric chain hoists

4. MAINTENANCE MANUAL

Assembly and Maintenance Manual Type RSBW

Operating instructions Actuator and Emergency exit AZ/AZM 200-B30 AZ/AZM 201-B About this document. Content

MANUAL. Status: January DrallEx Swivel

Operating Instructions

Operating Instructions Garlock Butterfly Valves DN : mm / 2-24

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

Star Swivel-Arm Hoist Installation and Operating Instructions

MANUAL. Single charger

Operating instructions STAR LIFTKET Electric chain hoists

8.50 Kampmann Equestrian Solarium Perfect Enhances the Vital Functions and the Immune System Table of Contents.

Installation and operating instructions. BPW Landing gear. BPW-BA-SV e

Assembly and Maintenance Manual Type ASNU

Installation, Operating and Maintenance Instructions Retractable Door / Art.-Nr.:

Operating Instructions Hoist Chains EN 818-7

3 Ton Trolley Jack. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference.

LIGHT MEDIUM HEAVY. Low, average. max load occurs with roughly equal frequency. Max load occurs almost continuously. 1Dm 1Cm 1Bm

Installation and Operational Instructions for EAS - HTL housed overload clutch Sizes 01 3 Type 490._24.0

Mounting and Operating Instructions. Shelter Lifting, Rolling and Loading System Type , Order no

Electric chain hoists O p e r a t i n g i n s t r u c t i o n s

Operating instructions Spray nozzle SDU

Turbocharger / TPL-B Original assembly instructions English

Spare Parts List Return line filter RF

Regulation for Installing

Operating Instructions and Inspection Log for Transmobil

aks-efw 300 Fastening set with weighing hanger for hoist scales with EC calibration Operating manual (translation of the original operating manual)

Timing-Belt Reverse Unit 8 80 R50 II Notes on Use and Installation

Operating manual Separator

Rolli D6/5A. Operating Instructions HORN GMBH & CO. KG. Product Description. Safety Indications. Mounting. Commissioning.

Trolley jack K K K K K K 21242

Turbocharger / A100-L Original assembly instructions English

Porte 150 Users Manual Swing Gate Opener 24V DC

Installation and Operating Instructions for EAS -NC clutch Type 45_. _. _ Sizes 02 and 03

MEYER-Rotating Fork Positioners are attachments used to transport loads and replace

Installation and Operational Instructions for ROBA -D Couplings Type 91_. _

Turbocharger / TPS-H Original assembly instructions English

AC 100. Operating instructions Pneumatic Crimper AC 100. Date of issue: 05/2010. Keep for future use!

Rotary feed-through DDF-S/-KS

Manuelle Kugelkupplung Non-automatic ball coupling Attelage à boule verrouillage manuel

HST-BL-2830MS & HST-BL-2830MS-USA

OPERATOR S MANUAL 2200 SERIES LIFT - LIL HOISTER. July 2017

Installation and Operational Instructions for EAS -Compact overload clutch, Type 49_. 4._ Sizes 4 and 5

Operating Instructions & Parts Manual. Brake Drum Handler Model: 46000

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

ENGINE WINCHES from 300 to 5000 kg - TS and TD Series

-Montage- und Betriebsanleitung

Instructions for installation, operation and maintenance of: GATE VALVE

Operating Instructions

General Instructions and Inspection Instructions for Crane

Oil-free piston compressors KK and piston vacuum pumps KV

Assembly and Maintenance Manual Type AS

Grab System. BAUER GB 40 Hydraulic Grab Carrier

Mechanical Operating Instructions

Assembly and Operating Manual

Installation and Operating Manual for Tank and Equipment Cleaning Nozzles Series 5TM

Operating instructions POWER LIFTKET Electric chain hoists

Catalyser Introduction. 3. Hazard Information. 2. Area of Application. 3.1 Symbology

Storage, operating and maintenance instructions for AZ plug valves and Standard valves

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

original operating manual Operating manual Manual flow meter FMOGne Translation of the Item-No.: ,

Operating Instructions Hoist Chains EN 818-7

GB/US... LP11 lifting platform. Vers. 6.00

Operating Instructions. Parallel shaft cam gear

Spare parts list Return line filter RFM with 2-hole attachment

Original Operating Manual

Operating instructions LIFTKET Electric chain hoists

Operating Instructions. TM Girder Clamps

Installation and Parts Manual for SPANCO A Series Steel Gantry Cranes

ELEKTROMATEN SE Sectional-door-drive. Emergency manual operation. Special versions. Limit switches. Door controls. Mounting

Operating and Maintenance Manual. HADEF Spur Gear Hoist Type 9/98

Transcription:

1. User Groups Duties Operator Operation, visual inspection Specialist personnel OPERATING INSTRUCTIONS (Translation) Hoisting crane Type 4781.0,25 Assembly, disassembly, repair, maintenance Tests GB Qualifications Instruction by means of the operating instructions; Authorised person 1 Mechanic Authorised person 2 per TRBS- 1203 (Technical expert) 2. SAFETY INSTRUCTIONS +50 C Where to use this device Operate the equipment in accordance with the information in these operating instructions. -20 C Only use to lift, lower and pull freely-movable loads. Only use when in perfect working order. Only allow to be operated by personnel instructed on how to do so. Safe working practices First read the operating instructions! Always be conscious of safety and hazards when working. Observe lifting device and load during all movements. Report damage and deficiencies on the equipment immediately to the person responsible. Repair equipment first before continuing work! The following are not allowed: Overload (--> technical data, type plate, payload plate) Mechanical propulsion. Impacts, blows. Exclusions on use Not suitable for permanent operation and vibration stress. Not approved for use as builders hoist (BGV D7). Not approved for use on stages or in studios (BGV C1). Not approved for use in explosive areas/environments. Not suitable for aggressive environments. Not suitable for lifting hazardous loads. Organisational measures Ensure that these operating instructions are always at hand. Ensure that only trained personnel work with the equipment. Check at regular intervals whether it is being used in a safety and hazard conscious manner. Installation, service and repair Only by specialist personnel! Only use original spare parts for repairs. Do not modify or alter safety-relevant parts! Additional attachments must not impact safety. Further regulations to be observed are: German Industrial Health and Safety Ordinance (BetrSichV). Country-specific regulations. German Accident prevention regulations (BGV D8). 3. Technical data Type 4781.0,25 207610 Order-No. 210215 209900 Permitted load first rope layer t 0,25 0,32 Permitted load last rope layer t 0,25 0,32 Minimum breaking force kn 16 20 Minimum load kg 15 15 Crank force N 160 200 Lift per crank turn mm 64,6 64,4 Total rope capacity m 3,9 3,9 Rope-ø mm 6 6 Weight without rope kg 31 31 haacon policy is one of continuous development. We reserve the right to amend specifications without notice or obligation. 4. Description The hoisting crane is used to raise and lower all types of loads, weighing up to 0,32 t, with a pivoting radius of 750 mm. The crane arm can be rotated through 360. The rotational movement is provided via a selflocking, manually operated worm gear. This rules out the possibility of the crane arm swinging out accidentally. The crane can be dismantled in such a way that it can be handled by a single person. No part weighs more than 18,5 kg. The crane mast, crane arm and ratchet crank can be easily stowed away and transported. The crane mast is made from 60 mm square tubing, for which suitable mounting tubes (e.g. 70 square tube x4) must be present. A wire rope Ø 6 mm is used for the lifting equipment, providing an effective lift of max. 3.9 m. The load is reliably held in any position by an automatic internal reverse-running lock. Lowering under load is made possible by cranking in the relevant direction. In its unladen state, the drive shaft is separated from the rope drum. This prevents the following from occurring: Slack rope formation and loosening of the rope on the drum. Winding on the rope in the wrong direction. The rope drum is grooved in accordance with DIN 15060, to provide better guidance of the rope. To draw off rope in an unladen state, press and hold a knob provided with an information label until the required length of rope is removed. Only press the knob when the rope is unladen, and only with the hand (do not strike). The ratchet crank has three working positions. Right - Centre - Left. The centre position is used for cranking during raising and lowering. To insert the ratchet crank on the crane arm or crane mast, push in the knob in the crank pin. By releasing it in the final position, the crank is secured against sliding off accidentally. Where the crane is being used as a spare wheel hoisting crane, the spare wheel can be secured with a lifting strap on the load hook of the wire rope. 5. Operation For use as a spare wheel hoisting crane and in general. Insert the crane mast (201468) into the installed mounting tube (e.g. 70x4, insertion min. 400 mm). Hook the crane arm (201469, 215493) into the retaining profiles on the crane mast. Insert the cotter pin (104572) located on the crane arm into the corresponding hole and secure with a clip connector to prevent removal. Insert the ratchet crank (201470) into the worm gear of the crane mast and pivot into the required working position by cranking. Move the ratchet crank to the drive shaft of the crane arm, by cranking draw off sufficient wire rope that the load hook can be hooked in. Raise the spare wheel by cranking on the crane arm, and if necessary crank the crane mast to the desired lowering position. Insert the crank and lower the spare wheel down to the ground. If the red marking on the rope is visible, adjust the cranking! The spare wheel is loaded in the reverse sequence. 6. Testing The equipment must be checked in accordance with the conditions of use and the operating conditions at least once per year by an authorised person 2 per TRBS 1203 (Technical expert) (testing per BetrSichV, 10, sect. 2 represents implementation of the EC guidelines 89/391/EEC and 95/63/EC or the annual occupational safety inspection per BGV D8, 23, sect. 2 and BGG956). These checks must be documented: Before commissioning. After significant alterations before recommissioning. At least once per year. In the event of unusual occurrences arising that could have detrimental effects on the safety of the winch (extraordinary tests, e.g. after a long period of inactivity, accidents, natural events). After repair works that could have an influence on the safety of the winch. 094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 1

Technical experts (AP2) are persons, who have sufficient knowledge based on their education and experience, in the areas of winches, lift and pull systems and the relevant official occupational health and safety rules, accident prevention regulations, guidelines and generally accepted engineering rules (e.g EN standards), to evaluate the operational safety of winches, lift and pull systems. Technical experts (AP2) are to be nominated by the operator of the equipment. The implementation of the annual occupational safety inspection as well as the training to obtain the aforementioned knowledge and skills can be provided by haacon hebetechnik. 7. MAINTENANCE RECOMMENDATIONS The operator determines the intervals themselves based on frequency of use and the operating conditions. Regular cleaning, no steam jets! Carry out visual check on inaccessible brakes / locks every 5 years at the latest, replace brake pads as required. General overhaul by the manufacturer after 10 years at the latest. ATTENTION! Inspection, maintenance and repair works only on an unloaded hoist. Work on brakes and locks only by qualified specialist personnel. The hoisting crane is designed for a service life of 1000 lifts under load. Maintenance and inspection work Intervalle Visual and functional tests Before Brake function under load every use Zustand des Seiles und Aufnahmemittel Aufnahmerohr des Kranes einfetten. Lubrication (grease nipple) Drahtseil bei sichtbaren Beschädigungen austauschen. Ersatzseil beim Hersteller bestellen. Check type plate for legibility Professional inspection Check gear parts, grease and replace if necessary Lubricant recommendations: Multi-purpose grease per DIN 51502 K3K-20. after 100 lifts under load or annually 2-5 years Ratchets crank In case of sluggish operation, oil properly. Only disassemble the crank when the equipment bears no load! Do not oil or grease the brake pads! Replacing the rope Push in the knob on the crane arm and pull off the whole rope by hand. Remove the cover plate (104564). Unscrew the two stud bolts which clamp the rope in place and remove the rope. Insert the new rope as far as the end of the mounting hole and secure with stud bolts M8x10. Screw the cover plate into place and wind up the rope. When the crank is turned in a clockwise direction, the rope should wind up. The rope must be coiled by ten revolutions of the crank without any load before the rope can be fully loaded. According to DIN 15020, page 8, sheet 1, point 7, two safety windings must remain on the drum in the lowest possible load position. 8. REPLACEMENT PARTS When ordering spare parts it is e s s e n t i a l to quote: The type and serial number of the equipment / item and part number 9. Disassembly, disposal Make sure to observe the safety instructions. Dispose of the equipment and the substances within it in an environmentally responsible manner. 094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 2

094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 3

094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 4

094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 5

094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 6

094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 7

094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 8

094083_c_de_hebekr_s haacon hebetechnik gmbh Telefon +49 (0) 9375-84-0 Fax +49 (0) 9375-84-66 9