A Near Term Reusable Launch Vehicle Strategy

Similar documents
An Innovative Two Stage-to-Orbit Launch Vehicle Concept

SABRE FOR HYPERSONIC & SPACE ACCESS PLATFORMS

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

3. Design Options and Issues

MS1-A Military Spaceplane System and Space Maneuver Vehicle. Lt Col Ken Verderame Air Force Research Laboratory 27 October 1999

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

The SABRE engine and SKYLON space plane

Lunar Surface Access from Earth-Moon L1/L2 A novel lander design and study of alternative solutions

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Media Event Media Briefing Arif Karabeyoglu President & CTO SPG, Inc. June 29, 2012

Vehicle Reusability. e concept e promise e price When does it make sense? MARYLAND U N I V E R S I T Y O F. Vehicle Reusability

Boeing CST-100. Commercial Crew Transportation System. Keith Reiley, The Boeing Company. February, 2011

Ares I Overview. Phil Sumrall Advanced Planning Manager Ares Projects NASA MSFC. Masters Forum May 14, 2009

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

HYPERSONIC PROPULSION AT PRATT & WHITNEY OVERVIEW Richard R. Kazmar Pratt & Whitney Space Propulsion West Palm Beach, FL.

Unlocking the Future of Hypersonic Flight and Space Access

Preliminary Cost Analysis MARYLAND

AF Hypersonic Vision

From HOTOL to SKYLON British Spaceplane Programmes: Past, Present and Future

H-IIA Launch Vehicle Upgrade Development

Welcome to Aerospace Engineering

Cost Estimation and Engineering Economics

FACT SHEET SPACE SHUTTLE EXTERNAL TANK. Space Shuttle External Tank

NASA s Choice to Resupply the Space Station

SILENT SUPERSONIC TECHNOLOGY DEMONSTRATION PROGRAM

Lessons in Systems Engineering. The SSME Weight Growth History. Richard Ryan Technical Specialist, MSFC Chief Engineers Office

What s Cheaper To Fly: Rocket or TBCC? Why?

Mass Estimating Relations

Mass Estimating Relations

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology. FY 2011 Total Estimate. FY 2011 OCO Estimate

Ares V: Supporting Space Exploration from LEO to Beyond

7. PRELIMINARY DESIGN OF A SINGLE AISLE MEDIUM RANGE AIRCRAFT

Blue Origin Achievements and plans for the future

Transportation Options for SSP

Design Rules and Issues with Respect to Rocket Based Combined Cycles

Supersonic Combustion Experimental Investigation at T2 Hypersonic Shock Tunnel

Abstract. 1 American Institute of Aeronautics and Astronautics

IAF-98-V.4.02 The Road from the NASA Access-to-Space Study to a Reusable Launch Vehicle

Appenidix E: Freewing MAE UAV analysis

CONCEPT STUDY OF AN ARES HYBRID-OS LAUNCH SYSTEM

AMBR* Engine for Science Missions

A Model-Based Systems Engineering Approach to the Heavy Lift Launch System Architecture Study

NASA s Space Launch System Marks Critical Design Review

AEROSPACE TEST OPERATIONS

Atlas V Launches the Orbital Test Vehicle-1 Mission Overview. Atlas V 501 Cape Canaveral Air Force Station, FL Space Launch Complex 41

Upper Stage Evolution

Current Launch System Industrial Base

Lunar Cargo Capability with VASIMR Propulsion

THE FALCON I LAUNCH VEHICLE Making Access to Space More Affordable, Reliable and Pleasant

Rocket 101. IPSL Space Policy & Law Course. Andrew Ratcliffe. Head of Launch Systems Chief Engineers Team

Review of iterative design approach Mass Estimating Relationships (MERs) Sample vehicle design analysis

Chapter 10 Miscellaneous topics - 2 Lecture 39 Topics

Development of Business Cases for Fuel Cells and Hydrogen Applications for Regions and Cities. FCH Aircraft

AE 451 Aeronautical Engineering Design I Propulsion and Fuel System Integration. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering December 2017

TOWARDS A HEAVY LAUNCHER - PROPULSION SOLUTIONS - A. Souchier - C. Rothmund Snecma Moteurs, Direction Grosse Propulsion à Liquides

SPACE PROPULSION SIZING PROGRAM (SPSP)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 24 R-1 Line #7

Turbo-Rocket. A brand new class of hybrid rocket. Rene Nardi and Eduardo Mautone

CRITICAL DESIGN REVIEW. University of South Florida Society of Aeronautics and Rocketry

Beating the Rocket Equation: Air Launch with Advanced Chemical Propulsion

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

THE BIMESE CONCEPT: A STUDY OF MISSION AND ECONOMIC OPTIONS

Electric VTOL Aircraft

John R. Olds, Ph.D., P.E. Principal Engineer/CEO SpaceWorks Engineering, Inc. (SEI)

Mass Estimating Relations

Designing evtol for the Mission NDARC NASA Design and Analysis of Rotorcraft. Wayne Johnson From VTOL to evtol Workshop May 24, 2018

Program Summary Model 281 Proteus

AIR FORCE INSTITUTE OF TECHNOLOGY

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

Air Platforms Community of Interest Update

CHAPTER 1 INTRODUCTION

Enhanced. Chapter 3. Baseline

On-Demand Mobility Electric Propulsion Roadmap

Taurus II. Development Status of a Medium-Class Launch Vehicle for ISS Cargo and Satellite Delivery

Responsive Access to Space The Scorpius Low-Cost Launch System

Supersonic Combustion of Liquid Hydrogen using Slotted Shaped Pylon Injectors

Next Steps in Human Exploration: Cislunar Systems and Architectures

1.1 The Ramjet and the Supersonic Combustion Ramjet (Scramjet) Engine Cycle

Dean Andreadis Pratt & Whitney Space Propulsion, Hypersonics, West Palm Beach, FL,

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Preface. Acknowledgments. List of Tables. Nomenclature: organizations. Nomenclature: acronyms. Nomenclature: main symbols. Nomenclature: Greek symbols

Copyright 2016 Boeing. All rights reserved.

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

Opportunities For Innovative Collaboration. Propulsion Directorate Propulsion & Power for the 21st Century Warfighter

Flight and Terminal Ballistic Performance Demonstration of a Gun-Launched Medium Caliber Ramjet Propelled Air Defense Projectile

Martin J. L. Turner. Expedition Mars. Published in association with. Chichester, UK

Performance Evaluation of a Side Mounted Shuttle Derived Heavy Lift Launch Vehicle for Lunar Exploration

Suborbital Flight Opportunities for Cubesat-Class Experiments Aboard NLV Test Flights

lights on, down 2 ½ 40 feet, down 2 ½ Kickin up some dust 30 feet, 2 ½ down faint shadow

Rocketdyne Development of the Supercritical CO 2 Power Conversion System

A Discussion of Spacelift

K. P. J. Reddy Department of Aerospace Engineering Indian Institute of Science Bangalore , India.

Massachusetts Space Grant Consortium

blended wing body aircraft for the

V-280 Valor Joint Multi-Role Technology Demonstrator

Reducing Landing Distance

Transcription:

A Near Term Reusable Launch Vehicle Strategy Ramon L. Chase Warren Greczyn Leon McKinney February 2003 (update) 2900 South Quincy Street Arlington, VA 22202 1

Introduction Provide data that could be used in the formulation of 2008 operational prototype reusable military space plane candidates Consistent with Air Force aircraft operational concepts Mature into a full operational capability by 2010 Space launch mission capabilities Military space plane and space launch legacy (1960-1990s) What was accomplished in previous programs How might it be applied today to a near term reusable launch vehicle 2

Program Legacy 1965-70 Air Force Aerospace plane and DynaSoar programs 1965-68 CIA Isinglass program 1975-78 NASA and Air Force4 single stage to orbit studies 1978-79 Air Force Military Crews in Space study 1979-80 AF HQ (RDSL) mission analysis and cost benefit studies 1980-82 Air Force Advanced Manned Space-Flight Capability study 1980-82 Air Force Transatmospheric Vehicle study 1982-84 Air HQ (RDSL) Science Dawn program 1984-85 Air Force Science Realm program 1984-86 DARPA Copper Canyon study 1986-88 Air Force Have Region program 1986-92 DOD-NASA National AeroSpace Plane (NASP) program 1992-96 SDIO DC-X program 1996-01 NASA & Lockheed-Martin X-33 program 2000- NASA Space Launch Initiative program 3

Military Space Plane Legacy of the 1960-80s AMSC Isinglass Isinglass: rocket-powered air launched reconnaissance aircraft AMSC: AF Advanced Manned Space flight Capability program Science Dawn: MSP program after down select from AMSC concepts Science Realm: design of structural test articles from SD designs Have Region: manufacture and test of SR subscale structural test articles Copper Canyon (DARPA): air-breathing SSTO concept NASP: air-breathing SSTO Concept Science Dawn Science Realm Copper Canyon Have Region NASP 4

Isinglass Isinglass: Mach 17, rocket powered, air-launched reconnaissance aircraft. RS-129: Staged combustion hydrogen-oxygen rocket component development program Light weight structures: Diffusion bonded titanium honeycomb 5

Reusable Launch Vehicle Legacy of the 1990s: What Happened? Have Region NASP 1988, Change of Administration, new priorities 1988, Have Region completed, no follow-on 1992, NASP X-30 program cancelled 1996, NASA X-33 rocket powered SSTO technology demonstration program initiated 2001, X-33 program cancelled 2001, NASA Space Launch Initiative Program 2001, NASA-Air Force near term activity X-33 NASA SLI 6

Reusable Launch Vehicle Technology Legacy Summary Isinglass Light weight structure and TPS concepts applicable to reusable launch vehicle concepts Science Dawn 3 Military space plane concepts In-depth preliminary designs by hand picked design teams Upgraded SSME performance, 109 and 115 %, horizontal operation, 2-position nozzle Have Region 3 structural concepts, 2 partial successes, 1 validated concept Stainless steel hydrogen tank liner Propellant utilization fraction of 0.88 NASP X-33 New materials Composite hydrogen tank, propellant utilization fraction of 0.74 Carbon-carbon aero surfaces High temperature heat pipe sharp leading edges Linear aerospike engine development 7

Attributes of a Near-Term Cost Optimized Reusable Launch Vehicle Design Concept Design Reference Mission Minimize ideal velocity requirements Design Concept Simple Configuration, validated structural concept, maximum use of existing subsystems, components and facilities Propulsion Existing engine, minimize modification requirements, long life components, boost pumps and low pressure propellant tanks, common APU, RCS and main propulsion propellants Structural Design Current materials, low cost manufacturing processes, flat surfaces, hot structure (no TPS, no insulation, no tiles), integrated load bearing structure and tankage, flat bulkheads, low propellant pressurization, structural margin Operational Concept and Infrastructure Airplane like operations (life cycle maintenance), built in test and status monitoring, automated fueling, containerized payloads, co-location at existing operating bases, horizontal take-off, self ferrying 8

Low Cost, Near Term RLV Design Strategy Design reference mission: First stage performance requirement, global range boost-glide-skip 3,000 fps less than orbital velocity First stage usable propellant fraction approximately 0.82 No first stage orbital maneuvering propulsion system req d Vehicle design characteristics: Two stage, 1, 200,000 GTOW Operational prototype in 2008, full operational capability in 2010 12,000 lb in low earth Polar orbit. Full abort capability with two engines, or linear aerospike engine configurations Propulsion 2 modified SSMEs with 2-position nozzle, linear aerospike, or new Pratt & Whitney engine Self ferry capability with removable jet engine pods 9

Low Cost, Near Term RLV Design Strategy Continued Structures and materials Validated structural concept at 0.88 propellant utilization fraction Hot structures, integral propellant tanks(inherent in design), flat bulkheads Low pressure propellant tanks plus boost pumps Wet fuselage and wing Isinglass diffusion bonded honeycomb Current materials NASA Ames fight tested sharp leading edge materials Operation characteristics: Single operating base Horizontal maintenance, launch preparation and launch (no launch pad complexes ) Automated propellant loading Containerized payloads 10

Where Do We Stand Today? Design reference mission options: Low Earth orbit (current focus) Geo transfer orbit Global range boost-glide-skip Vehicle Design: Shift in emphasis from SSTO to TSTO concepts Potential shift from performance optimized to minimum cost designs Propulsion: Modified Shuttle main engine and the RL-10 Other existing engines (including air-breathing), or near term options Foreign engines, Russian and Japanese rocket engines Partially developed linear aerospike engine New more reliable, long life engine concepts Structures and Materials McDonnell Isinglass structural concept validated Boeing Have Region structural concept ( hot structure) validated NASP composite hydrogen tank, sharp leading edges, C-C aero surfaces high temperature materials and composites 11

What Might Be Possible by 2008 Change in paradigm from launch vehicle to aircraft operations Vehicle design options Vertical take-off two stage to low Earth orbit, multiple bases A subsonic horizontal take-off air-breathing two-stage to low Earth orbit, multiple bases A horizontal take-off assisted single stage global reach with a two stage to low Earth orbit plus a geo transfer orbit option, existing Air Force bases Propulsion Modify existing engines to meet vehicle design requirements Structures Incorporate McDonnell diffusion bonded honey comb into Boeing hot structures concept. Update materials and manufacturing methods Use NASP aero surfaces Use NASA AMES sharp leading edges Update materials in B-58 type landing gear design Subsystems Modified existing subsystems and avionics 12

Paradigm Evolution 1950s 1960s 1970s 2000s 2025 Thor, Atlas, Titan Expendable Vertical Launch Build-Up on Pad Saturn Expendable Vertical Launch Build-Up Off Pad and Roll Out Space Shuttle Partially Reusable Vertical Launch Build-Up Off Pad and Roll Out Advanced Launch Vehicles Fully Reusable Horizontal Launch Hangar Service/ Taxi Out 13

A Paradigm Shift Now 2002 2009-2015 2025 Current Paradigm Continues Two-Stage-to-Orbit Vertical Take-Off Launch Vehicle-Based Ground Operations Rocket Powered Alternative Paradigm Begins Now Two-Stage-to-Orbit Horizontal Take-Off Military Airplane-Based Operations Rocket Powered X Vision Single-Stage-to-Orbit Horizontal Take-Off Fully Reusable Airplane-Based Operations Combined Cycle Propulsion 14

Reusable Launch Vehicle Capabilities Horizontal take-off and landing Adverse weather, day and night operations One mission per day sustainable surge capability Twenty four hour turnaround Twelve hour call up from post-flight readiness Two hour flight readiness from alert Co-location with military Military aircraft ground and flight operations Centralized life cycle maintenance Self ferry capability Twenty four hour on-orbit residence capability 15

2008 Vehicle Weight Summary* Structure 85,000 lb Body Wing Flight Compartment Vertical Tail Propulsion 21,000 lb Main Engine(s) Ancillary Systems Propellant Feed System Helium Pressurization System Subsystems 18,500 lb Reaction Control System Landing Gear Prime Power Electrical Distribution and Control Aero Surface Controls Avionics Environmental Control Margin 10,500 lb Residuals, Reserves, In-flight Losses, RCS Propellants 9,000 lb Payload (Grand Forks, Polar orbit) 23,000 lb Inert Weight (Including Payload) 167,000 lb Ascent Propellants (including in-flight reserves ) 1,060,000 lb Gross Take-Off Weight 1,227,000 lb Useable Propellant fraction: 0.872 *Science Dawn data base, Global Range Boost-Glide-skip flight Profile 16

Accelerated Program Schedule Summary* Calendar Year 2005 2006 2007 2008 2009 Program Milestones Start Final Configuration System PDR 90% Drawing Release Rollout First Flight Aerospace Plane Assist System (Risk Mitigation, Back-Up) Manufacturing Facilities Structure PDR Fabricate and Assemble Build Scale Test Model Decision to Proceed First Flight Launch Site Construction Complete * Based on Science Dawn proposal data, details available 17

Reconstitution and Post Flight Maintenance* Minutes 000 050 100 150 200 250 300 350 400 450 500 550 600 650 700 750 Full Stop on Runway Post Flight Operations (19 Technicians, Specialists and Manager) Tow to Maintenance, Refurbishment and Readiness Facility Post Flight Safing (37 Technicians, Specialists, Foreman and Manager) Payload Operations (20 Technicians, Payload Specialists, Foreman and Manager) Flight Readiness Start Refurbishment Operations (38 Technicians, Specialists, Foreman and Manager) Tow to Storage Facility Tow to Readiness Facility Payload Operations (17 Technicians, Payload Specialists, Foreman and Manager) Readiness Operations (37 Technicians, Specialists, Foreman and Manager) Tow to Fueling Facility Propellant Loading (Automated Fast-Fill Operation) Tow to Runway * Boeing/SAC estimate based on detailed subsystem analysis Engine Start, Brakes Off, Begin Take-Off Roll 18

Post Flight Ground Operations Jet Fuel Storage (Underground) Space plane Mission Control N Maintenance, Refurbishment and Readiness Facility Payload Storage Helium Storage Space plane Storage Shelters Space plane lands and comes to stop on runway Space plane is towed to Maintenance, Refurbishment and Readiness Facility Post flight safing operations are performed on space plane Fuel purge/vehicle cool-down Vehicle Inspection Payload Operations Remove Payload Container Strip Alert Shelter ATC Tower Conventional Aircraft Hangars Refurbishment Operations Checkout and replace/ repair Tow to Storage Facility activate status monitoring system Helium Storage Fueling Facility LOX, LH2 Storage (Underground) Strip Alert Shelters LOX, LH2 Production Facility 19

Flight Readiness Ground Operations Jet Fuel Storage (Underground) Strip Alert Shelter Spaceplane Mission Control N Maintenance, Refurbishment and Readiness Facility ATC Tower Payload Storage Helium Storage Conventional Aircraft Hangars Spaceplane Storage Shelters Upon receipt of ATO, flight readiness operations are initiated. Space plane is removed from storage and towed to Maintenance, Refurbishment and Readiness Facility. Mission flight data base generation is initiated. Payload inspection, checkout and repair operations conducted. Payload containerized and moved to the flight readiness facility for insertion into the space plane. Space plane inspection, checkout and repair operations conducted. Load payload and place mission data into space plane computers. Close out space plane. Transfer to on-board power. Strip Alert Shelters Helium Storage Fueling Facility LOX, LH2 Storage (Underground) LOX, LH2 Production Facility Tow space plane to automated fueling facility. Conduct chill-down operation and load fuel. Tow vehicle to strip alert facility with automated topping. Disconnect fuel topping and start engines. Taxi to runway and takeoff. 20

Near-Term RLV Self-Ferry landing Click on Movie to Play 21

Near-Term RLV Returning From a Mission Click on Movie to Play 22

Near-Term RLV Fueling Click on Movie to Play 23

Near-Term MSP Taking Off Click on Movie to Play 24

Accelerated Program Schedule Summary* Calendar Year 2005 2006 2007 2008 2009 Program Milestones Start Final Configuration System PDR 90% Drawing Release Rollout First Flight Aerospace Plane Assist System (Risk Mitigation, Back-Up) Manufacturing Facilities Structure PDR Fabricate and Assemble Build Scale Test Model Decision to Proceed First Flight Launch Site Construction Complete * Based on Science Dawn proposal data, details available 25

Program Cost Assumptions 3 Operational prototype aerospace planes Single operational base 7-10 launches per year Fuel manufacturing and storage facilities Logistics support (25% of flyaway costs) 5 year operational period ( 2008-2012) Second stage not included ( Plus $2 B ) New rocket engine not included( Plus $2 B ) 26

Model 2008 ROM Budgetary Funding (2002 Dollars in Millions) Development Non-Recurring Airframe and Launch Assist $3,000 Avionics 300 Engines - SSME 270 - Ground and Flight Test 1,000 - Total Development Non-Recurring $4,570 Development Hardware/Facilities/Operations Air Vehicle (3 Operational Prototypes) - Air Frame Manufacture 3,000 - Avionics 120 - SSME 600 - GE CF-6100 - Total Air Vehicle $3,820 Operational Hardware/Facilities - Fuel Facilities 600 - Logistics Support 1,000 - Operational Cost 460 - Total Operational Hardware/Facilities $2,060 Program $10,450 27

Summary Four key design parameters determine the technical feasibility of a reusable launch vehicle. They are: 1. The vehicle design concept, 2. The reference design mission, 3. Propulsion system performance, and, 4. The structural design concept (determines the usable propellant fraction achievable). Near term design concepts include both assisted SSTO and TSTO options. After careful review three years ago the AF SAB considered SSTO to be to high a risk to be considered as near term. Design reference mission options include: 1. A low Earth orbit, or 2. A Geo transfer orbit. Propulsion choices include: 1. A subsonic jet engine. 2. A supersonic jet engine, 3. A supersonic combined cycle turbo- ramjet, and 3. Several rocket engine options. Two structural design concepts have been validated. They are the Douglas Isinglass and the Boeing Have Region. Two additional Have Region test articles were designed and built, but not tested. They are the Lockheed Martin and McDonnell Douglas (now Boeing). 28

Summary Continued A low earth orbit SSTO capable reusable launch vehicle is considered high risk in the near term. Currently available propulsion and structural design candidates do not support a near term SSTO option. An assisted low Earth orbit capable SSTO may be considered a near term option. Sled and rocket assist design options based on current rocket propulsion capabilities plus at least one Have Region structural design concept could provide the performance capability for a low Earth design reference mission. An assisted SSTO design option is considered to be medium to high risk at this time. TSTO is considered to be the lowest risk near term option. Both current propulsion and structural design options would support a TSTO design option. 29

Summary Continued Low earth to orbit design reference missions are considered to be the easiest to achieve and the lowest risk option. A Geo transfer orbit design reference mission is highly efficient to perform a total mission model. A Geo transfer design reference mission model would eliminate both SSTO and assisted SSTO vehicle design candidates. The mission velocity requirement is significantly higher than the mission velocity requirements for low Earth orbit missions. A global range sub orbital first stage with a boost-glideskip mission profile requires significantly less mission velocity (approximately 15% less) compared to a low Earth orbit design reference mission. The required first stage mission velocity for a global range boost-glide-skip profile, would require a usable propellant fraction requirement of approximately 0.82. 30

Summary Continued A supersonic air-breathing turbojet engine is a potential first stage propulsion system for TSTO vehicle design concepts. However, a Mach 4 first stage would achieve less then 3% of the kinetic energy needed to achieve a low Earth-to-orbit design reference mission. A 97% capable second stage would be difficult even for a hydrogen-oxygen fueled second stage. Higher energy design reference missions may not be achievable. A combined cycle turbo-ram engine could increase staging velocity to Mach 5-6, however, the same conclusion about the Mach 4 turbojet apply to a somewhat lesser degree. A hydrocarbon ram-scramjet is currently being developed that would increase the staging velocity to Mach 6-8. It would be very challenging to have a hydrocarbon ram-scramjet engine for a near term system. Rocket propulsion is the best propulsion choice at this time. 31

Summary Continued The Lockheed- Martin Have Region structural design test article did not complete testing. X-ray inspection of the manufactured test article revealed faulty welding. The test article weight was heavier then predicted The test article did, however, successfully demonstrate the manufacturability of a 3 mil thick stainless steel liner for the hydrogen tank. The Lockheed Martin X-33 program did not validate a structural test article. The McDonnell Douglas test article was a scale up of the Isinglass test article that was successfully design, built and tested in the 1960s. The actual weight of the Have Region test article was heaver than predicted. Unfortunately, the load transfer structure failed during the first structural load test. subsequently, the test article blew up. The Boeing Have region test article was successfully designed, built and tested. Some buckling of a lower surface skin panel occurred during reentry testing. Close inspection showed the test article was not built to specifications. The test article contained over 95% of the parts required for the entire vehicle and weighted less then predicted. As of two years ago the test article was still in storage at the Boeing Kent facility. A half scale composite hydrogen tank was successfully designed, built and tested in the NASP program. 32

Conclusions A large number of near term reusable launch vehicle design concepts have been investigated since the late 1970s. New design concepts continue to emerge today. While the Boeing RASV was the preferred choice during Science Dawn, it is most likely not the preferred choice today. Missions, operational requirements, payloads, and technologies have continued to evolve. A low Earth orbit design reference mission may not be an appropriate design reference mission. A geo transfer design reference mission should be investigated further. Propulsion choices are limited. Air-breathing propulsion systems do not appear to be an appropriate choice. Current rocket propulsion choice is the SSME. The Rocketdyne linear aerospike engine would require further work and funding to transition from a prototype into a long life, reliable, flight weight operational engine. A Pratt &Whitney expansion cycle is a highly desirable new engine, but would need development. 33

Conclusions and Recommendations Continued As a result of Have Region only one validated structural design concept emerged. The Boeing concept has a propellant utilization fraction of 0.88, sufficient for an assisted SSTO low earth orbit, or a TSTO design concept with a Mach 23 staging speed. Conduct an independent in depth design study to verify validity of the near term RLV ( pending NSF proposal, $1 million ) Support the development of the Pratt & Whitney class of high thrust hydrogen oxygen expansion cycle rocket engine as part of the NASA rocket engine development program. A 2008 operational prototype can be done with acceptable risks Validated structural concept(s) Existing materials and manufacturing techniques Existing rocket engines (require modifications) Boost-glide-skip first stage mission profile minimizes performance and operational requirements Substantial margins available Modified existing subsystems and avionics 34