HMA Thin Lifts for Pavement Preservation in Tennessee

Similar documents
If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

A Crack is a Crack Mn/DOT s Perspective on Cracking in Asphalt Pavements

I.D.O.T. Update Version -

All Regional Engineers. Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Mixture Design Composition and Volumetric Requirements July 25, 2014

Use of New High Performance Thin Overlays (HPTO)

Innovative Warm Mix Asphalt Projects: The Contractor s Perspective

Ultra-Thins 2019 CEW. Tim O'Rourke RCRC Manager

Louisiana s Experience

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT

DOCUMENTATION WORKBOOK FY 2017

2017 Local Roads Workshop Local Agency HMA Acceptance Specification

MUNICIPALITY OF MONROEVILLE

The Honorable Connie Bernardy, DFL Lead House Transportation & Regional Governance Policy Committee 253 State Office Building Saint Paul, MN 55155

The INDOT Friction Testing Program: Calibration, Testing, Data Management, and Application

Development of long life structural asphalt

ADDRESS PO BOX MAIN STREET 175 DRIFT ROAD 100 BILBY ROAD

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

Florida s Turnpike Enterprise High Tension Median Cable Barrier Pilot Project. William H. Cook, P.E. Florida s Turnpike Assistant Roadway Engineer

Developing Affordable GTR Asphalt Mixes for Local Roadways

Barry Paye, P.E. Wisconsin DOT Materials Lab

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Performance Tests of Asphalt Mixtures

Long Life Asphalt Performance Testing January 17, 2018

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P )

NCAT/MnROAD Cracking Group Update. March 29, 2018

North Eastern States Materials Engineers Association (NESMEA) October 18 th 19 th, 2016 Newark, DE

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.

Control of Pavement Smoothness in Kansas

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface.

Table Standardized Naming Convention for ERD Files

SULFUR EXTENDED ASPHALT INVESTIGATION - LABORATORY AND FIELD TRIAL

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

Thomas Bennert, Ph.D. Rutgers University Center for Advanced Infrastructure and Transportation (CAIT)

EFFECT OF SUPERPAVE DEFINED RESTRICTED ZONE ON HOT MIX ASPHALT PERFORMANCE

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant

Developing Affordable GTR Asphalt Mixes for Local Roadways

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

SEAUPG 2009 CONFERENCE-HILTON HEAD ISLAND, SOUTH CAROLINA

SUCCESSFUL PERFORMANCE PAVEMENT PROJECTS 2015 TxAPA Annual Meeting September 23, 2015 Austin District Mike Arellano, P.E. Date

BERKSHIRE REGIONAL GROUP PURCHASING PROGRAM Laura Wood, CPO Phone: (413) Main Street Fax: (413) North Adams, MA 01247

SKID RESISTANCE EVALUATION PROGRAM

2016 NJDOT Research Showcase 10/26/16

Asphalt Pavement Construction Update

Wentzville Parkway South Phase 2 & 2A

Influence of Hot Mix Asphalt Macrotexture on Skid Resistance

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

COUNCIL COMMUNICATION

Do I have a problem?

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT

EXPERIMENTAL PROJECTS

Developing Affordable GTR Asphalt Mixes for Local Roadways

Pavement Performance Prediction Symposium July 17, 2008 University of Wyoming Laramie, Wyoming

Pavement Management Program Report

PRESERVATION IN THE NATIONAL PARK SERVICE. Northeast Pavement Preservation Partnership Meeting Portsmouth, NH November 8-10, 2010

ACC Technology Showcase November 10, 2015 Newport Beach, CA. Ronald Corun Axeon Specialty Products LLC Director - Asphalt Technical Services

Fuel Resistant. Punishing Conditions. Supreme Production.

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

2018 NACE Conference Wisconsin Dells, WI. Joseph Cheung P.E. FHWA Office of Safety

Multiple Stress Creep Recovery (MSCR): New Binder Grade Testing and Terminology

Over-Dimensional Vehicle Restriction Study for US 129 in TN

National Center for Asphalt Technology Pavement Test Track

APPENDIX G. Greenhouse Gas and Climate Change Analysis

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

HURON COUNTY ENGINEER S OFFICE

Performance of Stone Matrix Asphalt Pavements in Maryland L. Michael 1, G. Burke 1, and C.W. Schwartz 2. Abstract

DEVELOPMENT OF AN ASPHALT PAVEMENT TEST FACILITY AT THE OSU UNMANNED AERIAL VEHICLE FACILITY

s Contact the Area Construction Engineer at for RAP sample location. Page 2 of 10

Ultra-thin Bonded Wearing Course Performance Update, Minnesota

Calendar Year 2014 Report on Life-Cycle Cost Analyses

Page 1 of KA

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

Arkansas State Highway and Transportation Department. Rotary Club of Stuttgart Tuesday, April 7, 2015

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

Transportation accomplishments

Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons Depth Gallons TOTAL CAPACITY 1400 GALLONS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

What Is and Is Not High Friction Surfacing

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

NCAT Report EFFECT OF FRICTION AGGREGATE ON HOT MIX ASPHALT SURFACE FRICTION. By Pamela Turner Michael Heitzman

Atlantic County Utilities Authority CNG Fleet Project

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

PPA WORKSHOP APRIL 7-8, 2009 MINNEAPOLIS, MN

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.

TRB Webinar: Design and Production of High-Reclaimed Asphalt Pavement Mixes. May 7, 2009, 2:00 PM EDT

Smoothness Specification Update

Rolling Road (Route 638) Widening Project

Price per ton. Total Contract. Price

2/5/2019. Definitions. Consolidation. Compaction 101: Doing the Right Things, the Right Way Session W14 Dale Starry, Volvo Construction Equipment

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

Draft Results and Recommendations

IMPACTS OF ENERGY DEVELOPMENT ON TEXAS ROADS

Maine Turnpike Authority

Caltrans Implementation of PG Specs. Caltrans. Presentation Overview. HMA in California. Why, When & How? How will if affect YOU?

ROAD COMMISSION FOR IONIA COUNTY

Impact of Environment-Friendly Tires on Pavement Damage

Emergency Repair of Runway after Cargo Plane Accident

2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager

Transcription:

HMA Thin Lifts for Pavement Preservation in Tennessee The Tennessee Program 5,109 Interstate Lane Miles 26,244 State Route LM 31,353 Total* MARK WOODS, P.E. TDOT DIV. OF MATERIALS AND TESTS * As of 2008 The Tennessee Program Average Unit Price 411-D 12.5-mm NMAS PG64-22 Historically, resurfacing practices involved milling the surface and replacing with 3-4 binder and 1-1/4 surface. $9 $85.00 $8 600,000 500,000 The Worst First approach. If it ain t broke, don t fix it. Cost/ton (AUP) $75.00 $ $65.00 $ 400,000 300,000 200,000 Annual Tonnage $55.00 100,000 $ 2006 2007 2008 2009 2010 Year 0 AUP Total Quantity 2008 Bituminous Adjustments Interstate LM s Paved Bituminous Adjustments* Interstates - $4,984,504.33 State Routes - $8,268,530.42 Total - $13,253,034.75 Approximately 10% of TDOT s resurfacing program. 900 800 700 600 500 400 300 200 100 0 1987 ~10% of interstate system 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 * - 5,109 Total Interstate LM s statewide * - As of 10/30/2008 1

State Route LM s Paved Tennessee Pavement Preservation Initiative 4000 3500 3000 2500 2000 1500 1000 500 ~10% of 0 state route system 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 The department has made the decision to increase our use of preventive maintenance treatments on state routes to approximately $10 million (10%) of the budget for pavement management/resurfacing in 2008. March 27, 2008 * - 26,244 Total State Route LM s statewide Tennessee Pavement Preservation Initiative Annual Spending Costs PG64 HMA Surface vs. Micro-surface A July 25 th Letter to TN FHWA Office A List of Preventive Maintenance Activities... Ultra-Thin (<1 ) and Thin (1 & 1-1/2 ) Asphalt Overlays Micro-surfacing Etc... July 25, 2008 Annual Cost 40,000,000 35,000,000 30,000,000 25,000,000 20,000,000 15,000,000 10,000,000 5,000,000 0 2006 2007 2008 2009 2010* TOTAL MICRO SURFACING ACS MIX(PG64 22) GRADING D TDOT s first official thin lift SR-50, Robertson Co. 2.5 miles 1 lane 15% Rap, 1 lane virgin Average core thickness 0.91 Range 0.73 1.25 Design N des = 50 gyrations Virgin Recycle Opt. AC 6.8 6.8 Design Air Voids 6 6 VMA 21 20.8 VFA 70 72 Vbe 15.0 14.8 Stability (lb) 3677 3677 Flow (0.01 in) 16.0 15.2 DAR 1.78 1.78 2

Produced Virgin Recycle Placement Date 6/17/2008 6/18/2008 %AC 6.41 6.62 Prod. Air Voids 3.5 2.5 VMA 17.9 17.4 VFA 80.4 85.4 Vbe 14.4 14.9 Stability (lb) 4283 3950 Flow (0.01 in) 19.1 16.7 DAR 1.91 1.90 APA Rut Depths (mm) 6.3 5.3 Prior to 2008, TN s smallest surface mix was ½ (12.5-mm) NMAS, typically placed at 1-1/4 Two new gradations were developed for: 3/8 (9.5mm) ¼ (4.75 mm) Both Marshall Mix Design The FIRST new mix specification: Titled 411 TL ¼ (4.75-mm) NMAS 75-blow Marshall spec Developed based on: 4.75-mm SP specification from the Pooled Fund Phase One draft report Local materials TDOT s current specification for 307-Cs leveling course. A screenings mix for surface 9 8 TDOT 307 Cs Leveling Course 3

4.75-mm 9 Phase One 8 Report TDOT 307 Cs Leveling Course 9 4.75-mm Phase One 8 Report Typical TN #10 Screening TDOT 307 Cs Leveling Course 411 TL Specification 411 TL Specification Gradation limits for 411-TL were set essentially the same as TDOT 307-Cs leveling course This specification allowed for less #4 and no 3/8, to permit lighter application rates. ¼ (4.75-mm) NMAS 6.0-8.0 allowable optimum AC% VTM: 4.0±0.2%* Minimum 16% VMA Minimum Stability: 2000 lb DAR: 1.0-2.0 Maximum 15% natural sand Maximum 15% RAP (Processed -5/16 ) Minimum 50% approved non-polishing surface aggregates 411 TL Specification 4 Projects were let in June 2008 under this specification at prescribed spread rates of 85, 65, and 45 lbs/yd 2 (Approx. thickness of 7/8, 5/8, and ½, respectively) 2 project were awarded: Greene Co. 45 lbs/yd 2 65 lbs yd 2 The SECOND new mix specification: Titled 411 TLD 3/8 (9.5-mm) NMAS 75-blow Marshall spec Developed based on current TDOT specification for 411- D, typical ½ (12.5-mm) NMAS surface mix 4

9 8 9 8 9.5-mm SP TDOT 411D ½ NMAS surface mix TDOT 411D ½ NMAS surface mix 9 9 8 8 411 TLD Specification 9 8 3/8 (4.75-mm) NMAS 5.3-7.0 allowable optimum AC% VTM: 3.8±0.3%* Minimum 14% VMA Minimum Stability: 2000 lb DAR: 0.6-1.2 Maximum 15% RAP (Processed -5/16 ) 5

411 TLD Specification Thin-lift Letting 3 Projects were let in June under this specification at a prescribed spread rates of 85 lbs/yd 2 (Approx. thickness of 7/8 ) 1 project was awarded in Campbell Co. 7 total thin lift projects were let in June 2008. 3 projects were awarded based on cost per square yard. Thin-lift Letting - 2008 Existing Surface ALICATION PROJECT TYPE MIX NMAS COST ($/ton) COST ($/yd2) RATE (lbs/yd2) MICRO* Micro 1/4" (4.75-mm) 22 (Agg) 173.28 2.13 CNG203 411TL 1/4" (4.75-mm) 45 112.00 2.52 CNG098 411TL 1/4" (4.75-mm) 65 84.50 2.75 CNG088 411TL 1/4" (4.75-mm) 65 98.25 3.19 CNG195 Micro 1/4" (4.75-mm) 32 (Agg) 173.28 3.20 CNG202 411TLD (9.5-mm) 85 76.25 3.24 CNG174 411TLD (9.5-mm) 85 82.00 3.49 CNG081 411TLD (9.5-mm) 85 92.50 3.93 CNG204 411TL 1/4" (4.75-mm) 85 99.00 4.21 411D* 411D (12.5-mm) 132.5 75.53 5.00 *Hypothetical data collected from previous lettings Existing Surface 65 lb/yd 2 ¼ Mix 6

65 lb/yd 2 ¼ Mix 65 lb/yd 2 ¼ Mix APA Rut Depths Campbell Co (3/8 NMAS) 3.97 mm Greene Co. (¼ NMAS) 5.67 mm Alternate Bid Contracts In the March 2009 contract letting, TDOT announced 9 contracts to be alternate bid between 411TL thin lift asphalt and micro-surface. 8 contracts: 45 lb/yd 2 HMA thin lift vs. 22 lb/yd 2 micro 1 contract: 65 lb/yd 2 HMA thin lift vs. 36 lb/yd 2 micro Alternate items were quantified by the square yard. Alternate Bid Contracts Alternate Bid Contracts March 2009 County Lowest Unit Application Rate Approx cost/ton Square Price (lbs/yd2) L (mi) Award Yards PG64 PG64 Micro Micro PG64 411TL Micro 411TL 411TL Clairborne 64,533 2.26 2.26 45 22 4.4 HMA 100.44 205.45 Grundy 78,318 2.06 2.27 45 22 4.8 Micro 91.56 206.36 Hardin 82,368 2.45 2.27 65 36 6.54 HMA 75.38 126.11 Lincoln 201,800 1.91 2.01 45 22 13.76 HMA 84.89 182.73 Macon 78,892 2.20 2.00 45 22 6.19 HMA 97.78 181.82 Overton 64,218 2.5 2.38 45 22 4.12 HMA 111.11 216.36 Sevier 46,206 1.9 2.24 45 22 3.52 HMA 84.44 203.64 Stewart 84,480 1.53 2.27 45 22 6 HMA 68.00 206.36 Warren 98,462 2.05 2.02 45 22 6.62 Micro 91.11 183.64 55.95 center line miles total 2009 AUP for 411TL by ton: $79.60 Approx. 2009 AUP for micro surface by ton: $187 March 2010 County Lowest Unit Application Rate Approx cost/ton Square Price (lbs/yd2) L (mi) Award Yards PG64 PG64 Micro Micro PG64 411TL Micro 411TL 411TL Bedford 200,831 2.42 85 32 12.8 Micro 151.25 Hawkins 349,395 3.09 1.81 65 22 24.54 Micro 95.08 164.55 37.34 miles total 2010 AUP for 411TL by ton: $74.28 Approx. 2010 AUP for micro surface by ton: $180 7

Thin Lift and Micro Quantities Federal Projects Total Quantity Description Unit 2006 2007 2008 2009 2010 ACS MIX(PG64 22) GRADING D TON 457369 480619 305301.6 492664.6 279376 ACS MIX(PG64 22) THIN LIFT CS ASPHALT S.Y. 698574 ACS MIX(PG64 22) THIN LIFT CS ASPHALT TON 5249 13359 9515 ACS MIX(PG76 22) THIN LIFT CS ASPHALT TON 132 ACS MIX(PG64 22) THIN LIFT D ASPHALT TON 40556 26341 ACS MIX(PG70 22) THIN LIFT D ASPHALT TON 11355 16660 14789 EMULSIFIED ASPHALT FOR MICRO SURFACING TON 297 2029 3388 2842 2394 AGGREGATE FOR MICRO SURFACING TON 2462 16763 28189 23701 19899 MICRO SURFACING S.Y. 176780 837631 The Tennessee FHWA and Federal Lands office adopted the two provisions for use on multiple projects including: Between Gatlinburg and Pigeon Forge 85 lb/yd 2 ~30 centerline miles on Natchez Trace Parkway As of November 2010, over 300 centerline miles placed of 411TL and 411TLD placed. Conclusions / Recommendations All thin mixes are best accompanied by a proper application of tack coat, preferably polymer modified. The >2*NMAS lift thickness rule of thumb should still apply. TDOT currently plans on limiting these mixes to lower volume routes. Micro vs thin lift HMA alternates were successful. Need to evaluate lifespan of each product at various application rates to evaluate comparability. 8