en Converter FU 4/5 Operator s Manual

Similar documents
en Electrik-breaker EHB 11 BLM/... Operator s Manual

en Electrik-breaker EH 27/115 Douple insulated WMM WC Operator s Manual

en Internal vibrators IRSEN-FU Operator's manual

en Vibratory plate BPU...A. Operator s Manual

en Vibratory plate DPU 5045H Hand start Operator s Manual

INTERNAL VIBRATOR-FREQUENCY INVERTER IRFUN.../ en Operator s Manual

en Vibratory plate DPU 25..H.. Operator s Manual

VIBRATORY PLATE DPU 2440F WGB en Operator s Manual

DPU 2950 DPU 2960 DPU 2970

en Vibratory plate DPU Operator s Manual

en Vibratory plate DPU 4045H Operator s Manual

VIBRATORY PLATE DPU 2440H DPU 2450H en Operator s Manual

Installation manual wall-mounted distributor

PRO-TYP II. Single and 3-phase Test Adapter with Type 2 Plug for Testing Electric Charging Stations with PROFITEST MTECH+ and MXTRA

Installation manual portable distributors

Megohmmeter Test Probe

SPARKSCAN1 HIGH VOLTAGE CLAMP OPERATING MANUAL

Type 6213 EV, 6281 EV

CORDLESS TACKER MODEL NO: CCT48 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS0414

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type 0283, Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

en Vibratory plate BPU 3050A Operator s Manual

Instruction manual. CSV 402 caravan power supply. Table of contents

Submersible pump with flexible shaft PF 3 Operator s Manual

Ex m Solenoid Operator Type 0519

Safety. Operating instructions Solenoid valve VGP DANGER. Contents WARNING CAUTION. Changes to edition Elster GmbH Edition 10.

AC 100. Operating instructions Pneumatic Crimper AC 100. Date of issue: 05/2010. Keep for future use!

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Operating instructions

AXIAL FANS Axis / Tubo OPERATION MANUAL

Instruction manual Electric glass door lock Touch-to-open

Instruction Manual. Caravan Charging System CSV 404. Table of contents

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Operating instructions

HPP09E Hydraulic Powerpack

28W WORK LAMP Model: CTL28 Part No:

Operating instructions Solenoid interlock TKM/TKF. 1. About this document. Content

Installation Instructions (Translation) Marking. Description. Danger, warning and note symbols. Technical data. ANTARES ExtSet.

Explosion protected terminal boxes type, GHG 72.

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

Instruction Manual. Ex-Time 40 / 50

Catalyser Introduction. 3. Hazard Information. 2. Area of Application. 3.1 Symbology

Battery Charger JCB-FCH20LI2

GEIGER-GJ56.. with mechanical end stop For Venetian blinds and exterior blinds

18V CORDLESS STAPLER/NAILER

PrioVino Premier. Translation of Original Operating Instructions. Status: August First edition January 2018 / PrioVino GmbH

MV Series Motors Operation & Parts Manual

Compact System NRGS 11-2 NRGS Original Installation Instructions English

Assembly and Operating Instructions

Installation and Operating Instructions Magnetic Vibrator MR 1

OPERATING INSTRUCTIONS

Exchange of rollers from the XTS-Mover

HD18F2M1.

Überwachte Fertigungsstätte

ORIGINAL INSTRUCTIONS

Safety. Operating instructions Solenoid valve for gas VG 6 VG 15/10 DANGER. Contents WARNING CAUTION. Changes to edition 07.15

VIBRATORY PLATE BPU 2950A en Operator s Manual

Operator s and Maintenance Manual

Operating Instructions Pedestrian Turnstile Type MPT 33

Additional operating instructions according to ATEX 94/9/EC Volumetric flow controller VM-PRO-Ex

Operating Instructions

1100W PORTABLE GENERATOR

OPERATING INSTRUCTIONS

BENCH GRINDER MODEL CBG6RZ OPERATING & MAINTENANCE INSTRUCTIONS

Operating instructions Rotary actuators M135 M140 M150 M180. June 2012 / / EN

RENA AF371Feeder Operating Manual. Feeder. Operating Manual. Manual Part #: M AF371 Operations Rev

Braking Devices BR 230/ Assembly- and Commissioning Instructions

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

Operating Instructions K Always on the safe side.

Battery Charger JCB- SCH20LI.2

AIR FILTER MODEL NO: AF1000 OPERATION & MAINTENANCE INSTRUCTIONS PART NO:

Sparkasse zu Lübeck (Sort code ) Acc.No

Operating Instructions

Katalysator Nr /

Rotary feed-through DDF-S/-KS

KD1E Range Potential Indicators

SCOPELITE TIMING LIGHT OPERATING MANUAL

1CATALOGUE METEOROLOGICAL INSTRUMENTS. The weather specialists since 1859

Operating instructions. sonnenprotect for operators. KD-337 Part no Version X00.

A company of ThyssenKrupp Elevator. ThyssenKrupp Aufzugswerke. Operating Manual. Oil buffer

en Vibroplate VP 1550 (RAW) OPERATOR S MANUAL

Belt Conveyor Pull Rope Switch Types HEN, HEK and SEM OPERATING INSTRUCTIONS

Operating Instruction Manual for Energy Management System EBL 99 C, Art.-Nr Seite 1 / 7

ACROBAT SWING STAND MODEL

Oil-free piston compressors KK and piston vacuum pumps KV

SeekTech Inductive Clamp

Asynchronous generators

AGRO POWER Products and Applications

GEIGER-GJ56.. For Venetian blinds and exterior blinds

BENCH GRINDER MODEL CBG6RP OPERATING & MAINTENANCE INSTRUCTIONS 0101

INTERNATIONAL STANDARD

Operating instructions Solenoid interlock EX-AZM About this document. Content

OPERATING INSTRUCTIONS

Instruction Manual AVTM for. Strip Chart Recorder Catalog Nos and

These operating instructions apply for: NCX 380 NCZ 300 NCX 480 NCZ 370 NCX 580 L NCZ 480 NCX 660 K NCZ 560 NCZ 660 NCZ 800

Instruction Manual. ThinkTop D30 ESE02248-EN Patented Sensor System Registered Design Registered Trademark. Original manual _1

Adjustable Speaker Mount GRAVIS 8

Adjustable Speaker Mount GRAVIS 12

ELECTRIC CAR POLISHER

Mod: KLD6-12/35XLAS-N

Transcription:

www.wackergroup.com 0201424en 003 02.2007 Converter FU 4/5 Operator s Manual

1. Foreword Foreword For your own safety and protection from bodily injuries, carefully read, understand and follow the safety instructions in this manual. Please operate and maintain your Wacker machine in accordance with the instructions in this manual. Your Wacker machine will reward your attention by giving trouble-free operation and a high degree of availability. Replace faulty or defective components Immediately. All rights, especially the right for copying and distribution are reserved Copyright 2007 by Wacker Construction Equipment AG No part of this publication may be reproduced in any form or by any means, electronic or mechanical, including photocopying, without express permission in writing from Wacker Construction Equipment AG. Any type or manner of reproduction, distribution or storage on data carriers or storage mediums not authorized by Wacker represents an infringement of valid copyrights and will be prosecuted. We expressly reserve the right to make technical modifications - even without due notice - which aim at improving our machines or increasing their safety standards. Vorwort.fm 3

Table of contents 1. Foreword 3 2. Safety instructions 5 2.1 General...5 2.2 Operation...5 2.3 Safety checks...6 2.4 Maintenance...6 2.5 Transport...7 2.6 Maintenance checks...7 3. Technical data 8 4. Description 9 4.1 Field of application...9 4.2 Transport to work site...9 5. Operation 10 5.1 Putting into operation...10 5.2 Motor protection...10 6. Maintenance 11 6.1 Maintenance schedule...11 6.2 Slip rings...11 6.3 Carbon brushes...11 7. Electric wiring diagram 12 8. Diagram 13 9. Disposal 14 9.1 Environmentally friendly reuse...14 EC - Conformity-Certificate 15 DIN EN ISO 9001 Certificate 17 4

2. Safety instructions for 3-phase frequency and voltage convertes Safety instructions 2.1 General 2.1.1 Converters may only be operated by persons who are at least 18 years of age are physically and mentally fit for this job have been instructed in operating with converters and proved their ability for the job to the employer may be expected to carry out the job they are charged with carefully. The persons must be assigned the job of operating converters by the employer. 2.1.2 Converters may only be operated if the operating instructions of the manufacturer relating to the specific product and these safety instructions are observed. 2.1.3 The persons entrusted with the operation of converters are to be familiarised with the necessary safety precautions relating to the machine. In case of unusual applications the contractor must compile and issue the necessary additional instructions. 2.2 Operation 2.2.1 The actuation (control) elements and safety equipment must not be inadmissibly tampered with or their operation prevented. 2.2.2 It must be ensured that the converter is only connected to the voltage and frequency specified on the nameplate. Choose correct cross section for extension cords. 2.2.3 Before the converter is commissioned, it must be ensured that the protective hoods are firmly installed. 2.2.4 Before the converter is commissioned, the machine must be installed in a stable condition to prevent it from unintentionally tipping over, slipping or falling. 2.2.5 The converter must not to be switched on and off by inserting the plug into the socket or pulling it out. This also applies to the equipment to be connected to the converter. SV00052GB.fm 5

Safety instructions 2.2.6 The power supply cable of the converter must not be used to pull the plug out of the socket. 2.2.7 The power supply cable of the external vibrator must not be used to pull the plug out of the socket. 2.2.8 Electric equipment and material may only be used if they comply with the operational and local safety requirements. They must be in proper conditions and they must be maintained in this condition. 2.2.9 It is forbidden to operate converters in hazardous environments. Danger to life 2.2.10 Do not expose electrical equimpent to rain. Do not use electrical equimpent in damp or wet surroundings. 2.3 Safety checks 2.3.1 Before starting operation, the operator has to check that all control and safety devices function properly. 2.3.2 Check electric cables regularly for damage. 2.3.3 Converters may only be operated with all the safety equipment. 2.3.4 If defects in the safety equipment or other defects are detected which impair the safe operation of the internal vibrator, the supervisor is to be notified without delay. 2.3.5 The machine must to be switched off immediately in case of defects jeopardizing the operational safety of the equipment. 2.4 Maintenance 2.4.1 Only use original spare parts. Modifications to this machine including the adjustment of the maximum speed set by the manufacturer are subject to the express approval of WACKER. In case of nonobservance all liabilities shall be refused. 2.4.2 The converter is to be disconnected from the mains supply for maintenance and repair work. 2.4.3 Work on the electric parts of the machines may only be carried out by skilled technicians. SV00052GB.fm 6

Safety instructions 2.4.4 The green/yellow protective earth conductor of the connection cable must be longer so that it does not become detached if the strain relief clamp fails. There is a danger to life and limb if this connection is broken. After repair work, check protective earth conductor for continuity. 2.4.5 All safety devices must be reinstalled properly immediately after maintenance and repair jobs have been completed. 2.5 Transport 2.5.1 For loading and transporting converters with lifting devices, suitable attachments are to be provided at the specified attachment points. 2.5.2 On transport vehicles converters are to be secured against slipping or tipping over. 2.6 Maintenance checks 2.6.1 According to the conditions and frequency of use, converters have to be checked for safe operation at least once every 6 monts by skilled technicians, such as those found at WACKER service stations, and be repaired if necessary. Please also observe the corresponding rules and regulations valid in your country. SV00052GB.fm 7

Technical data 3. Technical data FU 4/200 FU 5z/200 Item no 0008890 0008891 Length x width x height Operating weight (Ground) Input ratings Rated current Power input Output Voltage Rated current Frequency Power input Socket Drive engine mm: kg: A: kva: V: A: Hz: kva: 790 x 350 x 495 800 x 350 x 495 64 75 Thtee-phase current 400 V 50 Hz 10 13,2 6,9 9,2 42 3 ~ 52 69 200 3,8 5 3 x 32 A 4 x 32 A 3-phase squirrel cage motor for connection to the mains Protection system IP 44 Sound pressure level 1 m Distance L PA : 77 db(a) 80 db(a) TD00720GB.fm 8

4. Description Description 4.1 Field of application For use in applications with Wacker 42 V / 200 Hz high frequency internal vibrators, 42 V / 200 Hz external vibrators. 4.2 Transport to work site Conditions: Only use suitable lifting equipment with a minimum lifting capacity of 80 kg for the transport of the converter. Always switch off engine during transport! Attach appropriate fastening means to central lifting point provided. Tie down the converter securely during transport on the loading surface of a vehicle. Note: Also refer to the specifications in safety instruction. T00824GB.fm 9

Operation 5. Operation 5.1 Putting into operation 5.1.1 Connection: Make sure available voltage corresponds to voltage required for converter before connection. Factory setting is 400 V unless otherwise indicated when ordering. Use and correctly connect green-yellow cable lead of supply line to plug connection for equipment grounding conductor. Also pay close attention to a perfect connection of the equipment grounding conductor when using an extension line. 5.1.2 Switching on the converter: Only switch on the converter under no-load conditions. 5.2 Motor protection The overload circuit breaker is set to the rated current of the motor. In case the converter is switched off by means of the overload circuit breaker find out why and eliminate defect. T00824GB.fm 10

6. Maintenance Maintenance 6.1 Maintenance schedule Component Maintenance work Maintenance interval Feed cable Check for perfect condition, change if defective. daily 6.2 Slip rings 6.2.1 The surface of the slip rings must be bright. If necessary, clean the surface, respectively polish with emery paper. Before, make sure that the converter is disconnected. Remove abrasive dust. 6.3 Carbon brushes 6.3.1 The carbon brushes should rest with entire cross section and with moderate pressure on the slip rings. Bed-in new carbon brushes only with currentless (dead) conveter as follows: Put emery cloth with smooth side on slip ring such that the brushes rest on the abrasive side. Move emery cloth to and fro until brushes fit to the round shape of the slip rings. Remove abrasive dust. T00824GB.fm 11

Electric wiring diagram 7. Electric wiring diagram not connected Plug Input ratings Generator Engine SK00568GB.fm 12

Diagram 8. Diagram Selection of required cross section for extension of cables and power lines This procedure takes into consideration: The ohmic and inductive resistance of the line with an admissible loss of voltage of 5% and cos phi = 0,8 as per voltage-frequency-curve. The admissible warming-up of the lines as per VDE standard (table of required minimum cross section). Voltage - Frequency - Curves Cross-section area of cable in mm2 2 Rated current x length of cable A x m Minimum cross-section area according to VDE Cable Max. load Max. fuse mm 2 A A 1 15 10 1,5 18 10/3~16/1~ 2,5 26 20 4 34 25 6 44 35 10 61 50 16 82 63 25 108 80 SK00590GB.fm 13

Disposal 9. Disposal 9.1 Environmentally friendly reuse Provide for environmentally friendly reuse of the machine. Comply with all regional regulations and directives such as the European directive regarding old electric and electronic devices. Do not add the device to normal waste disposal. Instead, it should be collected separately. T01088GB.fm 14

EG - Konformitätserklärung EC - Conformity-Certificate Wacker Construction Equipment AG, Preußenstraße 41, 80809 München bescheinigt, daß das Baugerät: hereby certify that the construction equipment specified hereunder: 1. Art / Category: Umformer / Converter 2. Typ / Type: FU... / FUE... / KTU... 3. Gerätenummer innerhalb Typenserien-Nummer / Type serial number of equipment: 0007752, 0007949, 0007978, 0007979, 0008884, 0008890, 0008891, 0008901, 0008902, 0008934, 0008935, 0008947, 0008948, 0008949, 0008950, 0108479, 0107999, 0108000, 0610011, 0610012, 0610013, 0610015, 0610019, 0610020, 0610022, 0610023, 0610094, 0610156 Bescheinigung bitte sorgfältig aufbewahren / File certificate carefully in Übereinstimmung mit folgenden Richtlinien hergestellt worden ist: has been produced in accordance with the following standards: 98/37/EWG 89/336/EWG 73/23/EWG C0004917GB.fm Dr. Stenzel Leitung Forschung und Entwicklung Research and Development Management

DIN EN ISO 9001 Certificate Prüf- und Zertifizierungsinstitut VERBAND DER ELEKTROTECHNIK ELEKTRONIK INFORMATIONSTECHNIK e.v. C E R T I F I C A T E Registration-Number: 6236/QM/06.97 This is to certify that the company Wacker Construction Equipment AG Wacker-Werke GmbH & Co. KG at the following locations Head Office Munich Preußenstraße 41 80809 Munich Production plant Reichertshofen Karlsfeld logistics centre Sales regions with all branches all over Germany has implemented and maintains a Qality Management System for the following scope: Machine manufacture Construction machines This Q System complies with the requirements of DIN EN ISO 9001:2000 and the requirements of the German and international Road Traffic Act. VDE Testing and Certification Institute Certification This Certificate is valid until 2009-06-05. Date: 2003-05-30 63069 Offenbach, Merianstraße 28 Telefon: +49 (0) 69 83 06-0, Telefax: +49 (0) 69 83 06-555 E-Mail: vde-institut@vde.com, http://www.vde-institut.com The VDE Testing and Certification Institute is accredited by DAR Accreditation Bodies according to DIN EN ISO 17020 and DIN EN ISO 45012 and notified in the EU under ID.No. 0366. TGA-ZM-09-92-00 KBA-ZM-A 00021-97

Wacker Construction Equipment AG - Preußenstraße 41-80809 München - Tel.: +49-(0)89-3 54 02-0 - Fax: +49-(0)89-3 54 02-390 Wacker Corporation - P.O. Box 9007 - Menomonee Falls, WI 53052-9007 - Tel.: +1-(1)(262)-255-0500 - Fax: +1-(1)(262)-255-0550 - Tel.: (800)770-0957 Wacker Asia Pacific Operations-Skyline Tower, Suite 2303, 23/F, 39 Wang Kwong Road, Kowloon Bay, Hong Kong-Tel.: +852 2406 6032-Fax: +852 2406 6021