Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois

Similar documents
Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Study Speedway Gas Station Redevelopment

2.0 Development Driveways. Movin Out June 2017

Construction Realty Co.

INDUSTRIAL DEVELOPMENT

Planned Development Application 1450 Sherman Avenue Evanston, IL TRAFFIC CIRCULATION IMPACT STUDY

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

King Soopers #116 Thornton, Colorado

Appendix C. Traffic Study

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

MEMORANDUM TO: Oak Park and River Forest High School District 200. Kenig, Lindgren, O Hara, Aboona, Inc.

Trip Generation Study: Provo Assisted Living Facility Land Use Code: 254

Trafalgar Road & Lower Base Line Transportation Study Ontario Inc.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC PARKING ANALYSIS

HUMC/Mountainside Hospital Redevelopment Plan

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

Section 5.0 Traffic Information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

Traffic Engineering Study

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

TRANSPORTATION TECHNICAL REPORT

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

Lacey Gateway Residential Phase 1

Lakeside Terrace Development

appendix 4: Parking Management Study, Phase II

Transportation Land Development Environmental S e r v i c e s

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

Ingraham High School Parking and Traffic Analysis

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

Transportation & Traffic Engineering

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009

Downtown Lee s Summit Parking Study

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

Draft Report: West Berkeley Bowl Project

This letter summarizes our observations, anticipated traffic changes, and conclusions.

TRAFFIC IMPACT ANALYSIS

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Alpine Highway to North County Boulevard Connector Study

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Traffic Feasibility Study

IMPROVEMENT CONCEPTS

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

Proposed CVS/pharmacy

Traffic Impact Analysis Update

Traffic Impact Study for the proposed. Town of Allegany, New York. August Project No Prepared For:

Existing Traffic Conditions

Proposed Inn at Bellefield Traffic Impact Assessment

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Traffic Impact Study for Proposed Olive Boulevard Development

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

ANDERSON PROPERTY SITE ANALYSIS

Purpose: General Provisions:

APPENDIX B Traffic Analysis

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

Mercer Island Center for the Arts Parking Management Plan

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

7359 WISCONSIN AVENUE MONTGOMERY COUNTY, MARYLAND

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

STAFF REPORT # CHANGE OF ZONING

Parking/Traffic Assessment Study

Clean Harbors Canada, Inc.

Introduction. School Overview TECHNICAL MEMORANDUM

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

Traffic Impact Study for Hamilton Fields

APPENDIX E. Traffic Analysis Report

TRANSPORTATION TECHNICAL REPORT

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

Bi-County Transitway/ Bethesda Station Access Demand Analysis

830 Main Street Halifax Regional Municipality

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

Transcription:

Traffic and Parking Study for an Athletic Recreation Center Janes Avenue Shopping Plaza Site Woodridge, Illinois N 83 rd Street Janes Avenue Soccer Fields Janes Avenue Shopping Plaza Cypress Cove Family Aquatic Park Janes Avenue Prepared For: Prepared By: March 31, 2014

Contents List of Figures and Tables, iii 1. Introduction...1 2. Existing Conditions...3 Site Location...3 Roadway System Characteristics...3 Existing Traffic Volumes...4 Public Transportation...4 3. Athletic Recreation Center Development...7 Development Plan...7 Site Accessibility, Parking and Circulation...7 Programming Space...8 Hours of Operation...8 Peak Periods of Activity...8 Peak Employment Levels...9 Directional Distribution of ARC-Generated Traffic...9 ARC Traffic Generation...9 ARC Traffic Assignment...11 4. Projected Future Traffic Conditions...14 5. Traffic Analysis...17 6. Parking Analysis Compliance with Woodridge Zoning Regulations...21 Parking Supply and Demand...22 Parking Demand Reduction Strategies...23 Parking Overflow Accommodations...23 7. Conclusions and Recommendations...24 Appendix Athletic Recreation Center Traffic and Parking Study ii

List of Figures and Tables Figures 1. Site Location...2 2. Aerial View of Site Area...2 3. Existing Roadway Characteristics...5 4. Existing Traffic Volumes...6 5. Directional Distribution of ARC-Generated Traffic...10 6. ARC-Generated Traffic Volumes without Multi-Use Gym Addition...12 7. ARC-Generated Traffic Volumes with Multi-Use Gym Addition...13 8. Projected Future Traffic Volumes without Multi-Use Gym Addition...15 9. Projected Future Traffic Volumes with Multi-Use Gym Addition...16 10. Recommended Janes Avenue Pavement Marking Plan...26 Tables 1. Directional Distribution of ARC-Generated Traffic...9 2. Traffic Generated by the ARC...11 3. Level of Service Criteria...18 4. Capacity Analysis Existing Traffic Conditions...19 5. Capacity Analysis Projected Future Traffic Conditions...19 6. ARC Parking Requirements by Zoning...21 7. Projected Peak Parking Demand...22 Athletic Recreation Center Traffic and Parking Study iii

1. Introduction This report presents the methodologies, findings, and recommendations of a Traffic and Parking Study conducted by Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) for the Woodridge Park District s planned Athletic Recreation Center (ARC) on the Janes Avenue Shopping Plaza site at the northeast corner of Janes Avenue and 83 rd Street in Woodridge, Illinois. The site is bounded by the Janes Avenue soccer fields on the north, the Piers II condominium community on the east, 83 rd Street on the south, and Janes Avenue on the west. Figure 1 shows the site location and Figure 2 shows an aerial view of the site area. The Janes Avenue Shopping Plaza will be razed and the plaza s existing driveways (two on Janes Avenue and one on 83 rd Street) will be closed. The Janes Avenue soccer fields parking lot and driveways will also be removed. An approximately 77,930 gross square-foot, two-story ARC building (85,030 gross square feet with multi-use gymnasium addition) will be built on the property containing a gymnasium, turf field, health and fitness facility, track, program rooms, and administrative space. Site ingress and egress will provided from two new driveways on Janes Avenue. The ARC will be supported by a 286-space parking lot (306 spaces with multi-use gymnasium addition) that will be shared with the Janes Avenue soccer fields immediately north of the site. The anticipated ARC grand opening is in October 2016. The purpose of this study was to (1) examine existing traffic conditions adjacent to the site, (2) quantify the traffic generation from the planned ARC and assess the impact that the facility would have on traffic conditions adjacent to the site, (3) review site circulation, (4) evaluate site parking supply and demand, and (5) determine any roadway or access improvements necessary to accommodate the ARC-generated traffic and enhance the overall plan. Athletic Recreation Center 1 Traffic and Parking Study

Figure 1 Site Location Site 83 rd Street Janes Avenue Figure 2 Aerial View of Site Area Athletic Recreation Center 2 Traffic and Parking Study

2. Existing Conditions Transportation conditions in the vicinity of the site were inventoried to obtain a database for projecting future conditions. Four general components of existing conditions were considered: (1) the geographical location of the site, (2) the characteristics of the area roadway system, (3) existing traffic volumes, and (4) public transportation. Site Location As noted previously, the planned ARC is located on the site of the existing Janes Avenue Shopping Plaza at the northeast corner of Janes Avenue and 83 rd Street in Woodridge, Illinois. The site is bounded by the Janes Avenue soccer fields on the north, the Piers II condominium community on the east, 83 rd Street on the south, and Janes Avenue on the west. The Park District s Cypress Cove Family Aquatic Center is located at the southeast corner of the intersection, the 83 rd Street retail center is located at the northwest corner, and the Ultimate Faith Christian Center is located at the southwest corner. Roadway System Characteristics 83 rd Street is a minor arterial roadway that borders the south side of the ARC site. It is under the jurisdiction of the Village of Woodridge. In the vicinity of the site, 83 rd Street is a three-lane roadway with one lane in each direction and a center median that accommodates left-turn movements at intersections. There is a dedicated right-turn lane on the east leg of 83 rd Street at Janes Avenue. The posted speed limit on 83 rd Street is 30 miles per hour (mph) and parking is not permitted on the roadway. The Southern DuPage County Regional Trail, an off-road multiuse path, extends along the north side of 83 rd Street to the west of Janes Avenue and along the south side of 83 rd Street to the east of Janes Avenue. Sidewalks are located along 83 rd Street on the opposite side of the road from the trail. Janes Avenue is a collector road that borders the west side of the ARC site. It is also under the jurisdiction of the Village of Woodridge. In the vicinity of the site, Janes Avenue is a three-lane roadway with one lane in each direction and a center median that accommodates left-turn movements at intersections. There is a dedicated right-turn lane on the south leg of Janes Avenue at 83 rd Street. North of 83 rd Street there is a sidewalk on both sides of Janes Avenue. South of Athletic Recreation Center 3 Traffic and Parking Study

83 rd Street there is a sidewalk on the west side of Janes Avenue and a multi-use path on the east side between 83 rd Street and Sheffield Lane. The intersection of Janes Avenue with 83 rd Street is under traffic signal control and there are pedestrian signals with countdown timers on all four legs of the intersection. This signal is not part of a signal system. There are diagonal line crosswalks on the north and east legs of the intersection to guide users of the Southern DuPage County Regional Trail, and parallel line crosswalks on the west and south legs of the intersection. The posted speed limit on Janes Avenue is 25 mph to the north of 83 rd Street and 35 mph to the south of 83 rd Street, and parking is not permitted on the roadway. The existing roadway system characteristics are shown in Figure 3, including lane configurations, traffic controls and parking regulations. There are presently no traffic control signs posted on the Janes Avenue Shopping Plaza driveways. Existing Traffic Volumes Traffic counts were conducted by KLOA, Inc. at the Janes Avenue/83 rd Street intersection and the intersections of the Janes Avenue Shopping Plaza driveways with 83 rd Street and Janes Avenue. The counts were conducted during the evening (6:00-8:00 P.M.) of Thursday, January 23, 2014 and the morning (10:00 A.M.-12:00 P.M.) of Saturday, January 25, 2014, which are times that would coincide with the typical peak period of activity at the ARC, as confirmed by Park District staff. Weather conditions on the traffic count days were cold but dry. The traffic count data indicates that the peak hours of traffic activity during the traffic count period are from 6:00-7:00 P.M. on the weekday and from 11:00 A.M.-12:00 P.M. on the Saturday. The existing peak hour traffic volumes are shown in Figure 4. Summaries of the traffic count data are contained in the Appendix of this report. KLOA, Inc. also counted the number of pedestrians and bicyclists in the crosswalks at the Janes Avenue/83 rd Street intersection. However, due to the cold weather, there were only a couple of pedestrians and bicyclists at the intersection during the count periods. Public Transportation The ARC site is adjacent to two Pace bus routes that serve the Woodridge community. Route 821 (IL 53/83 rd Street-Belmont Metra Station) Provides weekday morning rush hour service from the IL 53/83 rd Street intersection to the Belmont Metra Station in Downers Grove and weekday evening rush hour service from the Belmont Metra Station to the IL 53/83 rd Street intersection. The route travels along 83 rd Street past the ARC site. Route 834 (Joliet-Downers Grove) Provides weekday and Saturday service between Joliet Union Station and Yorktown Center in Lombard. The route travels along Janes Avenue past the ARC site and there are posted bus stops with benches adjacent to the site and at the northwest corner of the Janes Avenue/83 rd Street intersection. Athletic Recreation Center 4 Traffic and Parking Study

P JANES AVENUE P JANES AVENUE SOCCER FIELDS N NOT TO SCALE 25 SITE JANES B AVENUE SHOPPING PLAZA PIER II CONDOMINIUMS RETAIL CENTER B P P 83RD STREET 30 P P 30 LEGEND ULTIMATE FAITH CHRISTIAN CENTER 35 P P CYPRESS COVE FAMILY AQUATIC CENTER P - TRAVEL LANE - TRAFFIC SIGNAL - STOP SIGN - NO PARKING XX - SPEED LIMIT - BIKE PATH B - PACE BUS STOP PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Existing Roadway Characteristics Job No: 14-021 Figure: 3 5

30 (29) 358 (409) 13 (9) JANES AVENUE N NOT TO SCALE 31 (24) 1 (0) 12 (8) 17 (13) 0 (1) 5 (6) 374 (423) 1 (1) 10 (4) 287 (367) 0 (0) 2 (3) SITE 11 (7) 295 (368) 119 (63) 198 (295) 68 (72) 14 (20) 118 (83) 433 (173) 198 (143) 6 (2) 3 (7) 10 (6) 743 (397) 83RD STREET 59 (79) 214 (204) 1 (0) 355 (387) 88 (118) 79 (86) 132 (226) 74 (111) LEGEND 00 (00) - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Existing Traffic Volumes Job No: 14-021 Figure: 4 6

3. Athletic Recreation Center Development The following provides a description of the ARC development plan, site access and circulation, on-site parking supply, facility programming and employment, projected traffic generation, and the directional distribution and assignment of ARC-generated traffic. Development Plan The Woodridge Park District plans to construct an Athletic Recreation Center (ARC) on the site of the Janes Avenue Shopping Plaza at the northeast corner of Janes Avenue and 83 rd Street. The Janes Avenue Shopping Plaza will be razed and the existing Janes Avenue soccer fields parking lot will be removed to accommodate the approximately77,930 gross square-foot, two-story ARC building (85,030 gross square feet with multi-use gymnasium addition) and adjoining parking lot. The anticipated ARC grand opening is in October 2016. The site plan for the development is contained in the Appendix of this report. Site Accessibility, Parking and Circulation The existing curb cuts at the driveways to the Janes Avenue Shopping Plaza (two on Janes Avenue and one on 83 rd Street) will be closed, as will the driveways to the Janes Avenue soccer fields parking lot. Site ingress and egress for the ARC will be provided from two new driveways, both of which will be on Janes Avenue. The south driveway on Janes Avenue will be located approximately 480 feet north of 83 rd Street and aligned with the driveway to the 83 rd Street retail center. The north driveway on Janes Avenue will be located approximately 120 feet north of the south driveway. Both driveways will provide one entrance lane and one exit lane. The ARC will be supported by a 286-space surface parking lot (306 spaces with multi-use gymnasium addition) that will be shared with the Janes Avenue soccer fields immediately north of the site. The lot is intended to serve ARC patrons and staff members as well as users of the Janes Avenue soccer fields. A drop-off/pick-up lane will be located on the north side of the ARC building and will accommodate approximately four vehicles. Several programmed activities will generate dropoff/pick-up traffic, such as Kidz Squad, basketball and soccer games/practices, birthday parties, Athletic Recreation Center 7 Traffic and Parking Study

winter camp, etc. Building servicing will occur at the northeast corner of the building. Emergency service vehicles will have access to the building from the north, south and west sides. Programming Space The ARC will have space allocated to the following uses and activities: 1 st Level Gymnasium with one full-size basketball court (or two short courts) and bleacher seating Optional multi-use gymnasium addition with one short basketball court and bleacher seating Turf field (one full-size or two short fields) with bleacher seating and batting cages 2 program rooms Multi-purpose room for rentals/birthday parties for up to 20 people Child watch room Kitchen Locker rooms Administrative space Lobby/public space Mechanical/storage rooms Small outdoor playground 2 nd Level Track overlooking turf fields below Fitness facility Aerobics room Hours of Operation The hours of operation at the ARC are anticipated to be as follows: Weekdays: 6:00 A.M. - 11:00 P.M. Saturdays: 7:00 A.M. 9:00 P.M. Sundays: 8:00 A.M. - 8:00 P.M. Peak Periods of Activity The ARC will provide programming during all 12 months of the year. The peak month that is anticipated to generate the highest number of program participants and facility users is January due to the limited number of outdoor recreational opportunities available in the winter. Weekday visitation is expected to be highest on Monday and Wednesday evenings (6:00-7:00 P.M.) after typical work hours. Weekend visitation is expected to be highest on Saturdays during the late morning hours from 11:00 A.M.-Noon. A few large events are envisioned over the course of the year, such as basketball and soccer tournaments. These events are anticipated to be scheduled on Friday evenings after 6:00 P.M. and on weekends. Athletic Recreation Center 8 Traffic and Parking Study

Peak Employment Levels Staffing levels at the ARC will coincide with the programming schedules. During the peak activity periods, approximately 30 staff members are anticipated to be on-site, consisting of facility managers, programmed activity leaders, gym/turf field competition monitors, child watch personnel, and custodial staff. Directional Distribution of ARC-Generated Traffic The directions from which traffic will approach and depart the site are a function of several variables, including the distribution of households in the Woodridge Park District boundary area and the continuity of the roadway system. Based on these variables, as well as current traffic patterns in the area, the estimated directional distribution of ARC-generated traffic is shown in Table 1 and Figure 5. Table 1 DIRECTIONAL DISTRIBUTION OF ARC-GENERATED TRAFFIC Direction Percent of Traffic Janes Avenue To and From the North 55% Janes Avenue To and From the South 10% 83 rd Street To and From the East 15% 83 rd Street - To and From the West 20% Total 100% ARC Traffic Generation Traffic generation estimates for the ARC were developed for the anticipated peak weekday (6:00-7:00 P.M.) and Saturday (11:00 A.M.-Noon) activity times at the ARC. The weekday peak time coincides with the tail end of the commuter rush hour and the Saturday peak time coincides with the midday time period when weekend traffic volumes on the adjacent roadway system are typically at high levels. The ARC-generated traffic volumes for the peak weekday and Saturday activity times are shown in Table 2, with and without the potential multi-use gymnasium addition. These volumes were estimated from a survey of a comparable facility, national traffic generation rates contained in the Institute of Transportation Engineers (ITE) Trip Generation Manual (9 th Edition, 2012), and anticipated facility programming and employment schedules provided by the Park District. Athletic Recreation Center 9 Traffic and Parking Study

55% JANES AVENUE N NOT TO SCALE SITE 20% 15% 83RD STREET 10% LEGEND 00% - PERCENT DISTRIBUTION PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Directional Distribution of ARC-Generated Traffic Job No: 14-021 Figure: 5 10

The comparable facility utilized in this analysis is the Bolingbrook Park District s Annerino Community Center at 201 Recreation Drive in Bolingbrook, Illinois. This facility is a little smaller in size (approximately 50,000 sf) than the ARC but offers similar recreational/programming activities. The facility has a gymnasium with basketball/volleyball courts, programming rooms, a fitness center, a climbing wall, and community activities, but does not have indoor or outdoor swimming facilities. Traffic counts were performed by KLOA, Inc. at the Annerino Center in July 2005 and a trip generation profile for the facility was developed. This profile was referenced in developing the traffic generation estimates for the ARC shown in Table 2. Table 2 TRAFFIC GENERATED BY THE ARC Land Use Athletic Recreation Center w/o Multi-Use Gym addition Athletic Recreation Center w/ Multi-Use Gym addition Weekday P.M. Peak Hour 1 Number of Vehicle Trips Saturday Midday Peak Hour 2 Size Enter Exit Total Enter Exit Total 77,930 gsf 124 134 258 152 146 298 85,030 gsf 133 145 278 166 159 325 1 Trip generation based on Trip Generation Manual, 9 th Edition, Institute of Transportation Engineers, 2012 (Land Use Code 495 Recreational Community Center). 2 Trip generation based on traffic volume surveys of the Annerino Community Center in Bolingbrook, Illinois. ARC Traffic Assignment The weekday and Saturday peak period vehicle trips generated by the ARC were assigned to the roadway system based on the directional distribution shown in Table 1 and Figure 5. Figure 6 shows the assignment of the ARC-generated peak hour traffic volumes without the multi-use gymnasium addition. Figure 7 shows the assignment of the ARC-generated traffic volumes with the multi-use gymnasium addition. Athletic Recreation Center 11 Traffic and Parking Study

58 (71) 10 (13) JANES AVENUE 55 (60) 8 (10) 19 (20) 15 (17) N NOT TO SCALE 15 (17) 58 (71) 55 (60) * (*) 45 (49) * (*) SITE 20 (22) 8 (10) 83RD STREET 25 (30) 12 (15) 27 (29) 13 (15) 48 (58) 19 (23) LEGEND 00 - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) (00) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) * - MINIMAL VOLUME PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois ARC-Generated Traffic Volumes Without Multi-Use Gym Addition Job No: 14-021 Figure: 6 12

62 (77) 11 (14) JANES AVENUE 60 (65) 9 (11) 20 (22) 16 (18) N NOT TO SCALE 16 (18) 62 (77) 60 (65) * (*) 49 (54) * (*) SITE 22 (24) 9 (11) 83RD STREET 27 (33) 13 (17) 29 (32) 14 (16) 51 (64) 20 (25) LEGEND 00 - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) (00) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) * - MINIMAL VOLUME PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois ARC-Generated Traffic Volumes With Multi-Use Gym Addition Job No: 14-021 Figure: 7 13

4. Projected Future Traffic Conditions The projected future traffic volumes during the weekday and Saturday peak periods of traffic activity at the ARC, upon completion of the ARC facility in 2016, are shown in Figures 8 and 9 for the ARC development with and without the multi-use gymnasium addition, respectively. The projected future traffic volumes were calculated by combining the estimated traffic generated by the ARC (Figures 6 and 7) with the existing traffic volumes, minus the traffic presently generated by the Janes Plaza Shopping Plaza, which will be razed. The existing shopping plaza has at total of approximately 16,600 square feet of retail space within two buildings. Approximately 62 percent of the retail space is presently vacant. Active uses within the plaza include a 7-Eleven convenience store, a pizzeria, a hair salon, an insurance company, and a tax services company. Since the traffic generated by these uses will no longer be present on the site when the ARC is constructed, it was removed from the analysis of future traffic conditions. Athletic Recreation Center 14 Traffic and Parking Study

445 (508) 10 (13) JANES AVENUE 30 (29) 372 (425) 58 (71) 371 (448) 8 (10) 19 (20) 15 (17) 55 (60) * (*) 45 (49) N NOT TO SCALE 31 (24) * (*) 12 (8) 10 (4) 293 (374) 48 (58) SITE 138 (86) 203 (303) 88 (94) 137 (106) 427 (171) 198 (143) 83RD STREET 77 (99) 213 (204) 88 (118) 79 (86) 137 (231) 74 (111) LEGEND 00 - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) (00) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) * - MINIMAL VOLUME PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Projected Future Traffic Volumes Without Multi-Use Gym Addition Job No: 14-021 Figure: 8 15

449 (514) 11 (14) JANES AVENUE 30 (29) 373 (426) 62 (77) 376 (453) 9 (11) 20 (22) 16 (18) 60 (65) * (*) 49 (54) N NOT TO SCALE 31 (24) * (*) 12 (8) 10 (4) 294 (375) 51 (64) SITE 140 (89) 204 (304) 90 (96) 138 (108) 427 (171) 198 (143) 83RD STREET 79 (102) 213 (204) 88 (118) 79 (86) 138 (233) 74 (111) LEGEND 00 - WEEKDAY EVENING PEAK HOUR (6:00 PM-7:00 PM) (00) - SATURDAY MIDDAY PEAK HOUR (11:00 AM-12:00 PM) * - MINIMAL VOLUME PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois Projected Future Traffic Volumes With Multi-Use Gym Addition Job No: 14-021 Figure: 9 16

5. Traffic Analysis Intersection capacity analyses were performed for the intersection of Janes Avenue and 83 rd Street, as well as the intersections of the ARC driveways with Janes Avenue and 83 rd Street, to determine the operation of the existing roadway system, evaluate the incremental impact of the ARC, and determine the ability of existing roadway system to accommodate future traffic demands. Analyses were performed for the following weekday evening and Saturday midday peak period traffic conditions: 1. Existing traffic volumes 2. Projected future traffic volumes (with ARC without multi-use gymnasium addition) 3. Projected future traffic volumes (with ARC with multi-use gymnasium addition) The traffic analyses were performed using SYNCHRO computer software, which generally follows the methodologies outlined in the Transportation Research Board s Highway Capacity Manual (HCM), 2010. The methodologies use traffic signal timings and phasing, stop sign controls, traffic volumes, and street characteristics to determine the average control delay and levels of service for vehicles at an intersection. Traffic signal timings for the Janes Avenue/83 rd Street intersection were obtained from the Village of Woodridge for use in this analysis. The ability of an intersection to accommodate traffic flow is expressed in terms of level of service, which is a qualitative term developed to express intersection operating conditions. Alpha designations from A to F are assigned based on the average control delay experienced by vehicles passing through the intersection. Control delay is that portion of the total delay attributed to the traffic signal or stop sign control operation, and includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay until resumption of free flow speed. Level of Service A is the highest grade (best traffic flow, least delays), Level of Service E represents saturated or at-capacity conditions, and Level of Service F is the lowest grade (oversaturated conditions, extensive delays). Typically, Level of Service D is the lowest acceptable grade for peak-hour conditions in a suburban environment such as Woodridge. For signal-controlled intersections, levels of service are calculated for lane groups, intersection approaches, and the intersection as a whole. For two-way stop controlled (TWSC) intersections, levels of service are only calculated for the approaches controlled by a stop sign. Level of Athletic Recreation Center 17 Traffic and Parking Study

Service F at TWSC intersections occurs when there are not enough suitable gaps in the flow of traffic on the major (uncontrolled) street to allow minor-street traffic to safely enter the major street flow or cross the major street. The Highway Capacity Manual criteria for levels of service and the corresponding control delay for signalized and unsignalized intersections are shown in Table 3. Tables 4 and 5 summarize the results of the capacity analyses for the existing and projected future peak period conditions, respectively. The capacity analysis worksheets are included in the Appendix of this report. Table 3 LEVEL OF SERVICE CRITERIA Signalized Intersections Level of Service A B C D E Interpretation Very short delay, with extremely favorable progression. Most vehicles arrive during the green phase and do not stop at all. Good progression, with more vehicles stopping than for Level of Service A, causing higher levels of average delay. Light congestion, with individual cycle failures beginning to appear. Number of vehicles stopping is significant at this level. Congestion is more noticeable, with longer delays resulting from combinations of unfavorable progression, long cycle lengths, or high V/C ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. High delays result from poor progression, high cycle lengths, and high V/C ratios. Average Control Delay (seconds per vehicle) 10 >10-20 >20-35 >35-55 >55-80 F Unacceptable delays occurring, with oversaturation. >80.0 Unsignalized Intersections Average Control Delay Level of Service (seconds per vehicle) A 0-10 B >10-15 C >15-25 D >25-35 E >35-50 F >50 Source: Highway Capacity Manual, 2010. Athletic Recreation Center 18 Traffic and Parking Study

Table 4 CAPACITY ANALYSIS EXISTING TRAFFIC CONDITIONS Weekday PM Peak Period Saturday Midday Peak Period Intersection LOS Delay LOS Delay Janes Avenue / 83 rd Street 1 C 25.2 C 22.9 Janes Avenue / North Site Access Drive 2 B 10.5 B 11.3 Janes Avenue / South Site Access Drive 2 B 11.0 B 11.3 83 rd Street / Site Access Drive 2 C 15.4 C 15.1 Note: LOS=Level of Service; Delay is measured in seconds. 1 Represents overall intersection operations under traffic signal control. 2 Represents operation of site access drive under stop sign control. Table 5 CAPACITY ANALYSIS PROJECTED FUTURE TRAFFIC CONDITIONS Weekday PM Peak Period Saturday Midday Peak Period Intersection LOS Delay LOS Delay ARC w/o Multi-Use Gymnasium Addition Janes Avenue / 83 rd Street 1 C 24.8 C 22.9 Janes Avenue / North Site Access Drive 2 B 11.5 B 12.3 Janes Avenue / South Site Access Drive 2 B 13.0 B 14.3 ARC w/ Multi-Use Gymnasium Addition Janes Avenue / 83 rd Street 1 C 24.8 C 22.9 Janes Avenue / North Site Access Drive 2 B 11.6 B 12.4 Janes Avenue / South Site Access Drive 2 B 13.2 B 15.0 Note: LOS=Level of Service; Delay is measured in seconds. 1 Represents overall intersection operations under traffic signal control. 2 Represents operation of site access drive under stop sign control. Athletic Recreation Center 19 Traffic and Parking Study

The capacity analysis results shown in Table 4 indicate that the traffic-signal controlled intersection of Janes Avenue and 83 rd Street presently operates at a satisfactory level of service C in both the weekday evening and Saturday midday peak periods. Vehicle queues on each of the four intersection approaches were observed to range from two to seven vehicles, and all vehicles were observed to clear the intersection with each signal cycle. The westbound vehicle queues on 83 rd Street did at times extend beyond the Janes Avenue Shopping Plaza driveway on 83 rd Street, but the southbound vehicle queues on Janes Avenue were never observed to extend back to the shopping plaza s south driveway on Janes Avenue. The access driveways to the Janes Avenue Shopping Plaza also operate at satisfactory levels of service B or C during the peak periods under stop sign control. Under projected future traffic conditions with the ARC but without the multi-use gymnasium addition, the Janes Avenue/83 rd Street intersection will continue to operate at the same level of service C during the weekday and Saturday peak periods with minimal changes in average vehicle delay. The future ARC access driveways on Janes Avenue are also projected to operate at a satisfactory level of service (B) under stop sign control during the same peak periods, and southbound vehicle queues on Janes Avenue are not projected to extend back to the ARC access drives. The addition of the multi-use gymnasium will have a minimal traffic impact on the operation of the Janes Avenue/83 rd Street intersection and the ARC access drives with no changes in level of service and minimal increases in average vehicle delay. Athletic Recreation Center 20 Traffic and Parking Study

6. Parking Analysis A parking analysis was performed to (1) determine project compliance with the off-street parking requirements of the Village of Woodridge Zoning Regulations, (2) compare the proposed parking supply with the projected peak parking demand, (3) identify potential parking demand reduction strategies, and (4) develop a plan to accommodate potential periodic overflow parking. Compliance with Woodridge Zoning Regulations The site plan depicts a surface parking supply of 286 spaces for an ARC without the multi-use gymnasium addition, which exceeds the off-street parking requirements in the Village s zoning regulations by 11 spaces, as shown in Table 6. With the multi-use gymnasium addition, the parking supply is proposed to be increased to 306 spaces, which as shown in Table 6 would also exceed the Village s parking requirements (by 2 spaces). The site plan depicts nine accessible parking spaces, seven adjacent to the west side of the ARC building and two adjacent to the outdoor soccer fields, which exceeds the minimum accessible parking requirements (7-8 spaces) of the Illinois Accessibility Code for this sized lot. Table 6 ARC PARKING REQUIREMENT BY ZONING Land Use Net Floor Area Parking Ratio Municipally- or privately- 64,026 sf nfa 1.0 space/250 sf nfa owned recreation w/o Multi-Use Gym + 19 spaces for buildings or community outdoor soccer centers fields Parking Parking Surplus/ Required Provided (Deficit) 275 286 11 71,126 sf nfa w/ Multi-Use Gym 1.0 space/250 sf nfa + 19 spaces for outdoor soccer fields 304 306 2 Athletic Recreation Center 21 Traffic and Parking Study

Parking Supply and Demand The proposed parking supply was compared with nationwide parking data on suburban recreational community centers, as published by the Institute of Transportation Engineers in Parking Generation, 4 th Edition, 2010. The ITE parking demand data indicates this type of land use generates an average weekday peak parking demand ratio of 3.2 spaces per 1,000 square feet of gross floor area. In addition, the outdoor soccer fields are estimated by Park District staff to require another 19 spaces. The application of this parking demand ratio yields a peak parking demand of 268 spaces for an ARC facility without a multi-use gymnasium addition, and a peak parking demand of 291 spaces for an ARC facility with a multi-use gymnasium addition, as shown in Table 7. In either case, the proposed parking supply would be adequate to meet the projected peak parking demand leaving a surplus reserve ranging from 15-18 spaces. Table 7 PROJECTED PEAK PARKING DEMAND Land Use Gross Floor Area ITE Parking Ratio 1 Suburban Recreational 77,930 sf gfa 3.2 spaces/1,000 sf gfa Community Centers w/o Multi-Use Gym + 19 spaces for outdoor soccer fields Peak Parking Demand Parking Provided Surplus/ (Deficit) 268 286 18 85,030 sf gfa w/ Multi-Use Gym 3.2 space/1,000 sf gfa + 19 spaces for outdoor soccer fields 291 306 15 1 Represents average weekday peak parking demand ratio for recreational community center (Land Use Code: 495) in a suburban location, as documented in Parking Generation, 4 th Edition, 2010, published by the Institute of Transportation Engineers, plus parking demand estimate of 19 spaces for outdoor soccer fields. The proposed parking supply was also compared with the projected peak parking demand generated by the anticipated facility programming and employment schedules, as provided by the Park District, for the peak weekday and weekend hours of visitation during the peak visitation month of the year (January), as well as for the highest ARC visitation month (October) that overlaps with outdoor soccer games scheduled at the Janes Avenue soccer fields. As noted earlier, the ARC parking lot will be used by those participating in games at the Janes Avenue soccer fields. Similar to the comparison with the ITE parking demand ratios above, this comparison indicated that the proposed parking supply would be adequate to meet the projected peak parking demand. The breakdown of this parking analysis is included in the Appendix of this report. Athletic Recreation Center 22 Traffic and Parking Study

Parking Demand Reduction Strategies Potential strategies that could effectively reduce parking demand at the ARC site are described below. Carpooling The Park District can provide notices to participants in activities at the ARC that encourage carpooling to events to ease traffic congestion on the site at the conclusion of activities and to reduce the demand for parking. Bicycle Parking The Park District can provide a sufficient supply of covered outdoor bicycle racks to encourage bicycle use as an alternative mode of travel to the ARC, in combination with providing a multiuse path connection along 83 rd Street to the Southern DuPage County Regional Trail at the northeast corner of the Janes Avenue/83 rd Street intersection. Parking Overflow Accommodations Should activities at the ARC create a parking demand that exceeds the site s 286-space capacity (306-space capacity with multi-use gymnasium addition), employees and/or participants can make use of the Park District s parking lots at the Cypress Cove Family Aquatic Center (394 total spaces) across 83 rd Street from the ARC site. The potential need for additional parking could be related to periods of high visitation at the ARC that overlap with soccer games at the Janes Avenue soccer fields, periodic events at the ARC such as basketball or soccer tournaments, or a large event such as the facility s grand opening. Athletic Recreation Center 23 Traffic and Parking Study

7. Conclusions and Recommendations Based on the proposed ARC development plan and the preceding traffic and parking study, the following conclusions and recommendations are made: The location of the proposed ARC on the Janes Avenue Shopping Plaza site is a relatively centralized location within the Woodridge Park District boundary area and is conveniently accessible from two major roadways (Janes Avenue and 83 rd Street), two Pace bus routes (Routes 821 and 834), the Southern DuPage County Regional Trail, and the local sidewalk system. The redevelopment of the site will result in the closing of the existing curb cut on 83 rd Street and the existing four curb cuts along Janes Avenue, two of which serve the Janes Avenue Shopping Plaza and two of which access the Janes Avenue soccer fields parking lot. ARC ingress and egress will be provided from the two new driveways on Janes Avenue, which will efficiently disperse site traffic onto Janes Avenue. The south ARC driveway will be aligned with the 83 rd Street retail center driveway and will be located 150 feet further from the Janes Avenue/83 rd Street intersection than the existing south driveway to the Janes Avenue Shopping Plaza, which will lessen the likelihood that southbound vehicle queues from the Janes Avenue/83 rd Street intersection will impede access to/from the ARC. The north ARC driveway will be located approximately 120 feet north of the south driveway. Both ARC driveways should be designed with a single entrance and exit lane, with stop signs and stop lines installed on the exit lanes. The volume of traffic generated by the ARC during the weekday (6:00-7:00 P.M.) and weekend (Saturday 11:00 A.M.-Noon) peak periods of activity at the ARC can be adequately accommodated on the adjacent roadway system with minimal impacts to traffic operations. The Janes Avenue/83 rd Street intersection presently operates at a satisfactory level of service C during the peak periods and will remain at the same level of service upon completion of the ARC, regardless of whether the multi-use gymnasium addition is added. Athletic Recreation Center 24 Traffic and Parking Study

This minimal traffic impact from the ARC is due in part to the fact that traffic currently generated by the Janes Avenue Shopping Plaza will be eliminated when the plaza is razed for construction of the ARC. The ARC access driveways on Janes Avenue are also projected to operate at a satisfactory level of service (B) under stop sign control during the peak periods, with or without the multi-use gymnasium addition. To prevent left-turning conflicts on Janes Avenue by motorists bound to the ARC and 83 rd Street retail center, the existing two-way left-turn channelization lane (i.e., painted median) on Janes Avenue should be re-striped to provide a dedicated left-turn lane for turning movements to the ARC south driveway and 83 rd Street retail center drive. To the north of the ARC south driveway, the left-turn lane would transition back to the existing two-way leftturn channelization lane, as shown in Figure 10. All drive aisles within the ARC parking lot should operate with two-way circulation. The drop-off/pick-up lane on the north side of the ARC building will accommodate approximately four vehicles. Many of the programmed activities that generate drop-off/pickup traffic will have different start and end times, which will spread out the traffic movements using this lane. If the lane is fully-utilized, drivers will be able to park in the nearby spaces to pick-up program participants. To prevent traffic conflicts, lane striping and/or pavement treatments should be used to differentiate the drop-off/pick-up lane and channelize traffic movements past the lane. Building servicing (i.e., trash pick-up, loading) will occur at the northeast corner of the building and will not impede traffic movements through the site. Emergency service vehicles will have access to the ARC from the north, south and west sides. The proposed 286-space parking lot (ARC without multi-use gymnasium addition) exceeds the off-street parking requirements in the Village s zoning regulations by 11 spaces. With the multi-use gymnasium addition, the proposed parking lot expansion to 306 spaces would exceed the Village s zoning requirements by two spaces. The proposed parking supply for the ARC, with or without the multi-use gymnasium addition, would also adequately accommodate the projected average weekday peak parking demand based on nationwide parking data for suburban recreational community centers published by the Institute of Transportation Engineers, as well as estimates of the ARC s peak parking demand based on anticipated facility programming and employment schedules during the peak weekday and weekend hours of visitation during the peak visitation month of the year (January) and the highest ARC visitation month (October) that overlaps with outdoor soccer games scheduled at the Janes Avenue soccer fields. Athletic Recreation Center 25 Traffic and Parking Study

50' 50' 75' 75' JANES AVENUE ONLY 4 14 7 10 15 15 14 15 15 9 15 15 15 15 7 Bike Rack ACTIVITY RECREATION CENTER 7 9 10 13 9 10 13 9 10 13 9 10 N NOT TO SCALE ONLY 83RD STREET PROJECT: TITLE: Athletic Recreation Center Woodridge, Illinois RECOMMENDED JANES AVENUE PAVEMENT MARKING PLAN 26 Job No: 14-021 Figure: 10

Nine (9) of the proposed parking spaces will be designed as accessible spaces, seven adjacent to the west side of the ARC building and two adjacent to the outdoor soccer fields, which exceeds the minimum accessible parking requirements (7-8 spaces) of the Illinois Accessibility Code for this sized lot. Should periodic events at the ARC, such as tournaments, create a parking demand that exceeds the site s 286-space capacity (306-space capacity with multi-use gymnasium addition), employees and/or participants can make use of the Park District s parking lots at the Cypress Cove Family Aquatic Center (394 total spaces) across 83 rd Street from the site. Potential strategies to reduce parking demand on the ARC site include encouraging program participants to carpool and providing a sufficient supply of outdoor covered bicycle racks. The preferred bicycle rack design is the Inverted U, A, Post and Loop, or Wave-style rack as these provide good support to the bicycle and users are able to lock both the wheels and frame of the bicycle to the rack. While the ARC site plan shows paved connections to the existing sidewalk system along Janes Avenue and 83 rd Street, a wider multi-use path should be considered along the ARC frontage on 83 rd Street to provide a better linkage to the Southern DuPage County Regional Trail at the northeast corner of Janes Avenue/83 rd Street intersection to accommodate ARC users that travel by bicycle. Crosswalk markings should be installed across the two ARC access driveways. The stop signs and stop lines should be installed in advance of the crosswalks. Athletic Recreation Center 27 Traffic and Parking Study

Appendix

Site Plan

Peak Parking Demand Analysis Based on Facility Programming & Employment Schedules

PROJECTED PEAK PARKING DEMAND (Capacity: 286 w/out gym addition / 306 spaces w/ gym addition) Parking Demand No. of Program January October No. of No. of Staff Weekday Saturday Weekday Saturday Activity Participants Coaches/Vol.'s (Refs/Scorers) Total 6:00-7:00 PM 11:00 AM-Noon 6:00-7:00 PM 11:00 AM-Noon Fitness Area 1 60 60 48 48 48 48 Walking/Jogging Track 1 10 10 8 8 8 8 Group Fitness Room 1 25 1 26 21 21 21 21 Indoor Athletic Turf (2 Fields) Games 2 40 8 2 50 0 67 0 67 Practices/Rentals 2,3 40 4 44 29 0 29 0 Gymnasium (2 Courts) Games 2 40 4 4 48 0 64 0 64 Practices/Rentals 2,3 40 4 44 29 0 29 0 Multi-Program Room #1 20 1 21 14 14 14 14 Multi-Program Room #2 23 1 24 16 16 16 16 Multi-Program Room #3 23 1 24 16 16 16 16 Child Watch Room 20 2 22 Included in count from other activity areas Employees (Facility) 13 13 13 13 13 13 Outdoor Soccer Games (1 Field Programmed) Games 2,5 22 4 3 29 0 0 0 19 Practices/Rentals 2,3 22 4 26 0 0 17 0 Future Gymnasium Addition (1 Court) Games 2,5 20 2 4 26 0 17 0 17 Practices/Rentals 2,3 20 2 22 15 0 15 0 1 An auto occupancy of 1.25 people/car was assumed for all adult activities. 2 An auto occupancy of 1.5 people/car was assumed for all youth activities. 3 Assumes 1/2 participants are dropped-off/picked-up without parking. 4 Gym addition activities include youth basketball practices, youth floor hockey, open gym, etc. 5 Game start times separated by 30 minutes to avoid parking demand overlap. Peak Demand w/o Gym Addition Peak Demand w/ Gym Addition 194 266 212 286 209 284 226 303

Traffic Counts

Woodridge, IL Weather: Very Cold and Dry 01/28/14 83rd St and Janes Ave 11:09:56 Thursday January 23, 2014 TURNS/TEAPAC[Ver 3.61.12] - 15-Minute Flow Rates: Appr/Exit Totals Intersection # 7 83/janes/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total 1800 484 828 328 388 328 404 568 728 2028 1815 404 732 260 348 260 352 504 628 1744 1830 340 720 204 340 300 300 444 560 1604 1845 312 716 348 368 348 368 420 608 1744 1900 328 552 300 336 288 332 376 520 1516 1915 276 500 220 304 236 256 380 428 1300 1930 336 440 404 236 300 324 380 412 1416 1945 212 352 240 216 192 200 320 308 1020 TURNS/TEAPAC[Ver 3.61.12] - 60-Minute Volumes: by Movement Intersection # 7 83/janes/thurs ============================================================== Begin N-Approach E-Approach S-Approach W-Approach Int Time RT TH LT RT TH LT RT TH LT RT TH LT Total ===== ============== ============== ============== ============== ===== 1800 119 198 68 118 433 198 74 132 79 88 214 59 1780 1815 98 182 66 109 400 171 70 127 81 83 202 63 1652 1830 98 161 55 111 350 161 66 121 81 83 193 61 1541 1845 88 168 57 96 306 150 84 136 98 71 179 61 1494 1900 78 162 48 81 242 138 71 123 97 64 159 50 1313 1915 60 115 31 60 157 106 55 91 70 49 109 31 934* 1930 34 79 24 34 96 68 43 68 50 28 64 21 609* 1945 14 30 9 12 42 34 10 29 21 16 31 7 255* ===== ============== ============== ============== ============== ===== TURNS/TEAPAC[Ver 3.61.12] - 60-Minute Volumes: Appr/Exit Totals Intersection # 7 83/janes/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total 1800 385 749 285 361 309 356 484 631 1780 1815 346 680 278 348 299 338 436 579 1652 1830 314 622 268 337 293 314 405 529 1541 1845 313 552 318 311 293 320 389 492 1494 1900 288 461 291 273 254 278 364 417 1313 1915 206 323 216 189 182 195 270 287 934* 1930 137 198 161 113 123 131 175 180 609* 1945 53 88 60 54 48 50 80 77 255*

Woodridge, IL Weather: Very Cold and Dry 01/28/14 83rd St and Janes Ave Pedestrians Only 11:11:07 Thursday January 23, 2014 TURNS/TEAPAC[Ver 3.61.12] - 15-Minute Flow Rates: Appr/Exit Totals Intersection # 8 83/janes/peds/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total 1800 0 0 0 0 0 0 0 0 0 1815 0 0 0 0 0 0 0 0 0 1830 0 0 0 0 0 0 0 0 0 1845 0 0 0 0 0 0 0 0 0 1900 0 0 0 0 0 0 0 0 0 1915 0 0 0 0 0 0 0 0 0 1930 0 0 0 0 0 0 0 0 0 1945 0 0 0 0 0 0 0 0 0 TURNS/TEAPAC[Ver 3.61.12] - 60-Minute Volumes: by Movement Intersection # 8 83/janes/peds/thurs ============================================================== Begin N-Approach E-Approach S-Approach W-Approach Int Time RT TH LT RT TH LT RT TH LT RT TH LT Total ===== ============== ============== ============== ============== ===== 1800 0 0 0 0 0 0 0 0 0 0 0 0 0 1815 0 0 0 0 0 0 0 0 0 0 0 0 0 1830 0 0 0 0 0 0 0 0 0 0 0 0 0 1845 0 0 0 0 0 0 0 0 0 0 0 0 0 1900 0 0 0 0 0 0 0 0 0 0 0 0 0 1915 0 0 0 0 0 0 0 0 0 0 0 0 0* 1930 0 0 0 0 0 0 0 0 0 0 0 0 0* 1945 0 0 0 0 0 0 0 0 0 0 0 0 0* ===== ============== ============== ============== ============== ===== TURNS/TEAPAC[Ver 3.61.12] - 60-Minute Volumes: Appr/Exit Totals Intersection # 8 83/janes/peds/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total 1800 0 0 0 0 0 0 0 0 0 1815 0 0 0 0 0 0 0 0 0 1830 0 0 0 0 0 0 0 0 0 1845 0 0 0 0 0 0 0 0 0 1900 0 0 0 0 0 0 0 0 0 1915 0 0 0 0 0 0 0 0 0* 1930 0 0 0 0 0 0 0 0 0* 1945 0 0 0 0 0 0 0 0 0*

Woodridge, IL Weather: Very Cold and Dry 01/28/14 83rd St and Janes Ave Bikers Only 11:12:14 Thursday January 23, 2014 TURNS/TEAPAC[Ver 3.61.12] - 15-Minute Flow Rates: Appr/Exit Totals Intersection # 9 83/janes/bikers/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total 1800 0 0 0 4 0 4 0 0 4 1815 0 0 0 0 0 0 0 0 0 1830 0 0 4 0 4 0 0 0 4 1845 0 0 0 0 0 0 0 0 0 1900 0 0 0 0 0 0 0 0 0 1915 0 0 0 0 0 0 0 0 0 1930 0 0 0 0 0 0 0 0 0 1945 0 0 0 4 0 4 0 0 4 TURNS/TEAPAC[Ver 3.61.12] - 60-Minute Volumes: by Movement Intersection # 9 83/janes/bikers/thurs ============================================================== Begin N-Approach E-Approach S-Approach W-Approach Int Time RT TH LT RT TH LT RT TH LT RT TH LT Total ===== ============== ============== ============== ============== ===== 1800 0 0 0 0 0 0 0 1 0 0 1 0 2 1815 0 0 0 0 0 0 0 1 0 0 0 0 1 1830 0 0 0 0 0 0 0 1 0 0 0 0 1 1845 0 0 0 0 0 0 0 0 0 0 0 0 0 1900 0 0 0 0 0 0 0 0 0 0 1 0 1 1915 0 0 0 0 0 0 0 0 0 0 1 0 1* 1930 0 0 0 0 0 0 0 0 0 0 1 0 1* 1945 0 0 0 0 0 0 0 0 0 0 1 0 1* ===== ============== ============== ============== ============== ===== TURNS/TEAPAC[Ver 3.61.12] - 60-Minute Volumes: Appr/Exit Totals Intersection # 9 83/janes/bikers/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total 1800 0 0 1 1 1 1 0 0 2 1815 0 0 1 0 1 0 0 0 1 1830 0 0 1 0 1 0 0 0 1 1845 0 0 0 0 0 0 0 0 0 1900 0 0 0 1 0 1 0 0 1 1915 0 0 0 1 0 1 0 0 1* 1930 0 0 0 1 0 1 0 0 1* 1945 0 0 0 1 0 1 0 0 1*

Woodridge, IL Weather: Very Cold and Dry 01/28/14 Janes Ave and Janes Plaza North Access Dr 11:17:58 Thursday January 23, 2014 TURNS/TEAPAC[Ver 3.61.12] - 15-Minute Flow Rates: Appr/Exit Totals Intersection # 11 janes/janesplaza/north/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total 1800 40 4 0 32 28 4 8 36 76 1815 48 28 24 52 52 8 28 64 152 1830 40 32 12 60 68 28 20 28 144 1845 44 24 4 32 44 16 12 32 104 1900 40 16 4 36 36 12 12 36 96 1915 36 16 8 24 20 8 20 36 84 1930 32 16 28 36 32 24 16 40 112 1945 36 16 4 16 28 12 4 28 72 TURNS/TEAPAC[Ver 3.61.12] - 60-Minute Volumes: by Movement Intersection # 11 janes/janesplaza/north/thurs ============================================================== Begin N-Approach E-Approach S-Approach W-Approach Int Time RT TH LT RT TH LT RT TH LT RT TH LT Total ===== ============== ============== ============== ============== ===== 1800 30 0 13 17 0 5 0 0 10 12 1 31 119 1815 29 0 14 20 0 5 0 0 11 13 2 30 124 1830 26 0 14 17 0 5 0 0 7 11 2 25 107 1845 27 0 11 13 0 5 2 0 9 10 2 20 99 1900 26 0 10 12 0 4 2 0 9 9 2 17 91 1915 18 0 8 9 0 3 2 0 8 7 1 11 67* 1930 11 0 6 7 0 1 2 0 6 4 1 8 46* 1945 6 0 3 4 0 0 0 0 1 1 0 3 18* ===== ============== ============== ============== ============== ===== TURNS/TEAPAC[Ver 3.61.12] - 60-Minute Volumes: Appr/Exit Totals Intersection # 11 janes/janesplaza/north/thurs ============================================================== Begin Approach Totals Exit Totals Int Time N E S W N E S W Total 1800 43 22 10 44 48 14 17 40 119 1815 43 25 11 45 50 16 18 40 124 1830 40 22 7 38 42 16 16 33 107 1845 38 18 11 32 33 15 15 36 99 1900 36 16 11 28 29 14 13 35 91 1915 26 12 10 19 20 11 10 26 67* 1930 17 8 8 13 15 9 5 17 46* 1945 9 4 1 4 7 3 1 7 18*