At-FST Series I N S TA L L AT I O N A N D O P E R AT I N G I N S T R U C T I O N S W W W. A I G I S M E C H. C O M

Similar documents
FULL HEIGHT ALUMINUM TURNSTILE DOUBLE UNIT AT-FAL SERIES I N STALLATION AND O P E RATING I N STRUCTIONS

THT-100 ASTG THT-100 ASTG2 Security Turnstiles. Installation, Operation and Maintenance Manual. 1 Rev

- 4 amp (100VA). - 4 amp (100VA). - Eight (8) Fuse Protected Outputs. - Eight (8) PTC Protected Outputs.

Rack Mount Power Supplies

INSTALLATION MANUAL. Middle. Def tank. Standard. Middle. Standard. Def tank WARNING. Level of Difficulty CAUTION. Parts List.

4 amp (100VA). - 4 amp (100VA). - Four (4) Fuse Protected - Four (4) PTC Protected

CCTV Rack Mount Power Supplies

SMP3CTX Series Power Supply/Charger

CCTV Rack Mount Power Supplies

INSTALLATION MANUAL. Recessed In-Ceiling Motorized Projection Screen

PowerMaster MODEL MBG. Installation Manual U L R UL 325 AND UL 991 LISTED MEDIUM DUTY BARRIER GATE OPERATOR TABLE OF CONTENTS

MODEL ELC-12/40-CVM-D BATTERY CHARGER

- 4 amp (100VA). - 4 amp (100VA). - Eight (8) Fuse Protected Outputs. - Eight (8) PTC Protected Outputs.

The steering column is of a modular construction and features easy to service electrical switches.

70 Series 8700 Coupler 2-pc Hub & Shaft Three Phase Brake Instructions IP43 & IP56 (NEMA 2 & 4) Housing

DC CCTV Power Supplies Installation Guide

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

70 Series 8700 End Mount Three Phase Brake Instructions IP43 (NEMA 2) Housing

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

WARNING TABLE 3-1: DAILY SAFETY CHECK

'99-03 CHEVROLET/GMC IFS 4WD 6" SUSPENSION SYSTEM P/N INSTALLATION INSTRUCTIONS

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

CRYSTALVUE PUBLIC VIEW DISPLAY (PVD) FEED THROUGH MOUNTS

INSTALLATION INSTRUCTIONS

70 Series 8700 End Mount Three Phase Brake Instructions IP56 (NEMA 4) Housing

Service Manual 6301B

MicroPod Sub User manual / Bedienungsanleitung / Manual del Usario

CHROME ALLEY CAT L.E.D. FUEL & BATTERY GAUGE 7381

POWERED RUNNING BOARDS INSTALLATION MANUAL

Norcal Power/SWR Meter Assembly & Operating Manual. Revision 1D 10/15/2008

Applicable to the Following Part Numbers. Notes and Maintenance. Torque Specifications. Metric SAE. Use above torque setting unless otherwise noted

Airbags, servicing. Airbag system, safety precautions WARNING!

LGT-306L / LB Club Car Precedent LED Light Bar Bumper Kit Installation Instructions

Installation and Service Manual

AD1240 Champion Series Outdoor, Medium Duty Pan/Tilt

Vertical Vinyl Curtain Door

ALVARADO (1029 mm) 25 (635 mm) 36.5 (927.1 mm)

Operating Instructions Type MPT 53

SPIRIT HIGH SPEED FABRIC ROLL-UP DOOR OWNER S MANUAL

INSTALLATION AND OPERATING INSTRUCTIONS OF THE INTERNATIONAL ISOBOX SERIES ISOLATION TRANSFORMERS.

EXTRA LARGE OUTDOOR HOUSINGS

2-row and All-row systems included.

Installation, Operation and Maintenance Manual

(1032 mm) 30.5 (775 mm) 44 ( mm)

Signal Mirror Installation Instructions

FOODSAFE IL INSTALLATION MANUAL

Operating Instructions Pedestrian Turnstile Type MPT 33

Instruction Sheet. CFRD Series. High CFM Split Rear Doors

TOYOTA SIENNA TRAILER WIRE HARNESS Preparation

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL

WINCHMAX. Hydraulic Winch Instructions b b b

Rostselmash Torum 740

Product Description. Product Numbers. Warning/Caution Notations. Required Tools. Wiring. Prerequisites

Installation Instructions For Motor Control Center (MCC) Units

Instructions for 2-row monitoring only

Prestige Series Edge-Lit LED Sign IMPORTANT SAFEGUARDS READ AND FOLLOW ALL SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS OF THE INTERNATIONAL ISOBOX SERIES ISOLATION TRANSFORMERS.

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

2010+ Victory Cross Country / Cross Roads Installation Guide Nov 2014

Florham Park, NJ USA Call (ASCO) for sales or service

EXTREME R MOTOR OWNER'S MANUAL

Ford Super Duty SuperCab A Ford Super Duty SuperCrew A

MODEL 8682 SUREFLOW ADAPTIVE OFFSET CONTROLLER

Self-Testing Industrial Series

COOKSON OWNER'S MANUAL

Opening Quality Doors Around The World. Installation Instructions Bi-Parting Freight Doors - Q Style (Power and Manual)

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

SPIRIT HD HIGH SPEED FABRIC ROLL-UP DOOR OWNER S MANUAL

FC-27W 7 dome housing. Installation Instructions

PRODUCT INFORMATION BULLETIN #3365 DIGITAL MOTOR CONTROL PLATTER SYSTEMS For Serial Number and After

Requirements LEO Power Operator Installation Instructions Patents: 5,881,497; 7,316,096; 7,484,333 CAUTION CAUTION WARNING

* * APPLICABLE MODELS: 2014 > Mazda 3

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

INSTALLATION INSTRUCTIONS

* * APPLICABLE MODELS: 2014 > Mazda 6

3ATS & 3NTS J-design 600 A 3ADTS & 3NDTS A Transfer Switches. Installation Manual. Installation A DANGER. Table of Contents WARNING

INSTALLATION INSTRUCTIONS

Validator and Control Board Update Instructions for BC1

Model MC4 MEDIA CONTROL by OWI

R O A D S M I T H TRIKE CONVERSIONS BY THE TRIKE SHOP

* * APPLICABLE MODELS: 2017 > CX-5

- 4 amp. - 4 amp. - Sixteen (16) Fuse Protected - Sixteen (16) PTC Protected

Idle Timer Controller - A-ITC520-A Ford E Series Ford F250 - F Ford F250 - F550 (*B-ITC520-A) F650/F750

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Idle Timer Controller - ITC515-A Ford Transit Contact InterMotive for additional vehicle applications

ASSEMBLY MANUAL. 45-Foot Air Double Disc Drill. Amity Technology, LLC th Avenue North Fargo, ND (701)

Installation Instructions

Model 712 Cable Crash Beam Vehicle Barrier

Florham Park, NJ USA Call (ASCO) for sales or service

INSTALLATION AND USER MANUAL

SAFETY. Injury hazard

The POWER. In PRESENTATION PRODUCTS. Instruction Book for COSMOPOLITAN ELECTROL For Sizes Up To 9'x12' DA-LITE SCREEN COMPANY, INC.

FORD E4OD/4R100 AUTOMATIC TRANSMISSION EQUIPPED VEHICLES

Product Manual MNX10015 / REV B MODEL SB142, SB242. Dual Output Series Switch Boxes

INSTALLATION INSTRUCTIONS AND OPERATION MANUAL

ASSEMBLY. Transmission Automatic Transmission 5R44E and 5R55E. Special Tool(s)

* * APPLICABLE MODELS: 2016 > CX-3

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Transcription:

FULL HEIGHT GALVANIZED STEEL TURNSTILE SINGLE UNIT 3 60 At-FST Series AT-FST SERIES I N S TA L L AT I O N A N D O P E R AT I N G I N S T R U C T I O N S W W W. A I G I S M E C H. C O M

SAFETY PRECAUTIONS CAUTION RISK OF ELECTRIC SHOCK CAUTION: TO REDUCE RISK OF SHOCK, DO NOT SERVICE WITH THE POWER ON. REFER SERVICING TO QUALIFIED SERVICE PERSONNEL. The lightening flash with an arrowhead symbol within an equilateral triangle is intended to alert the user to the presence of non-insulated "dangerous voltage" within the product's enclosure that may be of significant magnitude to constitute a risk of shock to persons The exclamation point within an equilateral triangle is intended to alert the user to presence of important operating and maintenance (servicing) instructions in the literature accompanying the product. WARNING: TO PREVENT FIRE OR SHOCK HAZARD, DO NOT EXPOSE THE INSIDE OF THE HEADER TO RAIN OR EXCESSIVE MOISTURE Attention: Qualified personnel only in accordance with National Electrical Code or applicable local codes should perform installation and servicing WARNING: 120 VOLT POWER MUST BE OF AMPLE SUPPPLY FOR OPERATING THIS EQUIPMENT SAFELY AND IT MUST BE PROPERLY GROUNDED. Page 1 of 17

CONTENTS 1. SITE PREPARATION 2. EXPLODED VIEW DRAWING 3. UNPACKING 4. INSTALLATION 5. FUNCTIONAL TEST 6. MAINTENANCE 7. SERVICE 1 SITE PREPARATION Page 2 of 17

2 EXPLODED VIEW DRAWING (EVD) Page 3 of 17

3 UNPACKING The Turnstile is packaged to allow the installer to work out of the crate as the installation progresses. Check to insure that the following parts are included for the applicable turnstile ordered: NOTE: The following list is shown in the order that they will be required for installation. 1 BOX MOUNTING AND INSTALLATION HARDWARE Quantity Description Part # on Drawing 4 Spindle Connector Nut 6 1 Spindle Pivot Mounting Plate 8 1 Lower Bearing & Housing 7 4 Cabinet Keys N/A 10 3/8 X 3-3/4 Anchor Bolt w/ Washer and Nut N/A 4 5/16-18 X 3/4 Header Mounting Bolt w/ Nut and Washers N/A 12 5/16-18 X 1 3/4 Spindle Arm Assembly Bolt N/A 10 1/4-20 X 1/2 Ceiling Plate Screw N/A 10 1/4-20 Nylock Nut N/A INDIVIDUALLY WRAPPED COMPONENTS Quantity Description Part # on Drawing 1 Barrier Assembly 1 3 Passage Panel 2 1 Header & Mechanism 3 2 Passageway Ceiling Panel 4 3 Spindle Arm Assembly 5 4 INSTALLATION NOTE: FOLLOW THE BELOW INSTRUCTIONS CLOSELY. THE ORDER OF INSTALLATION AND ASSEMBLY IS CRITICAL TO A SUCCESSFUL INSTALLATION. REMOVE AND POSITION THE BARRIER ASSEMBLY (PART #1 ON EVD) Position Barrier in exact place to be installed. LEVEL AND PLUMB all sides. Drill and set anchor bolts. Page 4 of 17

REMOVE ONE OF THE PASSAGE PANELS (PART # 2 on EVD) NOTE: All Passage Panels are identical. CAUTION: Exact positioning of the Center Passage Panel in relationship to the already installed Barrier is critical to a successful installation. Position and anchor Center Passage Panel as shown above. The angle parts of the assembly face inward toward the Barrier. REMOVE AND INSTALL THE HEADER / MECHANISM ASSEMBLY (PART # 7 on EVD) INSTALL HEADER / MECHANISM Page 5 of 17

Lift the Header and Mechanism and set it on top of the Center Passage Panel and the Barrier as shown in figure ST-10 below. Note that the side with the Ceiling Plate Support Rails goes to the Center Passage Panel side. Open the doors of the Header and secure the Header and Mechanism to the Passage Panel and Barrier using the 5/16x3/4 Bolts provided. Use washers and nuts as shown in Figure ST-10 below. INSTALL AND ANCHOR OUTER PASSAGE PANELS AND CEILING PLATES (PART # 2 & 4 ON EVD) Page 6 of 17

Using the 1/4-20 x 1/2 Button Head Screws and 1/4-20 Nylock Nuts, loosely attach a Ceiling Plate to the top of the Passage Panel as shown in Figure ST-12 above. Place the Nylock nuts on the Ceiling Plate side and use the 1/4 washers on bottom side. Attach the Ceiling Plate / Passage Panel assembly to the Header using the same 1/4-20 x 1/2 Button Head Screws and Nylock nuts. Note the orientation of the Ceiling Plate edge with trim as shown in figure ST-13 above. Attach the 2 nd Ceiling Plate / Passage Panel assembly the same way to the other side of the Header. Anchor both End Passage Panels as shown in Figure ST-17 belo INSTALL SPINDLE ARM ASSEMBLIES Lift the Operating Mechanism to the install position. Page 7 of 17

From inside the Header, slide the tab of the mechanism lock on both sides to release the mechanism. From beneath lift the mechanism strait upward (two persons) until the slide bar tabs are accessible. Slide the tabs back to closed position and gently set the mechanism on it as shown in Figure ST-21. ASSEMBLE THE SPINDLE ARM SECTIONS Page 8 of 17

Remove the 3 Spindle Arm Assemblies along with the 4 Spindle Connector Nuts, 3 Spindle Upper Support Brackets and 1 Bottom Hub. See Figure ST-23 above for identification. Assemble the 3 Spindle Arm Assemblies together as shown in Figure ST-24 below. Do the assembly close to the installation but not underneath it. Starting at the bottom near the Heal Protectors, loosely bolt the spindle connector Nuts to the Spindle Assemblies using the 5/16 x 1 3/4 bolts provided. A 5/16 washer goes against the head of the bolt. Repeat for the next three Spindle Connector Nuts. ATTACH THE LOWER HUB TO THE ASSEMBLED SPINDLE ARMS Page 9 of 17

Attach the Lower Hub to the Spindles by engaging the pins of the hub into the Spindle Arm Sections. Two pins will engage each Spindle Arm Section. o Note that you may need to tap on the Hub to get the pins engaged. ATTACH THE SPINDLE PIVOT MOUNT AND POSITION THE ASSEMBLY Insert the Spindle Pivot Mount into the Lower Bearing and stand the assembly up to rest on the Pivot Mount. Slide the entire assembly under the turnstile header and mechanism hub as shown in figure ST-26 above. INSTALL THE SPINDLE ARM ASSEMBLIES Page 10 of 17

Slide the Upper Hub up the shaft and position the Spindle Assemble under the Hub. See figure ST-27 above. Turn the Spindle Assembly until one set of the arms are pointing to the middle of the Center Passage Panel. Slide the Upper Hub down the shaft and engage the hub pins into the Spindle Arm Assemblies. See figure ST-28 above. LOWER AND LOCK DOWN THE MECHANISM. CAUTION: When lifting the mechanism to slide the tab for receiving, do not lift too high because the hub will disengage the center column. Lower the mechanism in the reverse manor of when it was lifted. Insure that all the pins in the Hub are fully engaged into the Center Column and Spindle Arm Assemblies. Slide the mechanism lock plates to the locked position. SQUARE, PLUMB and ANCHOR the Spindle Arm Assembly and Pivot Mount Tighten all bolts before square and plumb step. SQUARE and PLUMB the Spindle Arm Sections (Figure ST-30 below). Anchor the Spindle Pivot Mount Plate (Figure ST-30 below). Page 11 of 17

SECURE THE TOP OF THE TURNSTILE TO FENCE POSTS OR WALLS Secure to top of the turnstile to prevent top sway. Page 12 of 17

WIRING FOR THE STATUS INDICATOR LIGHTS CAUTION: Standard anti-static procedures should be observed when handling the Status Light Boards. It is recommended you ground yourself to the turnstile frame before handling the board. Remain in contact with the turnstile while handling the board. Remove the Status Light Cover using the #10-24 screws. Remove the Status Light assembly from the mullion using the #4-40 screws. Connect the wires to the terminal block on the Status Light Board as shown in Figure 23 above. 120 VAC power connection o o ELECTRICAL CONNECTION: Power for the turnstile must come into the header cabinet. Depending on the requirements of the site, it can either come in from the top or from one end of the cabinet. Where there are multiple turnstiles in a row it may be necessary to pass through from turnstile to turnstile with the power and control wires. Page 13 of 17

CAUTION: When drilling into cabinet do not allow metal chips to fall on or near electrical components. Collect all chips and insure area is clean before applying power. Use watertight connections where entering the cabinet with conduit. Connect power to terminal block as labeled. CAUTION: Standard anti-static procedures should be observed when handling the Turnstile Control Boards. It is recommended you ground yourself to the turnstile frame before handling the board. Remain in contact with the turnstile while handling the board. Connect card reader, pushbutton or other control contacts to either EXT1 or EXT2. Access control devices (Card Readers, Pushbuttons, etc.) must provide a momentary dry contact closure to activate the turnstile for one pass. 5 FUNCTIONAL TEST 1 With all electrical connections made, turn power on and perform a functional test of the turnstile. 2 When power is applied the turnstile center spindle arms should be locked. Try to rotate the arms in either direction. They should not rotate! A B ( Lower Solenoid) ( Upper Solenoid) START Figure 44 Start Button Location 3 TEST ROTATION a. On the control board of the direction of rotation to be tested first, push the START button. b. The solenoid that controls the direction being tested will release the locking pawl from the ratchet and allow the spindle arms to rotate. c. Push the turnstile arm sections in that direction, they should rotate for one cycle (120 degrees) and then re-lock automatically. d. Repeat a minimum of three times in each direction of rotation being tested. 4 TEST RELOCK TIMER a. Push the START button and the solenoid will activate the locking pawl. Wait ten seconds and the solenoid will de-activate the locking pawl. b. Push the START button and the solenoid will activate the locking pawl. Rotate the spindle arms approximately 10 degrees and hold in that position for more than 10 seconds, the solenoid will continue to activate the locking pawl. 5 TEST THE CENTERING MECHANISM a. Push the START button and rotate the spindle arms to just past _ cycle. Stop the arms there and release them. They should rotate on their own and finish the cycle to the home position. Page 14 of 17

6 TEST THE ACCESS CONTROL DEVICE(S) a. Repeat the steps in number four above except use the access control device (Card Reader, Pushbutton, etc.) instead of the START button on the controller. 7 VERIFY THE STATUS LIGHTS ARE FUNCTIONING a. Verify that the red X status light is on before presenting the card. b. Present the card, the red X status light will turn off and the green arrow status light will turn on. c. Rotate the spindle arms to just past mid cycle and the green arrow status light will turn off and the red X status light turn back on. 8 CHANGE FROM FAIL SECURE TO FAIL SAFE or FAIL SAFE TO FAIL SECURE (IF REQUIRED) a. Disconnect the solenoid linkage (A) from the Solenoid by pulling out solenoid pin (X). b. Rotate Solenoid to line up with solenoid linkage (B) and reconnect Solenoid using solenoid pin (X). c. Disconnect the Pawl load spring (C) from the pawl pin (Y). d. Reconnect pawl load spring (C) to pawl pin (Z). e. On the Control Board that controls the Solenoid being changed, slide switch (S) to opposite position that it is in. A START X FINISH ;; X C B ;;; Y;; ;;; ; ;;; Z ; S S Figure 45 Conversion Page 15 of 17

CONNECTION DIAGRAM: FULL HEIGHT SECURITY TURNSTILE Home Switch SW - 1 Limit Switch SW - 2 PAWL SWITCH SW - 3 SOLENOID BLACK - 8 BLACK - 9 BROWN - 1A WHITE - 2 BROWN - 3 RED - 4 WHITE - 5 BROWN - 6 RED - 7 SOCKET on Mechanism 5 7 9 A 1 B A 2 B A 3 B 4 6 8 Mating PLUG BLUE - 1 1 2 BLUE - 2 YELLOW - 3 3 YELLOW - 4 4 WHITE - 5 5 GREEN - 6 6 ORANGE - 7 7 WHT/BLK - 8 8 WHT/BLK - 9 9 24VAC from Transformer ORANGE ORANGE J1 J3 J2 J4 GND + 24 N. C. C N. O. STATUS LIGHT terminal BLK RED WHT GRN ORG HARNESS CABLE from Header to Status Light BLK RED WHT GRN ORG J14 J13 J17 J16 J15 J11 J12 J8 J7 J6 START J10 J9 J5 SOL 24 V RESET HOME EXT2 EXT1 LIMIT NOTE: On two-way control systems there are two Controller Boards. Wiring differences are; 1. The jumper wires from J1 to J3 and J2 to J4 on Controller A will change to; from J1 and J2 on Controller A to J1 and J2 on Controller B 2. There will be jumper cable from J5 on Controller A to J5 on Controller B DRY CONTACT CLOSURE(s) (from external Card Readers, Pushbuttons, etc.) Figure 46 Wiring Diagram SERVICE AND MAINTENANCE All bearings are self-lubricating and do not require servicing or lubrication. Annually check solenoid plungers for wear. If excessive wear is observed replace solenoid. Annually check mechanism self-centering and speed control cylinder by observing while rotation the spindle section. Annually check for loose bolts or nuts. Page 16 of 17

MECHANISM PARTS 11 2 8 3 ;; 5 ;; 7 1 9 6 10 4 Figure 47 Mechanism Parts Dwg # Part Number Description 1 315 4453 011 Solenoid Assembly 2 315 4383 001 Locking Pawl Assembly 3 315 4385 900 Shock Absorber 4 315 4396 910 Detent Centering Spring 5 315 4396 920 Detent Shock Spring 6 315 4397 910 Pawl Return Spring 7 315 4397 920 Solenoid to Pawl Spring 8 315 4417 001 Detent Cam Roller 9 315 4420 900 Hitch Pin Clip 10 315 4455 011 Detent Cam Assembly 11 315 4530 500 Ratchet and Bushing Assembly Page 17 of 17

2010 Aigis Mechtronics 1124 Louise Road,Winston-Salem, NC 27107-5450 Tel: 336.785.7740 Fax: 336.785.7744 100 0253 001 AIG 01/10 Printed in U.S.A. Data subject to change without notice WWW.AIGISMECH.COM