Hot Injection Adapter Kit - Installation Guide

Similar documents
Deans Switch Microfluidics

Installing the 6850 Direct Valve Column Connector Kit

260 Solvent Vapor Exit Accessory

Agilent G3969A Transfer Line Interface for an Agilent 7697A HS Accessory

INSTALLATION OF OPTIC 3 INJECTOR SYSTEM ONTO AN SHIMADZU GC-2010 GAS CHROMATOGRAPH.

Customer Information. Service Engineer s Responsibilities. Additional Instruction Notes GC Preventive Maintenance Checklist Standard

Installing the CO 2 Cryogenic Oven Cooling Kit

Dionex AS-DV Autosampler Preventive Maintenance Procedure

Nickel Catalyst Tube on a 6820 GC, Accessory G4318A

Installing a Cool On-Column Inlet

Agilent SD-1 Purification System ml/min

Installing the Dionex ICS-1100/1600/2100 Auxiliary Valve

6890 Installing ¼ Glass Columns

Choose for Your Instrument

AZ Chrom s.r.o.

Agilent 210/218 - Isocratic Pump

Agilent 6890 Gas Chromatograph

Installing a PTV Inlet

Installing a PTV Inlet

Installing a Purged Packed Inlet

Agilent 210/218 - Binary Pump

Technical Procedure for Pyrolysis-Gas Chromatography/Mass Spectrometry (Py-GC-MS)

Troubleshooting Tips & Tricks for your GC Analyzer & CFT Application

Thermo Scientific. TRACE GC Ultra UFM. Ultra Fast Module Device Instruction Manual. PN , Revision May 2010

In addition to this instruction sheet, the following are included in this kit (some additional parts are included for future maintenance):

Choose for Your Instrument. GC Supplies - Agilent Instrument Quick Pick Guide

Nickel Catalyst Tube Accessory 19205A

Choose for Your Instrument. GC Supplies - Bruker (Varian) Instrument Quick Pick Guide

Maintenance of the Electronic ( EPC ) Pressure Controllers on SRI GCs

Analysis of Petroleum Fractions by ASTM D2887

1310 Inlets. 1 of 36. Jun Illustrated Parts Breakdown Agilent 6890 Gas Chromatograph Service Manual

Increased sensitivity and reproducibility in the analysis of trace fatty acid methyl esters in jet fuel

Peristaltic Pump Operating Instructions

AZ Chrom s.r.o.

For more information about Agilent Technologies services please visit our web site using the following URL

10 Maintenance. Agilent Technologies. This chapter describes the maintenance of the module Infinity Binary Pump User Manual

Agilent Valve Kit G4231A/B and G4232A/B/C

Valve Box and Valve Accessories G4315A, G4316A, G4317A

Agilent G5632 Valve Kit Instructions

MODEL 905V OPERATING INSTRUCTIONS

Technical Procedure for Gas Chromatography-Mass Spectrometry (GC-MS)

Installing a Purged Packed (PP) Inlet

(8) Perform negative-pressure check IAW paragraph (9) Install mask-mounted regulator in regulator holder.

ASSEMBLY INSTRUCTIONS GT MIXED 150/280 SEALED CONNECTION SYSTEM

Agilent G1554A On-Column Capillary Inlet with EPC

Thermo Scientific. TRACE GC Ultra. Gas Chromatograph Spare Parts Catalog. PN , Revision October 2011

GC Inlet Maintenance:

M-9424-M50CJ INTAKE MANIFOLD INSTALLATION INSTRUCTIONS

Customer Information. Service Engineer s Responsibilities. Additional Instruction Notes GC Preventive Maintenance Checklist Standard

CONTENTS TOOLS REQUIRED:

Fuel Pump ( ) Table of Contents. Summary. View Related Topic. Summary. General Information Test. Preparatory Steps. Remove.

GCMS-QP2010 Series. Consumables. Shimadzu Gas Chromatograph/Mass Spectrometer

Agilent 6850 Series II Network GC System G2630A Performance Specifications

Installation Guide Thermal Conductivity Detector Accessory 19232E

NUMBER: S.M. REF.: Listed in Table ENGINE: EPA07 Series 60 DATE: October 2012 SUBJECT: REFERENCES TO THE TURBOCHARGER PURGE ROUTINE

Agilent InfinityLab LC Series 1260 Infinity II Fraction Collectors

Genuine Restek Replacement Parts For Agilent 5890 GCs

Agilent Valve Kit G4231A/B/C and G4232B/C/D

Updated gear lash procedures for the compact gear train assembly have been added to the Series 60 Service Manual.

Installation Manual v1.0: Twin CP3 Fuel Injection Kit Dodge 5.9L

RMK HANDLEBAR KIT P/N ; ; APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Verify accessory fitment at Polaris.com.

Cylinder and Valve: AirHawk II Air Mask

GC Supplies - Varian/Bruker Instrument Quick Pick Guide

Fisher ED and EAD easy e Valves CL125 through CL600

Agilent InfinityLab Quick Change Valves G4231A/C and G4232C/D

Agilent Multimode Inlet for Gas Chromatography

Application Note. General Use Inlet Solvent Filters. Inlet Solvent Filters. Filters and Degassers. New!

NPD to FID conversion on SRI 8610C or 310C GC July2012

JK SHIELD TIRE CARRIER INSTALLATION INSTRUCTIONS

INSTALLATION, OPERATION, & MAINTENANCE MANUAL

FULL POWER VERSION 2018 ONLY FOR COMPETITION PURPOUSE

Achieving Higher Sensitivities Using GC-FID with the Agilent Multimode Inlet (MMI)

Agilent G2738A Upstream Capillary Interface

Franking system PostBase One Service documentation

29 Installation Step 1. Unpacking the GC Cable diagrams Step 2. Placing the GC system on the benchtop Step 3. Turning the power on

TECHNICAL INSTRUCTIONS

Technical Procedure for Gas Chromatography (GC-FID)

INSTALLATION INSTRUCTIONS ELEVATION FRONT BUMPER DODGE RAM

Liquid Injection Techniques in GC and GC-MS

Installation Guide. Volatiles Interface for 6890 Gas Chromatograph Accessory G2319A

Optima ETF-600/ETF-610

INSTALLATION AND SERVICE MANUAL FOR TURBO-CARB HIGH CAPACITY CARBONATOR

Agilent 7820A Gas Chromatograph

INSTRUCTION, GPT HAND PUMP KIT (BUCHER PUMP) INSTALLATION

RANGER 900 POWER STEERING KIT

Agilent G4236A 2D-LC Valve Installation Guide

Design ED and EAD easy-e Valves Class 125 through 600

The Analysis of Hydrocarbon Composition in LPG by Gas Chromatography using the DVLS Liquefied Gas Injector

REAR ROOF SPEAKER KIT

Thank you for purchasing the Craven Speed FlexPod Complete Gauge Pod Kit For R56, R58, R59, R60 with Refresh Engines (2011+)

Fisher ED and EAD easy e Valves CL125 through CL600

PROBLEM Timing chain may break causing engine damages. SOLUTION Replace timing chain.

DL/DS Series Diaphragm Valve

Set Your Sights on Superior Performance

Installation of the 2 position/10 port valve into the 1100 series thermostatted column compartment

JC BALL VALVES ASSEMBLY AND MAINTENANCE MANUAL

It is strongly recommended that this kit be installed by an authorized Polaris dealer.

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

Hydrocarbon Fuel Doser Injector Valve Fuel Supply Line December Publication Number / Title Platform Section Title Change

Types C401, C402, C407, C421, C427, C403, and C831 Jet Bleed Internal Valve Retrofit Kits

Transcription:

Hot Injection Adapter Kit - Installation Guide This guide provides the instruction for installing the Hot Injection Adapter kit (P/N 19050733) on the SSL/SSLBKF injector for the use with an external device for gas sampling. See Figure 1. Figure 1. Hot Injection Adapter Hot Injection Adapter Introduction The Hot Injection Adapter consists of the following parts: head, short PTV liner, liner seal, and stem. See Figure 2. Figure 2. Hot Injector Adapter Assembly Head Liner Seal Short PTV Liner Stem P/N 31709712 Revision A December 2013 2013 Thermo Fisher Scientific Inc. All rights reserved.

Installing the Adapter To install the hot injection adapter on the injector: 1. Assemble the hot injection adapter if not already done. See Figure 3. Figure 3. Adapter Assembly Liner Seal Liner Fixing Screws Stem Guides a. Place the liner seal on the liner. b. Insert the liner into the stem. c. Couple the head and the stem paying attention to properly align the corresponding holes doing match the polarizing guides on the head and on the flange of the stem. d. Fix the stem to the head screwing the three fixing screws using a T8 Torxhead screwdriver. Note The stem conducts heat from the body of the SSL/SSLBKF injector to the head of the adapter allowing a hot injection. 2. Put the GC in standby condition. 3. Cool the oven, injector, and detector to room temperature. Note By pressing the Maintenance button, the GC cool down is automatically carried out. 4. Close the gas supplies. 5. Power off the GC. a. Push down the power switch (breaker), located at the back of the instrument, to the position O. b. Unplug the power cable from the AC Input connector into the back of the GC and from the wall outlet. 6. Remove the column end from the injector. a. Open the front door of the GC. b. Loosen the retaining nut from the injector fitting on the upper interior wall of the GC oven. c. Remove the analytical column with its nut and ferrule from the bottom of the injector. 7. Put the autosampler away if present. 8. Remove the SSL/SSLBKF injector module from its seat. a. Open the module flap cover. b. Using a T20 Torxhead screwdriver, unscrew the three captive fixing screws. c. Throw upward the module from its seat of the injector housing. Place the SSL/SSLBKF module on a clean surface. 2

WARNING Make sure the o-ring remains into its seat on the gas connection. Do not install the module if the o-ring is missing. O-ring 9. Replace the module flap cover with the one provided. See Figure 4. Figure 4. Module Flap Cover for Hot Injection Fixing Holes Module Flap Cover Note The fixing holes present on the top of the module flap cover can be used for making more stable a sampling device that requires to be seat directly on the injector. 10. Reinstall the injector module into the main frame. a. Open the module flap cover. b. Place the injector module in its seat. Be sure to insert the 25-pin male connector, on the bottom of the module, into the 25-pin female connector on the injector seat of the injector housing. c. Use a T20 Torxhead screwdriver to tighten the three captive fixing screws without overtighten. CAUTION To maintain the correct alignment the screws must be tightened in turn. Tighten each screw only a small amount before moving to the next screw. Repeat until all are secure. 11. Remove the top parts of the injector. See Figure 5 on page 4 3

Figure 5. Injector Top Parts Removal Septum Cap Ring Nut Septum Holder/Liner Cap with Septum Liner Seal (O-ring) Liner a. Unscrew the septum cap of the injector. b. Unscrew the ring nut. c. Remove the septum holder/liner cap with septum from the injector body head. 12. Remove the liner and its seal. a. Use tweezer to remove the current liner with the liner seal (o-ring) from the injector. 13. Remove the injector body. See Figure 6. Figure 6. SSL Injector Body Removal SSL/SSLBKF Injector Body Fixing Screws Internal Body Head O-ring External Body Head O-ring SSL Injector Body Carrier Line O-ring Purge Line O-ring Split Line O-ring 4

a. Using a T20 Torxhead screwdriver, undo the two injector body fixing screws, and extract the injector body from its housing. Note Do not remove the carrier, split, and purge lines o-rings. 14. Install the spacer plate. See Figure 7. Figure 7. Spacer Plate O-rings Spacer Plate a. Place the spacer plate and its three o-ring on the injector base. Note The three o-ring of the spacer plate do not replace the carrier, purge, and split lines o-rings but are put on them, then six o-rings are present on the base. 15. Reinstall the injector body. See Figure 8. 5

Figure 8. Injector Body Reinstallation a. Reinstall and fix the injector body into its housing by screwing the two fixing screws. b. If required, replace both the internal and external body head o-rings using tweezers. 16. Install the hot injection adapter on the top of the injector. See Figure 9. Figure 9. Hot Injection Adapter (1) Hot Injection Adapter a. Avoid touching the septum with your fingers. Insert a new septum into the septum holder cavity of the hot injection adapter using tweezers. See Figure 10 on page 7. 6

Figure 10. Hot Injection Adapter (2) b. Guide the ring nut on the hot injection adapter with the septum, then fix it screwing the ring nut. See Figure 11. Figure 11. Hot Injection Adapter (3) ) c. Screw and tighten the septum cap to finger-tight. See Figure 12. Figure 12. Hot Injection Adapter (4) CAUTION Do not overtighten the septum cap because you might damage the septum and affect instrument performance. 7

17. Close the module flap cover. 18. Connect the hot injection adapter to the device for the sampling of gas. See the example in Figure 13. Figure 13. Hot Injection Adapter (5) IN OUT CAUTION If only a port of the adapter is connected to the device for the sampling of gas, close the other one with the blind nut provided. 19. Reconnect the column end to the injector and verify the connection point. 20. Open the gas supplies. 21. Power on the GC. 22. Plug the power cable to the AC Input connector into the back of the GC and to the wall outlet. 23. Flip out the power switch (breaker) to the position I. 24. Pressurize the module with the carrier gas. 25. Check for leaks. a. Use a handheld electronic leak detector (Thermo Scientific GLD Pro leak detector or equivalent) to check the two fitting for leaks. b. If you detect a leak, tighten the connection and retest it. c. Repeat this process until all connections are leak free. 26. Close the front door of the GC. 27. If present, update the autosampler for the new injection position. 8