Wind Control Panel Instruction Manual (for use with AIR Breeze and AIR 40 12V turbines)

Similar documents
Wind Control Panel Instruction Manual (for use with AIR Breeze and AIR 40 12V turbines)

User Manual. Solar Charge Controller 3KW

10A / 15A / 20A Solar Charge Controller. PU1024 / PU1524 / PU2024 series INSTRUCTION MANUAL

Duo Battery Charge Controller

Owner s Manual. Solar Controller GP-PWM-30

User Manual Solar Charge Controller 3KW

LS0512 Solar Charge Controller

LIGHTNING PROTECTION UNIT (LPU)

Coleman Air C440-HVM 440 Amp Diversion Controller Version 3.2

SCC-MPPT Solar Charge Controller

MPPT SOLAR CONTROLLER FOR MODELS: 20A baterai 12V 24V

Solar Charge Controller

User Manual. Wind and Solar Hybrid Charge Controller 1KW / 2KW 48VDC. HCON Series

LS0512R Solar Light Controller

AeroVironment Universal Solar Pump Controllers

C.E. Niehoff & Co. C653/C653A and C625 Alternators Troubleshooting Guide NOTICE. Hazard Definitions. Battery Charge Volt and Amp Values

Contents INTRODUCTION... 2 CHECK YOU HAVE RECEIVED... 4 WHAT YOU WILL NEED...4 TECHNICAL CHARACTERISTICS...5 WIRING DIAGRAMES...6 CABLES...

SMT. Installation and Operation Manual. Model:SMT WITH MPPT TECHNOLOGY

SCC-MPPT Solar Charge Controller

INSTRUCTION, TRAIL CHARGER KIT P/N

Microgrids Outback Power Technologies

The Traveler Series: Wanderer

Blancett Flow Meters A Division of Racine Federated Inc. 100 East Felix Street South, Suite 190 Fort Worth, Texas FAX:

SOLAR LIGHTING CONTROLLER SUNLIGHT MODELS INCLUDED IN THIS MANUAL SL-10 SL-10-24V SL-20 SL-20-24V

Signal Mirror Installation Instructions Standard West Coast Mirror

INSTALLATION GUIDE PRISONER TRANSPORT LIGHTING. pro-gard.com STRONG RELIABLE SECURE

BEAMER MODEL VDC Spotlight with joystick control panel MODEL VDC Spot/flood light with joystick control panel

Missouri Wind and Solar Wind Turbine Installation Instructions

Slope Detector IV Installation Instructions

The Traveler Series: Wanderer

Intelligent Charging System Series

SECOND GENERATION Use this guide with unit serial number prefix beginning with BWF using Terra Power separator.

DURA-PANEL W OUTPUT: 12 VDC, 20 Watt W OUTPUT: 12 VDC, 50 Watt W OUTPUT: 12 VDC, 100 Watt

MicroTech III Water Source Heat Pump Wall-Mounted Room Temperature Sensors

Art. No. EC-315. Art. No. EC-330. Art. No. EC-340 SWITCH-MODE BATTTERY CHARGER CONTENTS IMPORTANT SAFETY PRECAUTIONS... 2

SPECIAL SPECIFICATION 8676 Solar Panel Power Supply System

Solar Hybrid Power Generating System CPS1200EOH12SC CPS2200EOH24SC CPS3000EOH24SC. User s Manual K01-C

JOHN DEERE GATOR SWITCH PANEL INSTRUCTIONS FITS 1GTRXUV2 AND 1GTRXUV4 CABS (p/n: 1XUVSP)

S&C Vista Underground Distribution Switchgear

Electronic Dynamo Regulator INSTRUCTION MANUAL. COPYRIGHT 2014 CLOVER SYSTEMS All Rights Reserved

SBC / 2140 / Stage Battery Charger User Manual

Off Grid Cabin Special Pkg 1-170W PV

Tri-Spark Ignition System Installation Triple Cylinder TRI-0001

Some admonitions you must know before using DS600

MANUAL Model: PT 12/24-60 Solar Converters Inc. - Rev. F

Wind Energy System.

Zeon Control Pack Relocation Kit 78 Cable Length

Owner s Manual. Contents GP-PWM-30-SQ GP-PWM-30-SQ

Off Grid Residential Package 1.0KW

Recommended Tools: Phillips Screwdriver, Flat Blade Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver,

The Traveler Series: Adventurer

SCC-MPPT Solar Charge Controller

Electrical Wiring Practices

672W Off Grid Residential Package

Gentex by VOXX Corporation Installation Instructions

Special Note About The JDM High Performance Water Pump:

American Weigh Scales LS-110. User Manual. LS-110 (110lb x 0.2lb) Copyright 2010 American Weigh Scales, Inc. All rights reserved. Rev. 2.

AUTO CHARGE 12HO-PIM AUTOMATIC BATTERY CHARGER

3 Year SENTRY 300 S / 300 D. Installation/Owners Manual. High Quality Low Voltage Vehicular Swing Gate Opener

Coleman Air Diversion Controller Model C160M Version 4.3 With Extended Diversion Mode

Inverter User Manual

WIRELESS SMART TOW SYSTEM (3RD GENERATION)

INTELLICHLOR SALT CHLORINATOR COMMERCIAL SYSTEM COMSYS-8 (P/N )

Coleman Air Diversion Controller Model C40

STRESS-TEK, INC S. 194 th Street Kent, WA June 2011 Stress-Tek, Inc. Doc Rev A

VEHICULAR CHARGER TM

Model No. SB1B-14 Linear Standby Regulator. B & C Specialty Products P.O. Box B Newton, KS (316)

Advanced Troubleshooting Guide Snorkel V Battery Charger Rev 0 3JAN07

isrn 1600W 24V W nd & Solar Hybrid Charge Controller User Manual Contents:

GPS AutoSteer System Installation Manual

Owner s Manual. Contents GP-PWM-10-SQ

The Power Systems Industry Experts. Installation Instructions. PT100 Stationary Generator Monitoring System

User Guide. BreezePro TPW-400DT 12/24V 400W Wind Turbine A. NOTICE. B. SAFETY PRECAUTIONS (Important) C. About BreezePro

C802/C802D/C802TD/C820 Alternators Troubleshooting Guide

MODEL NUMBER: MEDIUM DUTY ONBOARD AIR SYSTEM

Cruising Charger Series OWNER S MANUAL

C FORD F250 / F L POWERSTROKE DIESEL WITH AUTOMATIC TRANSMISSIONS ONLY

AERL RACEMAX MAXIMIZER User's Manual

The Traveler Series TM : Adventurer

Description Sets the priority for the AC source (AC1 or AC2) for qualification and transfer.

Eclipse Solar Suitcase

Montana State University: Solar Cells Lecture 9: PV Systems. Montana State University: Solar Cells Lecture 9: PV Systems

RoadComfort TM. Installation Manual Vibration Massage & Heat

Product Data Sheet : LIGHTHAWK 6 CELL

USER MANUAL Seabourne Solutions LLC

L I T H I U M B AT T E R Y

ECO SOLAR POWER KITS. User Manual GP-ECO-10 GP-ECO-20 GP-ECO Go Power! Worldwide Technical Support and Product Information gpelectric.

Installation and Service Manual

1000 Watt Power Inverter INSTRUCTION MANUAL HT87112-AUOXY

PFadvantage MF 6850/6855; Ideal 9080/9090

Boston Gear Ratiotrol DC Motor Speed Control

For additional technical tips, please visit

USER MANUAL MPS 1-5KW SERIES

Electronic Dynamo Regulator INSTRUCTION MANUAL. COPYRIGHT 2014 CLOVER SYSTEMS All Rights Reserved

AEROMOTIVE Part # HP Hot Rod EFI Kit INSTALLATION INSTRUCTIONS

ELECTRO-MECH SCOREBOARD CO.

Installation and Operations Manual

Installation Manual GT500 GT500R RAB

10 AMP ON BOARD BATTERY CHARGER

GPS AutoSteer System Installation Manual

Transcription:

Wind Control Panel Instruction Manual (for use with AIR Breeze and AIR 40 12V turbines) The wind control panel is fully calibrated and ready for installation. Please follow the instructions below for proper installation. P/N VOLTAGE BREAKER AMMETER 2-ARAC-103 12 VDC 160 W TURBINE 25A 15 2-ARAC-104 24 VDC 160 W TURBINE 10A 8 2-ARAC-107 48 VDC 160 W TURBINE 5A 8 2-ARAC-108 12 VDC 400 W TURBINE 40A 30 OVERVIEW: The POWER switch is used to turn the wind turbine control panel on and off as well as provide protection in the case of a major fault. The STOP-RUN toggle switch controls the operation of the wind turbine. In the RUN position, it allows the wind turbine to operate and produce power while in the STOP position it places an electric brake on the wind turbine spindle stopping the rotation (in this mode, slight blade rotation may occur in strong winds). The center position is an OFF position (disconnecting the wind turbine), but is not recommended. The Ammeter monitors the wind turbines production. The wind control panel should be connected to a wind turbine with a current rating equal to or less than the panel's rating. The Air Breeze and Air 40 units have built-in battery charge regulators. If a wind turbine is utilized that does not have a built-in regulator, an external diversion load controller will be necessary to provide proper protection from over charging the battery bank. Warning Disconnect battery(s) prior to making connections. Secure the rotor blades of the wind turbine mechanically so that it is unable to rotate. Pg.1/5

MECHANICAL INSTALLATION: Locate a suitable mounting area for the Wind Control Panel, preferably close to the battery bank and maintaining the ability to view the meter and operate the controls. Panel Mount: The panel should be mounted in a clean and dry environment. Be sure the mounting location is mechanically sound. Allow adequate space behind the panel so that the components will not touch any surfaces, wires or other items. In the back of this manual you will find a 1:1 cutout template to assist in installation. Identify your optimum mounting location keeping in mind that adequate room will be needed for the large wire sizes (#10 - #8) to be terminated on the terminal block (TB-3). Using the template, cut the large opening and drill the six mounting holes. ELECTRICAL INSTALLATION: 1) Wind Turbine: Connect the wires of the wind turbine (TB-3), Negative (Black) to Terminal 2 and Positive (Red) to Terminal 1 of the Control Panel using the appropriate wire size and crimps. The Green (Ground) wire of the wind turbine should not be connected to the boat grounding system but instead should be connected to the Negative wire (Black) of the wind turbine prior to connecting to the Control Panel Terminal 2. If the ground wire is directly connected to the negative vessel buss or ground system, the wind turbine may not operate properly. Warning ABYC STANDARDS AND PRACTICES should be followed during the installation along with recommendations made in the Air manual. This manual is made available to assist during installation and start up and is not intended to supersede the ABYC Standards or the other requirements and recommendations. Pg.2/5

Caution Interconnect wire sizing (wind turbine/input and battery bank/output), of the control panel is critical to proper operation of the wind turbine. Consult a Wire Sizing Table to confirm the minimum appropriate wire size for a voltage drop of less than 3%. A wiring sizing table is available at www. under Wire & Cable section of the AIR manual. 2) Battery: Connect the battery feed wires to TB-3 Negative (Terminal 4) and Positive (Terminal 3) of the 12V battery bank to the control panel using the appropriate wire size and crimps. CAUT ION: Be sure these wires are not connected to the battery at this time! 3) Mounting: Mechanically install the panel into place using all six mounting holes. 4) Connection: Verify the POWER switch on the Control Panel is in the OFF position. Set the STOP-RUN switch in the STOP position. Connect the battery feed wires from the Control Panel to the battery bank terminals. Make sure all connections are tight and the wires are properly sized. TROUBLESHOOTING 1) Wind Turbine is Cycling On/Off: When the battery bank is approaching full charge, the wind turbine may start and stop frequently. This is caused by the wind turbine attempting to do the final top off on to your battery bank. Rotate the potentiometer located on the body of the AIR wind turbine slightly counterclockwise (10 ). This will cause the wind turbine to turn off first allowing other sources, such as a PV array, to complete the 3 stage charging process. 2) Wind Turbine Not Operating Properly: The AIR wind turbine contains a microcontroller for operating its systems. From time to time transients or electrical noise (i.e. lightning strikes, keying the SSB microphone, etc.) may cause these microprocessors to go unstable. To correct the problem turn off the circuit breaker, wait approximately two minutes and then re-power the device. If this is unsuccessful, please refer to the manufacturer's manual for additional troubleshooting techniques. Pg.3/5

START UP: Remove the mechanical tie off of the wind turbine. Turn the POWER switch to the ON position and the RUN-STOP switch to the RUN position. If there is sufficient wind present, the wind turbine should begin turning and current should be displayed by the Ammeter. However, if the battery bank is fully charged, the wind turbine will not rotate. Please see the wind turbine instruction manual for more information. Warning Set the wind turbine RUN-STOP switch to the STOP position prior to switching POWER switch off or on. In order for the wind turbine to be operational, the POWER switch must be in the ON position. When wind is available, this will allow the wind turbine to begin charging the battery bank. Leaving the circuit breaker on and wind circuits active will deplete only a minor amount of energy from your battery during non-energy producing periods and should not be of concern. The wind system works in harmony together with other energy producing systems on board such as solar PV, alternator or AC powered battery charger and therefore it is not necessary to turn off the wind circuit breaker when these are active. The wind turbine monitors battery charge condition and controls the energy into the battery bank and will not overcharge the batteries should they become fully charged. Note It is strongly recommended the installer/user read the turbine operating manual prior to powering up the PWP Wind Control panel and related equipment. Adjustments may be necessary based on the type of batteries in the system and other optional features which may be needed for your particular installation. Technical questions and support is available during our normal business hours. Call: 303-242-5820 Mon-Fri 8-5 pm MST Pg.4/5

Wind Control Panel Connection Diagram Wind Generator Connection Diagram Wind Generator Battery Bank + - Battery to Fuse connection max of 7" per ABYC Fuse (optional) RED BLACK Mechanically support wires in mast from pulling on splices. Pg.4/5 12/24 VDC House Battery Notes: 1) Wire size is critical to the successful operation of the alternat ive energy system. If greater wire lengths are needed, wire size may have to be changed and sized to allow a maximum of 3% voltage drop over the distance of the connection. 2) Locate the Wind Control Panel (WCP) in an area close to the house battery bank but outside any high temperature areas. Do not install in a tight battery compartment that houses vented wet cell batteries. Must be in a dry compartment. 3) Do not run wind generator wires in bundles that contain SSB radio antenna. 4) Always place STOP-RUN switch on the WCP in STOP position prior to making connections to the WCP. 5) Battery connection is made last. Wind Circuit Breaker on the WCP must be placed in the OFF position prior to making final connections at the battery. 6) Crimp and butt splice connections are critical for proper system operation. Use proper crimping tools and complete clean, stripped wires when making these connections. 7) Wind generator is required to have a built in regulator (e.g. AIR Wind Turbines) to prevent overcharging of batteries. If wind generator is not equipped with a built-in-regulator, an external shunt regulator (a diversion load controller) or similar should be connected to the battery to prevent overcharging condition by the wind generator. + _ + _ 1 2 3 4 Wind Generator Battery

Appendix Wind Control Panel 1:1 Cutout Cut along dotted line Drill 6 Holes 3/16 inch Pg.5/5