DATE Updated November 30, 2007

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of 10 Apparatus Service Tests Revised

32 quarts Transmission Allison HT 740 Automatic Fluid

Driver Operator Aerials: Maintenance and Testing. 4 Skills Total. NFPA 1002, Standard for Driver Operator Professional Qualifications, 2014 Edition

ADESCO.LLC January 21, 2011

Driver/Operator Program Part III - Tanker

Main Fire Pump Engagement. Shifting Into Pump 2006 / 2007 KME

PUMP PERFORMANCE TEST

W & Y Series Split Shaft Transmission Operation & Maint.

Table of Contents Illustrations

L-l0 Cumins Turbo charged engine needs five minute cool down at idle speed. Wisconsin engine needs five minute cool down at idle speed

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of Sutphen Aerial Operations Revised

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of Sutphen Aerial Operations Revised

Maintenance and Specifications

As a safety precaution, remove keys from the ignition while working under or around the vehicle.

C21 Series Transmission Operation and Maintenance Instructions

100 Gallon Skid Sprayer

S200-P Series Centrifugal Fire Pumps Operation and Maintenance Instructions

Driver/Operator - Mobile Water Supply

: 1250 gpm in the deck mode : 800 gpm while operating in the ground base - Dual Inlet : 1000 gpm while operating in the ground base - Single Inlet

ESCONDIDO FIRE DEPARTMENT TRAINING MANUAL ENGINE MODULE HOSE PAGE 1 OF 20 Supply Hose Lays Revised

Background. Vehicle Specifications

ESCONDIDO FIRE DEPT TRAINING MANUAL Section DRIVER OPERATOR Page 1 of 13 Pumps and Accessory Equipment Revised

Pierce Ultimate Configuration (PUC) Pumpers Operation & Maintenance Manual

Pierce Ultimate Configuration (PUC) Pumpers Operation & Maintenance Manual

Inspections of Aerial Equipment

Filling and Flushing the Hydrostatic System

Suction Elbow Flow Performance Tests

Property of American Airlines

BIG SPRING FIRE DEPARTMENT STANDARD OPERATING PROCEDURES SOG 417: LADDER TRUCK OPERATIONS SOP: 417. Ladder Truck Operations.

Coolant Refill/Air Purge Tool User Instructions

QUARTERLY / ANNUAL MOBILE FIRE APPARATUS INSPECTION REPORT. Manufacturer. Serial no. Legend:

ADO-Pumping Apparatus Manipulative Skill Objectives PREVENTIVE MAINTENANCE

MASTER COALESCER JR & PORTABLE MASTER COALESCER JR AIR PUMP MODEL INSTALLATION MANUAL

TRAINING BULLETIN APPARATUS P-2 January 22, 1998 FLOWMETERS

R I T. Title: Westech 372 Polisher Semiconductor & Microsystems Fabrication Laboratory Revision: C 08/07/07 1 SCOPE 2 REFERENCE DOCUMENTS

Installation, Operation & Maintenance Manual. For Pro-Fill kits with part numbers beginning in BG

High Rise Fire Pumps CM/CGV Series, CMU/CGV Series. Operation and Maintenance

Superior Performance

Installation, Operation & Maintenance Manual

Mini Pump Installation, Operation & Maintenance Manual. For Models: BA-MS-633

HL Series Centrifugal Fire Pumps Operation and Maintenance Instructions

Operation and Maintenance. S100 Series Centrifugal Fire Pumps. Table of Contents. Visit us at F /22/02 6/21/18

Gas Engine overheat diagnosis

PRELIMINARY. Engine Speed Standby Power Prime Power Continuous Power. RPM kwm BHP kwm BHP kwm BHP. Litre / hour

Front Suction Flow Test

NUMBER: S.M. REF.: Listed in Table ENGINE: DD Platform DATE: May 2010

100 Gallon 4- Wheel Sprayer

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

West Metro Fire Protection District

The following is a list of guidelines that apply to all evolutions.

of Fire Pump Assemblies

Pump Operating and Maintenance Manual - Models

Installation, Operation, Repair and Parts Manual

50 Gallon Skid Sprayer

ADJUSTING PRESSURE USING THE BOOM NOZZLES OPERATION

Powered Industrial Vehicle Policy

Inspection, Testing, and Maintenance Fire Pumps NFPA 25, Chapter 8 as amended by CCR, Title 19 Page 1 of 8

CAUTION. Start & Stop Procedures. Section 1-2. Engine Oil Level

Voltmaster Centrifugal Trash Pumps

Maximum Flow: 600 GPM (3800 LPM) Portable Base 1250 GPM (4800 LPM) Direct Mount. Maximum Pressure: 200 PSI (1380 Kpa, 13.8 BARS)

100 Gallon Skid Sprayer

Trailer Sprayer Owner s Manual

Symptom: P0068-MANIFOLD PRESSURE/THROTTLE POSITION CORRELA- TION - VACUUM LEAK DETECTED

Operation and Maintenance. CG Series Centrifugal Fire Pumps. Illustrations

1/2" AIR DRIVEN DIAPHRAGM PUMP

Honda Accord/Prelude

OWNER S MANUAL. Model: FSUTV-45-12V ( ) (45 Gallon Lawn & Garden UTV Sprayer, Boom Ready) Technical Specifications. Assembly Instructions

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.

6X6 3-Stage Jet Pump. Safe Operating Procedures

S200-G Series Centrifugal Fire Pumps Operation and Maintenance Instructions

NMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST

GHT-15 OPERATION AND MAINTENANCE MANUAL

PENNSYLVANIA STATE FIRE ACADEMY PUMPER - DRIVER/OPERATOR (PDO) SKILL STATIONS. Pumper -Driver / Operator (PDO) Skill Stations

Priming Systems Installation Instructions

Technical Bulletin

Putty 2000 Chop Check Start-Up Instructions

Engine Performance 1500 RPM

Centrifugal PTO Pumps. 2 nd Edition

HORRY COUNTY FIRE / RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING PROCEDURE SOP 715 HYDRANT AND WATER POINT INSPECTIONS

AKRON NEW YORKER MULTIVERSAL NOZZLE

STYLE 5148 MERCURYMASTER OSCILLATING NOZZLE INSTALLATION, OPERATING, AND MAINTENANCE INSTRUCTIONS

REAR MOUNT AERIAL LADDER USED AS A WATER TOWER

180 Lake Ave North Paynesville, MN Phone: (320) MASTER MANUFACTURING MASTER GARDNER

WILDFIRE OPERATOR TRAINING MANUAL

Begin Program: Welcome everyone and introduce yourself, speaker(s) and/or interpreter if one is present/necessary. Feel free to include your name/prog

Powered Industrial Trucks

-ff. F=*'l DETROIT DIESEL ELECTRONIC FIRE COMMANDER PRESSURE GOVERNOR OPERATION GUIDE EEE]EI. ElFIlE I IDLE I MESSAGES DISPLAYED HERE

Model No. LG55-3PT 55 Gallon Sprayer 3 Point Lawn & Garden Sprayer Model No. LG27-3PT 25 Gallon Sprayer GENERAL INFORMATION

OWNER S MANUAL. Model: LG-30-TRL ( ) (30 Gallon Lawn & Garden Trailer Sprayer)

ON-VEHICLE INSPECTION

Installation of the Altitude-Compensating Fuel Pump on IO-240-B Series Engines.

OPERATING INSTRUCTIONS

Tests & Adjustments - General Machine. General Safety Hydraulic Tank Turbo Boost Regulator

SAFETY AND OPERATING MANUAL

SAFETY MANUAL READ FIRST!

AFC 12917: Deaeration Tank Hose Rerouting. Study Guide TMT Course Code: 8438

123 Industrial Loop Road Paynesville, MN Phone:

M-6642-MB Boss Oil Cooler INSTALLATION INSTRUCTIONS

11 OPERATION AND VERIFICATION

Transcription:

Pump Service Testing SCOPE This guideline shall apply to all members of the Stoney Point Fire Department (SPFD) and shall be adhered to by all members responsible for conducting pump service testing. PURPOSE All apparatus with fire pumps exceeding 500 GPM will receive annual pump testing. The on duty staff may also request pump testing post significant incidents in which the pump may have been damaged, significant repairs or as needed to assure that the apparatus will perform to its capacity. After completing all of the required/recommended testing Guidelines the results will be filed with all maintenance records for that specific piece of equipment. If for any reason the pump fails to pass the testing Guideline the on duty officer will notify the Fire Chief Immediately. All apparatus must be properly maintained in accordance with the manufacturer s guidelines. This is in addition to the weekly maintenance check. A trained fire apparatus service technician should be used for all work on Stoney Point Fire Department apparatus with oversight by the Station Maintenance Officer. Each individual apparatus will be given a complete preventive maintenance check at least once a year. All Stoney Point Fire Department apparatus with pumps will be service tested at least annually, in accordance with NFPA 1911. The Station Day Shift Captain shall oversee the annual testing and proper documentation of each piece of fire apparatus. At the conclusion of the testing the Day Shift Captain shall notify the Fire Chief of any deficiencies or units that failed to pass.

Procedure 1. Safety Precautions During Service Tests A. All personnel should wear protective clothing and hearing protection. B. Prevent water hammer: Open and close all valves and nozzles slowly. C. Do not stand over or straddle hose. D. Mark all discharges and couplings, and monitor for separations. E. Manipulate engine throttle slowly. Prevent sudden changes, which can damage equipment and personnel F. Tie down test nozzles and equipment securely. G. Walk, don t run. And watch where you are walking H. Beware of the location of all personnel in relation to hose lines. 2. Guidelines for test conditions A. Air Temp. (0 100 F) B. Water Temp. (35 90 F) C. Barometric Pressure (29 in. Hg. Minimum, Corrected to Sea level) D. Vacuum (Minimum required shall be permitted to be reduced by 1 in. Hg. For each 100 ft. of elevation) E. Max. Lift (10 Feet) F. Suction Hose (Max. 20 ft.) G. Water Supply (Test at draft if possible) H. Pump Pressure (All tests are conducted at Net Pump Pressure) 3. Engine Accessories (All drive train, electronics, and load management shall operate as normal) 4. Test Results (All test results must be within 90% of the original delivery rating of the unit NFPA 1911, current edition) TESTING GUIDELINES 5. Engine Speed Check (No Load Governed Engine Speed) A. Check all fluids prior to test B. Bring engine to normal operating temperature (Approx. 180 190 F) C. Chock Wheels D. Set parking brake E. Place transmission in neutral (N) position F. Test maximum governed engine speed using throttle pedal in cab

G. Record records results on worksheet H. Proceed to dry vacuum test Test # 1 (Dry pump vacuum test) A. Drain main pump (close tank to pump valve) B. Connect 20 ft. (2 10ft. Sections) of hard suction hose to pump suction C. 1000 GPM 5in. hose D. 1250 GPM 6in. Hose E. 1500 GPM 6in. Hose F. Cap hard suction hose G. Close all discharge, drain, and tank fill valves H. Cap all pump intakes and open all intake valves (Close all intake drains) I. Uncap all pump discharges (Valves closed) J. Run priming pump until max. in. Hg. Is achieved on apparatus gauge M. Do not run priming pump for more than thirty seconds N. Record time required reaching both 22 in. Hg. And max. in. Hg. O. Turn off engine and priming pump, listen for leaks P. Observe vacuum reading for 5 minutes. Max. allowable drop 10 in. Hg. In 5 minutes Record test results on test sheet Test # 2 (Priming test) A. Set up pitot with proper nozzle size for capacity test B. Remove suction hose cap and replace strainer C. Attach rope to suction hose and strainer D. Place hard suction in to the pit E. Submerge the strainer at least 24 in. below the surface F. Tie of hose with rope G. Use chaffing pad on hard suction as needed H. Measure water level in pit (Max. 10 ft. lift) I. Chock wheels on the engine J. Set up pitot manifold (Deck Gun) K. Start engine and engage pump L. Place transfer valve in parallel or volume position (Skip if Single Stage) M. Start priming pump and stop watch, time priming test N. Test ends when water discharges at nozzle and out the priming pump O. 1000 and 1250 GPM pumps must be under 30 seconds P. 1500 GPM may allow 15 seconds extra if equipped with 4 in. front/rear suction

Q. Maintain minimum of 50 PSI pump pressure R. Maintain water flow S. Record results on worksheet Test # 3 (100% Capacity @ 150 PSI. 20 Minutes) A. Select and set up proper pitot nozzle size for GPM B. Place transfer valve in parallel position C. Slowly raise pump pressure and pitot pressure to desired readings D. Re measure lift distance E. Start time test and record all gauge readings on worksheet F. Obtain and record all manual pump readings within one minute of 5 minute readings G. Continue test for 20 minutes from 1st recording H. Record all gauge readings at 5 minute intervals I. Monitor engine and pump performance Test # 4 (Pressure Control Device Test @ 90 PSI) I. Obtain 90 PSI. By adjusting engine throttle only II. Set pressure control device for 90 PSI III. Slowly close all discharge valves one at a time IV. Observe and record pump discharge pressure rise on worksheet V. Open discharge valve to allow water to flow Test # 5 (70% capacity @ 200 PSI. 10 Minutes) A. Select and set up proper pitot nozzle size for required GPM flow B. Place transfer valve in Parallel position C. Slowly raise pump pressure and pitot nozzle pressure to desired D. Start time test and record all gauge readings on worksheet E. Obtain and record all manual pump counter readings F. Continue test for 10 minutes G. Record all readings in 5 minute intervals H. Monitor engine and pump performance Test # 6 (50% Capacity @ 250 PSI npp) A. Select and set up proper pitot nozzle size for required GPM flow B. Place transfer valve in series position C. Slowly raise pump pressure and pitot nozzle pressure to desired readings D. Start time test and record all gauge readings on worksheet

E. Obtain and record manual pump counter readings F. Continue test for ten minutes G. Record all information on the worksheet at every five minute interval. H. Monitor engine and pump for performance Test #7 (Pressure control device test @ 250 PSI npp) A. Obtain 250 PSI. By adjusting engine throttle only B. Set pressure control device for 250 PSI. C. Slowly close all discharge valves one at a time D. Observe and record pump discharge rise on worksheet (Not to exceed 30 PSI) E. Open discharge valve to allow the flow of water. F. Slowly reduce engine speed, and shut off water flow G. Disengage main pump H. Idle engine for ten minutes before shutting down ALLOW ENGINE TO RUN FOR ADDITIONAL 10 MINUTES, CYCLE PUMP End of test Guidelines A. Check engine for abnormalities and engine fluid leaks B. Check and refill all engine fluids as needed (Do not open radiator) C. Check, clean, and return all equipment used D. Clean test site E. Note all problems or observations on service testing form. F. Advise duty captain or paid staff member of any problems found or equipment that needs to be taken out of service. G. Complete the final results section of the service testing form H. Complete and sign service testing form. I. Service testing record should be then filed in Apparatus maintenance book.