Part 3 Agreement Programs for 2017 and Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act

Similar documents
Renewable and Low Carbon Fuel Requirements Regulation Summary:

LOW CARBON FUELS IN BRITISH COLUMBIA

Carbon Intensity Records under the Renewable and Low Carbon Fuel Requirements Regulation

Renewable and Low Carbon Fuel Requirements Regulation Summary:

British Columbia Ministry of Energy, Mines and Petroleum Resources Victoria, B.C. January 31, 2018

RICanada Comments on the British Columbia Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act and the Renewable and Low Carbon

Low Carbon Fuel Requirements in Canada

California Environmental Protection Agency. Air Resources Board. Low Carbon Fuel Standard (LCFS) Update 2015 CRC LCA of Transportation Fuels Workshop

LOW CARBON FUELS IN BRITISH COLUMBIA. BioCleantech Forum November 3, 2016

CITY OF MINNEAPOLIS GREEN FLEET POLICY

LOW CARBON FUEL REQUIREMENTS IN BRITISH COLUMBIA

Environment and Climate Change Canada Clean Fuel Standard for ISCC Stakeholder Meeting North America

Request for Proposals. Verifiable Carbon Offsets Generated in North Carolina, South Carolina or Virginia

In this Information Bulletin, the following terms, where capitalized, have the following meanings:

The California Low Carbon Fuel Standard. John D. Courtis August 10-12, 2009

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

Your Fuel Can Pay You: Maximize the Carbon Value of Your Fuel Purchases. Sean H. Turner October 18, 2017

Renewable Fuels Regulations. Performance Report: December December 2012

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

Canada s Passenger Automobile and Light Truck Greenhouse Gas Emission Regulations for Model Years

Re: Comments on British Columbia Low Carbon Fuels Compliance Pathway Assessment

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic

Fuels Roadmap for 2020 and beyond - implications for future strategy

Trans-Asia Phils Manufacturing Industries Corporation

The Modernized Green Commercial Vehicle Program

CertRom. BUCHAREST, S5 Calea 13 Septembrie 231A; Ph: , Fax: ;

New Ultra Low Sulfur Diesel fuel and new engines and vehicles with advanced emissions control systems offer significant air quality improvement.

Merger of the generator interconnection processes of Valley Electric and the ISO;

Introduction to General Requirements for CORSIA. Tetsuya Tanaka Chief, Climate Change Section - Environment ICAO Secretariat

TORONTO TRANSIT COMMISSION REPORT NO.

Yukon s Independent Power Production Policy

Unilever Sustainable Palm Oil Sourcing Policy

Overview of Electricity Trade Agreement between Québec and Ontario. May 10, 2017 For Information Purposes Only

Solar-Wind Specific Request for Proposals

Feasibility of Establishing an E85 Fuelling Station in Oshawa

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

How Carbon Intense Is Your Fuel?

ENERGY STAR Program Requirements for Single Voltage External Ac-Dc and Ac-Ac Power Supplies. Eligibility Criteria.

RFP Agricultural Tractors (AG tractor) SCOPE OF THE PROPOSAL

British Columbia Low Carbon Fuels Compliance Pathway Assessment

Evaluating Stakeholder Engagement

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

Request for Qualifications. for

New EU Regulation on General Safety. Implementation of Tyre Aspects

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

Avon Products, Inc. Particulars. RSPO Annual Communications of Progress Particulars Form. About Your Organisation. 1.1 Name of your organization

County of Sonoma Agenda Item Summary Report

The Director, Purchasing and Materials Management recommends that:

Opportunities for High Blend Liquid and Gaseous Biofuels in the UK

SECONDARY FUEL TESTING ARRANGEMENTS

Palm Oil Processors and Traders Operational Profile 1.1 Please state your main activity(ies) within the supply chain Post-refinery processor Ingredien

MEMORANDUM. Proposed Town of Chapel Hill Green Fleets Policy

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

RFS2: Where Are We Now And Where Are We Heading? Paul N. Argyropoulos

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

City of Palo Alto (ID # 6416) City Council Staff Report

Decision on Merced Irrigation District Transition Agreement

Baronie NV. Particulars. RSPO Annual Communications of Progress Particulars Form. About Your Organisation. 1.1 Name of your organization

Please note: This guideline has been updated according to the BPP extension requirements.

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

BASF SE. Particulars. RSPO Annual Communications of Progress About Your Organisation. Membership. Particulars Form Page 1/1.

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

JOINT PRESS RELEASE BY MYHSR CORPORATION & SG HSR PTE LTD LAUNCH OF ASSETS COMPANY TENDER FOR THE KUALA LUMPUR SINGAPORE HIGH SPEED RAIL PROJECT

Net Metering Policy Framework. July 2015

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

City Transfer Stations: Loading Services and Fees

Loblaws Inc. Particulars. RSPO Annual Communications of Progress About Your Organisation. Membership. Particulars Form Page 1/1

CN is offering our Fleet Integration Program for grain shippers who are using privately owned, covered hopper cars for

WESTERN EIM BENEFITS REPORT Second Quarter 2018

Maritime emissions IMO discussions

ANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS. Article 1. General Provisions

RFQ Fleet Vehicles. The City of Dawson Creek is requesting quotations for the supply and delivery of:

Recharge Kick-off Meeting Recharge Activity Review Process for

PROPOSED HEAVY-DUTY VEHICLE AND ENGINE GREENHOUSE GAS EMISSION REGULATIONS UNDER CEPA, 1999

ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL

Consumer Goods Manufacturers Operational Profile 1. Main activities within manufacturing Biofuels Operations and Certification Progress 2. Do you have

Environmental and Conservation NGOs Operational Profile 1.1 What are the main activities of your organization? WWF was established in We are a s

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

Economic and Social Council

Application Summary Additional Vehicles & Amendment to Licence

LAJKONIK SNACKS SP Z.O.O

RNG Production for Vehicle Fuel. April 4, 2018

RSB List of Documents and references

RSB ROUNDTABLE ON SUSTAINABLE BIOMATERIALS RSB List of Documents and references. 18 January RSB reference code: RSB-DOC

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

Colgate-Palmolive Company

Oil Palm Growers Operational Profile 1. Main activities as a palm oil grower Palm oil grower & miller Palm oil mill/palm kernel crusher operator Opera

TRIANGULO ALIMENTOS LTDA

Letter Supporting Continuation of Clean Energy Vehicles Rebate

The Regional Municipality of York. Purchase of Six Battery Electric Buses

Wendy's International, LLC

Draft Marrickville Car Share Policy 2014

HELLENIC REPUBLIC MINISTRY OF DEVELOPMENT DIRECTORATE-GENERAL FOR ENERGY DIRECTORATE FOR RENEWABLE ENERGY SOURCES AND ENERGY-SAVING EXTENSIVE SUMMARY

Item No Halifax Regional Council June 21, 2016

Appendix C SIP Creditable Incentive-Based Emission Reductions Moderate Area Plan for the 2012 PM2.5 Standard

MCCAIN FOODS (AUST) PTY LTD

California Greenhouse Gas Vehicle and Fuel Programs

Dragsbaek A/S. Particulars. RSPO Annual Communications of Progress About Your Organisation. Membership. Particulars Form Page 1/1

Mobergarna AB RSPO Annual Communications of Progress 2014 Particulars About Your Organisation Organisation Name Mobergarna AB Corporate Website Addres

Transcription:

Part 3 Agreement Programs for 2017 and 2018 Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act Ministry of Energy, Mines and Petroleum Resources Government of British Columbia August 2017 1

Introduction A Part 3 Agreement is an agreement between a Part 3 fuel supplier and the Director under the Greenhouse Gas Reduction (Renewable and Low Carbon Fuel Requirements) Act (Act) to take actions that would have a reasonable possibility of reducing GHG emissions through the use of Part 3 fuels sooner than would occur without the agreed-upon action. Part 3 Agreements provide a mechanism for Part 3 fuel suppliers to generate credits in order to comply with B.C. s low carbon fuel requirements under the Renewable and Low Carbon Fuel Requirements Regulation (Regulation). The Act requires that only Part 3 fuel suppliers recognized by the Director may enter into a Part 3 Agreement. Fuel companies are recognized as Part 3 fuel suppliers after submitting a compliance report that is verified by the Director, or after being appointed by the Director for the purpose of entering into an Exclusion Agreement with another Part 3 fuel supplier. For more information about compliance reporting, see Information Bulletin RLCF-003 Compliance Reporting Requirements. For more information about Exclusion Agreements, see Information Bulletin RLCF-015 Exclusion Agreements and Reports. Part 3 Agreements are performance-based and provide credit for the achievement of project milestones. When a project milestone is not fulfilled, the project may be cancelled and associated credits reallocated to other projects with Part 3 Agreements from the same compliance period. For more information, see Information Bulletin RLCF-014 Projects supported under Part 3 Agreements. Credits awarded through a Part 3 Agreement are indistinguishable from other credits under the Regulation and, as such, may be used to meet compliance obligations or may be traded with other Part 3 fuel suppliers. For more information on credit trading and a list of the Part 3 fuel suppliers currently recognized by the Ministry, see Information Bulletin RLCF-013 Validation and Transfer of Part 3 (Low Carbon Fuel) Credits. Program principles The following principles guide the Ministry s approach to Part 3 Agreements: Part 3 Agreements support the accelerated development and market penetration of low carbon fuels by promoting innovation across a diversity of projects Part 3 fuel suppliers have an equal opportunity to access credits through Part 3 Agreements, and equal credit is awarded for equal action, within project types Part 3 Agreements are fair and flexible able to accommodate and adapt to changing circumstances and markets Continuous improvement in the implementation of Part 3 Agreements will consider the needs of Part 3 fuel suppliers and input from stakeholders Low carbon fuel credits vs. emission offsets Part 3 Agreements avoid or reduce GHGs and are awarded credits on that basis under the Act. Consequently, these GHG reductions cannot be recognized under British Columbia s Emission Offsets Regulation. Once a Part 3 Agreement has been signed, the actions under the Agreement can no longer qualify as offset projects under the Emission Offsets Regulation. 2

How many credits are available? The Director may enter into Part 3 Agreements that issue a total of not more than one quarter (25%) of the sum of all debits reported by Part 3 fuel suppliers during the previous compliance period. In determining the credit pool for a given program year, the Director must consider credit allocations committed to under multi-year agreements for existing projects. The following table identifies the total credits available for Part 3 Agreements in 2017 and subsequent years, and the credit pools for new projects. This information is current as of the publication of this document; the credit pools for new projects in 2018 and subsequent years will change once the 2017 Part 3 Agreements are established. Part 3 Agreement program year Total credits available for Part 3 Agreements Credit pool for new projects 2017 (estimated) About 230,000 At least 15,000 2018 (projected) About 313,000 At least 100,000 2019 (projected) About 409,000 At least 200,000 2020 and subsequent years (projected) About 507,000 At least 400,000 3

How does a Part 3 Agreement work? Part 3 Agreements describe a project or activity to be supported, and set out a workplan with milestones and credits that represent progress toward the completion of the project or activity. Credits are awarded milestone by milestone after the Director receives the documentation described in the agreement. It is in the best interest of the proponent to consider how and when project milestones will be achieved in order to ensure that credit awards can occur on a predictable schedule. If the work associated with a milestone is not completed by the date specified in the agreement, the Director may refuse to issue the credits. In some cases, the credit may be awarded if the proponent completes the milestone within a timeframe that is acceptable to the Director. In other cases, the agreement may be cancelled. Multi-year projects All Part 3 Agreements include a firm Schedule B commitment to allocate credits from the current program year. The Schedule B credits are awarded upon the completion of project milestones by the deadlines specified in the agreement. These deadlines may be in the current year or in a future year. The allocation of Schedule B credits is guaranteed by the Ministry. Most Part 3 Agreements also include an agreement of intent in Schedule C to allocate credits from a future program year for the completion of project milestones by a specified deadline. At the time the Part 3 Agreement is signed, the Ministry intends to honour the Schedule C credits as described in the agreement. Should credits be unavailable in a future year, the Director will consider adjustments to the agreement at that time to allow for the allotment of credits from later years as they become available. Third-party projects The Director will consider project proposals by Part 3 fuel suppliers that involve a third party. Under this type of project a third party, such as a fuel retailer, would receive compensation from the fuel supplier for work towards project milestones, while the fuel supplier would receive the agreed-upon credits. 4

2017 program Given the limited number of credits available for new projects in 2017, the Ministry will only consider proposals in two priority project categories. Priority category 1: Pumps for higher biofuel blends Offering consumers the choice of higher biofuel blends is a key step towards developing new compliance pathways for the petroleum industry. The Ministry will consider agreements to support projects that include the fuel supplier actions described in (a) and (b), below: Fuel supplier actions (a) By the end of 2018, install, advertise and operate 1 new pump and supporting infrastructure at an existing, public fuelling station in B.C. that currently sells petroleum gasoline or diesel finished fuels. The new pump must be designed and used to supply finished gasoline with 15% ethanol, finished diesel with 10% biodiesel, or finished diesel with 50% hydrogenationderived renewable diesel (HDRD). Public fuelling station includes facilities where members of the public must join a cooperative or cardlock program. The new pump must be labelled in accordance with section 7.3 of the Regulation. Biodiesel supplied at the new pump must meet one of the standards identified in section 2 of the Regulation, i.e., CAN/CGSB-3.524-2011 or ASTM D6751-15cel. (b) Advertise and sell the higher biofuel blend at the new pump at the equivalent price, or lower, of the baseline fuel (regular gasoline or diesel) being sold on the same date at the same fuelling station, for 3 years after the commissioning date. Equivalent price will be based on the percentages in the table below, which are derived from the fuel energy densities in section 11.02 of the Regulation and the nominal biofuel content of different finished fuel blends. Finished fuel Biofuel Energy density Equivalent price Regular gasoline 5% 34.13 MJ/L Baseline E15 15% 33.02 MJ/L 97% of baseline E85 85% 25.25 MJ/L 74% of baseline Regular diesel 4%* 38.49 MJ/L Baseline B20 20% 38.00 MJ/L 99% of baseline HDRD 50% 37.58 MJ/L 98% of baseline HDRD + B20 70%** 36.93 MJ/L 96% of baseline * Calculated as 4% biodiesel. ** Calculated as 50% HDRD and 20% biodiesel. Credits allocated 1,500 credits for each new pump Up to 1,500 credits, awarded as a multiplier of the credits accrued through the supply (under section 6 of the Act) of ethanol, biodiesel and/or HDRD at the new pump. Biofuel carbon intensity (gco 2 e/mj) Multiplier Ethanol 50.00 2x Ethanol 30.00 49.99 3x Ethanol 29.99 4x Biodiesel 10.00 2x Biodiesel 0.00 9.99 3x Biodiesel -0.01 4x HDRD 30.00 50.00 2x HDRD 20.00 29.99 3x HDRD 19.99 4x A 2x multiplier means that the agreement will award twice the credits reported and validated in a given compliance period. The multiplier will only be applied to fuels with a valid B.C. low carbon fuel code. 5

The Ministry would prefer to support individual pump installations across a number of fuel suppliers. If a fuel supplier wishes to install one biofuel pump, the above credits would be awarded under Schedule B of the agreement, representing a firm commitment from the 2017 program. If a fuel supplier wishes to install more than one biofuel pump, the first pump would be supported under Schedule B, and the second and subsequent pumps would be supported (based on the same parameters) in Schedule C of the agreement, representing the intention to award credits in 2018 and future years. Priority category 2: Cold weather biodiesel supply The use of additives has enabled the supply of biodiesel in cold weather settings around the world that are equivalent to winter conditions in the interior of B.C. The Ministry will consider agreements to support projects that include the fuel supplier actions described in (a) and (b), below: Fuel supplier actions (a) Testing and demonstrated use of additives to improve the cold weather operability of finished diesel fuel blended with biodiesel, such as B2, B5 or B20. The testing may occur at facilities inside or outside B.C., but must specifically address biodiesel performance in Operability Zone BC 2, BC 3, BC 4 or BC 5 between October 1 and March 31. The demonstrated use may also occur inside or outside B.C., but must include an in-province demonstration in one of the Operability Zones by the end of 2019. The fuel supplier must publish a generalized report of findings, and release this report to the public. The report does not need to reveal the successful additive formulation for the fuel supplier s blending facility, but it does need to report the performance of vehicles using the successful blend. HDRD does not qualify for this program. (b) Advertise and supply B2, B5 or B20 with the selected additive in Fuel Operability Zones BC 2, BC 3, BC 4 or BC 5 between October 1 and March 31. Credits allocated 1,000 credits for automobiles and light-duty trucks 1,000 credits for heavy-duty trucks 2,000 credits for diesel engine inland ferries, including diesel engine cable ferries 4,000 credits for locomotives Up to 1,000 credits, awarded as a multiplier of the credits accrued through the supply (calculated under section 6 of the Act) of the biodiesel component of the B2, B5 or B20 blend. Biodiesel carbon intensity (gco 2 e/mj) 10.00 Multiplier 4x 0.00 9.99 6x -0.01 A 4x multiplier means that the agreement will award four times the credits reported and validated in a given compliance period. The multiplier will only be applied to fuels whose carbon intensity has been approved with a B.C. low carbon fuel code. 8x 6

The Ministry would prefer to support test and demonstration programs across a number of fuel suppliers, including for the same diesel vehicle type. If a fuel supplier wishes to undertake a test and demonstration program for one diesel vehicle type, the identified credits would be awarded under Schedule B of the agreement, representing a firm commitment from the 2017 program. If a fuel supplier wishes to undertake a test and demonstration program for more than one diesel vehicle type, the highest priority vehicle type (for the fuel supplier) would be supported under Schedule B, and programs for other vehicle types would be supported under Schedule C, representing the intention to award credits in 2018 and future years. The Ministry will consider proposals under the 2017 program that combine categories 1 and 2, such as the installation and operation of a biofuel pump to supply B20 in the B.C. interior (for example, Kamloops or Prince George), and the testing and supply of B20 with additives at the new pump under cold weather conditions. The quanta of credits identified for categories 1 and 2 would be added together in recognition of the complexity of the combined endeavour. How will proposals be evaluated? Mandatory criteria for all projects Each proposal will be evaluated against the following criteria on a pass or fail basis: Was submitted on time at the specified location in the specified format Was submitted by a recognized Part 3 fuel supplier that is in compliance with the Act Satisfies the Director that the proponent has a reasonable possibility of delivering on the milestones outlined in the proposal Graded criteria for priority category projects Priority category proposals that pass the initial screening process will be evaluated by Ministry staff using the following criteria. A score below 60% will disqualify the proposal from further consideration. Proponents may be required to provide the Director with additional information as part of the evaluation process. Project design and management (up to 5 points each; 30 points total) How well does the business case offered in the Proposal: Demonstrate a thorough understanding of the obstacle(s) to development, supply, and/or increased market penetration of low carbon fuels that is addressed by the project Provide effective approaches to address obstacle(s) associated with the project Use current best practice methodologies for analysis of the obstacle(s), effectiveness of proposed actions, and anticipated outcomes Demonstrate a reasonable timeline and implementation plan for the project, including: o appropriate milestones and corresponding credit awards o effective and appropriate performance measures Present a detailed budget organized by quarter or as is appropriate for the project Outline the format and timetable for project monitoring and reporting 7

What is the application process? The application process involves the following steps: 1. Fuel supplier submits completed application. The Ministry will consider applications submitted by email to lcfrr@gov.bc.ca by: 2017 program deadline: 8:00 A.M. Pacific time, October 6, 2017 Late submissions or those submitted by any other means will not be considered. 2. Ministry reviews and evaluates the applications based on the above criteria. All applications received in a given intake period will be assessed against each criterion, to establish relative merit. The total weighted score from all of the graded criteria will inform the Director s decision to award a Part 3 Agreement. While the criteria presented are designed to make the Director s decisions as objective and transparent as possible, section 8.01 of the Act states that the decision to enter into a Part 3 Agreement is at the discretion of the Director. 3. The Ministry contacts fuel suppliers whose proposals merit further consideration. Only those proponents whose proposals are selected for development in the 2017 and/or 2018 program years will be contacted. 4. Detailed project agreements under the 2017 program must be developed and signed by December 31, 2017. 5. Successful projects are listed in Information Bulletin RLCF-014 Projects supported under Part 3 Agreements. Application format The application cover page is available online at http://gov.bc.ca/lowcarbonfuels. All fields must be completed, and the cover page must be the first page of the proposal. Proposals must be no more than 10 pages, excluding the cover page but including appendices, and must include an Executive Summary that concisely describes the information presented in the proposal. Most of the successful applications received have been 4-6 pages long. Any information that could be considered confidential must be clearly identified. 8

2018 program Given the limited scope of the 2017 program, the Ministry would like to initiate discussions with established Part 3 fuel suppliers on a more ambitious program for 2018. The 2018 projects would be proposed and designed by fuel suppliers, with the participation of third parties as appropriate. In general, the Ministry encourages Part 3 fuel suppliers to propose projects worth up to 50,000 credits per year for up to 3 years. The credits identified for the first year would be included in Schedule B; the credits identified for the second and third year would be included in Schedule C. The following examples are intended to illustrate the different kinds of projects and/or milestones possible under a Part 3 Agreement. Successful project proposals have included elements from one or more categories. Projects related to the 2017 priority categories will also be considered in the 2018 program. All projects must lead to GHG reductions through the supply of low carbon fuels in B.C. Reduce the carbon intensity of a Part 3 fuel These projects would address barriers to achieving direct GHG reductions, and could include: fuel switching in an existing Part 3 fuel production facility carbon capture and storage at an existing Part 3 fuel production facility Increase the accessibility of low carbon fuels These projects would address supply, access, and market penetration barriers, and could include the production, blending, and/or distribution of low carbon fuels. Increase the market share of low carbon fuels These projects would address barriers that hinder low carbon fuel demand, and could include: information/education for fleet managers and drivers marketing campaigns to support greater uptake of low carbon fuels pricing campaigns to promote the purchase of low carbon fuels research related to increasing low carbon fuel demand How will proposals be evaluated? Mandatory criteria for all projects Each proposal will be evaluated against the following criteria on a pass or fail basis: Was submitted on time at the specified location in the specified format Was submitted by a recognized Part 3 fuel supplier that is in compliance with the Act Satisfies the Director that the proponent has a reasonable possibility of delivering on the milestones outlined in the proposal 9

Graded criteria for fuel supplier designed projects Fuel supplier designed proposals that pass the initial screening process will be evaluated by Ministry staff using the following criteria. A score of below 60% in any section will disqualify the proposal from further consideration. Proponents may be required to provide the Director with additional information as part of the evaluation process. Validity of carbon intensity reduction (up to 10 point each; 40 points total) How well does the Proposal: Use valid assumptions and data in the analysis of estimated GHG and carbon intensity reductions Use conservative estimates for the calculations of emissions reductions or avoidance Identify the risks associated with the project and offers a reasonable mitigation plan for said risks Demonstrate a high degree of certainty of achieving estimated GHG reductions Project design and management (up to 5 points each; 30 points total) How well does the business case offered in the Proposal: Demonstrate a thorough understanding of the obstacle(s) to development, supply, and/or increased market penetration of low carbon fuels that is addressed by the project Provide effective approaches to address obstacle(s) associated with the project Use current best practice methodologies for analysis of the obstacle(s), effectiveness of proposed actions, and anticipated outcomes Demonstrate a reasonable timeline and implementation plan for the project, including: o appropriate milestones and corresponding credit awards o effective and appropriate performance measures Present a reasonable budget, organized by quarter or as is appropriate for the project Outline the format and timetable for project monitoring and reporting Market transformation potential (up to 5 points each; 25 points total) How effectively will the project outlined in the proposal: Contribute to accelerated adoption of low carbon fuels Demonstrate leadership or innovation in clean energy transportation Be reproducible by other Part 3 fuel suppliers and/or consumers Address a specific technical issue currently affecting Part 3 fuel suppliers that is an obstacle to reducing greenhouse gas emissions from the use of Part 3 fuels Demonstrate the additionally of the emissions reductions or avoidance associated with the project work i.e., that these emissions reductions or avoidance are a product of the project and would not have occurred otherwise Additional benefits (up to 5 points total) Does the project outlined in the proposal offer: Additional (non-ghg) environmental benefits Additional economic/job creation benefits Additional social benefits 10

What is the application process? The application process involves the following steps: 1. Fuel supplier submits completed application. The Ministry will consider applications submitted by email to lcfrr@gov.bc.ca by: 2018 program deadline: 8:00 A.M. Pacific time, June 1, 2018 Late submissions or those submitted by any other means will not be considered. 2. Ministry reviews and evaluates the applications based on the above criteria. All applications received in a given intake period will be assessed against each criterion, to establish relative merit. The total weighted score from all of the graded criteria will inform the Director s decision to award a Part 3 Agreement. While the criteria presented are designed to make the Director s decisions as objective and transparent as possible, section 8.01 of the Act states that the decision to enter into a Part 3 Agreement is at the discretion of the Director. 3. The Ministry contacts fuel suppliers whose proposals merit further consideration. Only those proponents whose proposals are selected for development in the 2017 and/or 2018 program years will be contacted. 4. Detailed project agreements under the 2018 program must be developed and signed by December 31, 2018. 5. Successful projects are listed in Information Bulletin RLCF-014 Projects supported under Part 3 Agreements. Application format The application cover page is available online at http://gov.bc.ca/lowcarbonfuels. All fields must be completed, and the cover page must be the first page of the proposal. Proposals must be no more than 10 pages, excluding the cover page but including appendices, and must include an Executive Summary that concisely describes the information presented in the proposal. Most of the successful applications received have been 4-6 pages long. Any information that could be considered confidential must be clearly identified. 11