Installation and Operation Guide October 2010

Similar documents
equalizersystems.com. Installation and Operation Guide October Revision- November 2016

TJ Series- 8065M. Hydraulic Trailer Tongue Jack System. Installation. Installation and Operation Guide January 2012 Revision- April 2013

Single Leg AM / CM 20, 24 and 30. Installation

Single Leg AM/CM 20, 24 and 30

RV Stabi-Lizer Installation & Operation Manual Effective May 2018

Prepared specifically for Monaco Owners

(800) equalizersystems.com AUTO-LEVEL. NEWMAR Operation and Warranty Guide

(800) For Sprinter/ r Contents. Required. Installation. Manifold. Hydraulic. Warranty. Diagrams. Appendix EQ019R2

AUTO-LEVEL & Slide-Out Forest River Georgetown Operation and Warranty Guide

(800) equalizersystems.com EQ Smart-Level Installation/Operation/Warranty Guide For Sprinter/Mercedes Chassis

Auto-Level Installation-Troubleshooting & Warranty Guide

(800) equalizersystems.com Smart-Level Installation/Operation/Warranty Guide Effective May Contents

Auto Level Installation-Troubleshooting & Warranty Guide

Auto Level Installation Operation Troubleshooting & Warranty Guide

Quad Pump Auto System Installation/Owner s Manual

Patriot Jack Systems OEM INSTALLATION MANUAL

MOTORIZED FOLDING CAMPER WINCH

Installation Instructions

DUAL WIDEBAND AIR/FUEL RATIO GAUGE Product Numbers: GS-W702W_Dual, GS-C702W_Dual, GS-T702W_Dual

POWER GEAR SLIDE-OUT MANUAL

FLEETWOOD TRAVEL TRAILER SLIDEOUT SYSTEM OWNER S MANUAL

Owner s Manual Dual Planetary Gearmotor Auto Programming Slim Rack Slide Out System

AGRI-COVERTM SWITCH CONTROL INSTRUCTIONS

NOTE. Installation and Service Manual Dual Planetary Gearmotor Slim Rack Slide Out System

Patriot Jack Systems OWNER'S MANUAL

Installation Instructions

AGCO. Corn Header Manual d HEADSIGHT.COM

INVERTER HARNESS INSTALLATION FOR FREIGHTLINER CASCADIA

GERINGHOFF. Corn Header Manual f HEADSIGHT.COM

Mercedes MBE 906/ L & 7.2L Engine Module. Part # Installation Instructions

INSTALLATION GUIDE. Universal System for Zero Turn Mowers

GM 6.6L Duramax. Up to 90HP Gain. AgDieselSolutions.com

DRAGO. Corn Header Manual f HEADSIGHT.COM

60 PSI Boost Gauge. For Product Numbers: MT-DV01_60, MT-WDV01_60

Hydro-Sync Slide-Out System

22004 INSTALLATION INSTRUCTIONS INSTALLATION 07-UP JEEP JK 2/4 DOOR REAR COILOVER CONVERSION SYSTEM COMPONENTS INCLUDED HARDWARE INCLUDED

EZ Carrier 3. Owner s Manual. Keep instructions for future reference

ActuLink ABS Module - ABS-MOD-400

Installation and Service Manual M² Sync Room Slideout System without Room Lock Connectors on Control Box

Installation Instructions and Warranty Information

Service/Installation Manual Full Wall Slide Systems CONTENTS. 82-S0379 Rev 3. Page. Before you operate the slide system 2

Service/Installation Manual Full Wall Slide Systems

**DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!**

Installation Instructions

20250 Module Installation Guide

Installation Instructions

advanced FLOW engineering Instruction Manual P/N: Make: Can-AM Model: Maverick Year: Engine: 1000cc

TERMS OF USE TERMS AND CONDITIONS. Plumbing and Heating Products (PL-WR)

Installation Instructions **THIS RAIL MOUNTING KIT USES 11 BOLTS**

10 Year Limited Warranty

BEFORE YOU BEGIN LIST OF COMPONENTS. Isopropyl SWITCH SCOTCH-BRITE PAD ALCOHOL PREP PAD SWITCH HARNESS REVOLVER PCM COVER STICKER

Installation Instructions

Power. On Your Terms.

Installation Instructions

Transmission Guardian

2000SR. Installation Instructions May Donovan Enterprises 3353 S.E. Gran Park Way Stuart, Florida

LB LB LLY LLY 1000

Installation / Owners Manual

Jeep Wrangler (TJ)

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Read this entire manual before operation begins.

SELECT DIAGNOSTIC GUIDE. INST028 Doc 3.02

30100 Module Installation Guide L

II DISTRIBUTION & SUBSTATION TYPE C

POWER CELL FOR DYNA WITH CLEAN CHROME COVER 562

Installation Instructions and Warranty Information

Female Plug. connecting to Fuel Quantity

Installation Instructions

COVER PAGE CUSTOM QUICK INSTALL MOUNTING KIT NOTE!

GM 2500,3500 Nerf Bar Installation Instructions

Equipped with AEM Dryflow Filter No Oil Required! INSTALLATION INSTRUCTIONS PART NUMBER C (GUN METAL GRAY FINISH) NISSAN SENTRA 1.

EyeMax TECHNICAL MANUAL. Technology, LLC FOR UPDATED INFORMATION, VISIT TABLE OF CONTENTS

Aug 24, 2017 ATS AFX Spindle Installation Instructions

Kit Part Number:

CRD610 Automatic Fitting Inserter

Linear Actuator. Installation Manual. warranty installation parts list. Linear Actuator Installation Manual Page 1

AGCO Conversion Manual a HEADSIGHT.COM

AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

VW/AUDI MK7 VEHICLES

BX Jeep Liberty Renegade 2012 Jeep Liberty Sport Installation Instructions

WINCH MOUNT KIT FOR POLARIS RANGER P/N ASSEMBLY / OWNERS MANUAL. Application WINCH KIT NO. 25-9xxx

Please visit for the latest version of these installation instructions.

I N S T A L L A T I O N G U I D E

Operating Manual. 2012, 2024, and 2026 Soil Sampler th AVE N Fargo, ND Phone: (701) Web: farmqa.com

INSTALLATION INSTRUCTIONS BASE RAIL MOUNTING KIT GM COMPOSITE BED 58208

Installation Instructions

INSTALLATION MANUAL DURAMAX DIESEL POWERED PICKUP TRUCKS MODEL RP-100 & RP-150. With New Quick Connect Components!

Installation Instructions

COLD AIR INTAKE SYSTEM, CIVIC Si,

15100 Module Installation Guide Mercedes EPA07 w/dpf

INSTALLATION INSTRUCTIONS PART NUMBER: CHEVROLET Camaro V8-6.2L

Installation and Operation Manual

before serial number 2214

SELECT -24 INSTALLATION GUIDE. INST036 Doc 2.02

78-88 G Body Rear Trailing Arm Kit

INSTALLATION INSTRUCTIONS

Gooseneck Hitch Ball plate with 2-5/16" ball spins in/out 30,000 lb. rating. (5,000 lb. vertical load) Requires only one 3" hole in truck bed

INSTALLATION INSTRUCTIONS PART NUMBER:

INSTALLATION MANUAL STEP SLIDER BD-SS-200-JK4. Made in the USA. Front Bracket Middle Bracket Rear Bracket. Tools Required

Transcription:

1-800-846-9659 www.equalizersystems.com Hydraulic Trailer Jack Installation and Operation Guide October 2010 Hydraulic Trailer Jack AJ Dual Leg General Description Dual leg trailer jack Lifting capacity: 14,000 lbs Stroke: 24 inches

Installation Tools Required for Installation Ratchet, sockets and wrench set Wire cutters/crimpers Electric drill and bits Screw gun bit Welding equipment (if welding leg in place) Additional Parts Needed for Installation # 6 gauge power wire (to connect battery +12V to the pump) # 6 gauge ground wire (to connect battery 12V ground to pump) # 6 gauge ring terminals Wire loom and clips (to secure and protect harness and switch) Self tapping screws or pop rivets (to secure loom clips) Wire ties Jack Mounting The AJ style jack is available in bolt on or weld on configurations (depending on the mounting option ordered for the system). Mounting provisions must be designed with adequate strength to sustain trailer weight and jack lifting capacity. If bolting the jack in place, ensure the use of appropriate size for the application (½ or 3/8 ) and quantity of mounting hardware. The use of Grade 8 bolts is recommended. Welding the jack in place requires sound welding practices. The jack should be mounted so that when the trailer is level (while mounted to the tow vehicle) there is a Minimum of 10 inches of Ground Clearance. This is usually achieved by mounting the jack so that the foot is slightly below the bottom edge of trailer. The bottom of the footpad should not be lower than any other item mounted on the trailer. Pump Mounting The pump is mounted with threaded studs that are fitted to the pump body. Flange nuts are provided. The pump can be mounted either vertically or horizontally. Switch Harness and Hydraulic Lines The jack system has been shipped with all necessary switchgear, harnesses and hydraulic lines. These items are specifically engineered to operate your system and should not be altered in any manner. Modification of any factory-supplied item may result in the denial of all Warranty claims. 2

Switchgear The unit may have been provided with a key switch in the switchgear box (depending on the option ordered). If unit is not supplied with a key switch, the +12v battery lead must be fed through a power disconnect switch to fully isolate the system during travel or inactivity. Minimum switch rating must be 80 ampere DC. Switchgear is plugged into the system harness through a weather resistant connector (shown in Fig.1) Fig.1 Weather Resistant Connector Battery Connections Battery Lead (+12volts): Attach a # 6-gauge (minimum) wire between the positive +12 volt terminal on the battery and the plus ( + ) terminal on the contactor; shown in Fig.2 If circuit protection is required, install an 80 amp (minimum) circuit breaker. Fig.2 Attach +12V Positive from Power Supply (6 gauge min.) Attach ground to Pump mount here. (6 gauge min.) Pump Ground (-12volts): Attach a # 6 gauge (minimum) wire between the negative -12 volt terminal on the battery and the pump grounding stud on the power unit. It is not acceptable to allow the weld to be the sole grounding connection. 3

Reversing Contactor Wiring

Hydraulic Hose Connections Connections to Top/ Extend Jack Port: If equipped with a manual selector valve: The extend port on the pump is fitted with a manual selector valve extending from the manifold block. The Selector Valve has Twist Turn Knobs to select jack operation. The hose are to be connected from the selector valve to the top fitting (cap or closed end) of each jack leg. Connect to Jack Top Fittings If not equipped with manual selector valve: The extend port on the pump is fitted dual connection assembly (see below). Hoses are routed from this assembly to the top fitting (cap or closed end) of each jackleg. The port is marked with a T near the reservoir. Connect to Jack Top Fittings Connect to Jack Bottom Fittings Hose Connections Bottom/ Retract Jack Port: The pump retracts port is equipped with a TEE fitting. The port is marked with a B near the reservoir. This fitting is connected to the bottom fitting of each jack (rod end). It does not matter which one is left or right. 5

System Purging Following component installation, this procedure must be performed with the initial running of hydraulic system. All electrical and hose connections must be completed before the purging process. 1) Fill the reservoir 3/4 full with Dexron III Automatic Transmission Fluid. 2) Make sure the manual selector valves (black trumpet valves), if equipped, are fully pushed in to the IN/OPEN position to allow proper fluid flow. 3) Remove the Bottom (Retract) hoses from the TEE fitting at the pump and place them into a clean container. Cap the ends of the TEE fitting on the pump to ensure that no air or debris can enter. 4) With the Bottom hoses placed in a container, run the pump to fully EXTEND the jacks(s). Maintain the fluid level in the reservoir approx ½ full. Do not allow reservoir to run empty. If jacks(s) will not fully extend, crack loose the upper hose(s) at the jack(s) and run pump to extend until all the air is expelled. Retighten the hoses and complete the extension of the jack(s). Continue to maintain the fluid level in reservoir at 1/2 full. Note: normally only air will be expelled from the disconnected bottom hoses, however, it is possible some residual oil will be expelled. 5) Reconnect the Bottom (Retract) hoses to the Tee fitting at the pump. 6) Run the pump to RETRACT the jack(s). Maintain the fluid level in reservoir at ¾ full. Do not fill to full until after the legs are fully retracted. 7) If fluid in reservoir appears to be aerated (foaming), allow unit to sit until foam dissipates (approx 5-10 minutes). 8) Fully extend and retract jack leg(s) a minimum of 3 times. Allow the air in the foamed oil to dissipate as needed. Maintain the fluid level in the reservoir as needed. Reservoir Breather Cap Once the system is purged, install the 6-sided breather cap. Failure to do so will cause the jack to operate erratically. Make sure the reservoir has adequate fluid. Dextron III Fluid Level: When the jack is fully retracted, the fluid level in the reservoir should be approximately one inch below the fill cap. If fluid needs to be added, use Dexron III automatic transmission fluid (the same as used for a GM automobile). To Raise and Lower the jacks: Activate the keyed switch (if equipped), then push and hold the rocker switch in the up or down position. TRAILER UP to extend the jacks or TRAILER DOWN to retract. 6

If the system is equipped with a manual selector valve: 1. Twisting the knob counter clockwise to opens the valve for the desired jack operation. By turning both knobs out (counter clockwise), the jacks will operate in tandem. To operate only one jack, close the valve (turn it fully clockwise) to the jack that is to remain stationary. 2. Operate the switch in the desired direction. Trailer up to extend jacks or trailer down to retract jacks. 3. Twist the valve knobs to the IN/Closed (clockwise) position for storage or travel. When finished, remove the key or operate the manual disconnect to prepare the system for travel. The jack will hold a position by releasing the switch at any time. There is no need to take the weight off the jack when storing the trailer. Positive check valves in the system will not allow the jack to bleed down. CAUTION Warning: With any hydraulic application, holding any position on a cylinder must be done with safety in mind. Failure in the system may cause the leg to retract or extend on its own. When working under or near the trailer, always use jack stands of appropriate rating to support the weight of the trailer. The keyed switch must be in the off position and the key must be removed when the jack is not in use and/or when the trailer is in transit. If unit is not supplied with a keyed switch, the +12v battery lead must be fed through a power disconnect switch to fully isolate the system during inactivity or travel. The minimum switch rating must be 80 ampere DC. 7

Manual Override The AJ series pump has provisions for manual override. Before you begin this procedure, please read and understand these instructions. Required Items: Reversible Drill-capable of producing a minimum of 2000 r.p.m. End of Motor 1/4 (6mm) Allen Hex Wrench bit or driver. To override the jack: Open Manual selector valves (if equipped). Remove the foil seal from the top of the motor. Use a small flat head screwdriver if necessary. Insert the ¼ (6mm) Allen Hex key bit on the manual override shaft located at the top of the motor. To Retract: Run drill in the clockwise direction at 2000 r.p.m. (minimum). The jack will retract. To Extend: Run drill in the counterclockwise direction at 2000 r.p.m. (minimum). The jack will extend. Override Coupler (Under Foil Seal) Accepts 1/4 (6mm) Hex Allen Driver The jack runs for a few 8

Problem Solving The Jack runs for a few seconds, then stops The battery is weak or battery capacity is diminished. Charge the battery fully. It may be necessary to load test the battery. The jack only runs in one direction Verify appropriate battery voltage. Verify that all wires are attached appropriately. Verify proper function of the switchgear. I push the switch and nothing happens Ensure both positive (+12V) and negative (-12V) have adequate connection. Ensure full charge on your battery. The vast majority of calls to the Equalizer Systems Help Desk are related to low battery voltage. Ensure that the unit is properly grounded to the battery with a minimum # 6-gauge wire. Check all associated wiring. The jack is jerky when retracting This may be caused by air in the system, low fluid level, or incorrect hose installation. To purge leg, add fluid as necessary and run the leg to full extension and retraction at least twice. If problem persists, call Equalizer Systems for assistance. Fluid Level: When the jack is fully retracted, the fluid level in the reservoir should be approximately one inch below the fill cap. If fluid needs to be added, use Dexron III automatic transmission fluid (the same as used for a GM automobile). Avoid the most common issue. Always ensure & verify proper charge on the batteries. Proper and adequate grounding of the pump is essential. 90% of the phone calls to the Equalizer Systems Help Desk are found to be a weak / discharged battery or poor ground. If your problem is not listed or persists, call Equalizer Systems at 1- (800) 846-9659 Please gain prior authorization for warranty service or repair. 9

Equalizer Systems Limited Warranty Policy 1. Only warranty claims with prior written or verbal authorization from Equalizer Systems will be recognized, all other claims will be denied. 2. Equalizer Systems warrants slide out and leveling system components for a period of two years from the date of original sale of the vehicle. This warranty covers defects in material and workmanship only. Equalizer Systems is not liable for any damage due to abuse, neglect, misuse, negligence, misapplication, error of operation, accidental or purposeful damage or damage due to an act of God such as, wind or rain damage, flood, lightning or other natural occurrence of the like. Equalizer Systems limited warranty is applicable to the Equalizer Systems components only and does not apply to the vehicle, apparatus or property to which it is attached. Warranty parts will be shipped at no charge if the repair is authorized by an Equalizer Systems representative. Purchased components used in authorized warranty repairs will be reimbursed at the original purchase price. 3. Labor and freight expenses due to warrantable parts defects or workmanship will be reimbursed for a period of one year from the date of original sale of the vehicle. Freight expenses will either be prepaid by Equalizer Systems or reimbursed at the UPS Ground rate only. Any additional shipping charges or requirements are the obligation of the vehicle owner or service center performing the warranty repair. The owner or service center s obligation may include overseas shipping charges, border fees, brokerage fees and any other additional fee of the like. 4. Warranty labor will be reimbursed only for claims that have prior written or verbal authorization from an Equalizer Systems representative. Warranty labor compensation is required to correspond with the Warranty Parts Replacement Time Guideline published by Equalizer Systems. Any warranty repair not listed on this guideline will require prior authorization from an Equalizer Systems representative. A reasonable time allowance will be determined by the Equalizer Systems representative. Any warranty repair that is not listed on this guideline that is performed without prior authorization will be denied without exception. Time associated with learning about the repair or excessive diagnostic and installation time will not be reimbursed. Warranty labor will be reimbursed at the authorized service center s published shop rate if the rate is reasonable For that region. Overtime labor will not be reimbursed without exception. 5. Labor, parts and freight credit (if applicable) will be sent after the parts are tested and the warranty claim is validated. Returned parts that are found to be in normal operating condition are not warrantable and will be charged to the owner or service center. Equalizer Systems reserves the right to charge back the service center for labor claim 10

payments previously submitted if the installation of the warranted part is found to be inadequate at a later date. 6. Claims will be denied if the date submitted is greater than 30 days from the repair date. 7. Prior authorization is required before parts may be sent back to Equalizer Systems. A Return Authorization Number is required for items to be accepted. 8. Complete systems are not warranted unless authorized by an Equalizer Systems representative. There are absolutely no exceptions to this clause. 9. Consideration should be taken regarding the location and protection of Equalizer Systems components prior to installation. Please reference our installation manuals for recommended locations and maintenance, or visit www.equalizersystems.com for more information. The failure of any Equalizer Systems component due to extreme environmental conditions, improper installation, or lack of maintenance will not be covered under warranty. 10. Warranty coverage for parts or systems sold by non-authorized resellers (such as live or internet auctions) will be at the discretion of Equalizer Systems. 11. This warranty begins upon the original sale date of the vehicle and is transferable, with limitation, to subsequent owners upon furnishing the original sale date of the vehicle and proof of purchase. Only the remainder of the two year parts warranty is applicable. Warranty labor and freight are only applicable to original owner of the vehicle. 12. Equalizer Systems is not liable for loss of time, manufacturing costs, labor, material, and loss of profits, direct or indirect damages incurred by the vehicle manufacturer. 13. Excessive warranty labor resulting from inadequate access to the Equalizer Systems product will not be reimbursed. 14. Equalizer Systems will not pay a markup on warranty parts unless required by law. 15. Travel expenses, hotel, telephone, fuel or any other expenses of the like are not covered under warranty. Replacement Parts: 1. Replacement parts are warranted under the same guidelines listed above for the remainder of the original warranty or 90 days, whichever is longer. Proof of warranty repair date and original vehicle purchase date are required. No additional warranties, expressed or implied, are authorized by Equalizer Systems This warranty voids all previous issues. Questions concerning this warranty should be directed to: Equalizer Systems 55169 CR 3 North Elkhart, IN 46515 1-(800) 846-9659 1-(574) 266-6083 fax EQ009 11