CHA-50 Evaporator Operation

Similar documents
Title: CHA Flash Source

Temescal FC-1800 Electron Beam Evaporator System Refurbished by TES

Sputter System. SPS-R2R series. ULTECH Co., Ltd.

TM Vacuum Sputter System SOP

INDIAN INSTITUTE OF TECHNOLOGY KANPUR Kanpur , Uttar Pradesh, India Centre for Lasers and Photonics

Standard Operating Procedure: Mask Aligner

AccuSputter AW 4450-Series Sputtering Deposition Systems

Thermal Evaporator System (Solar cell)

DENTONVACUUM DESKV DESK V - SPUTTER/ETCH UNIT AND ACCESSORIES

TEMESCAL PRECISION COATING SOLUTIONS

HEX KORVUS TECHNOLOGY VERSATILE COATING SYSTEM FOR THIN FILM DEVELOPMENT SPUTTERING ORGANICS DEPOSITION

A Brief User s Manual of. The Scanning Tunneling Microscope

Holds six crystals with robust, automatic switching to maximize process uptime

Photographic Index for and Implanters

OPERATOR'S MANUAL FOR DOUBLE ACTING PISTON HAND PUMP

Throttling Pendulum Gate O-ring Replacement Procedure Rev. A, May 2012

CFM 1050 Reactive Closed Field Magnetron Sputtering System

Instruction Manual. AUTO 306 accessories: EB3 Multihearth Electron Beam Source and accessories. Volume 1 - Installation and Maintenance Instructions

Manifolds series 73A and 77A. Instruction manual

PRESSURE SENSOR INSTRUCTIONS

SJSU ENGR 10 Wind Turbine Power Measurement Procedure

Accurate to 0.1 NIST Traceable Advanced PID Algorighm USB Port Free datalogging/control software. Controllers I N S C O N TA G N

INSTRUMENT SECTION INDEX GENERAL INSTRUMENT CLUSTER. Removal. Installation. INSTRUMENT PANEL Removal

DKC400Y AC Sliding Gate Installation Manual. Sliding Gate Opener. Model: DKC400Y. Installation Manual WARNING

II-VI-CO2-BS-35 II-VI-CO2-BS-60

SPI Supplies Vacu Prep II TM Operation Manual

Using the WaferSense Auto Gapping Sensor (AGS) On Novellus Vector

Termination Procedure for 723 Series SolderTacts Contacts for Coaxial Cable: D , D

Operating Instructions EVG620 Aligner

READ INSTRUCTIONS THOROUGHLY BEFORE OPERATING TC-6 TC-15 TC Fax

1 2 3a 3b THREADING CARD 9 10 ABC Office

Safety Considerations

Energy efficient low voltage dichroic mirror halogen reflector lamps

Gate Valve Maintenance & Adjustment Procedures

Automotive Air Conditioning Manifold Gauge Sets

Tape & Reel Packaging Instruction

GC03 Logic gates and Transistors

TL4076 Top 5 Tips Get to know your TL4076

EXHAUST GAS RECIRCULATION (EGR) SYSTEM (4A FE)

Modix Big-60 Assembly Manual Part 2

Filament Change. Procedure for changing burnt X-Ray Generator Filament and replacing it with a new filament

Heat Engines Lab 12 SAFETY

AMS FAQ s and Hardware Tips

Process Chamber. Gear wheel, conical

Technical Service Bulletin IOX/DCX Transmitter Maintenance Schedule

Deans Switch Microfluidics

Air / Hydraulic Under Axle Jack

Owner s Manual Dual Planetary Gearmotor Auto Programming Slim Rack Slide Out System

Model VR4 Vacuum Regulator

OFI MODEL 130 HTHP BENCHTOP CONSISTOMETER INSTRUCTIONAL MANUAL

R I T. Title: Westech 372 Polisher Semiconductor & Microsystems Fabrication Laboratory Revision: C 08/07/07 1 SCOPE 2 REFERENCE DOCUMENTS

High Power, RF Excited EUV Flow Light Source EUV X LHP500FL Operating Manual

SlimRack Bed Lift System OEM INSTALLATION MANUAL

CO 2 LES. Converting A Gas Powered Corolla Wagon into an Electric Family Hauler By Sten Mander

SETTING ZERO S cont. IF THE ZERO REPEATS WITHIN +/- 1.0 LB THEN YOU ARE READY TO CHECK SPRINGS. PAGE 4 OF 9

Quick Start GUIDE. Tips for Successful InfraWeld Integration WHAT IS IT? THANK YOU FOR YOUR InfraWeld PURCHASE! KEY POINTS:

CP2000 Ballast - Replacing Thyristor Instruction Sheet

CDL Series Pre-Trip Inspection AT-TC3TS T1-JA01. Pre-Trip Inspection Checklist

Atomic Absorption Spectroscopy

Profile Spraying Machine, Makor Model IRIDE 206/W (Modified)

NEECO INDUSTRIES INC. INSTRUCTION MANUAL 7 1/16 10K SLAB GATE BODY

Installation Instructions

AMS Hardware Updates, Tips and Tricks. Ed Fortner, Bill Brooks Phil Croteau, John Jayne, AMS User s Meeting /26/14

TROUBLESHOOTING. 1. What is the model and serial number? If you don t know, how old is it? Give description.

Eurocompulsion Camshaft Installation

JK SHIELD TIRE CARRIER INSTALLATION INSTRUCTIONS

MIRRORLITE RECESSED EMERGENCY LIGHTING

The specified data apply only if actuators/signal indicators are combined with contact blocks and lamp sockets within the same product range.

JK SHIELD TIRE CARRIER INSTALLATION INSTRUCTIONS

Pressure Relief Valve Maintenance Manual

GATE VALVE MAINTENANCE AND ADJUSTMENT PROCEDURES

Installing the Low Level Indicator (P/N or P/N )

With the help of the impact gun it was a piece of cake to remove the 36mm axle nut. Without it I would be still trying

1464. Interior Installation. Cover Rear Seat Support Cut the vinyl to approximately the size of the rear seat support.

Manual Calibrator PCE-IC1

CASS Interface System Parts Section 1

Safe & Secure Series Electric Actuator with Internal Battery Back-up Installation, Operation & Maintenance Manual

Owner s Manual Dual Planetary Gearmotor Auto Programming Slim Rack Slide Out System

Retrofitting Kit Filter Cleaning for Cable Coater ECC 700

Sprayer Calibration For. Citrus

Mounted Instrument Head

SYSTEM TB 1000 BULK ADHESIVE APPLICATOR INSTRUCTION FOR SET UP AND OPERATION SYSTEM TB1000

Nissan GTR Alpha Fuel System

Upper Class Grille. Main Grille - # / # Dodge Charger. GRILLE Installation Guide. Parts included (1) Main Grille.

Petromax 834 renovation

Thermo-Bob 1 Installation Manual: Kawasaki Concours

Bisnet Solutions for Tomorrow, Today! The Die Casting Process Planner. Users Manual. August 5, A Product By: Bisnet - 1 -

Read this document carefully before implementing the upgrade!

REVELSTOKE - 1 YEAR DOWN. Applied to Equipment Instruction Number R Class-Group Generate Date: 11 March 2004

2014 HEIL DOT407AL 9240GL, DOUBLE CONICAL, TANDEM AXLE, CRUDE OIL TRANSPORT WITH PUMP & CENTRIFUGE NV1309 VIN: 5HTDL4527D7H45530

Summary of Substantive Changes between the 2008 and the 2017 edition of ASSE 1001, Performance Requirements for Atmospheric Type Vacuum Breakers

DETECTORS Photo Ionization Detector - PID. Overview

SERVICE MANUAL. Stander. Seat Assembly for Permobil Power Wheelchair

Fleck 2510 Manual Sediment Filter Installation & Start-Up Guide

1' to 10' deep and 1' to 25' deep

INSTALLATION MANUAL 2000WCY

RS696PXYQ1 (BLACK) (DESIGNER WHITE)

Tactical Laser Illuminator

Installing a Cool On-Column Inlet

Huron Speed Products Twin Turbo Install Gen 2 CTS-V (09-15)

Transcription:

CHA-50 Evaporator Operation Roger Robbins 7/8/2009 John Maynard The University of Texas at Dallas ERIK JONSSON SCHOOL OF ENGINEERING AUTHORS: Roger Robbins, John Maynard Page 1 of 18

CHA-50 Evaporator Operation Roger Robbins 7/8/2009 John Maynard C:\\MyDocuments\CleanRoomGeneral\Equipment\Evaporator-eGun\CHAmanual.doc Table of Contents CHA-50 EVAPORATOR OPERATION... 1 CHA-50 EVAPORATOR OPERATION... 2 TABLE OF CONTENTS... 2 CHA EVAPORATOR OPERATION... 3 INTRODUCTION... 3 DESCRIPTION... 3 Evaporation Chamber System... 6 OPERATING INSTRUCTIONS... 8 Vent & Load System... 8 Evaporation Process... 14 Setup Film thickness Monitor and Beam Control Parameters... 14 Establishing Electron Beam... 15 Depositing Material... 16 Unloading Samples... 17 AUTHORS: Roger Robbins, John Maynard Page 2 of 18

CHA-50 Evaporator Operation Roger Robbins 7/8/2009 John Maynard C:\\MyDocuments\CleanRoomGeneral\Equipment\Evaporator-eGun\CHAmanual.doc Introduction The CHA Evaporator is an electron beam metal evaporator with the capability of coating 24 six inch diameter wafers at a time. This tool is intended as a general purpose metal evaporator that will enhance step coverage by continuous modification of the landing angle of the evaporating metal atoms via a two axis revolution/rotation substrate holder system (planetary mount). This document will describe what the controls do and then describe how to run it. Description The evaporator hardware consists of three major blocks; 1) Control electronics rack; 2)evaporator vacuum system containing the electron gun and evaporator crucibles with the substrates to be coated mounted on a rotating planetary system; 3) Electron beam control power and thickness measurement electronics. These three sections are shown in the first three figures along with labels pointing out key controls. AUTHORS: Roger Robbins, John Maynard Page 3 of 18

Invisible sign What does it say? Vacuum Gage Auto Tech II controller system controller Shutter Control Fixture Control Chamber Temp? in deg C Cryo pump controls Cryo Pump Pressure Gage Programmable Sweep Controllers Figure 1. CHA-50 e-gun Metal Evaporator control rack identifying important controls. AUTHORS: Roger Robbins, John Maynard Page 4 of 18

Chamber Door wafers go in here Invisible sign What does it say? Door handling assist mechanism Location of Density and Z-Ratio Charts Figure 2. Evaporator Vacuum chamber door with visual port window. AUTHORS: Roger Robbins, John Maynard Page 5 of 18

Film Thickness monitor Electron Gun controls High Voltage Switch Figure 3. Electron gun power supply and film thickness measurement system The evaporator tool essentially consists of a cryo-pumped vacuum system designed to produce a low pressure vacuum in a large water cooled metal chamber where the wafers are mounted on a rotating planetary fixture which rolls around on a horizontal ring support, and an electron gun producing a beam of electrons which impinge on a metal of choice for evaporating contained in a graphite crucible liner. The electron beam heats the metal in the crucible and creates a metal vapor inside the vacuum vessel and the vapor coats the wafers thus creating the metal coating. This system is supported with power supplies, valving and shutter controls, a viewing-port, and a material deposition sensor which can measure the film thickness of the evaporated material. The following sections will describe in more detail the essential features required for operating the system. Evaporation Chamber System The evaporation chamber is a large stainless steel chamber which contains a planetary wafer holder system that can hold 3 planetarys which can hold eight wafers each for a total of 24 in the chamber at one time. Also contained inside the chamber is a Trigun assembly with 3 electron guns and 3 crucibles potentially holding three materials to be evaporated. The chamber is rough pumped by a large mechanical pump located behind the wall. High vacuum is produced by a 10 inch diameter cryo-pump located below the chamber. This pump can achieve a vacuum better than 5x10-7 Torr. AUTHORS: Roger Robbins, John Maynard Page 6 of 18

Quartz Lamp Heaters Evaporation shutter Crucible to hold crucible liner with metal for evaporation Electron Gun housing Figure 4. Vacuum chamber floor showing the three e-beam gun assembly for up to three materials to evaporate. Quartz lamp heaters can set the deposition temperature and the open shutter sets the evaporation time. There is shielding inside the vacuum vessel to catch stray evaporated metal. The evaporation chamber is constructed of heavy stainless steel. It needs to be strong to support a vacuum inside, because when the air is removed from inside, the outside air exerts something like 30,000 pounds of crushing force on it. It also has a serpentine set of water channels in its walls to keep it cool. At the top of the chamber is a motor drive shaft penetrating the vacuum wall to provide a rotating drive for the planetary assembly. There is a round viewing port to allow the operator to see inside and center the electron beam on the metal in the crucible. In this particular setup there are shields to prevent direct viewing of the hot metal to reduce the metal coating on the glass window, which eventually obscures visibility, so in order to actually see the crucible, there is an internal mirror that allows a crooked visual path to the crucible see Fig 3. Make sure that the two mirror slides are in place before making a run. Figure 3. Mirror assembly to protect window from metal deposition. AUTHORS: Roger Robbins, John Maynard Page 7 of 18

Operating Instructions Vent & Load System 1. Verify that the Auto Tech II controller is in the automatic mode. Auto Tech II Controller located in the instrument rack to the right of the chamber. 2. Set the Auto Tech II controller rocker switch to STANDBY. 3. Verify that the gate valve hydraulic pressure gauge indicates ~1000psi, then set the Auto Tech II controller rocker switch to VENT. Hydraulic Pressure gage located behind the instrument rack and at the edge of the rear panel 4. Wait for the system to rise to atmospheric pressure (~8 min). AUTHORS: Roger Robbins, John Maynard Page 8 of 18

5. Lower the chamber door. Pull out on door and lower 6. Remove the planetary by lifting it off of its hanger. Planetary hanger 7. Lay the planetary on a flat surface. Release clip for removing arm Alignment Pin Planetary on flat surface. Finger points to alignment pin AUTHORS: Roger Robbins, John Maynard Page 9 of 18

8. Remove the support arm by pushing the clip toward the center of the bearing and then lifting the arm off of the planetary. Retaining Ring 9. Unscrew the retaining ring and lift the back of the planetary off of the wafer holder. Removing the back of planetary. 10. Attach samples on a 6 wafer (supplied). 11. Place the 6 wafers in the planetary. tape samples to a 6 wafer Wafer to-be-coated mounts face down Placing wafer in planetary 12. Replace the back of the planetary on to the wafer holder, making sure to align the pin on the wafer carrier with the hole in the back of the planetary (finger pointing to the alignment hole in step 7.) AUTHORS: Roger Robbins, John Maynard Page 10 of 18

13. Screw on the retaining ring and place the holder arm on the bearing support, locking with the clip. Planetary ready for loading into the chamber. 14. Wipe planetary rail inside chamber with IPA on a clean room wipe. 15. Replace the planetary on its holder in the chamber. 16. Load the 2 nd and 3 rd planetary if necessary following steps 7-14. 17. Open shutter to access the metal crucibles with the shutter control switch. AUTHORS: Roger Robbins, John Maynard Page 11 of 18

18. Load Crucible with material to be deposited into gun #1 or Gun #2 material pockets, making sure there is enough material in the crucible. Close shutters before closing door. 19. NOTE: The fill level of material in the crucible liner is critical: In the three photos below, note the too-little, just right, and too-much examples. Too Little Just Right Too Much 20. Make sure the fixture controller rocker switch is set on MANUAL. Turn the motor toggle switch to ON. Verify operation of planetary system. 21. Verify that the shutter controller is in the OFF position. AUTHORS: Roger Robbins, John Maynard Page 12 of 18

22. Lift the chamber door and push it against the door switch. Door Switch Lift chamber door into position and push, making sure that the door makes the door switch (finger photo). 23. Set the Auto Tech II controller rocker switch to START, the STANDBY light should go out. If it doesn t, the door is not making good contact and needs to be leaned on more. START Rocker Switch 24. Chamber should rough down to ~100 microns and close the roughing valve and open the Hi-Vacuum valve automatically. Pump down to process vacuum level takes about 30 minutes. 25. Read the chamber vacuum pressures on the Ion gauge readout pictured here. Processing pressure is 5X10-6 Torr or below. AUTHORS: Roger Robbins, John Maynard Page 13 of 18

26. Wait until pressure reaches desired value before beginning the deposition process. Evaporation Process Setup Film thickness Monitor and Beam Control Parameters 1. Set the Film thickness measurement parameters on the Inficon thickness monitor. This monitor shows the deposition rate and total thickness achieved during the process... Inficon Gun filament supplies Inficon thickness monitor e-gun Power Source Off/On Switch #1 a. Open the PROGRAM mode by pressing the Program button on the inficon AUTHORS: Roger Robbins, John Maynard Page 14 of 18

Program button b. Press the DENSITY button on the front panel and enter the DENSITY value for the material to be evaporated and then press the ENTER button. (Find the Density on a chart taped to the chamber door panel.) ENTER button Density c. Now press the Z-RATIO button, enter the Z-RATIO, and press ENTER. (Find the Z-ratio on a chart taped to the chamber door panel.) d. Again press the PROGRAM button. The PROGRAM light will go out and you have finished setting the film thickness parameters. Establishing Electron Beam 1. Verify that both of the PROGRAMMABLE SWEEP controllers are ON. 2. Turn on the main breaker on the CV-14 power supply cabinet (marked #1). 3. Turn on the key switch marked #2 4. Press the H.V. ON button, marked #3. AUTHORS: Roger Robbins, John Maynard Page 15 of 18

5. Make sure the filament current knob is set to zero on the E-GUN CONTROLLER for whichever gun will be used; Gun #1 or Gun #2. 6. Press the FILAMENT ON button on the appropriate e-gun controller, (marked #4). Slowly increase the current knob and look through the door window to see the beam landing in the crucible on top of the metal-to-be-evaporated only. The beam should be landing approximately in the center of the crucible landing only on the metal-to-be-evaporated. If it is not landing there, plug in the remote control into programmable sweep for the gun you are using and center beam and adjust sweep so that it is sweeping inside the crucible. Remote Control for controlling electron beam landing location in crucible liner. Depositing Material 1. Increase the current until the material starts to melt. This will be a little different for different materials. 2. When the material is molten, press ZERO on the thickness monitor and open the shutter. AUTHORS: Roger Robbins, John Maynard Page 16 of 18

Zero Button 3. Increase the current until the thickness monitor reads 0.5 to 1.0 angstroms per second deposition rate. 4. When the thickness reaches your target value, close the shutter, turn the current knob to zero, press Filament OFF (#4), turn HI VOLTAGE off (#3), turn KEY SWITCH to OFF (#2), and finally turn MAIN breaker (#1) on the CV-14 power supply switch to OFF. 5. Let the system cool off for 5 minutes or more before venting Unloading Samples 1. Verify that the Auto Tech II controller is in the automatic mode. 2. Set the Auto Tech II controller rocker switch to STANDBY. 3. Verify that the gate valve hydraulic pressure gauge indicates ~1000psi, then set the Auto Tech II controller rocker switch to VENT. 4. Wait for the system to rise to atmospheric pressure (~8 min). 5. Lower the chamber door. 6. Remove the planetary by lifting it off of its hanger. 7. Lay the planetary on a flat surface. 8. Remove the support arm by pushing the clip toward the center of the bearing and then lifting the arm off of the planetary. 9. Unscrew the retaining ring and lift the back of the planetary off of the wafer holder. AUTHORS: Roger Robbins, John Maynard Page 17 of 18

10. Remove the 6 in wafers, un-tape your samples and take them with you. 11. Replace the back of the planetary on to the wafer holder, making sure to align the pin on the wafer carrier with the hole in the back of the planetary. 12. Screw on the retaining ring and place the holder arm on the bearing support, locking with the clip. 13. Wipe planetary rail inside chamber with IPA on a clean room wipe. 14. Replace the planetary on its holder in the chamber. 15. Open shutter to access the metal crucibles with the shutter control switch. 16. Remove crucibles and store them in the crucible storage box making sure that they are placed under the proper label. Close shutters before closing door. 17. Make sure the fixture controller rocker switch is set on MANUAL. Turn the motor toggle switch to ON. Verify operation of planetary drive and then turn off the toggle switch. 18. Verify that the shutter controller is in the OFF position. 19. Lift the chamber door and push it against the door switch. Lift chamber door into position and push, making sure that the door makes the door switch (finger photo). 20. Set the Auto Tech II controller rocker switch to START. The STANDBY light should go out. If it doesn t, the door is not making good contact and needs to be leaned on more. 21. Chamber should rough down to ~100 microns and close the roughing valve and open the Hi-Vacuum valve automatically. Pump down to process vacuum level takes about 30 minutes. 22. Done! Make sure the area is clean and take your samples with you. AUTHORS: Roger Robbins, John Maynard Page 18 of 18