UNDERFLOOR HEATING SYSTEMS. Technical Installation Guide

Similar documents
MANIFOLDS & WATER TEMPERATURE CONTROL

L634 [56.49] X UNICLASS L ambiente. more than underfloor UNDERFLOOR HEATING TRADE PRICELIST

Underfloor Heating. Solid floor Floating floor Suspended floor. Overlay. Ultra Flexible Underfloor Heating Pipe. Manifolds - All Floor Systems

T2 Wall Hung Radiator & UFH Manifolds

Product and installation manual. Underfloor Heating Composite Manifold

M-8100EP. Installation Guide ENGINEERED PLASTIC MANIFOLD SERIES. Introduction. A. Assemble Manifold Components

T2 Wall Hung Radiator & UFH Manifolds

Underfloor Heating Manifold Control Kit

Underfloor heating & cooling solutions by Wavin

LK Manifold RF. Design. Requirements. Documentation

M Installation Guide. PRECISION Manifold Series. Introduction. A. Assemble Manifold Components

PLUMBING SYSTEMS PIPE & FITTINGS

LK Manifold Shunt VS2

FCU Floor Control Unit

Manifold Isolation Valves

THERMOSTATIC INLINE CONTROL SHOWER VALVES Installation & aftercare instructions

Solar Thermal. Grant Solar Pump Station Installation & Servicing Instructions

THERMOSTATIC CONCENTRIC DUAL CONTROL SHOWER VALVES Installation & aftercare instructions

PLUMBING SYSTEMS PIPE & FITTINGS

SYSTEM KAN-therm. Underfloor heating. Comfort and efficiency TECHNOLOGY OF SUCCESS ISO 9001

Underfloor heating. installation manual. Nu-Heat v19. For more information visit UNDERFLOOR HEATING SOLAR THERMAL HEAT PUMPS

LK Manifold RF. Design. Requirements

MrPEX 1 ¼ Stainless Steel Manifold. Installation Guide

MrPEX 1 ½ " Brass Manifold Installation Guide

plumbaseindustrial.co.uk SYSTEMS PRICE GUIDE Multilayer Pipes and Fittings. HIU's, Meters & Valves

MMR25. Instruction Manual for Operation & Maintenance. IB International. Ph:

Engineered Water Solutions Installation and Commissioning Instructions FCU Floor Control Unit

Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions

FOR HEATING & PLUMBING SYSTEMS

Installation, Operating, Maintenance and Safety Instructions for CW332 Pressurised water system for boats 24 volt d.c.

Snow Melt EN_US_2014_V2.indb 171 2/7/ :18:52 AM

3.1 DISPENSER BLACK SHADOW SERIES. Tools Needed for Mounting SCS Dispenser Hammer

Part No: Genuine Mira Accessories

Underfloor Heating Manifold Kits

For assistance call T&M. Tubing and manifolds. installation guide

Tools Needed for Mounting Cleá Filling Station

Technical Installation Manual

GTFLOW EXTENSION MANIFOLD ASSEMBLY INSTRUCTIONS

Composite PEX-AL-PEX Tubing

LK Shunt Cabinet VS2, Shunt Cabinet VS2 Prefab

20 TONNE HYDRAULIC PRESS MODEL NO: CSA20FBT

Installation Guide Rollerdor RD55 Econ Roller Garage Door

VANDAL RESISTANT FITTINGS VR105, VR125, VR145 (VR106, VR115 Export only) PRODUCT MANUAL IMPORTANT

METERING VALVE 2" STEM GUIDED

Scale Feeder Manifold Water Filtration System Instruction Manual

Dual Port Manifold Water Filtration Systems Instruction Manual

Hot and Cold Plumbing Manifold Systems

6 Litre Oil-Less Air Compressor

HOT WASHER MODEL NO: KING 125 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS1009

APT14 Automatic Pump Trap Installation and Maintenance Instructions

Model 6518FR. NOTE TO INSTALLER: Please leave this information with the Maintenance Department. LIMITED WARRANTY

PRE-PLUMBED SEWAGE SYSTEM

Dual/Triple Manifold Water Filtration Systems Instruction Manual

Heating Manifold Systems

Acura TMV3 Bath Filler AC50010CP and AC50020CP

Rotary Folding Hoists

Key Installation Points. Table of Contents

INDOOR CLIMATE SOLUTIONS PRODUCT CATALOG Uponor Radiant Heating/Cooling

Product Manual PS3900 / PS4600 / PS7000 / PS15000 / BF1600 / BF1900 / BF2600 / BF

www. hydrofuse.com Installation Manual Fertilizer Machine V1.3

Wall Hung Radiator Systems. Wall Hung Radiator Systems

ALWAYS DISCONNECT DISPENSER FROM WATER SOURCE WHEN DISPENSER IS NOT IN USE.

CHECKLIST & COMPONENTS

Hydraulic Motorcycle Lift. Model CML3 & CML3 AIR Part No: ASSEMBLY & OPERATING INSTRUCTIONS 0212

Electric Diesel Pump EDP/12, EDP/24

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

ECONOPLATE BV SERIES HOT WATER SERVICE PACKAGED HEAT EXCHANGERS WITH THERMAL STORES

TS Series. MultiStage Centrifugal Pump Instruction Manual. Walrus America Inc. ISO 9001 Certified

Manifolds Controls Pipe Accessories

Safety, Operation and Maintenance Instructions For Long & Short Nose Upholstery Air Stapler (NS10 & NS11)

Installation Guide Rollerdor RD55 Econ Roller Garage Door

CIRCO5SolarCirculationUnit

CT3202.0_01 EN February 2018

MrPEX 1 ¼ Stainless Steel Manifold Installation Guide

Installation Guide Rollerdor RD77 Econ Roller Garage Door

ETP-5E & ETP-10E ECO-TECH PLUS ELECTRIC CONVECTION STEAMER PARTS AND SERVICE MANUAL

Installation must be in Accordance with AS/NZS

TL4076 Top 5 Tips Get to know your TL4076

INSTALLATION AND OPERATION MANUAL

CRD600 Automatic Fitting Inserter

CRD610 Automatic Fitting Inserter

Hydraulics. Part B, Section 1. This section covers the following unit configurations. 3700V

OWNER S OPERATING MANUAL

INSTRUCTION MANUAL. Direct Drive Air Compressor 2320, REV A. 1.

LABOUR ESTIMATE GUIDE

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

Compact Security FloodLight

Table of Contents Introduction 3 Chapter 2: Operation 4 Chapter 3: Components 5 Chapter 4: Specifications 8

PRODUCT OPERATING MANUAL

Full Flow Drinking Water System Model: 3MFF100

APT10-2 Automatic Pump Trap

MSC Manifolds - DIN for Steam Distribution and Condensate Collection Installation and Maintenance Instructions

BOLT TENSIONERS. carefully before use and retain it for reference.

To the Fitter: Ensure all relevant personnel read the points listed below and that a copy is passed on to the end user.

Rehau easy heat domestic heating system parts list EN ENERGY EFFICIENCY. Building Solutions Automotive Industriy

Service Manual Air Tech Second Stage

INSTRS30709 rev 1 02/10/09 Page 1

1901 Thermostatic Shower Mixer

Operation and Maintenance Instructions

ONBOARD AIR HOOKUP KIT

Transcription:

UNDERFLOOR HEATING SYSTEMS Technical Installation Guide April 2017

CONTENTS Section 1 - Introduction Page 3 Page 4 Pre-Installation Checks Tools & Site Requirements Section 2 - Manifolds Page 5-9 Page 10-11 Page 12-15 FMP Premium Manifolds FMC Contract Manifolds Water Temperature Pump Control Pack Section 3 - Fixing Systems Page 16 Page 17 Page 18 Page 19 Screed-Rail UFH System Screed-Clip UFH System Float UFH System Joist-Plate UFH System Section 4 - Installation Page 20 Page 21 Pressurising, Testing UFH System & Start-up information UFH Installation Overview Section 5 - Controls Page 22 Page 23 Page 24 Page 25 Page 26 Base UFH Controls 230v Wireless UFH Controls Premium UFH Controls 230v 24v UFH Controls Smart UFH Controls 230v Section 6 - FAQ / Warranty Page 27-28 Page 29 FAQ / Troubleshoot Guarantee & Warranty Page 2

Checking Your Order Upon delivery of your underfloor heating system, please check all products against your delivery note. Please contact us on 01245 227 630 within 24 hours of receipt if there are any problems with your delivery. Product Quantity Product Description Product Code Product Quantity Remaining Delivery Terms & Conditions Line Drawings (If applicable to your order) If you have requested a line drawing with your order. Please check this thoroughly before commencing the installation to ensure it meets with your requirements, especially make sure of the following: 1). That the manifold is indicated in the correct position. 2). That all the areas to be heated are indicated correctly. 3). That all unheated areas are indicated such Kitchen units & fixed furniture. 4). That the floor constructions are correct. Floor Construction/ UFH System Pipework Layout Manifold Location Coil & Cut Schedule Project Reference Manifold Sizing Chart Page 3

Technical Installation Guide Tooling (required for installation) Before installation of your underfloor heating system please ensure you have the following tools: (depending on your type of installation additional tools may be required) Measuring tape Masonry drill & bits Adjustable spanners/wrench Pipe cutter & bevelling tool Circlip hose pipe fasteners Hose pipe Pressure tester Screw drivers Stanley knife Spirit level Tacker gun & staples (maybe req d for your fixing system) Fine toothed hand saw Duck tape Marking paint Site Requirements Before installation of your underfloor heating system please ensure the following site requirements are met: The working area must be weather tight. The working area must be clean and swept of any debris or rubbish Access to mains pressure water for filling and testing Task lighting & power Any site specific safety & access equipment/scaffolding PPE etc. Tooling (available to Purchase from Multipipe) The following items are available to buy from Multipipe Ltd, please contact our offices for prices. Pipe Staple Tacker Gun Pipe Decoiler (Recommended for use with 500m pipe coils) Pipe Bevelling tool Pipe Cutter Multipipe Ltd Tel: 01245 227 630 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 4

210mm 354mm Technical Installation Guide Premium FMP Manifolds (#15-061..) Multipipe FMP manifolds are pre-assembled, supplied complete with flow metres, fill and drain points, automatic air vents and blanking plugs. Manifold finish is nickel-plated brass. Flow rail has a double regulating red sleeve 0-4 l/min flow meter per circuit. Return rail has a blue capped integrated electrothermic body (ready for actuator head) per circuit. The flow metres include an isolate function and are located on the top of the manifold. Flow metres provide a visual indication of flow rate through each circuit. Pipe is connected to manifold using 24x19mm threaded pipe connectors. Combined Flow Regulator and flow meter Automatic Air Vent Fill & drain point 24x19mm Thread Return Valve Isolating Ball Valve 15-14049 56mm L (mm) Manifold Ports 2 3 4 5 6 7 8 9 10 11 12 L (mm) 172 222 272 322 372 422 472 522 572 622 672 15-14049 - 1 Ball Valves (Not supplied with manifold) 65 B A 53.5 13.5 14.5 69.5 23.5Ø Dimension (mm) 1 A 26.5 B 51 C 56.5 D 81 Port Connection centre(s) 24x19mm Thread C 50 D Page

FMP Premium Manifold - Flowmeter Adjustment 19mm black spanner flats Combined Flow regulator and flow meter Flowmeter tube Red Collar 1 1 2 1 2 3 Fig. 1 Fig. 2 Fig. 3 Range of measurement 0-4 l/min Maximum operating pressure 6 bars Max. operating temperature 90 C Kv = 0.15 (1 l/min) -0.55 (4 l/ min) Kv max off scale = 0.9 Precision ±10% fs fs= Bottom of scale Cleaning the flow meter Turn the red collar (1) clockwise, until the isolating function is fully closed. Remove the flowmeter tube by securing the black spanner flats, then using either hand pressure or a 17mm ring spanner, gently unscrew the flowmeter tube anticlockwise. Clean the tube and screw it back on. Turn the red collar (1) anticlockwise until the isolating valve is fully open again. How to balance the circuits using flow meter Flowmeters have a double regulating function i.e. they not only adjust water flow but also include an isolating function which can be opened and closed without affecting the flow setting. The flowmeter has an inner combined flow regulator and flowmeter, see Fig. 1, and an outer red collar. The red collar, (1). is used for isolating the valve. The inner regulator is used to set the flow in the circuit, increasing or decreasing the flow by using the 19 mm spanner flats provided, see Fig. 2. The change in flow can be read in the scale on the flowmeter tube. The valve is supplied in the fully closed position. First open the isolating valve following the instructions below: Step 1 Lift the red collar and turn anticlockwise approximately three and a half turns. You will see the whole of the flow meter rotating and rising. If the valve is over-rotated more than three and a half turns - then the internal plastic threads can become damaged and cause leaks. If you reach the positive stop please rotate back half a turn. You are now ready to use the flow regulating function. Flowmeter pressure drop vs flow rate Step 2 Lower the red collar (1) until it touches the manifold. Then using a 19mm spanner, or your fingers, adjust the flow using the black spanner flats at the bottom of the Flow meter (2). You can read the required flow in litres per minute directly from the red indicator against the scale in the clear flow meter tube. Step 3 When you have set the required flow rate, raise the red collar (1) again, until it is engaged against the black spanner flats at the bottom of the flow meter (2), see Fig. 3. no. of turns for opening the flow regulator TA = Fully open. The above values refer to water temperature at 15 C Page 6

Premium FMP Manifolds (#15-061..) Accessories / Spares for Use with FMP Manifolds 15-14049 15-03161 15-53117 15-53118 15-53114 FMP Pair 1" UFH Manifold Ball Valve (Red/ Blue) 1"FT x 1" MT 16x2mm mlcp Pipe Connector (other sizes available) FMP Topway Lockshield with Flow Meter FMP Flow Metre Seat FMP Thermostatic Replacement Kit 15-53115 FMP Single Circuit manifold extension kit 15-06426 FMP 1 Manifold Coupling 15-53122 Blanking Cap (24x19mm thread) 15-53119 FMP Automatic Air Vent 1/2" for Manifold 15-53120 FMP Fill and drain valve 1/2" with male 3/4" hose 15-16161 16x2mm mlcp pipe repair coupling (other sizes available) Page 7

Technical Installation Guide FMP Premium Manifold - Adding an extra Circuit This guide shows you how to add an additional circuit to the Premium range manifold using the Single Circuit Manifold Extension Kit 15-53115 - Manifold Extension Kit 1x 15-53114 Thermostatic Replacement Kit 1x 15-53117 Lockshield with Flow Meter 1x 15-53118 Flow Meter Seat 2x 15-06298 Manifold End Tee Piece Step 1 The manifold when removed from the box should appear like this. (In this example we are using a 5-circuit manifold and are going to extend it to become a 6-Circuit). If the manifold has been pre-assembled (i.e. Air Vents, Fill & Drain Points & End caps have already been assembled to the manifold). Isolate & drain the system if necessary and remove these items so the manifold looks like the following image. 15-53117 Step 2 Both the flowmeter (15-53117) and the flowmeter seat (15-53118) are installed in the same way: initially inserting by hand and then tightening using an open-ended 24mm spanner until there is metal to metal contact between the flowmeter/ flowmeter seat and the manifold. The flowmeter mechanism is designed to be inserted inside the tubular projection from the flowmeter seat see Fig.1 15-53118 Once the above steps are completed the manifold should appear as Fig.2. Fig.2 Fig.1 Flowmeter Collar Manifold Manifold Take off Multipipe Ltd Tel: 01245 227 630 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 8

Technical Installation Guide Adding an extra Circuit to an FMP Manifold Step 3 The Thermostatic replacement kit (15-53114) is installed initially inserting by hand and then tightening using an open-ended 24mm spanner until there is metal to metal contact between it and the manifold. Once the above steps are completed the manifold should appear as Fig.3 Step 4 The Manifold End tee (15-06298) has a 1 M connection with an o-ring seal and requires tightening until the seal is compressed fully. The automatic air vents and Fill & drain points as already supplied with original manifold can then be connected to the top & bottom ½ F connection on the Manifold End tee pieces. Once the above steps are completed the manifold should appear as Fig.4 Fig.3 Multipipe Ltd Tel: 01245 227 630 Repeat as above Fig.4 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 9

Contract FMC Manifolds (#35-161..) Multipipe FMC contract manifolds are pre-assembled, supplied complete with flow metres, Manifold finish is nickel plated. Return rail has a capped integrated electrothermic body (ready for actuator head) per circuit. Flow metres provide a visual indication of flow rate through each circuit. Pipe is connected to manifold using 3/4 euro-cone pipe connectors. Isolation Ball Valve 35-14049 3/4 thread FMC Pair of Manifold 1" End Caps 35-53128 Accessories for Use with FMC Manifolds (not supplied with manifold) 35-14049 Pair 1 Isolation Ball Valves 35-53128 Pair 1 End Caps 35-06201 Flow Meter 15-91536 Female Blanking cap 3/4" 20-03161 16x2mm Eurocone (other sizes available) 15-16161 16x2mm mlcp pipe repair coupling (other sizes available) Page 10

Contract FMC Manifolds (#35-161..) 28mm 50mm 28mm 1 3/4 210mm Manifold Ports 2 3 4 5 6 7 8 9 10 11 12 L (mm) 106 156 206 256 306 356 406 456 506 556 606 Total length (inc Valves + End Sets) 233 283 333 383 433 483 533 583 633 683 733 INSTALLATION When fixing a manifold to timber studding or plaster board walls, it is recommended that fixing timber is placed within the timber wall construction where the manifold fixing points are to be drilled and screwed. This will ensure a secure fix for the manifold. Where this is not possible suitable cavity fixings can be used. Step 1 - Fix the manifold onto the wall using the fixing holes on the bracket and the plugs/ screws provided. It must be 650mm from the top of the EPS floor insulation to the top header level. Step 2 - Connect the 1 quarter turn isolation vales to the top and bottom headers (same end) of the manifold. To avoid leaks, ensure that the washers provided are positioned between the valve face and manifold prior to tightening the union nut. Step 3 - Connect the combined drain valve and air vent to the top and bottom headers of the manifold on the opposite side to the isolation valves. Again, to avoid leaks ensure that the fibre washers are in position between the valve face and manifold prior to tightening the union nuts. Step 4 - The pipe retaining rail should be fixed approximately 175mm below the manifold. It Is recommended that +150mm is added to the length of the tail over the length of the manifold. Step 5 - Place the fixing lugs onto the rail, push them tight against either side of the pipe (now protected by the corrugated sleeve) and screw them tight, once in position. Page 11

Technical Installation Guide 28-06151 - Water Temperature Control Pack with A rated Air Vent Socket for use with Temperature Gauge Temp Gauge: Part # 28-06080 (optional extra) Blanked Port Pump Outlet Elbow HEATING FLOW G3/4 x G1 O ring spinning nut Wilo Yono Para A rated Pump Assembled for 210mm Manifold Centres Inclined Dimension 211mm 212mm 1-1/2 Pump Flange UHC150 Thermostatic Mixing Valve HEATING RETURN Boiler Return Port Rp 3/4 G3/4 x G1 O ring spinning nut Boiler Flow Port Rp 3/4 UFH Controller - Type 28-06151 Suitable for up to 15Kw heating load, this compact lightweight underfloor thermostatic mixing control complete with Wilo Yono Para class A efficiency pump has been designed for direct connection to heating manifolds with 210mm centres and is supplied with G1 male O ring sealed connections as standard. Its versatile design and O ring connection system provides for simple and quick conversion from left to right hand format if required, as Illustrated. Installing the control pack to the manifold is simple and quick, requires no additional supporting bracket and so eliminates the need for time consuming drilling and fixing. Multipipe Ltd Tel: 01245 227 630 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 12

Technical Installation Guide 28-06151 - Water Temperature Control Pack with A rated Installation Insert the G1 spinning nut into the female sockets of the isolating ball valves on the manifold. Offer the control unit to the sockets, locating the bottom (TMV) connection first (Fig 1) then swing the top (mixed flow) connection, aligning the assembly, then push forward until G1 male threads mate with female connections. Screw top and bottom G1 connection spinning nuts alternatively a few turns at a time to maintain alignment (Fig 2) until fully engaged. Tighten spinning nuts (Fig 3) using appropriate tools, ensuring both ends of spinning nut are tightened at the same time in order to seal both O ring connections Pump outlet Elbow. The pump outlet elbow (Fig 4) is fitted with air vent, a blanked port for optional bypass kit and two temperature gauge sockets with fixing screw. A temperature gauge (optional extra) can be fitted to either socket so allowing for left or right handing of manifold connections. Boiler connections. The optional ¾ x 1 M/F elbow provides for the option of vertical or horizontal connection of the primary pipe work with the boiler. For vertical pipe runs connect the elbow to the return port and for horizontal pipe runs connect the control valve flow port (Fig 5). Screw in the male thread until the O ring contacts the valve port face then continue to turn clockwise within 1 turn until aligned suitably for the connecting pipe run. Tighten the locknut to secure and seal. Do not overtighten. Multipipe Ltd Tel: 01245 227 630 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 13

Technical Installation Guide 28-06151 - Water Temperature Control Pack with A rated Electrical Connection Connect the pump and zone valves (if fitted) to the electrical control circuit serving the system. Commissioning To protect and prevent damage to the mixing control and other devices in the heating circuits, it is recommended that the pipe work connecting to the boiler be flushed thoroughly of flux and debris before final connection, filling and venting the heating control and system. With the manifold isolated but filled and pressurised, open the supply connecting the mixing control to the boiler. Purge the primary pipe work until free of air. Then vent the control unit via the vent on the outlet elbow. Check that the primary pipe work and controls is filled and at system pressure then check all joints for leaks. Open the isolating valves on the manifold to integrate the primary circuit and mixing control and heating circuits. Check again that the system pressure is correct and that all connections are good. Finally check that the integrated system is free of air via the pump outlet elbow vent and the manifold vents. Mixing Control adjustment (Temperature setting) The thermostatic mixing valve (TMV) is factory set to provide 45 c mixed water to the heating manifold. The mixed water flow temperature can be adjusted and locked very simply to suit the designed flow requirements within the temperature range of 30-60 c. With the boiler on and the heating circuits balanced the mixed temperature is easily adjusted by the following method. 1. 2. Unscrew the central screw (Fig 8) approximately ½ turn anticlockwise to release the clutch locking mechanism. Turn the knob clockwise to decrease and anticlockwise to increase the temperature. 3. The numbers on the control knob indicate the approximate mixed flow temperature when aligned with the indicator rib on the valve body. Refer to Table 1. 4. Select and dial to the number required as shown in Table 1 then wait for the system to respond and the valve to stabilise by observing the temperature gauge (available separately) on the pump outlet elbow. If required adjust the control knob for further fine adjustment to achieve the required temperature outlet. 5. Tighten the central screw (Fig 8) approximately ½ turn clockwise to engage the clutch mechanism and lock the temperature setting. Multipipe Ltd Tel: 01245 227 630 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 14

Technical Installation Guide 28-06151 - Water Temperature Control Pack with A rated Changing to alternative handed manifold How to Do: Slacken the spinning nut on the manifold return connection remove and transfer to the opposite port (previously boiler return) re-tighten into this port which is now the heating manifold return. Do not over tighten. Slacken the G11/2 pump outlet connection rotating nut by approximately ½ turn anticlockwise. Rotate the pump outlet elbow assembly by 180 visually align with return port. Lightly tighten the 11/2 rotating pump union nut to retain alignment. Follow installation procedures taking particular care once assembled to manifold that all joints are tightened and checked for leaks. These instructions are written as a guide only and should be taken in the context they are written. Good engineering practices should be adhered to. Multipipe Ltd Tel: 01245 227 630 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 15

Technical Installation Guide Screed-Rail UFH System INSTALLATION Before installation can begin the sub floor must be cleared of all debris and rubbish. Pipe Staples are available in 40mm or 60mm depth for stapling to insulation. Edge insulation is to be installed to all perimeter walls, internal & external using suitable staples, nails or adhesives Floor insulation must be laid directly onto the sub floor to reduce downward heat losses and comply with any building regulations. The types and thickness is to be determined by the architect, builder or owner. Insulation boards should be butted up against the perimeter strip and laid in a staggered formation. Minimum 500 Gauge polythene must be laid on the insulation to form a slip membrane and prevent ingress of screed into the insulation zone which will cause thermal bridging. Polythene also prevents screed additives affecting the insulation board. Lap joints 100mm. Depending on your pipe layout lay the clip rail a minimum 100m from side walls and depending on your pipe pattern 500mm from end walls thus allowing for pipe returns. The rail has an adhesive backing tape. Use pipe staples to help secure the rail to the insulation board below. Lay the rail in rows at maximum 1-metre centres. The rail can be clipped together and cut as required. Connect the flow pipe to the required circuit on the flow manifold and begin to lay the pipe in accordance with your design. Firmly push the pipe into the rail slots. The slots are at 50mm centres to help you accurately place your pipe centres. Multipipe Ltd Tel: 01245 227 630 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 16

Technical Installation Guide Screed-Clip UFH System INSTALLATION Before installation can begin the sub floor must be cleared of all debris and rubbish. Pipe Staples are available in 40mm or 60mm depth for stapling to insulation. Edge insulation is to be installed to all perimeter walls, internal & external using suitable staples, nails or adhesives Floor insulation must be laid directly onto the sub floor to reduce downward heat losses and comply with any building regulations. The types and thickness is to be determined by the architect, builder or owner. Insulation boards should be butted up against the perimeter strip and laid in a staggered formation. Minimum 500 Gauge polythene must be laid on the insulation to form a slip membrane and prevent ingress of screed into the insulation zone which will cause thermal bridging. Polythene also prevents screed additives affecting the insulation board. Lap joints 100mm. Depending on your pipe layout lay the clip rail a minimum 100m from side walls and depending on your pipe pattern 500mm from end walls thus allowing for pipe returns. The rail has an adhesive backing tape. Use pipe staples to help secure the rail to the insulation board below. Connect the flow pipe to the required circuit on the flow manifold and begin to lay the pipe in accordance with your design. Use the pipe staples provided to secure the pipe every 500mm. These can be fitted easily by hand and have barbs to prevent them pulling out. Multipipe Ltd Tel: 01245 227 630 Unit 12, Great Hayes Bus. Park, Lower Burnham Road, Stow Maries, Essex CM3 6SQ Page 17

Float UFH System (Foiled & Non-Foiled) INSTALLATION Before installation can begin the sub floor must be cleared of all debris and rubbish. FOILED XPS / EPS The boards are supplied with return loops and return channels at one end. Lay the boards butt-jointed and trim to cover the c omplete floor. NON-FOILED XPS / EPS Follow installation guide for Foiled XPS / EPS and then below steps The return grooves are covered with the aluminium foil layer. These are to be site cut as required using a sharp knife. If additional grooves are required these can also be site cut using a hot wire tool. Lay the boards butt-jointed and trim to cover the complete floor. Aluminium plates have extremely sharp edges, please handle with care and wear appropriate PPE. The plates are grooved with an omega shape ensuring a snug fit. Some plates are supplied with score marks these can be snapped along these marks and used as infill plates. Begin to lay your foil faced insulation in a constant formation with all pipe runs correctly lined up. Connect the flow pipe to the required circuit on the flow manifold and begin to lay the pipe in accordance with your design provided. The pipe is a secure fit in the grooves and is easily snapped into place. Once all boards are laid begin to push the aluminium diffusion plates into position please refer to your design for this section. Page 18

Joist-Plate UFH System INSTALLATION A minimum of 100mm quilt insulation is required below the plates to keep downward losses to a minimum. Aluminium plates have extremely sharp edges, please handle with care and wear appropriate PPE. The plates are grooved with an omega shape ensuring a snug fit. Some plates are supplied with score marks these can be snapped along these marks and used as infill plates. Allow 200mm gap at end of runs for pipe returns, maintain a gap of 5mm between plates to allow for expansion. Simply fix the plates to the top of joistsusing a staple gun or tacks The plates are grooved with an omega shape ensuring a snug fit. Connect the flow pipe to the required circuit on the flow manifold and begin to lay the pipe In accordance with your design. You may need to support the plate from below whilst inserting the pipe. Ensure the insulation placed below the plates forms a complete blanket without voids. Page 19

Pressurise the System Connect a test bucket to the flow manifold fill & test point and secure using a circlip. Fill the test bucket with water as required Open the valve on the flow fill and drain point. Open ALL flow meters and actuator valves and pressurise the system up to 6bar. Close the ball valve on the test pump. Leave pressurised for an hour monitor the pressure on the test pump if pressure drops slightly pump back up to 6bar. As the system settles down the pressure may drop a small amount, this is Normal and can be expected. Once you are confident there are no leaks in the system, close the valve on the flow fill and drain point & remove the test bucket and hose. Maintain the system at test pressure until all follow on trades are complete and the heating system is connected and ready to be filled. It is good practise to install a pressure gauge in place of the flow manifold bleed point so a visual check can be made on the pressure in the system System Start-up Information When filling the primary pipe work close the manifold ball valves and ensure air in the heating system primary pipework is bled out of the air vent located on the pump pack upper elbow and not the manifold. This will prevent air entering the underfloor heating system and causing air locks. Underfloor heating systems which require drying out times, e.g. floor screed systems are to have sufficient drying time before switching on your underfloor heating. Natural timber floor finishes need to be climatized in-situ before switching on. In the following we have provided very general information but specific advice must be sought from your supplier, manufacturer and installer as to the correct procedure for system start up. Floor Screeds The floor screed should be laid for a minimum of 28 days before the underfloor heating system is heated. To put the system into operation the pipework between the boiler and the underfloor heating manifolds should be filled, vented and tested. The underfloor system should be filled, vented and tested with all isolating valves opened. Ensure that the circulator rotor is free by unscrewing the vent screw in the end of the circulator. Complete, check and test the system wiring in accordance with the latest edition of the IEE regulations. Balancing Valves If the loop balancing valve on the manifold has not been set at the manufacturers works this should now be carried out in accordance with the suppliers data. The loop control valves are either manual or actuator controlled by means of room thermostats. The valves should be opened and the water temperature control on the manifold should be set at 25/30 C. Check that all valves and thermostats on the system are correctly set and that the UFHC control is set to maximum. Switching on Switching on the system. Remember that actuators take some time to operate and there will be a 2 to 3 minute wait before anything happens. Check that the boiler is operating in accordance with the manufacturers instructions and set to run with a flow temperature of 82 C unless the boiler is directly controlling the flow water temperature to the loops, in which case it should be set to the starting temperature of the system. Page 20

Typical UFH Installation Overview Page 21

Base 230v UFH Controls 15-23011 230v 4-Zone Wiring Centre 15-23001 230v Dial Thermostat NSB 15-23013 230v 8-Zone Wiring Centre 15-23002 230v LCD Digital Thermostat NSB 15-23015 230v LCD Single Channel Time Clock 15-23003 230v LCD Programmable Thermostat NSB 15-23021 Remote Sensor 4.7K for use with Dial / Tamper Proof thermostats only 15-23010 230v Tamper Proof Thermostat NSB 15-23020 Empty Enclosure (for remote Sensor) 10-23023 230v Electrothermic Actuator Head Page 22

Wireless UFH Controls 18-00013 Wireless 8-Zone UH8-RF Wiring Centre 18-00096 NeoAir Wireless Thermostat 18-99908 Wireless Programmable Thermostat c/w Receiver 18-00091 Boost - Neo / RF repeater 18-00001 Wireless Programmable Thermostat 10-23023 230v Electrothermic Actuator Head 18-00005 Wireless Touchscreen Thermostat Page 23

Premium 230v UFH Controls 18-23011 230v 4-Zone UH4 Wiring Centre 18-23017 230v TM1-V3 Single Channel Time Clock 18-23013 230v 8-Zone UH8 Wiring Centre 18-23015 230v TM4-TS 4-Channel Time Clock 18-23001N 230v Dial (DS-SB) Thermostat (UH8 only) 10-23023 230v Electrothermic Actuator Head 18-23003N 230v Slimline Programmable Thermostat 18-23020 Remote Sensor (10k) 18-23005N 230v Touchscreen Thermostat 18-230201 Empty Enclosure (for remote Sensor) Page 24

24v UFH Controls 15-02413 24v 8-Zone Wiring Centre 15-02401 24v Dial Thermostat NSB 15-02415 24v LCD Single Channel Time Clock 15-02402 24v LCD Digital Thermostat NSB 15-23021 Remote Sensor 4.7K for use with Dial / Tamper Proof thermostats only 15-02403 24v LCD Programmable Thermostat NSB 15-02410 24v Tamper Proof Thermostat NSB 35-02422 24v Electrothermic Actuator Head 15-23020 Empty Enclosure (for remote Sensor) Page 25

Smart 230v UFH Controls Network control of your mains wired heating system from your Smartphone and Tablet 18-23013 230v 8-Zone UH8 Wiring Centre 18-23098 230v NeoStat Programmable Thermostat Example only Smartphone (not included) 18-99999 neohub - Neo System Gateway 18-99997 neoultra - Central Control 10-23023 230v Electrothermic Actuator Head Page 26

FAQ / Trouble Shooting? As described in earlier sections, the UFH system operation is relatively straightforward. Hot water from the primary heat source (boiler) is blended with the return water from the UFH secondary circuit at the mixing valve and distributed, via the secondary UFH pump, to the distribution manifold and into a series of UFH loops/ circuits of pipe embedded with the floor. Normally, there is a room temperature control, which will open and close a single or series of actuators mounted on the manifold, or prior to the manifold (single zone), depending upon the room requirement. If one or all thermostats are calling for heat, there is a boiler interlock switch to energise the boiler The majority of problems are usually simple installation problems, relating to the wiring or plumbing, or design problems with regards to the limitations of UFH and its suitability for the purpose intended. In all cases where an electrical fault is reported it is always prudent to check the obvious before replacing components. Is there an electrical supply? Is it switched on? Are there any fuses that may have blown and need replacing? Are any components overloaded? Is everything wired correctly? Under no circumstances replace a fuse with a higher rating than stated for the piece of equipment. If the water arriving at the manifold (prior to entering the mixing valve) is either cold or below the design temperature, check: The boiler is firing The primary pump is fitted The primary pump is working The boiler is of adequate size The primary pipework is sufficiently sized The primary pumps are large enough Operating Problems? If a loop or loops fail to warm, when other zones are working correctly. General things to look for: Check that the corresponding manifold valves are open Check that there is a demand from the corresponding room thermostat and/or the thermal actuator is open on demand. There may be an air lock in the loop, which will require purging, either shut down all other loops by closing the valves at the manifold or turn down all other room thermostats. This will concentrate all pump pressure to the problem lip and may shift the air blockage. If all else fails the loop can be flushed through with high-pressure water following the instructions details in Filling, Venting and Pressure testing. If circulation is apparent but poor, it may be that the regulating control valve on the manifold required adjustment. Check that all pump isolating valves are fully open. The UFH / Room is not getting Warm? General things to look for. That the room thermostat fitted is calling for hear and that the valve has opened using the visual window on the actuator. That the room thermostat is connected to and communicating to the correct actuator(s). That the room thermostats are not operating in temperate set-back mode. That the floor temperature is correct as it enters the floor loops. Although typical design water temperatures are suggested through this guide, there is some element of a learning curve with UFH, as on some occasions the design water temperature may need to be raised after commissioning and once the system has been in operation during a heating season. That the primary flow and return connections are installed correctly and not crossed over at the UFH manifold. That the primary water temperature is not too low. This needs to be at least 15 C higher than the UFH system water temperature, especially when using a Pump Control Pack. That the high limit thermostat on the V5 Compact Control Pack is not set too low. That the lockshield valve on the V5 Compact Control Pack is set correctly. Thermal resistance of floor covering is not too high, as this could reduce the floor heat output. If the system is too noisy? General things to look for. There is no air in the system That all pipes are firmly clipped in place and that the manifold brackets are tight. That the UFH pump speed is not set too high. The excessive pressure from another circulator in the system is not interfering (hence the importance of having a primary bypass) Page 27

FAQ / Trouble Shooting? If the running costs are high? General things to look for. That the UFH system is correctly electrically connected to the boiler to prevent short cycling and to ensure that the boiler is not running when it is not required. That the room temperatures and thermostat settings are not too high (typical comfort temperatures are 20 C in living quarters and 18 C in bedrooms) For any open windows or draughts, it is not unknown for windows to be open in cold weather, as the internal comfort remains constant with thermostatic controls. That the boiler is running correctly. Has it been serviced and/or commissioned by an approved engineer. That the floor downward losses are high due to inadequate level of floor insulations. The design water temperature is not met? General things to look for. Check all control valves are correctly installed in their correct orientations and that any remote sensors are installed and located in suitable position. Check the temperature settings are as per design and adjust as necessary, depending on the water temperature control system used. Check the primary water temperature is not too low. This needs to be at least 15 degrees in excess of the UFH system temperature. The system is losing pressure? General thing to look for. If the system is losing pressure either during testing and or after the system has been filled, but the flooring has not been laid, simple visual manual checks around the manifold and along each look of pipe should identify the problem area. If there are no clear visual signs, each loop circuit may require a separate pressure test to identify the exact location. If the floor has been laid, identification of the fault can be traced through signs of a wet patch around the leak. Obviously to make the repair, the floor will have to be raised, in screed floors, excavated carefully in the centre of the wet patch. Any leaks on the manifold are generally due to the connection and any loose nuts and unions will require tightening. Repairs To make repairs to the pipe, follow the process below: Repairing the pipe: Isolate the damaged pipe loop at the manifold. Cut out the damaged section of pipe. Prepare both ends of pipe using pipe cutters. For MLC Pipe use a bevelling tool. On panel systems, remove a small section of the floating panel or fixed tracked panel, to accommodate the compression fittings. Slide the compression adaptor nut over each end of pipe together with olive on PEX pipes, prior to inserting the insert sleeve into each end. Offer both ends of pipe/inserts to the compression coupler and tighten both nuts. Ideally, the joint will require and inspection chamber in case further maintenance is required. However, in practice this is often not practical, and the fitting is wrapped in suitable tape before burying in the screed (ensure approval with the building inspector is ought prior to doing this) Pressure test the system again before laying the floor covering. Page 28

Guarantee & Warranty The guarantee period shall be 12 months from the date of delivery. During such period, the Company shall remedy any defects in the goods arising out of defective materials or workmanship provided that the Purchaser shall immediately give notice of such defects to the Company both verbally and in writing. After giving such notice, the Purchaser shall within 7 days return the defective goods any part thereof to the Company at the Purchaser s risk and expense. The company cannot guarantee the quality or use of any third party manufacturer s fittings with its own, however supplied. Warranty claims are subject to proof that the products have been correctly installed. Warranty does not cover any defect, damage or malfunction in the product which is due to: failure to comply in any respect with Multipipe installation guidelines, maintenance or operating instruction; faulty storage handling, repair, miss-use; neglect; accident; abuse; or general wear and tear. Failure as a result of the heat transfer fluid freezing within the pipe will not be covered by this warranty. During the warranty period, The Company shall replace or remedy any defects in the goods arising out of defective materials or workmanship, provided that the purchaser shall immediately give notice of such defects both verbally and in writing to The Company. Before any warranty can be provided, the original purchaser will be required to provide proof or purchase and any supporting information Renovo may need to conduct any investigation into alleged defect. Page 29

Head Office: Unit 12, Great Hayes Business Park, Lower Burnham Road, Stow Maries, Chelmsford, CM3 6SQ Midlands Design and Estimating Office: Ladywood House, Ladywood Works, Leicester Rd, Lutterworth, Leicester LE17 4HD info@multipipe.co.uk www.multipipe.co.uk Sales (Head Office): 01245 227630 Midlands Office: 01245 850799 Technical: 01245 850799 Fax: 01245 698796