OPERATION & MAINTENANCE for Lamella plate separators OPERATION & MAINTENANCE QUICK GUIDE For models HB50 / HB20 / HB10

Similar documents
FULLY MOBILE, - TRACK MOUNTED, SELF CONTAINED, FULLY WEIGHED HIGH VOLUME MIXING PLANT

SaniTEE Wastewater Screens Installation & Service Manual FOR USE WITH SNT416, SNT418, SNT818, SNT 838, SNT1618, and SNT1638

Sludge Thickening. Wastewater Treatment Review. Gravity Thickening

INSTALLATION AND OPERATING INSTRUCTIONS FOR CONCRETE VAULT TYPE UNITS

IMPORTANT INSTRUCTIONS FOR OPERATION & MAINTENANCE OF

Dosage Pumps - Installation Guide

The Pump Matic Range

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Pumping Station. Marisa Handajani

Crispin Valves Operating Guide. Crispin

CTB3365x Introduction to Water Treatment

ABCD BFDC BEDA AB CDEFCC

PRODUCT OPERATING MANUAL

Orenco Automatic Distributing Valve Assemblies

BioSTEP Screened Pumping System Installation & Service Manual

Warning. Document ref: A October 2015

GL0098P Beta+ Septic Tanks Installation & Operation Guidelines

SUBMERSIBLE DIRTY WATER PUMP

Fuel and Oil Separators

AMERICAN RECIRCULATING SAND FILTER SYSTEMS

E-Z Treat Installation Guidelines

WASH SYSTEM. Instructions for Use

For maximum grit removal, the PISTA Grit Chamber should be

1BGrease Traps and. Frequently Asked Questions About Grease:

Subsoiler. 3, 5 and 7 Leg Mounted Subsoilers. Shear Pin. Auto Reset. Parts list and Operators Manual

Septic Tanks. Effluent Screen Cleaning. Effluent Screens. Surveying Abbreviations. Installation Keys. Septic Tanks, Holding Tanks & Pump Tanks

Mini Pump Installation, Operation & Maintenance Manual. For Models: BA-MS-633

WSB clean: Installation Manual

SUBMERSIBLE WATER PUMPS

As diesel fuel ages it degrades in 2 ways: particulate formation, and biological growth.

Over 330 Clarifier installations in 3 continents

SUBMERSIBLE WATER PUMP

DEPARTMENT OF THE ARMY HEADQUARTERS, UNITED STATES ARMY AVIATION CENTER AND FORT RUCKER FORT RUCKER, ALABAMA

American Water College 2010

SEPTIC TANKS. Round septic tanks. Standard version ECO version. Rectangular septic tanks. ECO version

Dynaswivel. Air Line Connectors. Ball-Swivel Plug. Never Fight an Air Tool Again! For Use with Most Air Tools THE PROBLEM THE SOLUTION

OPERATION & MAINTENANCE INSTRUCTIONS

Operating & Maintenance Manual

Installation, Operation & Maintenance Manual. TotlSep (TS) Series. FRP Oil/Water Separator

Sludge Blanket Level Measurement

T6 Owners Manual. Basic Function

(UK) Date : January 2014

GAMMA Septic Tanks Installation & Operation Guidelines

Unilift KP 150, KP 250, KP 350

AQUATOR Commercial Oil Water Separator Operating, Installation & Maintenance Manual

CIRCULAR CLARIFIER SYSTEMS

SUBMERSIBLE PUMP HSE RANGE

Fluid-O-Tech ROTOFLOW ROTARY VANE PUMP REBUILD MANUAL

Ensure staff are trained in use of equipment

SUBMERSIBLE MINI-PUMP

PRODUCT OPERATING MANUAL

#9040 FUEL TANK SWEEPER

SuperFlo 9,000 High Volume Pump Product Manual

HYDROCARBON SEPARATORS

September Leopold Sludge Collection Equipment

IMPORTANT NOTE The warranty will be void if the pump has been altered in any way

Inclined plate settlers

SUBMERSIBLE WATER PUMP

Crane Forks. Introduction. Important Notes. Key Benefits. User Guide

"F" SERIES (Cont.) AIR FILTER ASSEMBLY NOTE NOTE. To remove grasp the cover, loosen snap and. If engine is flooded, fuel can drain back into

Installation and Operating Instructions for Davey HM Series Pressure Systems with Pressure Switch

Matala. VersiFlow Series. Instruction and Maintenance Manual

OPERATION & MAINTENANCE INSTRUCTIONS

DO NOT USE LOW-PRESSURE GREASE GUNS FOR INJECTING SEAT SEALANT.

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

ARQUA STATION DF4 + DF7

ST. VINCENT AND THE GRENADINES

SUBMERSIBLE WATER PUMP OPERATING & MAINTENANCE INSTRUCTIONS. Model Nos. CSE400A. Part No iss 2

LABORATORY ZERO AIR GENERATOR MODEL N-GC1500 USER S MANUAL

Jersey Harbour Authority Maritime House, St Helier, Jersey, JE1 1HB Tel: +44 (0) Website:

Sewerage Services.

C. Biotec 30. Gebrauchsanweisung Directions for use Mode d emploi Gebruiksaanwijzing

E17H RAIL WHEEL INSPECTION

Excavator Forks. Introduction. Important Notes. Key Benefits. User Guide

Regulated Hose Supply Installation, Operation & Maintenance Manual

DELPHIN cube. Reliable process Strong tanks Clever modules. Compact biological wastewater treatment plants with fixed-bed technology

Turboflotor Blue 500. Operation Manual GB. Motor driven skimmer for saltwater aquaria up to a volume of 250 liters

User Guide. Concrete Washout System

INSTRUCTION MANUAL CONTRX FORKLIFT JIBS JLT, PBJLT, CHJLT

Recommendation for petroleum fuel treatment systems for marine diesel engines

Valve and Piping Replacements Various Facilities Deer Island Treatment Plant

To ensure proper installation, digital pictures with contact information to before startup.

BLASTRAC EBE Rigging System Floating Roof

OPTIMISING SEWAGE PUMPING STATION PERFORMANCE

Crane Forks. Introduction. Important Notes. Key Benefits. User Guide

AIR CLEANERS Model MC 3000 OWNER S MANUAL CAUTION Read complete instructions before operating. Please file for future reference.

15-GALLON OIL DRAIN DOLLY WITH 12 VOLT PUMP

Below are details for liquid waste haulers on the process for discharging domestic wastewater at SA Water septic waste disposal stations (SWDS).

SimplePAT. Battery Powered Portable Appliance Tester. User Manual Issue 1.0

Voltmaster Centrifugal Trash Pumps

Safety check e Safety and function test...to be kept in the cab

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES

SEWAGE PUMP MODEL # Zoeller is a registered trademark of Zoeller Co. All Rights Reserved. Español p. 14

GRINDER PUMP MODEL # Zoeller is a registered trademark of Zoeller Co. All Rights Reserved. Español p. 13

SERVICE GUIDE AGRICULTURAL TRACK REMOVAL INSTALLATION INSPECTION ALIGNMENT CPB-305

GeyserMax-Flow Series

INSTALLATION INSTRUCTIONS

Hand Pallet Truck 2.5 tons

Ashvale Light Bulb Replacement - Qualitative Risk Assessment Ref: - LBRA/14 Brian Urquhart

Transcription:

OPERATION & MAINTENANCE for Lamella plate separators OPERATION & MAINTENANCE QUICK GUIDE For models HB50 / HB20 / HB10 Lifting and Handling Do s Remove all water and solids contents before lifting or moving the unit; Always use the designated lifting points (Lip mounted Lifting Eyes or Fork lift Slots in base of unit); Lift shall always be undertaken in accordance with all relevant legislation and site requirements. Don ts Don t lift the unit with any WATER and SOLIDS present Don t lift or move the unit by applying force to any component other than those described above as this will result in severe damage to the unit and may result in personal injury. When do I need to Empty the Lamella? The frequency of emptying the unit is very dependent on the solids loading and the nature of the solids that it is separating. Until the operator has a complete understanding of the rate of solids build up in the unit, we recommend a Little and Often Approach to removing the deposited solids from the lamella unit, and this will determine the overall economic operational frequency of emptying required for your duty. How do I De-sludge the Lamella? The knife gate valves on each of the hoppers are used to empty the deposited solids. The valves should be opened in turn and the sludge discharged to a suitable receptacle. If problems are encountered with de-sludging refer to the relevant sections in the detailed Operating section of this document. Emptying The unit is emptied through the two de-sludging valves on the bottom of the Hoppers at the same time to ensure that all solids are washed from the each of the hoppers on the unit

QUICK GUIDE Setting Up For additional specific detailed information on the operations above please refer to the relevant sections following this Quick Guide document The Hopper Bottomed Units are designed to remove suspended solids from water to provide water clarification for a range of applications. Floating materials such as oil can also be removed in a variant of the standard unit. Process water, groundwater or site runoff can be discharge off site either to watercourse or sewer or for reuse in a process. The units are ideal for removing sediment load from water being discharged to sewer to reduce trade effluent discharge costs. All our units are Registered Designs, Patented or have Operating & Maintenance Manual This manual covers the Hopper Bottomed Unit Designated HB50 / HB20 / HB10 The standard unit is supplied skid mounted for temporary and mobile applications. Other options are available with bolt down feet for permanent installation; the operation of the unit is not affected by the type of base arrangement employed. Introduction 1. Thank you for selecting a WPL Lamella Hopper Bottomed Unit for your liquid/solids separation requirements. As a supplier of environmental equipment we strive to supply our customers with the highest quality products to meet your exacting demands. Safety Systems 2. 2.1 General Safety The larger units are equipped with a fixed ladder to enable an operator to inspect the unit over the rim at the inlet end of the unit. If the need arises to gain access to the top of the unit this should be done in a safe manner using appropriate safety precautions and systems of work Always ensure the units are placed onto firm level ground. The units could topple if landed onto uneven ground and then filled with water.

2.2 Maintenance Removal of plates is the most hazardous operation associated with the maintenance of the unit and will expose an operator to working at height, trip and falls hazards. These hazards will need to be assessed prior to carrying out this operation, and a safe system of work put in place prior to commencement. The plates will support a single person walking on their combined top edge; they will flex and deform against one another. It is recommended that the operator undertaking the work shall be equipped with a fall arrestor system from a suitable rated fixed point. 2.3 Permanent Access WPL can manufacture a number of standard access system and can design bespoke systems for individual requirements, these can be permanently fixed to the unit to give full inspection facilities to the whole of the unit. Operating Instructions 3. 3.1 Hoisting the Unit The unit must always be hoisted empty of all material and fluids; this shall be done by use of the lifting eyes on the upper lip of the main tank. This operation must be undertaken by experienced operators using tested and approved equipment. Individual unit weights are tabled in the next section. 3.2 Moving the Unit The unit must be empty of all material and fluids before transporting the unit using a suitably rated telly-handler or fork lift device by a suitably qualified person. It is important that Any Person who is to Operate the Lamella or Any Associated Equipment Supplied, Should Read and Understand the Operation Instructions before Undertaking Such Operations 3.3.1 Setting Up the Unit The unit should be set on a suitable structurally sound base capable of with standing the full tank weight of approximately 12.5 tonnes (HB50). The ground must be approximately level for best performance. (The top edge of the unit should be within 10 mm across its width and along its length).

3.4 Valves The units are shipped with the valves open to ensure they remain drained. Close the Sludge Knife Close the Sludge Level Close the Sludge Gate Valve(s) and Water Emptying Valve Fluidising Valve(s) 3.5 Connecting The Unit 3.5.1 Connection the Outlet pipework to the Unit The outlet hose should be complete with a suitable sized male Bauer for connection onto the units 150mm female Bauer coupling (Sizes may alter for different Units) 3.5.2 Connection the Inlet Pipework to the Unit The inlet hose should be complete with a suitable sized male Bauer for connecting onto the units 100 mm female Bauer coupling. (Sizes may alter for different Units)

3.6. Sludge Discharge Male 100mm Bauer Connection The operator should watch the discharge to visually ascertain the length of time to clear the deposited solids, i.e. until the flow quickens or becomes clear. The Sludge shall also be drained through this connection prior moving the Unit 3.7 Water Drain Down Connection and Sludge Level Indication When moving the unit the water must be drained down before lifting. The cleaner water can be drained through the 50 mm connection, followed by final sludge removal via the Knife Gate valves. The water drain down connection has a secondary function which enables the user to check on the depth of the sludge build up in the hopper. With a little practice an operator will be able to determine the quantity and thickness of the sludge build up in the hopper by draining out a sample of fluid/sludge in to receptacle and viewing the condition of the sample through this valve.

3.9 Cleaning 3.9.1 Cleaning Preparation Prior to attempting to clean the plates the retaining bar and scum weir must be removed. The plates cannot be removed with the bar in place and the scum weir board is a trip hazard that is not readily in view due to the stance that is required to undertake the plate removal & cleaning. A risk assessment shall be undertaken by the user prior to undertaking the plate cleaning 3.9.2 Plate Cleaning The plates can be cleaned in situ provided the silt has not been allowed to build up for too long. Cleaning of the plates should be undertaken with a pressure washer regularly, the exact frequency will be determined by operator familiarity. Failure to undertake the cleaning of the plates may give rise to poor performance of the unit and penalties if the discharge is consented and is exceeded

. 3.10 Plate Removal The plates can be removed by sliding them from the tank body. The plates weigh approximately 12kg each (HB50) with no deposited sludge attached. If left for an extended period of operation without cleaning the plates can become clogged and difficult to lift. Avoid this by periodic plate cleaning. The required frequency depends on the nature of product. Generally fatty products require more frequent cleaning (Weekly?) whilst other products require no cleaning. 3.11 Fluidising Sludge An air line connection can be coupled to the fluidising connection on the hopper to break up any consolidated sludge build up in the hopper. The valves should be opened slowly and the flow of air limited to prevent the settled sludge from being remixed into the clarified flow; care must be taken when carrying out this action. It must be undertaken by a suitably competent person who has been trained in the use of compressed air.

Specification 4 4.1 Model HB50 4.2 Capacities Weight Empty 2,500 kg Weight Full (water) 12,500 kg Total volume of unit 7.2 m3 Maximum volume of Sludge Hoppers 1.5 m3 Foot Print 3.7 m x 1.7 m Height 3.1 m 4.3 Operational Parameters Maximum flow rate 50 m3/hr Solids Removal 95% particles > 100 um Lamella Plate Area 50 m2 4.4 Connections Reference Number Description Size Type 1 Inlet 100 mm Female Bauer 2 Outlet 150 mm Female Bauer 3 Sludge (2) 100 mm Male Bauer 4 Water Drain Down 50 mm Male Bauer 5 Sludge Fluidizer (2) 25 mm Quick coupling 4.5 Connections Locations Description Position Inlet Flat End of unit Outlet Slopping End of Unit Sludge (2) Bottom of each Hopper Water Drain Down Slopping end at interface of hopper & main tank Sludge Fluidizer (2) Bottom of each hopper 4.6 Materials of Construction Clarifier Body 10 mm thick Steel EN 10025 grade S275 Sludge Hopper 10 mm thick Steel EN 10025 grade S275 Lamella plates PVC 4.7 Corrosion Protection Surface Preparation Shot-blasted to SA2.5 Minimum Primer 100 micron minimum d.f.t. 2 pack high solids Anti Corrosive Epoxy Primer External Top Coat 50 Micron minimum d.t.f. 2 Pack Modified Acrylic Finish to RAL 5001 Internal Top Coat 500 micron minimum d.t.f. High Solids Glass Flake Epoxy

Specification 5. 5.1 Model HB20 5.2 Capacities Weight Empty 1300 kg Weight Full (water) 3800 kg Total volume of unit 2.10 m3 Maximum volume of Sludge Hoppers 0.57 m3 Foot Print 2.5 m x 1.2 m Height 2.6 m 5.3 Operational Parameters Maximum flow rate 20 m3/hr Solids Removal 95% particles > 100 um Lamella Plate Area 20 m2 5.4 Connections Reference Number Description Size Type 1 Inlet 75 mm Female Bauer 2 Outlet 100 mm Female Bauer 3 Sludge 100 mm Male Bauer 4 Water Drain Down 50 mm Male Bauer 5 Sludge Fluidizer 25 mm Quick coupling 5.5 Connections Locations Description Position Inlet Flat End of unit Outlet Slopping End of Unit Sludge Bottom of Hopper Water Drain Down Slopping end at interface of hopper & main tank Sludge Fluidizer Bottom of hopper 5.6 Materials of Construction Clarifier Body 10 mm thick Steel EN 10025 grade S275 Sludge Hopper 10 mm thick Steel EN 10025 grade S275 Lamella plates PVC 5.7 Corrosion Protection Surface Preparation Shot-blasted to SA2.5 Minimum Primer 100 micron minimum d.f.t. 2 pack high solids Anti Corrosive Epoxy Primer External Top Coat 50 Micron minimum d.t.f. 2 Pack Modified Acrylic Finish to RAL 5001 Internal Top Coat 500 micron minimum d.t.f. High Solids Glass Flake Epoxy Note: In the interests of product development, the above specification may change without warning

6.1 Model HB10 6.2 Capacities Weight Empty 700 kg Weight Full (water) 1900 kg Total volume of unit 1.20 m3 Maximum volume of Sludge Hoppers 0.25 m3 Foot Print 1.9 m X 0.9 m Height 2.1 m 6.3 Operational Parameters Maximum flow rate 10 m3/hr Solids Removal 95% particles > 100 um Lamella Plate Area 10 m2 6.4 Connections Reference Number Description Size Type 1 Inlet 50 mm Female Bauer 2 Outlet 75 mm Female Bauer 3 Sludge 100 mm Male Bauer 4 Water Drain Down 50 mm Male Bauer 5 Sludge Fluidizer 25 mm Quick coupling 6.5 Connections Locations Description Position Inlet Flat End of unit Outlet Slopping End of Unit Sludge Bottom of Hopper Water Drain Down Slopping end at interface of hopper & main tank Sludge FluidiSer Bottom of hopper 6.6 Materials of Construction Clarifier Body 10 mm thick Steel EN 10025 grade S275 Sludge Hopper 10 mm thick Steel EN 10025 grade S275 Lamella plates PVC 6.7 Corrosion Protection Surface Preparation Shot-blasted to SA2.5 Minimum Primer 100 micron minimum d.f.t. 2 pack high solids Anti Corrosive Epoxy Primer External Top Coat 50 Micron minimum d.t.f. 2 Pack Modified Acrylic Finish to RAL 5001 Internal Top Coat 500 micron minimum d.t.f. High Solids Glass Flake Epoxy Terminology Term Descriptionn Inlet Connection for receipt of the flow to be treated Outlet Discharge point of flow after treatment Bauer Clip type coupling for Pipework Sludge Settled Deposited material Hopper Receptacle for settled sludge Ball Valve Quarter turn isolation valve Max flow Rate The hydraulic design capacity of the unit,(exceeding this flowrate will cause over-topping and inefficient treatment, Any flow below the Max Flow Rate can be put through the unit, the lower the flow the more effective the solid/liquid separation for a given product Talk to Siltbuster Staff if you have any concerns or queries regarding throughput).slide Valve Sludge Flow Isolation device Sludge Volume Maximum sludge that the unit will hold with out impairing the separator efficiency Lamella Plate upvc sheet onto which the separated solids deposit prior to collecting in the sludge hopper

2m 2.9m FRONT ELEVATION SIDE ELEVATION 2.3m 2.2m Including Ladder 1.9m HB50 WPL LAMELLA PLAN