Top Sport BOEN

Similar documents
TEST REPORT NO.LOW /13/R08OWN

Contact. Koleje Mazowieckie-KM sp. z o.o. Lubelska Warsaw, Poland

FORM FOR STAND CONSTRUCTION ORDER

PRODUCTION PROGRAM STEEL PIPES FOR MOTOR VEHICLES, CONSTRUCTION EQUIPMENT AND RAIL VEHICLES INJECTION PIPES BRAKE LINES FUEL LINES HYDRAULIC PIPES

Change to Method of Identification for S & ST Toggles, LW & SW Rockers, SB & SDB Pushbuttons

European Aviation Safety Agency

MATHEMATICAL MODELING AND NUMERICAL SIMULATIONS OF JAVELIN THROW

PROTECTION OF VEHICLES AGAINST MINES

Use and Maintenance Manual

Operating Tables FENIX OT-01 VIVAX OT-02

Substation automation for a better Baltic power supply

Supercapacitors. 1. Principle of operation and physical models 2. Materials used in supercapacitors 3. Applications

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Boiler Control Replacement Parts

Case Study: From Manufacturing to Microfinancing. by Rural Women of Bangladesh

Winter storage and time payments available at no extra cost. Free freight from factory (in stock, off season boats) thru March 1 st

A 3-Year Case Study of a Residential Photovoltaic System with Microinverters

DETERMINATION OF THE TOTAL EFFICIENCY IN THE ENGINE WITH DIRECT INJECTION OF THE PETROL

MARC LEAD MANAGERS LEAGUE TABLE FOR JANUARY 2013

FORD SUPPLIER MANAGEMENT

Service Bulletin

III. Safe in their alabaster Chambers

Bmw bank of north america cd

Roger Kraus Racing Inc Grove Way. Castro Valley, Calif 94546

EXPERIMENTAL COMPARATIVE STUDIES OF INJECTION SYSTEMS

Changing the way our world is powered.

SAS au capital de EUR R.C. Evreux B Siret APE : 2651B N TVA CEE FR

SIMPACK User Meeting. Dr Ahmed Al-Sened Chief R&D Manager. MAN B&W Diesel Ltd Stockport, UK November 2004

0.6/1kV Al-Cu XLPE Insulated PVC Sheathed Power Cable

VALLEY GUN CLUB SHOOTING CALENDAR 2018

MARC LEAD MANAGERS LEAGUE TABLE FOR APRIL 2013

Audi Configurator. Engine. Exterior. Interior. Product no. Description RRP

Grupa Azoty S.A. Group. Opinion and Report of the Independent Auditor Financial Year ended 31 December 2015

Underground Distribution Construction Manual

Quickie All Court IN THIS SECTION

Flat Suction Pads (Oval)

page 1/5 EN 16139:2013, test severity level 1

TORQUE SPECIFICATIONS

"MOVABLE PLATFORM" - THE IDEA AND ENERGY CONSUMPTION

LOGICAL FUNCTIONS AS EXEMPLIFIED BY PNEUMATIC CIRCUITS

TOTAL EFFICIENCY OF ADJUSTABLE COMPRESSION RATIO SI ENGINE

MATERIAL TEST REPORT/ Q.C. DOCUMENTATION MADE IN CANADA

Internrapport

OECD unemployment rate down to 6.4% in March 2016

TRAILER LIGHTS CONTROL UNIT MP4S INSTALLATION MANUAL

MARC LEAD MANAGERS LEAGUE TABLES FOR SEPTEMBER 2015

OECD unemployment rate down to 6.5% in January 2016

623CT. TECHNICAL SPECIFICATION Subject to change without notice.

page 1/5 EN 16139:2013, test severity level 1 Manager Kinnarps Test- & verification Center

POLAND COMMEMORATIVE ISSUES. Michel No. SG No. UM(**) MM(*) FU (O)

TURNOVER 10 X 13. Parts Manual

OECD unemployment rate falls to 6.0% in March 2017

(12) United States Design Patent (10) Patent No.: Park et al. US D683,324 S (45) Date of Patent: *1, May 28, Beijing (CN) (Continued)

INSTRUCTIONS FOR REMOVAL OF GROUND FAULT PROTECTION DEVICE FROM HOBART GENERATOR SETS SPECIFICATION NUMBER

Corporate Financing. International Finance. Investment Decision. Service Marketing. Decision

Koordinierte Einspeisung. Wie Einzelanlagen lernen im Parkverbund optimal zu arbeiten.

page 1/6 EN 16139:2013, test severity level 1 The sample submitted for test fulfils the requirements in above mentioned standards.

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

4 pole insulated conductor rails ULA 35A, 50A, 80A, 100A

Audio. Interior Options. Exterior Options. Packages PROTECTED

Land Rover fire truck modernization for improving transportation needs of the forestry farms and tree nurseries

OECD unemployment rate stable at 5.4% in March 2018

EVAPORATOR PRESSURE REGULATORS

*Indikátor kapacity hladiny oleja 16,2 l - Capacity until oil level indicator 16,2 l. Váha/Weight 9kg 12 G 1/2 G x M6.

SERIES K GILBERTS. Fixed Blade Grilles. Features

Mercedes C160 Manual READ ONLINE

OECD unemployment rate stable at 5.5% in January 2018

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool

2015 Jeep Cherokee Service Manual READ ONLINE

SERIES K. Fixed Blade Grilles

Current State of Voluntary Renewable Energy Markets

ISSN: [Sheikh* et al., 6(2): February, 2017] Impact Factor: 4.116

Brakes. Contents. Page

M60/M62 Camshaft Sensor Replacement

Comparative Study on Super Structure of Box Girder Bridge and Cable Stayedbridge with Extra Dosed Bridge

X-Trail. NISSAN X-TRAIL MEMBERS DISCOUNT: JULY 2017 *while stocks last

Regulated and Unregulated Substitutes: Aversion Effects of an Ethanol Mandate

Northern Region s Economic Conditions in July 2018

Dust Collectors AIRBLAST.

ELECTRONIC CIRCULATOR FOR HEATING SYSTEMS

Haynes 2017 Grand Cherokee Laredo Manual READ ONLINE

2018 Fees & Charges Parks & Recreation. Special Park Board Meeting Tuesday, November 14, 2017

Ford Ranger Pk Workshop Manual

Quarterly Update Report: Q4 2010

TMD90A Dual Input Digital Thermometer

Safety Alert. Replacement of the carburetor floater for ROTAX Engine Type 912 (Series) MANDATORY

CPS3 BATTERY CHARGERS

Every building, every city should have a story a story about lives, about people. Otherwise, a building is an object, an abstraction.

ERWEKA 8 ELNOVA ZT30 ZT40 ZT50 ZT60 ZT70 _!! disintegration testers ZT 20. If* h» L i J. Handelsgesellschaft mbh ERWEKA

RDE ENGINEERING AT THE ENGINE TEST BENCH. Jan Gerstenberg, Dr. Sandra Sterzing-Oppel, Dr. Benjamin Hartmann, Dr. Stephan Tafel Bosch Engineering GmbH

ECOLOGICAL ASPECTS OF DIESEL WORKS. Janusz Mysłowski, Marek Małkowski, Mirosław Uzdowski

High ingress protection ratings make a difference REO EMC-Filter with IP66

For the financial year from 1 January to 31 December 2012

2015 Jeep Grand Cherokee Limited Service Manual

BS BS BS BS

5LAT GWARANCJI. Verte model D7, Perfect Veneer, Oak California. Door collections to apartments.

VC ACADEMIC CALENDAR. Sun Mon Tue Wed Thu Fri Sat. Sum 10 Wk. & Sum II Final Exams. Cancel Fall 16 wk. & Fall I Non-Pays

Some of the shows are close to capacity and existing Exhibitors will be given first choice on their space until Jan 31, Please book early!

EXPERIMENTAL VERIFICATION OF KINETOSTATIC MODEL OF STRUT SUSPENSION MECHANISM

SERIES 940. Automations for sliding doors

Transcription:

CENTRALNY OŚRODEK SPORTU GIŻYCKO Tomasz Szostkowski - Dyrektor Centralny Ośrodek Sportu Ośrodek Przygotowań Olimpijskich w Giżycku ul. Moniuszki 22, 11-500 Giżycko KRS 0000374033, REGON 142733356-93112, NIP 7010273950 Bank Pekao S.A. 65 1240 5918 1111 0010 3717 0964 tel. +48 87 44 17 100-101; fax. +48 87 44 17 103 email: dyrekcja.gizycko@cos.pl Giżycko, 24.02.2021 r. REFERENCJE Centralny Ośrodek Sportu - Ośrodek Przygotowań Olimpijskich w Giżycku niniejszym zaświadcza, że firma TOP SPORT Jan Pietraszko z siedzibą w Bielsku-Białej przy ul. Górskiej 88, w ramach zadania inwestycyjnego pn.:,.dostawa i montaż kompletnej podłogi sportowej do COS-OPO w Giżycku", wykonała na potrzeby Zamawiającego, zadanie polegające na: dostawie i montażu kompletnej podłogi sportowej BOEN z warstwą ścieralną- dąb w klasie I wizualnej o powierzchni 1620 m2 i parametrach zgodnych ze specyfikacją istotnych warunków zamówienia na hali sportowej Przygotowań Olimpijskich w Giżycku. w Centralnym Ośrodku Sportu- Ośrodku Przedmiotowe prace zostały wykonane w terminie od 28.10.2020 do 03.12.2020, a ich wartość wyniosła 478 224,00 zł brutto. Powyższy zakres prac został wykonany terminowo, rzetelnie oraz zgodnie z wymaganymi technologiami. Wykonawca udowodnił swą wszechstronność i pełny profesjonalizm w realizacji powierzonego zadania, a także całkowite przygotowanie do stosowania nowoczesnych technik i materiałów budowlanych. Mając powyższe na uwadze w pełni polecamy firmę TOP SPORT Jan Pietraszko jako sprawdzonego i solidnego wykonawcę. CENTRALNY OŚRODEK SPORTU - OŚRODEK PRZYGOTOWAŃ OLIMPIJSKICH W GIŻYCKU 11-500 Giżycko, ul. Moniuszki 22 NIP 7010273950. REGON 142733356 Nr KRS 0000374033 tel./fax 87 4417100-101 dyrekc;a.gizycko@cos.pl www.cos_pl u, ilro egizycko O WAŁCZ O WARSZAWA os,ata COS-OPO w Giiycku cos COS OPO w Spale COS-OPO w Szczyrku COS OPO w Wałczu COS-OPO w Zakopanem COS-OPO we Władysławowie 11-500 Gliycko ul. Moniuszki 22 tel.: +48 87 44 17 100-101 00-449 Warszawa ul. Łazienkowska 60 tel.: +48 22 529 87 20 97-215 Inowłódz, Spała Al. Prezydenta Ignacego Mościckiego 6 tel.: +48 44 724 23 46 43-370 Szczyrk ul. Plażowa 8 tel.: +48 33 817 84 41 78-600 Walcz Al. Zdobywców Walu Pomorskiego 99 tel.: +48 67 258 44 61 34-500 Zakopane ul. Bronisława Czecha 1 tel.: +48 18 201 22 74 84-120 Władysławowo ul. Żeromskiego 52 tel.: +48 58 67 4 63 00