I-394 Corridor Performance

Similar documents
Current Corridor Characteristics. MN 62 Corridor Performance

US 10 Corridor Performance

Population Trends. US 12 Corridor Performance

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Metro Transit Service Improvement Plan

Transitways. Chapter 4

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS

Sales and Use Transportation Tax Implementation Plan

Extending TRACKS. Peer reviews, advanced design next for Southwest LRT

SOUTHWEST TRANSIT SEPTEMBER 2017 RIDER SURVEY. 1. What city do you live in? 2. How many years have you been a rider on SWT?

Committee Report. Transportation Committee. Business Item No

LAKE MINNETONKA WINTER RULES

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

C LINE: LONG-TERM GLENWOOD REALIGNMENT STUDY

Lake Minnetonka Conservation District (LMCD) (952)

Overview of Table 1 PERCENT CHANGES BETWEEN 2009 AND 2010, SELECTED MINNESOTA HEALTH STATISTICS. Category Percent Change

Community Advisory Committee. October 5, 2015

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Corridor Sketch Summary

Total Three Months 8. Breastfed Two Weeks 5. Total Twelve Months 12. Breastfed Twelve Months 13. Total Two Weeks 4. Initiated Breastfeeding 3

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation accomplishments

MPO Staff Report Technical Advisory Committee: July 12, 2017

Business Advisory Committee. July 7, 2015

I-35W Past, Present, and Future: METRO Orange Line

2015 ANNUAL REGIONAL PARK-AND-RIDE SYSTEM REPORT

2016 Regional Solicitation Application Scoring ROADWAY EXPANSION

Hennepin County Transit Oriented Development Program. The Ellipse, St. Louis Park, 2009

Background Information for MPRB Community Advisory Committee for 2010 Southwest Light Rail Transit Project DEIS Comment Letter Section 2

Tracking the Blue Line Extension

Metropolitan Council Metro Transit Project Description Budget Year

District 7 10-Year Capital Highway Investment Plan ( )

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

Operating & Maintenance Cost Results Report

Information Item. The below table summarizes the total number of applications and total funding applied for.

2016 HOUSI NG COUNT S

2017 Total 2017 Calendar Year Unduplicated Minnesota WIC Participation Count by City of Residence Minnesota WIC Information System

EXCEPTION TO STANDARDS REPORT

Winter Rules. Lake Minnetonka. Lake Minnetonka Conservation District 5341 Maywood Road, Suite 200 Mound, MN lmcd.

DRAFT Travel Demand Methodology & Forecast

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

Metropolitan Freeway System 2013 Congestion Report

Develop ground transportation improvements to make the Airport a multi-modal regional

Metropolitan Freeway System 2007 Congestion Report

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Tracking the Blue Line Extension

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

HIGHWAY SAFETY RESEARCH GROUP. Safety Analysis Tools Used for Coalitions and Districtwide Safety Investment Plans

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Highway 55 Commuter Bus Survey Results

2018 Corridors of Commerce Final Scoring

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Business Advisory Committee. November 3, 2015

ACTION TRANSMITTAL No

Kentucky Highway District 6

Fremont. Emerson. Plymouth. Ramp A/7th St Transit Center 8th/7th St & Hennepin 8th/7th St & Nicollet 8th/7th St & 3rd Ave 8th/7th St & Park

Overview. Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public Relations Considerations

Population Trends. US 71 Corridor Performance

Recommended Transportation. Capital Improvement Program

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

Slow Down! Why speed is important in realizing your Vision Zero goals and how to achieve the speeds you need

2016 Congestion Report

Winter Rules 2018/19. Lake Minnetonka. Celebrating 50 Years Protecting Lake Minnetonka

Regional Safety Study

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

Operate a Reliable and Convenient. Becky Allmeroth, State Maintenance Engineer. Tracker. Measures of Departmental Performance

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

Tracker. Operate a reliable and COnvenient transportation system. Becky Allmeroth, Chief Safety and Operations Officer

STH 60 Northern Reliever Route Feasibility Study Report

IMPROVEMENT CONCEPTS

2040 Metropolitan Transportation Plan -- Table XVII-1

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

West Broadway Reconstruction/LRT Design. March 19, 2015

Bi-County Transitway/ Bethesda Station Access Demand Analysis

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:

2040 REGIONAL TRANSPORTATION PLAN

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

Extending TRACKS. Conference set for mid-november for contractors interested in bidding to build SWLRT. Closing Excelsior Blvd, increasing

2016 Municipal Screening Board Data

Chapter 2. Description of the Regional Transit System

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

Operate a Reliable and Convenient. Becky Allmeroth, State Maintenance Engineer. Tracker. Measures of Departmental Performance

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

REVISED AGENDA. Special Southwest LRT Corridor Management Committee Meeting

UCLA Lake Arrowhead Conference. October 18, 2010

Introduction. Assumptions. Jeff Holstein, P.E., City of Brooklyn Park Steve Wilson, Principal Tim Babich, Associate Krista Anderson, Engineer

Residential Real Estate Activity Report 2000 Edition

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010

IH 35 FEASIBILITY STUDY

TOWARD SAFE AND RELIABLE ROADWAYS. Jill Ryan, MPH Eagle County Commissioner

Section 164: DWI Repeat Offender Fund Expenditure Report Federal Fiscal Year 2010

I-35W & Lake Street Station

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

SouthWest Transit s Microtransit Service 2018 APTA State Public Transportation Partnerships Conference Wednesday, August 15 th

Introduction and Background Study Purpose

Transcription:

Population Trends Corridor Context The corridor runs from edge of Hennepin County to downtown Minneapolis and serves the cities of Delano, Independence, Medina, and Wayzata. City Population 2000 2010 2,088 1,768 Medina 4,005 4,892 Minneapolis 382,618 382,578 Saint Louis Park 44,126 45,250 Wayzata 4,113 3,688 436,950 438,176 Current Corridor Characteristics Highway: I-394 2009 AADT: 12,900 148,000 2009 HCADT: 1,050 5,200 Number of lanes: 2-8 Key highway connections: I-94, I-494, MN 100, Public Transit Rail Transit Centers: Plymouth Rd, Louisiana Ave, Ramps A & B Five Park and Rides along corridor with a total capacity of 1,300 spaces Target Field Northstar Station BNSF line to Willmar SOO line (MN and S Spur) I-394 Corridor Performance Result Statewide Result 100% 86.9% 0% 3.2% Ride Quality Good--% of miles 85.9% 70.2% Ride Quality Poor--% of miles 2.3% 3.7% Measure Infrastructure Preservation Bridge Bridge Condition--% Good and satisfactory (by deck area) Bridge Condition--% Poor (by deck area)

Wright Co. dence EWaconia 0 Delano Independence Mound US 12 & I 394 Corridor Safety Performance (Minneapolis Hennepin to Delano) Co. Carver Co. Victoria tu 12 Spring Park 41 Corcoran Medina Orono Orono Tonka Bay Chanhassen 41 I-394/US 12 Existing Conditions - Safety Measure Miles 17 10,980 10 916 Fatal and Serious Injury Crashes per Mile Fatal and Serious Injury Crashes in Corridor Percent of All Severe Crashes in Corridor Top Four Driver Related Crash Issues Older Driver 6 24.0% Young Driver 4 Minnetrista Mound 16.0% Impaired Driver 2 8.0% Speed Related 1 4.0% Top Three Infrastructure Related Crash Issues Intersection/Interchange Crash 8 32.0% Minnetrista Lane Departure Crash 8 32.0% Head-on Crash Saint Bonifacius 2 8.0% Corridor Comparison to State Crashes US 12 Statewide for Statewide for I-394 Trunk Highways Interstates Fatal and Serious Injury Crashes 14 2,440 11 518 0.82 0.22 1.10 0.57 * Crashes may be under reported as this number is according to officer's first impression Note. Data presented include all fatal and serious injury crashes betw een 2006-2010. Long Lake Shorewood Excelsior See District Highway Safety Plan for additional issues and strategies 101 5 494 394 tu 169 D3 Completed Sept. 2009 Metro To Be Completed May 2012Plymouth Wayzata Deephaven Minnetonka Toward Zero Deaths Efforts tu 169 7 2012 TZD Safe TZD TZD Region County Safety County Roads Enforcement Grant Grant 494 Year Established Plan Completion (ATP) Date Hennepin No Yes Metro, Planned 2012 (ATP 5) Sept. 2011 0.5 1 2 3 4 Miles Eden Prairie 55 Hopkins New Hope Brooklyn Center Safety Needs 100 Golden Valley Saint Louis Park Edina Wright Yes No East Central 2011 (ATP 3) Oct. 2010 CMSP Problem Locations CMSP Problem Segments 100 Edina Robbinsdale 62 394 121 94 County Highways Anoka Co. Class Columbia 1 Railroads Hei County Boundaries Richfield Trunk Highways 35W Sa Minneap Map S

Planned Transit Investments Park and Ride I-394/US 12 Adjacent s I-394/US 12 s Investment Area ADA Other Infrastructure Grading, Signing, Striping, Surfacing Length (Miles) 1.2 Fiscal Year 2012 $ 1.4 Million Exit modification, mill and overlay Minnetonka $ 850,000.3 2013 : $ 700,000 $ 2.1 Million Investment Area Other Infrastructure Other Infrastructure Mill and Overlay, TH 55 to 77th Ave Replace Signing I-494 to I-94 Replace Signing I-694 to Lowry Tunnel Length (Miles) Route Fiscal Year 7.5 $ 13.7 Million 15.6 $ 750,000 8.6 I 94 $ 400,000 $ 15 Million

Corridor Performance Based Needs (2016-2021) Potential Transit Investments Park and Rides I 394 Facility Expansion Co Rd 73 and I-394 North 688 new parking spaces Bridge Preservation Preservation Culvert Preservation Pipe Replacement Safety Improvements* Mobility 4 Bridges 28 miles of poor pavement 1 Culvert 15 Poor pipes 2 CMSP Locations 1 CMSP Segment *Assumes completion of 12-15 STIP projects. *Systematic safety improvements are included as part of most highway projects. Refer to safety map for additional safety information

Recent Transit Investments Co Rd 73 Park and Ride $ 9.3 M Hwy 55 and Co Rd 73 Park and Ride $ 5.1 M $ 14.4 M Recent Investments (2002-2011)* Bridge s Mobility s Other Infrastructure Description 2009: Replace Bridge and Roadway Reconstruction () 2007: Deck Repairs on Bridges in Minneapolis 2006: Bridge Painting in Wayzata 2010: Exit Ramp Modifications (Xenia and Park Place) 2009: Permanent Markings (Metrowide) 2008: Concrete Rehabilitation, Bituminous Mill and Overlay (Wayzata to Minnetonka) 2007: Intersection Construction, Retaining Walls, Bridge Replacement, Mill and Overlay south of Medina 2006: Channelize, Signal in 2005: Mill and Overlay (East of Delano) 2010: Signal Timing, Installation of Fiber Optics (I-494 to downtown Minneapolis) 2006: Signing Replacement from (Plymouth Rd to Penn Ave) *Only includes projects over $500,000. Systematic safety improvements are routinely included as part of most highway projects $ 11.2 Million $ 630,000 $ 48.8 Million $ 3.2 Million $ 57 Million