CHARGING SYSTEM PRECAUTION CH 1

Similar documents
CHARGING SYSTEM PRECAUTION CH 1

2008 Toyota RAV ELECTRICAL Charging (2AZ-FE) - RAV4

CHARGING SYSTEM CHARGING SYSTEM CH 1

CHARGING SYSTEM ON-VEHICLE INSPECTION

STARTING SYSTEM (1ZZ FE) (April, 2003)

GENERATOR CH-9 COMPONENTS FOR REMOVAL AND INSTALLATION

CHARGING SYSTEM. Page PRECAUTIONS... CH-2 TROUBLESHOOTING... CH-2 ON-VEHICLE INSPECTION... CH-2 ALTERNATOR... CH-6

ON-VEHICLE INSPECTION

REMOVAL OF ALTERNATOR

CH 10 ALTERNATOR COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

Charging System Inoperative

ON-VEHICLE INSPECTION

GENERATOR REMOVAL OF GENERATOR (4A FE) CH 6

OVERHAUL 1. REMOVE GENERATOR PULLEY SST ( , ) HINT:

DESCRIPTION & OPERATION

ALTERNATOR - HITACHI

REMOVAL AC 67. Using a clip remover, disengage the 6 clips and remove the front fender apron seal upper. (2WD)

ARTICLE BEGINNING SERVICE PRECAUTIONS

STARTING SYSTEM STARTING SYSTEM ST 1

POWER STEERING PUMP (3VZ FE) POWER STEERING PUMP REMOVAL AND INSTALLATION Remove and install the parts as shown.

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

FUEL SYSTEM PRECAUTION FU 1

ALTERNATOR & REGULATOR - NIPPONDENSO

IG 1 1NZ-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM IGNITION COIL NO. 1 CAMSHAFT POSITION SENSOR SPARK PLUG CRANKSHAFT POSITION SENSOR A116185E01

COMPRESSOR REMOVAL OF MANIFOLD GAUGE SET ON VEHICLE INSPECTION AC 18 AIR CONDITIONING SYSTEM

STARTING/CHARGING SYSTEMS Brought to you by Eris Studios NOT FOR RESALE

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

REMOVAL FU 11 2TR-FE FUEL FUEL INJECTOR. Pinch. Checker. Detaching Switch Pull Out. Retainer. Fuel Hose Connector. Pipe. O-ring. Pinch.

FUEL PUMP SYSTEM CIRCUIT

1. SPECIFICATION

FRONT DRIVE SHAFT COMPONENTS DS 1 DRIVE SHAFT FRONT DRIVE SHAFT FRONT DRIVE SHAFT HOLE SNAP RING. w/o ABS: AUTOMATIC TRANSMISSION CASE PROTECTOR

INSPECTION ST 13 2UZ-FE STARTING STARTER. Terminal 50. Terminal C. Battery. Disconnect Battery. Terminal C. Disconnect. Battery.

ON-VEHICLE INSPECTION

WIPER AND WASHER SYSTEM

IGNITION SYSTEM ON VEHICLE INSPECTION NOTICE:

Power Steering Pump REMOVAL AND INSTALLATION OF POWER STEERING PUMP

ST 9 1GR-FE STARTING STARTER

IG 1 2GR-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM ENGINE ROOM R/B - IG2 FUSE - ST/AM FUSE IGNITION COIL NOISE FILTER NOISE FILTER A137458E01

SUSPENSION SYSTEM PROBLEM SYMPTOMS TABLE SP 1

1. SPECIFICATION Typ. HPS EPS Capacity 120 A 140 A. 76/140 A at 1,800/6,500 rpm. 70/120 A at 1,800/6,500 rpm. Normal output.

TIMING CHAIN COMPONENTS

TIMING BELT COMPONENTS EM 15

CHAPTER 22 STARTER Models J05C-TD, J08C-TP and TR

3/15/2015 1:10 PM TIMING CHAIN REMOVAL/INSTALLATION [L3 WITH TC]

TUNE UP EG2 12 ENGINE MECHANICAL

Engine Electrical System

DISTRIBUTOR DISTRIBUTOR REMOVAL

EG-37 ENGINE MECHANICAL TIMING BELT COMPONENTS FOR REMOVAL AND INSTALLATION 2JZ-GE

INSTALLATION EM 8 1NZ-FE ENGINE MECHANICAL DRIVE BELT INCORRECT CORRECT. Generator Vehicle Front A077960E03. Adjusting Bar. Bolt A. Bolt B.

Compressor HVAC: Service and Repair

CHARGING SYSTEM 7.7 GENERAL TROUBLESHOOTING. Alternator. Voltage Regulator. Battery. Wiring. Voltage Regulator Inspection HOME

IGNITION SYSTEM IG 1 2GR-FE IGNITION IGNITION SYSTEM INSTRUMENT PANEL JUNCTION BLOCK - IG2 FUSE ECM

FUEL PUMP SYSTEM CIRCUIT

THREE WAY CATALYTIC CONVERTER (TWC) SYSTEM

Radiator Service Tool Set Hexagon Wrench Set TOYOTA Electrical Tester Set. Capacity

INTEGRATED IGNITION ASSEMBLY (IIA) (4A FE)

STARTING & CHARGING SYSTEM SECTIONSC CONTENTS IDX

STARTER (for 2WD and Pre-Runner)


Mazda3 - Workshop Manual - Engine

BR 25 BRAKE HYDRAULIC BRAKE BOOSTER REMOVAL

able of Contents Sr. No: Content Page No: 1. A: Apply Safety Precautions and Guidelines at Workplace 5 2. B:Repair Lighting System of Vehicle 6

GENERAL <ELECTRICAL>

VALVE CLEARANCE ADJUSTMENT EM 7

STARTER COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

EM 112 1GR-FE ENGINE MECHANICAL ENGINE ASSEMBLY INSPECTION. Intake Air Surge Tank Side

DF 78. HINT: Face the rough side of the thrust washer marked by # to the differential case. INSPECTION

STEERING LOCATION INDEX

OIL PUMP (for 4WD and Pre-Runner)

CHAPTER 10 ELECTRIC SYSTEM

16. CHARGING SYSTEM 16-0 CHARGING SYSTEM NEXXON 50

STEERING SYSTEM PRECAUTION SR 1

ELECTRICAL SYSTEM CONTENTS LOCATION OF ELECTRICAL COMPONENTS 5-1 IGNITION SYSTEM 5-3 CHARGING SYSTEM 5-7

(a) Remove the rear floor service hole cover. (b) Disconnect the fuel pump connector.

SUSPENSION SYSTEM PROBLEM SYMPTOMS TABLE SP 1


ENGINE ELECTRICAL Click on the applicable bookmark to selected the required model year

ELECTRICAL SYSTEM CONTENTS LOCATION OF ELECTRICAL COMPONENTS 5-1 IGNITION SYSTEM 5-3 CHARGING SYSTEM 5-7

EC 44 1NZ-FXE EMISSION CONTROL AIR FUEL RATIO SENSOR AIR FUEL RATIO SENSOR CONNECTOR WIRE HARNESS CLAMP. AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1)

2010 Toyota Prius Repair Manual

Injectors (4A FE) FI 155. (b) If you have no sound scope, you can check the injector transmission operation with your finger.

INJECTOR ON VEHICLE INSPECTION 1. CHECK INJECTOR OPERATION

PR 3. PROPELLER SHAFT FRONT PROPELLER SHAFT ASSEMBLY (for 4WD) DISASSEMBLY

ALLDATA Online Toyota Truck Tacoma 4WD V6-4.0L (1GR-FE) - Service and... Service and Repair 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

2005 Toyota Truck RAV4 2WD L4 2.4L (2AZ FE)

REMOVE FRONT WHEEL RH

POWER STEERING TO INDEX POWER STEERING SYSTEM PRECAUTIONS... OPERATION CHECK... PROBLEM SYMPTOMS TABLE... VANE PUMP ASSEMBLY COMPONENTS...

GENERAL <ELECTRICAL>

EG1 485 OIL PUMP COMPONENTS FOR REMOVAL AND INSTALLATION

ST- 1 STARTING SYSTEM. Page TROUBLESHOOTING... ST-2 STARTER... ST-3 STARTER RELAY... ST- 12 CLUTCH START SWITCH... ST-1 2

FRONT BRAKE COMPONENTS

AXLE SYSTEM PROBLEM SYMPTOMS TABLE AH 1

TIMING CHAIN COMPONENTS

SEAT BELT WARNING SYSTEM

STARTER - HITACHI Isuzu Trooper II DESCRIPTION TESTING STARTER PERFORMANCE TESTS Starters HITACHI. Isuzu

EM 128 2UZ-FE ENGINE MECHANICAL ENGINE UNIT INSPECTION

2000 F-150 Workshop Manual

CHAPTER 8 ELECTRICAL. CHAPTER 8 ELECTRICAL ATV SERVICE MANUAL 2005/ version number WIRING DIAGRAM 8.2 PARTS INSPECTION AND SERVICE

COMPONENTS Toyota RAV ACCESSORIES & EQUIPMENT Front Seat - RAV4

Transcription:

1NZ-FE ARGING ARGING SYSTEM ARGING SYSTEM PRECAUTION 1 1. Check that the battery cables are connected to the correct terminals. 2. Disconnect the battery cables when the battery is given a quick charge. 3. Never disconnect the battery while the engine is running. 4. Check that the charging cable is tightly connected to terminal B of the generator. Terminal B A125204E01

2 PARTS LOCATION 1NZ-FE ARGING ARGING SYSTEM GENERATOR A119213E01

1NZ-FE ARGING ARGING SYSTEM 3 SYSTEM DIAGRAM W EC ECM 7.5A MET Charge Combination Meter B L FL MAIN IC Regulator Battery Generator E A119142E01

4 1NZ-FE ARGING ARGING SYSTEM ON-VEHICLE INSPECTION CAUTION: If the battery is weak or if the engine is difficult to start, recharge the battery and perform the inspections again before returning the vehicle to the customer. 1. ECK BATTERY CONDITION (a) Check the battery for damage and deformation. If severe damage, deformation or leakage is found, replace the battery. (b) Check the volume of electrolyte in each cell. (1) For batteries that are maintenance-free: If the electrolyte volume is below the lower line, replace the battery. If the electrolyte volume is above the lower line, check the battery voltage when cranking the engine. If the voltage is less than 9.6 V, recharge or replace the battery. Before checking the battery voltage, turn off all the electrical systems (headlights, blower motor, etc.). (2) For batteries that are not maintenance-free: If the electrolyte volume is below the lower line, add distilled water to each cell. Then, recharge the battery and check the specific gravity of the electrolyte. Standard specific gravity: 1.25 to 1.29 at 20 C ( 68 F) If the electrolyte volume is above the lower line, check the battery voltage when cranking the engine. If the voltage is less than 9.6 V, recharge or replace the battery. Before checking the battery voltage, turn off all the electrical systems (headlights, blower motor, rear defogger, etc.). 2. ECK BATTERY TERMINAL AND FUSE (a) Check that the battery terminals are not loose or corroded. If the terminals are corroded, clean the terminals. (b) Measure the resistance of the H-fuse and fuses. Standard resistance: Below 1 Ω If the results are not as specified, replace the fuses as necessary.

1NZ-FE ARGING ARGING SYSTEM 5 INCORRECT CORRECT INCORRECT A V B000543E03 B075171E06 Ammeter Terminal B Generator Battery Voltmeter A125200E01 3. ECK V-RIBBED BELT (a) Check the belt for wear, cracks and other signs of damage. If any defects are found, replace the V-ribbed belt. Replace the drive belt if any of the following defects are found: The belt is worn out and the wire is exposed. The cracks reach the wire in more than one place. The belt has pieces missing from the ribs. (b) Check that the belt fits properly into the ribbed grooves. With your hand, confirm that the belt has not slipped out of the grooves on the bottom of the pulley. 4. VISUALLY ECK GENERATOR WIRING (a) Check that the wiring is in good condition. 5. LISTEN FOR ABNORMAL NOISES FROM GENERATOR (a) Check that the generator does not emit any abnormal noise while the engine is running. 6. ECK ARGE WARNING LIGHT CIRCUIT (a) Turn the ignition switch on (IG). Check that the charge warning light turns on. (b) Start the engine and check that the light turns off. If the light does not operate as specified, troubleshoot the charge warning light circuit. 7. ECK ARGING CIRCUIT WITHOUT LOAD (a) Connect a voltmeter and an ammeter to the charging circuit as follows. If a battery/generator tester is available, connect the tester to the charging circuit in accordance with the manufacturer's instructions. (1) Disconnect the wire from terminal B of the generator and connect it to the negative (-) ammeter lead. (2) Connect the positive (+) ammeter lead to terminal B of the generator. (3) Connect the positive (+) voltmeter lead to positive (+) battery terminal. (4) Ground the negative (-) voltmeter lead. (b) Check the charging circuit. (1) Keep the engine speed at 2,000 rpm and check the reading on the ammeter and voltmeter. Standard current: 10 A or less Standard voltage: 13.2 to 14.8 V If the result is not as specified, replace the generator.

6 1NZ-FE ARGING ARGING SYSTEM If the battery is not fully charged, the ammeter reading will sometimes be more than the standard amperage. 8. ECK ARGING CIRCUIT WITH LOAD (a) With the engine running at 2,000 rpm, turn on the high beam headlights and turn the heater blower switch to the HI position. (b) Check the reading on the ammeter. Standard current: 30 A or more If the ammeter reading is less than the standard current, replace the generator. If the battery is fully charged, the ammeter reading will sometimes be less than the standard current. In this case, operate the wiper motor and the window defogger to increase the load and then check the charging circuit again.

1NZ-FE ARGING GENERATOR 7 GENERATOR ENGINE 1NZ-FE ARGING COMPONENTS 5.0 (51, 44 in.*lbf) ENGINE UNDER COVER RH N*m (kgf*cm, ft.*lbf) : Specified torque A115143E04

8 1NZ-FE ARGING GENERATOR FAN AND GENERATOR V BELT 11 (112, 8.1) FAN BELT ADJUSTING BAR ASSEMBLY 19 (189, 14) 9.8 (100, 7.2) GENERATOR ASSEMBLY 54 (551, 40) N*m (kgf*cm, ft.*lbf) : Specified torque A104514E03

1NZ-FE ARGING GENERATOR 9 GENERATOR DRIVE END FRAME PLATE RETAINER 133 (1356, 98) GENERATOR ROTOR ASSEMBLY GENERATOR PULLEY TERMINAL INSULATOR 4.1 (42, 36 in.*lbf) GENERATOR REGULATOR ASSEMBLY 4.5 (46, 40 in.*lbf) 2.0 (20, 17 in.*lbf) CORD CLIP x4 GENERATOR RECTIFIER END FRAME x3 PLATE SEAL TERMINAL INSULATOR x3 GENERATOR HOLDER WITH RECTIFIER 2.0 (20, 17 in.*lbf) 3.8 (39, 34 in.*lbf) 2.0 (20, 17 in.*lbf) GENERATOR BRUSH HOLDER ASSEMBLY x3 BRUSH COVER RECTIFIER PLATE REAR END COVER 4.4 (45, 39 in.*lbf) N*m (kgf*cm, ft.*lbf) : Specified torque A117298E08

10 1NZ-FE ARGING GENERATOR REMOVAL 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL 2. REMOVE ENGINE UNDER COVER RH 3. REMOVE FAN AND GENERATOR V BELT (See page EM-7) 4. REMOVE GENERATOR ASSEMBLY (a) Remove the terminal cap. (b) Separate the connector and the harness clamp. (c) Remove the nut and remove terminal B. A115418 A (d) Remove fan belt adjusting slider fixing bolts A and B and remove the fan belt adjusting slider. B A115419E01 (e) Remove fixing bolt B and remove the generator. B A115420E01 Turn SST 1-A DISASSEMBLY 1. REMOVE GENERATOR PULLEY SST 09820-63010 (09820-06010, 09820-06020) Hold SST 1-B A067417E01 SST 1-A and B 09820-06010 SST 2 09820-06020 (a) Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque. Torque: 39 N*m (400 kgf*cm, 29 ft.*lbf) NOTICE: Check that SST is securely fitted onto the generator rotor shaft.

1NZ-FE ARGING GENERATOR 11 (b) (c) Mount SST 2 in a vise. Insert SST 1-A and B into SST 2, and attach the generator pulley nut to SST 2. SST 2 A033334E01 Turn SST 1-A (d) To loosen the generator pulley nut, turn SST 1-A in the direction shown in the illustration. NOTICE: To prevent damage to the rotor shaft, do not loosen the generator pulley nut by more than one-half turn. (e) Remove the generator from SST 2. A033335E03 SST 1-A (f) Turn SST 1-B, and remove SST 1-A and B. (g) Remove the generator pulley nut and generator pulley. Turn SST 1-B Hold A067418E01 2. REMOVE GENERATOR BRUSH HOLDER ASSEMBLY (a) Remove the nut and terminal insulator. (b) Remove the nut, screw and rectifier plate. (c) Remove the 2 nuts and the rear end cover. A117294 (d) (e) (f) Remove the brush cover from the generator brush holder assembly. Remove the 3 screws and the generator brush holder assembly. Remove the plate seal. A117359

12 1NZ-FE ARGING GENERATOR 3. REMOVE GENERATOR REGULATOR ASSEMBLY (a) Remove the 2 screws and the generator regulator assembly. A117295 4. REMOVE GENERATOR HOLDER WITH RECTIFIER (a) Remove the 3 screws and the generator holder with rectifier. A117360 5. REMOVE GENERATOR ROTOR ASSEMBLY (a) Remove the 3 terminal insulators from the generator rectifier end frame. (b) Remove the 4 nuts and the cord clip. A117361 Hold A067420E01 (c) (d) (e) Using SST, remove the generator rectifier end frame. SST 09286-46011 Remove the plate retainer. Remove the generator rotor assembly from the generator drive end frame. NOTICE: Do not drop the generator rotor assembly. If the generator rotor is engaged too firmly, gently tap the generator rotor shaft to remove it using a plastic hammer.

1NZ-FE ARGING GENERATOR 13 9.5 to 11.5 mm A092175E01 INSPECTION 1. INSPECT GENERATOR BRUSH HOLDER ASSEMBLY (a) Using vernier calipers, measure the exposed brush length. Standard exposed length: 9.5 to 11.5 mm (0.374 to 0.453 in.) Minimum exposed length: 1.5 mm (0.059 in.) If the exposed length is less than the minimum, replace the generator brush holder assembly. B F A085101E01 2. INSPECT GENERATOR REGULATOR ASSEMBLY (a) Using an ohmmeter, check the continuity between terminals F and B. Standard: When the positive and negative poles between terminals F and B are exchanged, there is continuity in one direction but no continuity in the other direction. If the continuity is not as specified, replace the generator regulator assembly. E F (b) Using an ohmmeter, check the continuity between terminals F and E. Standard: When the positive and negative poles between terminals F and E are exchanged, there is continuity in one direction but no continuity in the other direction. If the continuity is not as specified, replace the generator regulator assembly. A085102E01 3. INSPECT GENERATOR DRIVE END FRAME (a) Check the stator coil for open circuits. (1) Using an ohmmeter, check the resistance between the coil leads. Standard resistance: Below 1 Ω If the result is not as specified, replace the generator assembly. A082703E04 A082704E03 (b) (c) Inspect the stator for ground. (1) Using an ohmmeter, check the resistance between the coil lead and drive end frame. Standard resistance: 10 kω or higher If the result is not as specified, replace the generator assembly. Inspect the bearing. (1) Make sure that the bearing is not rough or worn. If necessary, replace the generator assembly.

14 1NZ-FE ARGING GENERATOR B P1 P2 E B P1 P2 P3 E P3 A108392E03 4. INSPECT GENERATOR HOLDER WITH RECTIFIER (a) Using an ohmmeter, check the continuity among terminals P1, P2, P3 and B, and among P1, P2, P3 and E. Standard: When the positive and negative poles among terminals P1, P2, P3 and B are exchanged, there is continuity in one direction but no continuity in the other direction. When the positive and negative poles among terminals P1, P2, P3 and E are exchanged, there is continuity in one direction but no continuity in the other direction. If the continuity is not as specified, replace the generator holder with rectifier. Slip Ring 5. INSPECT GENERATOR ROTOR ASSEMBLY (a) Check the generator rotor for open circuits. (1) Using an ohmmeter, measure the resistance between the slip rings. Standard resistance: 1.7 to 2.1 Ω at 20 C (68 F) If the resistance is not as specified, replace the generator rotor assembly. A067421E02 Rotor Slip Ring A067422E02 (b) (c) Check the generator rotor for short circuits. (1) Using an ohmmeter, check the resistance between the slip ring and generator rotor assembly. Standard resistance: 10 kω or higher If the result is not as specified, replace the generator rotor assembly. Inspect the slip rings. (1) Make sure that the slip rings are not rough or scored. If rough or scored, replace the generator rotor assembly. 14.2 to 14.4 mm (2) Using vernier calipers, measure the slip ring diameter. Standard diameter: 14.2 to 14.4 mm (0.559 to 0.567 in.) Minimum diameter: 12.8 mm (0.504 in.) If the diameter is less than the minimum, replace the generator rotor assembly. A094149E01

1NZ-FE ARGING GENERATOR 15 30 mm Socket Wrench REASSEMBLY 1. INSTALL GENERATOR ROTOR ASSEMBLY (a) Place the generator drive end frame on the generator rotor assembly. NOTICE: Do not drop the generator rotor assembly. (b) Install the generator rotor assembly and the plate retainer. (c) Using a 30 mm socket wrench and press, slowly press in the generator rectifier end frame. A033357E01 (d) (e) Install the 4 nuts and the cord clip. Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf) Install the 3 terminal insulators onto the generator rectifier end frame. A117361 2. INSTALL GENERATOR HOLDER WITH RECTIFIER (a) Install the generator holder with rectifier with the 3 screws. Torque: 2.0 N*m (20 kgf*cm, 17 in.*lbf) A117360 3. INSTALL GENERATOR REGULATOR ASSEMBLY (a) Install the generator regulator assembly with the 2 screws. Torque: 2.0 N*m (20 kgf*cm, 17 in.*lbf) A117295

16 1NZ-FE ARGING GENERATOR A117359 4. INSTALL GENERATOR BRUSH HOLDER ASSEMBLY (a) Install the plate seal. (b) Install the generator brush holder assembly with the 3 screws. Torque: 2.0 N*m (20 kgf*cm, 17 in.*lbf) (c) Install the brush cover onto the generator brush holder assembly. (d) Install the rear end cover with the 2 nuts. Torque: 4.4 N*m (45 kgf*cm, 39 in.*lbf) (e) Install the rectifier plate with the nut and screw. Torque: 4.4 N*m (45 kgf*cm, 39 in.*lbf) for nut Torque: 3.8 N*m (39 kgf*cm, 34 in.*lbf) for bolt (f) Install the terminal insulator with the nut. Torque: 4.1 N*m (42 kgf*cm, 36 in.*lbf) SST 1-A 5. INSTALL GENERATOR PULLEY SST 09820-63010 (09820-06010, 09820-06020) Turn SST 1-A and B 09820-06010 SST 2 09820-06020 Hold SST 1-B A067417E02 (a) (b) (c) (d) Install the generator pulley onto the generator rotor shaft by tightening the generator pulley nut by hand. Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque. Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf) NOTICE: Check that SST is securely fitted onto the generator rotor shaft. Mount SST 2 in a vise. Insert SST 1-A and B into SST 2, and attach the generator pulley nut to SST 2. SST 2 A033334E01 SST 1-A (e) Tighten the generator pulley nut by turning SST 1-A in the direction shown in the illustration. Torque: 133 N*m (1,356 kgf*cm, 98 ft.*lbf) (f) Remove the generator from SST 2. Turn A033354E02

1NZ-FE ARGING GENERATOR 17 SST 1-A (g) Turn SST 1-B, and remove SST 1-A and B. (h) Turn the generator pulley, and check that the generator pulley moves smoothly. Turn SST 1-B Hold A067418E02 INSTALLATION 1. INSTALL GENERATOR ASSEMBLY (a) Provisionally install the generator with fixing bolt B. B A115420E01 B A (b) Provisionally install the fan belt adjusting slider with fan belt adjusting slider fixing bolts A and B, then move the generator toward the cylinder block and tighten bolt B. Torque: 11 N*m (112 kgf*cm, 8.1 ft.*lbf) A115419E01 A115418 (c) (d) (e) Install the connector and the wire harness clamp. Install terminal B with the nut. Torque: 9.8 N*m (100 kgf*cm, 7.2 ft.*lbf) Install the terminal cap. 2. INSTALL FAN AND GENERATOR V BELT (See page EM-7) 3. ADJUST FAN AND GENERATOR V BELT (See page EM-7) 4. INSPECT FAN AND GENERATOR V BELT (See page EM-8) 5. INSTALL ENGINE UNDER COVER RH 6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)