CITY OF BEVERLY HILLS STAFF REPORT

Similar documents
Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project

Click to edit Master text styles

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

NEWS RELEASE November 8, 2017

30-Day Look Ahead Summary August 2011

Sherman Oaks Community Traffic Plan

Purple Line Extension, Section 2 Southern California Edison, Phase I

FREQUENTLY ASKED QUESTIONS

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

Sepulveda Pass Corridor Systems Planning Study Update

FREQUENTLY ASKED QUESTIONS

Mobility Corridor Updates. Transit & Active Transportation Projects

Sepulveda Pass Corridor Systems Planning Study

East San Fernando Valley Transit Corridor. Community Meetings April/May, 2012

Janice Fortunato Senior Director Business Partnerships

Measure R. Measure R

Develop ground transportation improvements to make the Airport a multi-modal regional

I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

REGIONAL TRANSPORTATION SETTING

Purple Line Extension Section 1 Construction Community Meeting January 17, 2019

Purple Line Extension Section 1 Construction Community Meeting April 19, 2018

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

Transit Project Delivery Status Report. Significant Issues

Exposition Light Rail Transit Project

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles April 2014

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

Mobility Corridor Updates. Transit & Active Transportation Projects

Purple Line Extension. Rodeo Station AUR MOA October 24, 2017

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA)

Chief Capital Management Officer s Report

I-405 Corridor Master Plan

Exposition Corridor Transit Project

Construction Staging Area 4 Avenue Road

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019

ENVIRONMENTAL SETTING

ODOT District Two Monthly Construction Update

Business Advisory Committee. November 3, 2015

Landside Access Modernization Program (LAMP)

Community Open Houses November 29 December 7, 2017

City of Beverly Hills North Santa Monica Blvd Reconstruction. Traffic & Parking Commission June 04, 2015

ODOT District Two Monthly Construction Update

Mid-Coast Corridor Transit Project

I-84 Hartford Project Public Advisory Committee Meeting #19. March 28, 2019

Community Meetings June 2018

Welcome and Agenda. Thank you for joining us! 6:00 pm Open House. 6:30 pm Welcome & Presentation. 7:00 pm Q&A. 7:15 pm Open House Resumes

Metro Highway Program

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

Appendix G Traffic and Parking Report

Rail alignment and benefits (rab) study

Attachment D Environmental Justice and Outreach

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

BEVERLY HILLS STAFF REPORT

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

Southern California - CHSRA

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

4 COSTS AND OPERATIONS

Project Working Group Meeting #5

Business Advisory Committee. July 7, 2015

SAN FRANCISCO TO SAN JOSE PROJECT SECTION

3.8 TRANSPORTATION, CIRCULATION AND PARKING

Ottawa LRT Stage 2. McKellar Park Information Session

4.0 SUMMARY OF ARTERIAL INTERSECTIONS CONGESTION ANALYSIS AND IMPROVEMENT CONCEPTS

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

ADDITIONAL UTILITY RELOCATION COSTS ARE MISSING FROM THE ESTIMATE.

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

Measure R. Measure R

Operations Center FAQs

Section 3.12 Traffic and Transportation

STH 60 Northern Reliever Route Feasibility Study Report

H/Benning Phase 2 Construction. December 17, 2012

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

CONNECTING AND TRANSFORMING CALIFORNIA

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Community Meetings Welcome

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

Why coordinate the Van Nuys and Sepulveda Pass project studies together?

Corridor Management Committee. March 7, 2012

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Welcome. Public Open House Schedule. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna. West Kelowna. Wednesday, March 2, :00 p.m. 8:00 p.m.

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

Honorable Mayor and Members of the City Council

ALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002

Committee Report. Transportation Committee. Business Item No

Community Meetings. January/February 2019

Pomona Rotary December 19, 2017

2.4 Build Alternatives

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

4.1 Traffic, Circulation, and Parking

,ILLS CITY OF BEVERLY HILLS TRAFFIC AND PARKING COMMISSION. July 12, 2018 TO: Traffic and Parking Commission FROM: Transportation Staff SUBJECT:

Maryland Gets to Work

TRAFFIC PARKING ANALYSIS

Lane Closure Manual. Route Report Index: US12-A US12-03 (WB) US12-01 (EB WB) US12-02 (EB)

Transcription:

Meeting Date: July 7, 2011 To: From: Subject: CITY OF BEVERLY HILLS STAFF REPORT Honorable Mayor & City Council Pamela Mottice Muller, Director of Emergency Management 405 Closure Attachments: 1. 1-405 Sepulveda Pass Improvement Project Fact Sheet 2. Cal Trans Closure Map INTRODUCTION The 405 freeway will be closed, due to construction, from the 1-10 to the 1-101 for 53 hours on July 15 at 7:00 pm to July 18 at 6:00 am. This is expected to cause extreme traffic conditions to the area, especially the Westside. Traffic is expected to be significant throughout Beverly Hills and residents are asked to stay home during that weekend. Coordinated emergency plans are being developed. DISCUSSION Construction crews for the 1-405 Sepulveda Pass Improvements Project plan to demolish half the Mulholland Bridge in the Sepulveda Pass of Los Angeles in order to build a new, widened bridge, and a major carpool lane. The construction activity is part of a $1 billion capital improvement project for the 1-405 freeway. Therefore to accommodate the construction, the 405 freeway will close from July 15 through July 18. Beginning on Friday, July 15, ramps along the 10 mile closure will begin to shut down as early as 7 p.m. and the closure of freeway lanes will begin at 10 p.m. The freeway is expected to be totally closed by midnight. The closure will continue until 5 a.m. Monday morning, July 18. Ramps and connectors are expected to be reopened by 6 a.m. During this closure, the Mulholland Bridge, 1-405 freeway and access ramps will be closed. Motorists will be diverted at 1-10 Northbound and 1-101 Southbound. Sepulveda Boulevard will be open but intended as only an alternate route for local resident access. The detour diverts motorist on freeways around the closure but it is predicted that motorists will use canyons roads such as Benedict, Coldwater, and

Meeting Date: July 7, 2011 Laurel Canyons. Traffic conditions on local streets and freeways within the region of Los Angeles County and beyond are expected to be severe, with significant, multi-hour delays. The City of Beverly Hills can expect heavy traffic throughout the weekend. The City s road construction on the Benedict Canyon scheduled to start on July 5th will cease during this weekend. Cal Trans has an extensive awareness campaign reaching from Oregon to San Diego to notify motorists to stay away from these areas during that weekend. Another extended freeway closure period will be required for the second phase of work approximately one year later. Additional information including detour maps can be found by going to: http :Ilwww. metro. net/pro jects/l-405/ City departments are preparing for the weekend. The Police Department has the operational response lead. Communications is in charge of the outreach to both employees and the public. All departments are working on contingency plans. FISCAL IMPACT Costs should be minimal. There may be overtime which will be paid from department budgets. If the opportunity allows, the City will seek to recoup costs from the federal government or from Cal Trans. RECOMMENDATION Please advise family, friends and the Community to minimize travel as much as possible during this weekend. Pamela Mottice Muller Page 2 of 2 6/29/20 1 1

Attachment 1

)

What work will be done? What does bridge demolition preparation consist of? When will work begin and end? What time will crews be working? The Contractor will demolish and reconstruct the Mulholland Dr Bridge. The demolition will be staged, allowing the southern half of the Mulholland Dr Bridge to be demolished July i6 and 17, followed by approximately eleven months of south side bridge reconstruction. Then, the northern half ofthe Mulholland Dr Bridge will be demolished and reconstructed. Prior to demolition, traffic will be reconfigured, traffic signals and signs will be relocated, and the work zone will be separated from the traffic with concrete barriers. A construction work zone and yard will be established near the bridge. Existing wood from inside the bridge will be removed. Bridge demolition will occur July i6 and 17. Bridge reconstruction will last approximately eleven months for the southern half and then eleven months for the northern half of the bridge. At times, crews will be working 24 hours a day, seven days a week during both the demolition and reconstruction of the Mulholland Dr Bridge. Will there be closures of the Yes. During the demolition, you can anticipate closures of the 1-405 in both directions 1-405 and the actual Mulholland and the Mulholland Dr Bridge itself. Northbound 1-405 will be closed between 1-10 and Dr Bridge? US 101. Southbound 1.405 will be closed between US 101 and the Getty Center Dr ramps. These closures will take place during an entire weekend of demolition. The Mulholland Dr Bridge will also be closed intermittently during reconstruction. The closures are needed to protect the public. Once the demolition is complete, the bridge reconstruction continues for approximately eleven months. Will local access be impacted? Yes, but only during demolition and occasionally during reconstruction. The 1-405 Freeway will be closed in both the north and south directions for an entire weekend July i6 and 17. Detailed information, including detour and alternate routes, will be available at metro.net/4o5 prior to work starting. Will there be other expected impacts? Will the Mulholland Dr Bridge be open to traffic during reconstruction? Is the 1-405 Project coordinating its work with other projects near the freeway? What safety measures will be used? The reduction of traffic lanes on the bridge during construction will result in a reduction of lane capacity on the bridge. Yes. The Contractor will maintain one lane of traffic in each direction across the Mulholland Dr Bridge. Occasionally there may be night hours when traffic on the bridge will be restricted. Yes, the project team continually coordinates with the City of Los Angeles and its departments to minimize impact on other projects and traffic flow through the Sepulveda Pass. Bridge and freeway closures will be coordinated with emergency responders. Access for emergency responders will be maintained at all times throughout the demolition and reconstruction of the Mulholland Dr Bridge. During preparation for the demolition, k-rail (concrete barriers) will be placed on Mulholland Dr Bridge to protect the public and the construction crews during reconstruction. Full freeway closures in both the north and south directions will be implemented during bridge demolition to protect the public from any falling debris. Who can I contact regarding this You may contact Metro Community Relations at 213.922.3665 or via e.mail at fact sheet? l4o5@metro.net. Updates will be available at metro.net/4o5 that reflect all closures, dates and detours related to this activity. In addition to the website, you can find information on Facebook, Twitter and Nixle. Free accounts can be opened at Twitter.com, Facebook.com and Nixle. corn. What will the new bridge look like? The reconstructed Mulholland Dr Bridge will be widened, lengthened, and look similar to the existing bridge.

Attachment 2

1-405 Sepulveda Pass Improvements Project I Attachment 3: DETOUR ROUTES FOR CLOSED FREEWAY AND CONNECTORS MetrO 0040P034 530 41_ICY III III e VENTURA COUN 04011 5*40 OAKS 1 4 210 -~ 4-.- 121030 134 I~i ~14~1~ ~Lh~L ~ -4 S. Sr t ~ - S. P4530014 TWRNGA t 4 I AN 1113000 H0I13W00D~ WI ~ Los ANGELES COUNTY 210 1011103 0105 ~. ~ _ It 10 0 53014 ~ GELE SOlID 10-60 C C113 ~ ;1 ~ 0O5C~jtuS ~I. ~ -~ 0~ ~ I 60 N.44LAo~ ~ t~1~00~ ~ LOUT? 0410 57 05.4 LEGEND 40 05NOV41 ho UNTY NB/SB 1-405 Through-Traffic Detour EB 1-10 to NB 1-405 Connector Detour 60 1 SB US-lOl to SB 1405 Connector Detour WB 1-10 to NB 1-405 Connector Detour 710 40 NB US-lOl to SB 1-405 Connector Detour WB 1-10 to NB 1405 Secondary Connector Detour I PORT OF LONG leach NB US-lOl to SB 1-405 Secondary Connector Detour. Direction of travel I PORT OF LOS *550*45 44

~-4O5 Sepulveda Pass Improvements Project Attachment 3B REGIONAL ALTERNATE ROUTES Metra, ~.- 118 118 S. \~ AN 15868000 -.0~ - VENTURA COU If ~% 40-800086 ~ 23 / S. ~ ~_ BEVERLYHILLS WEST HOLLYWOOD TO 210 LOS ANGELES COUNTY / 60..~. / N a + LAO 0 INGLEW000 T SOUTH GATE 710 DOWNY, ~. -- /-.._.. -~o.,., -. I. LAND heights,.6o / / LEGEND I05_, -~ ~ CDMT100/ 5 ORANGE Alt I: Orange County/San Diego Route -5. CA 57. 1-210, CA 118 Alt 2: Long Beech Route 1605, 1-210. CA 118 Alt 7N: Santa Barbara Route US 101. CA 23, CA 118. 1-210. CA 2. 1-5. CA 110. I-TO Alt 7S: Santa Barbara Route Us 101, CA 27. CA I. 1-10 I L80E000D Alt 3: Port of Long Beach Route 710. 1-10, I S, CA 118 Alt 4: South Bay Route/Port of Los Angeles Route 1-110, CA 91. 1-710, I-TO, I-S. CA T34. US 101 Alt 5: LAX/Beach CitIes Route I-ItO. CA 91. 1-710 1-10, I S, CA 134, US 101 Alt 8: San Fernando Wiley/Central Valley Route 1-5/CA 118, 1-210. CA 2. -5, CA 110, I-ITO. I-Ia Alt RN: East Suburbs/Inland EmpIre Route 1-210, CA 118 Alt 9S: East Suburbs/Inland EmpIre Route CA 60. 1-605. 1-105 I PORT OF LONG REACH SANElY GROW 241 Alt 6N: Santa MonIca/Malibu Route CA I. CA 27. CA 118 Alt 6S: Santa MonIca/Malibu Route CA 1, I-TO Direction of travel I PORT OF LOS ANGELOS 40