Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Similar documents
2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

State Avenue Corridor Bus Rapid Transit (BRT)

Swift Green Line April 11, 2019

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

WELCOME. Transit Options Amherst - Buffalo Public Workshops

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

MOTION NO. M Identifying a Sound Transit 3 Candidate Project List for Development of a Sound Transit 3 System Plan and Directing Further Study

VAN NESS AVENUE BUS RAPID TRANSIT

Snelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1

Tempe Streetcar. March 2, 2016

NET TOLL REVENUE REINVESTMENT GRANT PROGRAM. South Bay Service Council

Arterial BRT Quarterly Update

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

Sound Transit East Link: Bus/LRT System Integration Study

Waco Rapid Transit Corridor (RTC) Feasibility Study

Transportation 2040: Plan Performance. Transportation Policy Board September 14, 2017

What IS BRT, Really? Not BRT and RNY

Service Quality: Higher Ridership: Very Affordable: Image:

VAN NESS AVENUE BUS RAPID TRANSIT

Puyallup Station Access Improvements Project

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

Approve summary for the Regional FTA Caucus meeting held May 8, 2018.

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

METRO Orange Line BRT American Boulevard Station Options

TRANSIT IDEA STRATEGIC INITIATIVE On BUS RAPID TRANSIT (BRT)

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

FY 2018 Recommended Wake Transit Work Plan

Development and Overview of the NY 5 Bus Rapid Transit Corridor. New York State MPO Conference June 5, 2009

5. OPPORTUNITIES AND NEXT STEPS

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

Transportation Improvement Program (TIP) Candidate Project List for Public Review

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Develop ground transportation improvements to make the Airport a multi-modal regional

engineering phase and during the procurement of design build contracts.

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:

Bus Rapid Transit: Basic Design for Non-Transit Planners

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run?

I-35W & Lake Street Station

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

METRO Light Rail Update

ARTERIAL BRT OVERVIEW

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

WAKE TRANSIT PLAN Summer 2018

Draft Results and Open House

Multnomah County Commission December 15, 2016

NVTA SIX YEAR PLAN PROJECTS BY MODE

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Regional Mobility Grant Program

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

7 COMPARATIVE EVALUATION OF ALTERNATIVES

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

Sound Transit 3. Appendix C: Benefits, Costs, Revenues, Capacity, Reliability, and Performance Characteristics

Colorado Association of Ski Towns August 26, 2016

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

Greater Cleveland Regional Transit Authority. Joe Calabrese CEO/General Manager

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

Draft Results and Recommendations

Leadership NC. November 8, 2018

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Strategies to keep people and goods moving in and through Seattle

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Testing Automated Collision Avoidance Systems for Transit Buses

FACT SHEET. US 192 Alternatives Analysis Modal Technologies. Alternative Description/Overview

South Lexington Transportation Study Lexington, Massachusetts

RTID Travel Demand Modeling: Assumptions and Method of Analysis

Minutes (Approved, with edit, July 12, 2017)

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

EAST LINK PROJECT. Environmental Scoping Information Report. Seattle to Bellevue to Redmond. September 2006

Troost Corridor Transit Study

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Level 2 Alternatives Screening Report

Greater Cleveland Regional Transit Authority. Joe Calabrese - General Manager

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Informal Business Discussion Minutes Tuesday, May 3, :00 PM 1. Transportation

Appendix G: Rapid Transit Technology Backgrounder July 2017

Transportation Infrastructure Investment Program moving

Sales and Use Transportation Tax Implementation Plan

Seattle & North King County. - I Bus Connections (CHOR~E. U_Oistnct7 \( The Regional Transit Authority ... 8RegiOna, Transit Authority ~...

Committee Report. Transportation Committee. Business Item No

Public Meeting. June 15, :30 7:30 p.m.

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

Transcription:

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Background PSRC s 2017 funding: Rural Town Centers and Corridor program Regional FTA competition May - Board released projects being recommended for public review and comment Today - Recommendation for approval to the Executive Board

Recommended Projects Rural Town Centers & Corridors Program Eight grant applications requesting $6.7 million Four projects being recommended for the $3 million available

City of North Bend North Bend Way/Park Street Roundabout - Amount: $1,000,000 - Phase: Construction Roundabout, including landscaping, sidewalks and shared-use trail connections, signage, and utility improvements.

City of Stanwood 90 th Ave/Viking Way Extensions - Amount: $1,437,750 - Phase: Construction Extend 90th Avenue from 271st Street to Viking Way, including a travel lane in each direction, parking, landscaping, and sidewalks

City of Orting $1,000,000 to construct a roundabout at the North Bend Extension Way/ Park Street intersection - Amount: $346,000 - Phase: PE/Design Whitehawk Boulevard Extend Whitehawk Boulevard NW to Calistoga SW. Includes a travel lanes, a center median, bike and pedestrian facilities, and a new traffic signal.

City of Snohomish $1,000,000 to construct a Bickford & Weaver roundabout at the Intersection Improvements North Bend Way/ Park Street intersection - Amount: $216,250 - Phase: PE/Design Install a new traffic signal, curbing, channelization, sidewalks, and drainage improvements.

Recommended Projects Regional FTA Competition Fifteen grant applications requesting $70.3 million Eight projects being recommended for the $32.2 million available

Community Transit Swift BRT Orange Line Project Development - Amount: $5,000,000 - Phase: PE/Design Complete Project Development phase for Swift BRT "Orange Line. Includes environmental review, alignment selection, and design/engineering.

Sound Transit Sounder Vehicle Procurement - Amount: $7,800,000 - Phase: Other Purchase one commuter rail locomotive and three passenger cars for ST s Sounder South line, serving Pierce and King Counties. New locomotive will be Tier 3 or Tier 4 EPA standard.

King County/Metro $1,000,000 to construct KCM Service a Expansion roundabout Battery at Electric the Bus North Bend Service Way/ Park Street intersection - Amount: $6,464,000 - Phases: Other, Construction Purchase eight slowcharge/extended range battery electric buses and construct eight charging stations at Metro s South Base. Buses will serve on eight KCM routes.

City of Seattle Rainier Rapid Ride Corridor - Amount: $3,000,000 - Phase: PE/Design Develop new BRT/RapidRide corridor along Rainier Ave S. Includes: BAT or transit-only lanes, signal modifications, channelization changes, TSP, transit stop amenities, and non-motorized infrastructure.

Pierce Transit $1,000,000 to construct a Corridor Improvements for roundabout at the Transit Speed & Reliability North Bend Way/ Park Street intersection - Amount: $1,440,000 - Phase: PE/Design Identify and prioritize transit preferential treatments along Pacific Avenue S/State Route 7 (Downtown Tacoma to Spanaway), including TSP, signal modifications, queue jumps, bus/hov lanes, stop amenities.

King County/Metro King County Metro System Expansion: Eighth Base - Amount: $1,601,335 - Phase: Planning Identify property and develop conceptual layout for construction of an eighth KC Metro Transit bus base. Base to accommodate up to 300 buses.

Washington State Ferries $1,000,000 to construct Seattle a Multimodal Terminal at Colman Dock - roundabout Pedestrian at the Overhead North Bend Loading Way/ Park Street intersection - Amount: $4,000,000 - Phase: Construction Replace Overhead Loading (OHL) structures of Slip 3 of the Seattle Multimodal Terminal at Colman Dock. New OHL will be wider and ADA compliant.

Sound Transit $1,000,000 to construct a roundabout at the North Bend Way/ Park Street intersection - Amount: $3,000,000 - Phase: Other High Capacity Buses Purchase four High Capacity Transit buses for ST Express Bus routes serving along I-5, SR-520, and I-90 corridors. New buses will have bike racks.

Today s Action The Transportation Policy Board should recommend Executive Board approval of the projects recommended for PSRC s federal funds as identified in Attachments A and B, including prioritized contingency lists of projects.

Questions?