SDH QUALITY ASSURANCE WALK -NEW

Similar documents
CLOVER ESTATES - CHESTERFIELD, MI

Home Maintenance Schedule

Building Integrity Property Services

Astro Single Section Homes

MODEL ERH-40J171 2 BEDROOM, 1 BATH NOMINAL SIZE: 28 X40 TOTAL AREA: 960 SQ. FT.

New homes from the $170 s - $220 s

Heritage THE.

THE C O L L E C T I O N 2017

Her THE C O L L E C T I O i HerNtage tag

Selection Sheet Page 1

The Ultimate Home Value with Quality, Durability & Flexibility in Design

OPT. DRY. LIVING ROOM 15'-10" x 11'-2" WASH OPT. 15" PANTRY REF'G OPT. D.W. KITCHEN KITCHEN OPT. D.W. REF'G LIVING ROOM

78' 1" 56' 6" 07-A1.1-SITE (30% of Scale); Ebbert; Projects 10 v1.0; 3/24/ :41 PM

Newmar DutchStar Initial Inspection Check Sheet

Where You Live Matters

Carpenter Home Inspections LLC

Southwest Florida s Most Experienced Builder Luxury Bath Features Neighborhood Features Award-Winning Design Features Quality Construction Features

CHAPTER 6: PLUMBING ELEMENTS AND FACILITIES


Two Story from Crest. Model Description Floor Width Sq. Ft. Page

Where You Live Matters

25' - 6" 4' - 0" 8' - 10" 4' - 0" opt. bath 4. opt. clo. 5' - 6" 17' - 0" opt. bed 4 11' - 6" 10' ceiling. flr. 3' - 5" 3050 sh.dl.

Specifications Floorplans

DIVISION 6: PLUMBING ELEMENTS AND FACILITIES

A B C D E F 113' - 2" 22' - 6" 22' - 6" 22' - 6" 22' - 6" 23' - 2" A A A3.11 A3.

Chapter 6. Plumbing Elements and Facilities

NOOK 10'-9" x 11'-11" KITCHEN 13'-2" x 11'-11"

GARDEN HOMES CITY HOMES. East 3 Street. Moody Avenue. Moody Avenue


PRODUCED BY AN AUTODESK STUDENT PRODUCT. View Name. Ref. Breakheart Project

With automotive exterior lines and innovative interior patio door the New Fuzion is More Than A Garage. Boasting a stylish modern interior with

Modifications and Additions

Included The seller reserves the right to alter and or change above stated options / Specifications at any time

New RepairBase Line Item additions for the Update

Challenger Bus Motorhomes 1998 Floor plans & Specifications

Snowden Grove. New Construction. built by Lenox Homes sales by the DC Team at Crye-Leike, Realtors 250, ,000

m o t o r c o a c h AMBASSADOR 03 E l e g a n t T r a v e l e r

The Cassidy INCLUDED ELEVATION A

Storage By Bev Gould

Inspection Points - Motor Homes

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED LATRINES BOH FPU Field Pack-up Units

The Mayberry OPTIONAL ELEVATION B. *Rendering is an artist s conception and is for illustrative purposes only.

Most dust and water leaks occur due to missing or mis-installed body sealer or components. The source of the leak is detected by:

TINY GREEN CABINS LLC. JIM WILKINS th Street White Bear Lake, MN

Price 600,000 ESTATE AGENTS. April Cottage, 9 Silver Street, Congresbury, North Somerset, BS49 5EY

Ship To. Item Code Description Qu... Price Each Amount 3H Rawhide Trailer 2010 Serial #1D9CS2423AP363770

The Mayberry OPTIONAL ELEVATION B. *Rendering is an artist s conception and is for illustrative purposes only.

Botaka Estates. New Homes Starting in the $160s BENTON CITY S NEWEST COMMUNITY. For More Information Contact Thomas Mayhew at (509)

Vehicle Final Inspection Checklist Form

Architect s Guide for Detailing & Specifying Access Floor Air Plenums

ABOVE Admiral s bus-like appearance and clean lines will command attention wherever you travel. And because it s a Holiday Rambler, you can count on

2004 MOTORHOMES GAS MODEL CLASS A. Comfortable Travel with Friends and Family

The Chesapeake OPTIONAL ELEVATION C. *Rendering is an artist s conception and is for illustrative purposes only.

NASH MODEL 22G NASH MODEL 21 5R NASH MODEL 23 5A

MICRO FRIDGE OHC MICRO FRIDGE WARD RV QUEEN BED OHC OHC MICRO WARD PANTRY FRIDGE

FERNHILL DEVELOPMENTS WINCHESTER PARK PHASE II WHITBY, ONTARIO

PHILADELPHIA CORPORATION FOR AGING HOUSING DEPARTMENT HARDWARE PRICE LIST FY 2017

The Mayberry. Courtyard Series OPTIONAL ELEVATION B. Rendering is Artist s Conception

The Mayberry OPTIONAL ELEVATION B

MAINTENANCE CATAGORIES. Visual inspection, cleaning. Repair large scale cracks or settling, major repairs/ replacement. Hire Structural Engineer.

EVALUATION OF THE 200,000 GALLON ELEVATED SINGLE PEDESTAL SPHEROID SPECKS RUN ROAD (RIDGEWAY) TANK BUNKER HILL, WEST VIRGINIA

House Plans, Inc. THE BRITTANY R.T. BAILEY P.O. BOX 267 EVANS, GEORGIA (706) FRONT ELEVATION B JULY 10, 2012 DRAWN BY: ELEVATIONS

OHC PANTRY DINETTE /TV DINETTE QUEEN BED REFER OHC

luxury crossover THE ULTIMATE Travel Trailers and Fifth Wheels

Casework. for Education. and Offices

B i l t m o r e The Biltmore

THE MARQUIS ON MAPLE

Included The seller reserves the right to alter and or change above stated options / Specifications at any time

Expedition vehicle UM 8-FH-AS / Unimog 4x4

THE ETHAN SINGLE-FAMILY HOME. OPTIONAL ELEVATION C Rendering is artist s conception and may include some optional features.

CENTRAL VACUUM SYSTEMS

HORSE BARNS & GARDEN SHEDS

Entire fresh water system, ½ ID tubing for constant pressure and volume in all areas Lacquer coated polished copper plumbing in holding tank bay 20

Make it a time to remember. Travel Trailers and Fifth Wheels

design options INTERIORS & EXTERIORS

Weekly Checks. (Deckhands and Pilot) (Tools / Equipment / Housekeeping) Equipment: Power Tools 1. Start 2. Clean 3. Fuel 4.

Utility Distribution Systems Installation, Operation, and Maintenance Manual

Inspection Report. Pauli Sumberg. Property Address: 6264 Fish Cove Road Blairsville GA Certified RV Inspection

RIVERSIDE 300 RIVERSIDE DR. AUSTIN, TEXAS REVISION TABLE OF CONTENTS WIFI/ FITNESS DECORATIVE LIGHTING PLAN

Certificate of Appropriateness Monthly Issuance Report March 2012

Light weight and beautifully appointed, there s a model just right for you.

REACH-INS 4 REACH-IN 4 REACH-IN 4 REACH-IN

The Chesapeake OPTIONAL ELEVATION C

Copyright 1999 National Glass Association v.4.0

PROPOSED DEVELOPMENT 18 OTEHA VALLEY ROAD EXTENSION, ALBANY

CHAPTER V RESIDENTIAL WIRING

The Newport OPTIONAL CRAFTSMAN ELEVATION. *Rendering is an artist s conception and is for illustrative purposes only.

THE BELLA SINGLE-FAMILY HOME. OPTIONAL ELEVATION D Rendering is artist s conception and may include some optional features.

Restroom & Shower Trailers

KITCHEN HOOD SCHEDULE. Owensboro Senior Living MAKE-UP AIR UNIT SCHEDULE PACKAGED TERMINAL AIR CONDITIONING UNIT SCHEDULE

Roof and Wall Specialties and Accessories

Committee Approved Critical Repairs

The Azalea OPTIONAL SCHELL STYLE D. *Rendering is an artist s conception and is for illustrative purposes only.

Proposed Kitchen Plan Scale:1/2"=1'-0"

285 PILOT STANDARD EQUIPMENT TECHNICAL SPECIFICATIONS

The Montauk OPTIONAL SCHELL STYLE C. *Rendering is an artist s conception and is for illustrative purposes only.

Work Instructions: Off Rent Service BR & SiteBox Office

Grise Fiord RCMP Detachment

Faircross Way, St Albans, AL1 4SD 1,850,000

ROSEBOROUGH RESIDENCE

Transcription:

SDH QUALITY ASSURANCE WALK -NEW conducted for Walnut Creek Document. Audit Title Conducted on 1/24/18, 12:20 PM Prepared by Michael Picariello Location 242 Sycamore Dr. Personnel Picariello Score 114/187-60.96% Completed on 3/16/18, 11:29 AM Report created with iauditor

Actions #1. Missing downspout at covered porch Tru Team Gutters installed with no defects? #2. Repair sod at side yard, missing splash blocks Seed/Sod installed - yard free of debris #3. Missing vent, seal penetration Helms A/C lines sealed #4. Missing shingles at garage eyebrow CJP Roof shingles clean, no defects - 2 -

#5. Missing boxing soffit and siding at eyebrow JCS Siding straight, no defects #6. Missing columns on covered porch JCS Columns painted, free of defects #7. Silicone all exterior penetrations Exterior Silicone, trim caulked, all painting complete, no defects, all nails and screws puttied #8. Adjust front door deadbolt 84 Lumber Exterior door handles and deadbolt latch proper function, clean and adjusted - 3 -

#9. Missing weatherstripping at front door, clean paint off of all weatherstripping, paint rear door threshold support and silicone Brothers Weather-strip, tight, clean, installed, Toe Kick installed and painted, and Thresholds Clean #10. Pressure wash and remove paint from Stone Brothers Veneer clean, no excess mortar #11. Repair holes in drywall Drywall clean, no footprints or writing, or holes #12. Adust weatherstripping caulk and paint door, brick mold and threshold support Fire door to home installed and functional - 4 -

#13. Missing base cap For crown Brothers #14. Silicone or caulk tops to wall Brothers Countertops secured to wall, caulked, no defects #15. Missing trim under countertop Brothers Island countertop installed, puttied, no defects #16. Wall cabinet door warped at desk area Seal penetrations underneath sink cabinet ATL West Cabinets trimmed, no defects, operable, shelves installed, supported, door bumpers installed - 5 -

#17. Stain shoe mold Brothers Toe kicks and shoe molding installed, puttied, no defects #18. I do not think there is supposed to be a 2 foot towel bar installed SDH to confirm Bath accessories installed, level and secured, no defects #19. Missing stairwell light Smoke detectors, Light fixtures, Switch plates in correct order / outlets straight, no defects/operable and clean #20. Add Trim andlanding and install handrail Brothers - 6 -

#21. Mud on the carpet AYS Carpet on steps clean and without defects #22. Adjust rear right window 84 Lumber Clean drywall mud Off of Fasten windows stool Brothers Window frames and glass clean, Windows and locks operable, Blinds operable no defects #23. Caulk at tub Brothers Floors clean, no defects, splits, chips, scratches, or Squeaks #24. Caulk add tub, drywall repair around register sand walls Brothers - 7 -

#25. Need to stain trim and cabinets Brothers #26. t installed Haskell s Shower enclosure square, Shower door, operable, no leaks, no defects #27. Need to stain shoe mold at cabinet Brothers #28. Need to adjust laundry room door Brothers Door operable, no defects, all sides - 8 -

#29. Repair drywall Brothers #30. Stain shoe mold at cabinets, caulk at Brothers #31. Adjust cabinet doors ATL West Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed #32. Caulk Brothers Surrounds installed, no defects - 9 -

#33. Need to foam around attic door SDH Clean-Painted/ Access Door operational and sealed #34. Clean out pan SDH Float switch connected, Pan cleaned out and Unit Operable #35. Was on able to confirm any water electrical or gas components Power and Gas turned on/ Home Cleaned #36. Interior was in progress getting touched up Also Home was not clean so could not confirm any flooring defects Exterior and Interior Paint and drywall complete - 10 -

#37. Paint top and bottoms of all doors Exterior and Interior Paint and drywall complete - 11 -

Audit - 114/187-60.96% HOME READY FOR QA PER SCHEDULE Score (0/15) 0% Was home ready for QI per schedule. Clean, point up done. Power and water on. Start ups completed. EXTERIOR PHOTO OF PROPERTY Attach photo. Appendix 1 EXTERIOR ITEMS (FRONT - SIDES - REAR) Score (13/24) 54.17% Water meter level, no defects? Concrete driveway, clean and no defects? Concrete control joints installed Pressure wash Complete Gutters installed with no defects? Appendix 2 Actions: #1 Shutters installed Yard graded - no signs of erosion issues - 12 -

Seed/Sod installed - yard free of debris Appendix 3 Actions: #2 Cleanouts exposed, cut to grade A/C pad level and free of defects A/C lines sealed Appendix 4 Actions: #3 Condensation line exposed Roof shingles clean, no defects Appendix 5 Actions: #4 Vents installed and sealed - 13 -

Siding straight, no defects Appendix 6 Actions: #5 Exterior Window frames free of paint or damages, Screens installed, free of defects Foundation parged, full coverage, no defects Pediments flashed and caulked, Garage header flashed Columns painted, free of defects Appendix 7 Actions: #6 Exterior Silicone, trim caulked, all painting complete, no defects, all nails and screws puttied Actions: #7 Handrails secured, no defects All exposed nails removed Exterior entry light installed and operational, no defects Doorbell operational Exterior door handles and deadbolt latch proper function, clean and adjusted - 14 -

Actions: #8 Weather-strip, tight, clean, installed, Toe Kick installed and painted, and Thresholds Clean Actions: #9 BRICK/STONE Score (2/3) 66.67% Veneer clean, no excess mortar Appendix 8 Actions: #10 Weep holes open Lintels, angle iron painted Step flashing installed and sealed All caulking clean bead, painted and in place SCREEN PORCH Screening complete, no tears All caulking clean bead, painted and in place Screen door operable, with safety latch Screen porch sealed to house DECK AREA Deck boards installed and cleaned, no stamps or tags chips or voids in the handrails, Pickets straight and nailed and set - 15 -

Handrails routed for smooth edge Secured to Home and footings GARAGE AREA Score (1/6) 16.67% Electric panel and breakers labeled, and fuctional Water heater installed, platform clean/working Drywall clean, no footprints or writing, or holes Appendix 9 Appendix 10 Actions: #11 Overhead door installed and operational, 2 remotes and warranty information Control joints installed in slab Fire door to home installed and functional Actions: #12 FOYER Score (3/3) 100% Light fixtures, Switch plates in correct order / outlets straight, no defects and clean Window frame(s) and glass clean, Window locks operable, no defects Entry closet completed, door operable, stop installed, no defects - 16 -

Flooring installed, cleaned, seam sealed or grouted, no defects, Check for floor squeaks PANTRY Score (3/4) 75% Flooring installed, cleaned, seam sealed or grouted, no defects Shelving installed, level, no defects Light fixture installed, level, no defects Door operable, no defects, all sides FIREPLACE Score (2/4) 50% Manual and start up package left for homeowner Gas logs installed and operable Mantel and moldings painted, no defects, Surround installed, clean, no defects Face / Grill clean, no defects or dents DINING ROOM - LIVING ROOM - STUDY Score (6/6) 100% Carpet/Tile/Hardwood clean / vacuumed, no defects, splits, chips, scratches, Check for floor squeaks A/C vents level, clear of debris, operable Window frames and glass clean, Windows and locks operable, Blinds operable no defects Door operable, no defects, all sides - 17 -

Light fixtures installed, operable, Switch plates / outlets straight, no defects and clean KITCHEN / NOOK Score (9/16) 56.25% Appendix 11 Actions: #13 Vinyl//Tile/Hardwood clean / vacuumed, no defects, splits, chips, scratches, Installed Square, Check for floor squeaks Light fixtures installed, operable, Switch plates / outlets straight, no defects and clean, GFI's installed and operable Island receptacles installed (correct color) Window frames and glass clean, Windows and locks operable, Blinds operable no defects Door operable, no defects, all sides Countertops secured to wall, caulked, no defects Actions: #14 Island countertop installed, puttied, no defects Actions: #15 Cabinets trimmed, no defects, operable, shelves installed, supported, door bumpers installed - 18 -

Actions: #16 Cabinets clean Toe kicks and shoe molding installed, puttied, no defects Actions: #17 Appliances installed, cleaned, set up, hooked up, operable, no scratches, dents or defects Anti-tip device installed Sink clean, no dents, no defects Sink faucet operable, Hot and Cold correctly set up Disposal installed and separate switch, operable, no defects BATHROOM - HALL FIRST Score (7/11) 63.64% Floors clean, no defects, splits, chips, scratches, Or Squeaks Door operable, no defects, all sides Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed Bath accessories installed, level and secured, no defects Actions: #18 Pedestal sink, clean, no defects Vanity faucet operable, no defect or leaks Mirror clean, level, no scratches or defects All scussion plates installed - 19 -

Surrounds installed, no defects Shower enclosure square, Shower door, operable, no leaks, no defects Tub/Shower drains are clear, Tub over flow Operable, Tub Shower buffed no Chips Toilet flushes, no defects, operable, shut off operable Light fixtures/exhaust fan operable, Switch plates in correct order / outlets straight, no defects and clean, GFI operable HALLWAY Score (9/10) 90% Smoke detectors, Light fixtures, Switch plates in correct order / outlets straight, no defects/operable and clean Appendix 12 Actions: #19 Door operable, no defects, all sides Window frames and glass clean, Windows and locks operable, Blinds operable no defects Closet Door operable, no defects, all sides Closet shelving, installed, level, no defects A/C vents straight, no defects Thermostat installed, clean, level, no defects - 20 -

Return air filters installed Floors clean, no defects, splits, chips, scratches, or Squeaks STAIRS Score (1/4) 25% Appendix 13 Actions: #20 Pickets installed at handrails, no stringer defects, no exposed nails, or Kneewalls Secure Handrails installed, puttied, returns installed at stringer, correct color hardware? Carpet on steps clean and without defects Actions: #21 2ND STORY HALLWAY Score (2/2) 100% Check for floor squeaks and check Linen Closet for Shelves and Operation MASTER BEDROOM Score (8/9) 88.89% Light fixtures operable, Switch plates in correct order / outlets straight, no defects and clean - 21 -

Door operable, no defects, all sides Window frames and glass clean, Windows and locks operable, Blinds operable no defects Actions: #22 Closet door operable Closet shelving, installed, level, no defects Floors clean, no defects, splits, chips, scratches, or Squeaks Actions: #23 A/C vents straight, no defects Return air filters installed BATHROOM-MASTER Score (8/13) 61.54% Actions: #24, #25 Floor clean, no defects, splits, chips, scratches Door operable, no defects, all sides Cabinets trimmed, defects, operable, shelves installed, supported, door bumpers installed Bath accessories installed, level and secured, no defects Vanity faucet operable, no defect or leaks Mirror clean, level, no scratches or defects Window frames and glass clean, Windows and locks operable, Blinds operable no defects Surrounds installed, no defects - 22 -

Shower enclosure square, Shower door, operable, no leaks, no defects Actions: #26 Tub/Shower drains are clear and operable,tub/shower complete, buffed, no defects or chips,tub overflow operable Toilet flushes, no defects, operable, shut off operable, All Scussions installed Light fixtures/exhaust fan operable, Switch plates in correct order / outlets straight, no defects and clean, GFI operable LAUNDRY ROOM Score (7/8) 87.5% Actions: #27 Door operable, no defects, all sides Actions: #28 Washer drain box installed correctly Flooring clean, no defects, seam sealed/ grouted, walls square Shelving installed and level Clean out cover installed Light fixture installed, operable A/C register straight, clear of debris, no defects Dryer vent installed 3RD BATH Description of the location of this room. - 23 -

Light fixtures/exhaust fan operable, Switch plates in correct order / outlets straight, no defects and clean, GFI operable Door operable, no defects, all sides Window frames and glass clean, Windows and locks operable, Blinds operable no defects Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed Bath accessories installed, level and secured, Mirror clean, level, no scratches Closet shelving, installed, level, no defects Vanity faucet operable, no defect or leaks Tub/Shower drains are clear, Tub over flow Operable, Tub Shower buffed no Chips Toilet flushes, no defects, operable, shut off operable A/C vents straight, no defects Floors clean, no defects, splits, chips, scratches, or Squeaks SECONDARY BEDROOMS (#1) Score (7/9) 77.78% Description of the location of this room. Appendix 14 Smoke detectors operational - 24 -

Actions: #29 Door operable, no defects, all sides Window frames and glass clean, Windows and locks operable, Blinds operable no defects Closet Door operable, no defects, all sides Closet shelving, installed, level, no defects Floors clean, no defects, splits, chips, scratches, or Squeaks A/C vents straight, no defects Light fixtures, Switch plates in correct order / outlets straight, no defects and clean SECONDARY BEDROOMS (#2) Score (8/9) 88.89% Description of the location of this room. Appendix 15 Smoke detectors operational Door operable, no defects, all sides Window frames and glass clean, Windows and locks operable, Blinds operable no defects - 25 -

Closet Door operable, no defects, all sides Closet shelving, installed, level, no defects Floors clean, no defects, splits, chips, scratches, or Squeaks Light fixtures, Switch plates in correct order / outlets straight, no defects and clean A/C vents straight, no defects SECONDARY BEDROOMS (#3) Score (8/9) 88.89% Description of the location of this room. Appendix 16 Smoke detectors operational Door operable, no defects, all sides Window frames and glass clean, Windows and locks operable, Blinds operable no defects Closet Door operable, no defects, all sides Closet shelving, installed, level, no defects Floors clean, no defects, splits, chips, scratches, or Squeaks Light fixtures, Switch plates in correct order / outlets straight, no defects and clean - 26 -

A/C vents straight, no defects SECONDARY BEDROOMS (#4) or Loft Description of the location of this room. Smoke detectors operational Door operable, no defects, all sides Window frames and glass clean, Windows and locks operable, Blinds operable no defects Closet Door operable, no defects, all sides Closet shelving, installed, level, no defects Floors clean, no defects, splits, chips, scratches, or Squeaks Light fixtures, Switch plates in correct order / outlets straight, no defects and clean A/C vents straight, no defects BATHROOMS - HALL SECOND Score (8/13) 61.54% Actions: #30 Floor clean, no defects, splits, chips, scratches Door operable, no defects, all sides Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed - 27 -

Actions: #31 Bath accessories installed, level and secured, no defects Vanity faucet operable, no defect or leaks Mirror clean, level, no scratches or defects All scussion plates installed Surrounds installed, no defects Actions: #32 Shower enclosure square, Shower door, operable, no leaks, no defects Tub/Shower drains are clear, Tub over flow Operable, Tub Shower buffed no Chips Window frames and glass clean, Windows and locks operable, Blinds operable no defects Toilet flushes, no defects, operable, shut off operable Light fixtures/exhaust fan operable, Switch plates in correct order / outlets straight, no defects and clean, GFI operable ATTIC / STORAGE ROOM Score (1/3) 33.33% Clean-Painted/ Access Door operational and sealed Actions: #33 Insulation Blown and Roof Sealed Float switch connected, Pan cleaned out and Unit Operable Actions: #34 BASEMENT Free of any defects. - 28 -

MISC. Score (1/6) 16.67% Power and Gas turned on/ Home Cleaned Actions: #35 Address installed straight, CO, Options implemented, Emergency Contact sticker, Door Blower Passed, Water Main Shut off All warranties and manuals In Folder left in kitchen drawer, and Termite Bait system installed Blinds installed and functional Exterior and Interior Paint and drywall complete Actions: #36, #37 Trash Bin and Porto John Removed - 29 -

Media Appendix 1 Appendix 2 Appendix 3 Appendix 4-30 -

Appendix 5 Appendix 6 Appendix 7 Appendix 8-31 -

Appendix 9 Appendix 10 Appendix 11 Appendix 12-32 -

Appendix 13 Appendix 14 Appendix 15 Appendix 16-33 -