HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

Similar documents
TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Merger of the generator interconnection processes of Valley Electric and the ISO;

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Decision on Merced Irrigation District Transition Agreement

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

LADWP Energy Storage Update. Board of Water and Power Commissioners August 15, 2017

Michigan Renewable Energy Case Study

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Minnesota Power s Community Solar Garden Program. Minnesota Senate Legislative Energy Commission 7/12/2018

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Southern California Edison

Interdepartmental Memorandum

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Contents. Solar Select TM Frequently Asked Questions

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM-Customer Resources. From: Kelly Birdwell Brezovec Approved by: /s/

Renewable Portfolio Standard Procurement Plan. November 12, 2013 Docs No:

Los Angeles. June 17, The Honorable City Council c/o Office of the City Clerk Room 395, City Hall Mail Stop 160

Pacific Gas and Electric Company TM

REGIONAL TRANSMISSION ORGANIZATIONS / INDEPENDENT SYSTEM OPERATORS AND THE ENERGY IMBALANCE MARKET: AN OVERVIEW OF THE PICTURE IN THE WEST

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Brownfields to Brightfields

Solar for Schools. John E.P. Morrison

The Gambia National Forum on

EXHIBIT A EMISSION PERFORMANCE STANDARDS (EPS) COMPLIANCE FILING FOR THE INTERMOUNTAIN POWER PROJECT (IPP) REPOWERING PROJECT

JEA Distributed Generation Policy Effective April 1, 2018

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

Feed-In Tariffs Presentation to the Nevada Production and Use of Energy Committee

ENERGY STORAGE AS AN EMERGING TOOL FOR UTILITIES TO RESOLVE GRID CONSTRAINTS. June 18, 2015 E2Tech Presentation

Wholesale Power Supply Socorro Electric Cooperative, Inc. Rob Wolaver, P.E. Senior Manager, Energy Resources

SCE s 2017 Integrated Distributed Energy Resources Request for Offers ( IDER RFO ) Market Awareness Webinar. August 30, 2017

TORONTO TRANSIT COMMISSION REPORT NO.

APPENDIX F: Project Need and Description

Renewable Energy System Tariffs and Pricing

Solano County Transit

Solar is Part of a Larger Energy Initiative

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Agenda. Industry Rate Trends Summary of Financial Targets Cost of Service Information. Valuation of Solar

S T A F F R E P O R T

STATE OF VERMONT PUBLIC UTILITY COMMISSION ) ) ) PREFILED TESTIMONY OF KIRK SHIELDS ON BEHALF OF GREEN MOUNTAIN POWER.

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

West Virginia Energy Plan and Becoming an Electric Generator

Guideline on Energy Storage

Eric Johnson, Director, External Affairs, ISO New England

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

RON ROBERTS SUPERVISOR, FOURTH DISTRICT SAN DIEGO COUNTY BOARD OF SUPERVISORS

Energy Savings through Solar Energy for Municipalities

SRP AND THE EVOLVING ENERGY WORLD ANDREA CHALMERS SENIOR SUSTAINABILITY STRATEGIST

May 2017 Pei Sue Ong, Capital Accounting Advice Manager Pacific Gas and Electric Company

Net Metering and Solar Incentive Proposed Framework

EITF Issue 15-A, Application of the Normal Purchases and Normal Sales Scope Exception to Certain Electricity Contracts within Nodal Energy Markets

Overview of S.L Competitive Energy Solutions for North Carolina

Solar Energy Proposal City of Galesburg WORK SESSION FEBRUARY 26, 2018

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Net Metering & Compensation Seminar

City of Philadelphia Renewable Energy Power Purchasing RFP Pre-Proposal Meeting

New Jersey Solar Roundtable

Solar Electric Systems for Multi-Tenant Units. Presenters

Overview. Program Details

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

R ANCHO C UCAMONGA MUNICIPAL U TILITY

Company Presentation

UTILITY-SCALE SOLAR & THE EVOLVING GRID

PENINSULA CLEAN ENERGY JPA Board Correspondence

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011

Renewable Net Metering Program Appendix ESD APX 001 1

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

Transportation Electrification: Reducing Emissions, Driving Innovation. August 2017

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

TO BOTTOM-LINE BENEFITS

MILLIGAN SOLAR PROJECT

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA )

Purple Line Light Rail P3 Project

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

Midwest Compliance Markets

Navajo Coal Replacement by 2015

MassDOT Highway ROW Solar PV Energy Program. Hongyan (Lily) Oliver Massachusetts Department of Transportation Office of Transportation Planning

Electricity Transmission Infrastructure Development in New England

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Transmission Access Charges (TAC) Katie Ramsey Staff Attorney Clean Coalition mobile

Wind Interconnection and Net-Metering in MA. Tim Roughan - National Grid Joe Feraci - NStar

June 13, Dear Mr. Klauss,

Net Metering Policy Framework. July 2015

Solar Power. Michael Arnold, LEED AP. ACI-NA Environmental Committee Meetings June 27, 2011

Solar Massachusetts Renewable Target (SMART) Program Summary Kaitlin Kelly Renewable Energy Program Coordinator

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Re: California Independent System Operator Corporation

3.17 Energy Resources

Example 1MW Solar System for Fosters Yatala

Work Session. Agenda Item # 2. Meeting Date April 20, Daryl Braithwaite Public Works Director. Prepared By. Suzanne Ludlow City Manager

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL REFERRED TO ENVIRONMENTAL RESOURCES AND ENERGY, FEBRUARY 6, 2017 AN ACT

Zero Emission Bus Impact on Infrastructure

Transcription:

SCHEDULED ITEM TO: FROM: HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD GEORGE F. MORROW, DIRECTOR OF UTILITIES DATE: JANUARY 28, 2013 SUBJECT: APPROVAL OF POWER SALES AGREEMENT ( PSA ) WITH SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY ( SCPPA ) FOR LONG TERM PURCHASE OF ENERGY, CAPACITY, AND ENVIRONMENTAL ATTRIBUTES SOURCED FROM SOLAR PROJECTS DEVELOPED BY SILVERADO POWER. RECOMMENDATION It is recommended that the Utility Board authorize approval of two Power Sales Agreements (PSA) with Southern California Public Power Authority (SCPPA) for long term purchase of energy, capacity, and environmental attributes from two solar projects as proposed for development by Silverado Power. BACKGROUND California Senate Bill X1-2 (SBX1-2), also known as the Renewable Portfolio Standard ( RPS ) requires all California's electric utilities to reach the 33% RPS, as measured by the percentage of their retail energy sales, by 2020. In general, the RPS framework consists of three (3) compliance periods as follows: Between January 1, 2011 and December 31, 2013, the utilities must procure renewable energy products equal to 20% of retail sales. By December 31, 2016, utilities must procure renewable energy products equal to 25% of retail sales, and by December 31, 2020, utilities must procure renewable energy products equal to 33% of retail sales and maintain that percentage in following years. In order to achieve its RPS targets, Azusa is actively pursuing opportunities to contract for requisite amounts of renewable portfolio standard compliance products, including renewable energy and unbundled Renewable Energy Credits (REC s). To identify, and potentially acquire, economically prudent, operationally feasible, and RPS compliant products, Staff seeks out RPS products both through SCPPA as well as on its own.

Page 2 SILVERADO PROJECT INTRODUCTION The Silverado Projects were offered in the SCPPA Request for Proposal in 2011 among over fifty (50) renewable projects. Staff conducted an in-depth due diligence review through the SCPPA RFP process along with other SCPPA member cities and concluded that the Silverado Projects have many superior characteristics and an attractive pricing structure when compared to other renewable projects submitted in response to the SCPPA RFP. The price was among the lowest for the technology offering on-peak energy profiles and the developer, Silverado Power, is reputable and experienced. Finally, Silverado projects will offer system and local capacity the increasingly desirable and thus pricey commodities. On November 15, 2012 the SCPPA Board of Directors voted to authorize execution of two Power Purchase Agreements (PPAs) with Silverado Power for renewable energy from two 20 MW photovoltaic facilities. Based on the SCPPA Board decision, the SCPPA Executive Director is authorized to execute the PPAs, provided that interested SCPPA members obtain their Boards /Councils approvals to enter into Power Sales Agreement (PSA) with SCPPA for the power to be purchased by SCPPA via the PPAs. What followed, the cities of Riverside and Pasadena have already gained their respective Councils approvals for procuring through SCPPA 50% (20 MW) and 32.5% (13 MW), respectively of the projects output. Azusa staff indicated interest in the remaining 17.5% (7 MW) of the projects output, subject to approval from this Board. By joint contracting (with Riverside and Pasadena) through SCPPA, Azusa would realize savings in joint resource procurement and reduced administrative costs in power scheduling and settlements while diversifying the operational risks across the two projects. PROJECT DESCRIPTION General: The Silverado Projects consist of two Solar Photovoltaic ( PV ) projects (Antelope Big Sky Ranch Project and Summer Solar Project). Each project is rated at 20 MW AC for a total of 40 MW and will be independently interconnected to the ISO controlled grids via Southern California Edison operated transmission facilities. Proposed Technology: Photovoltaic modules made with Polycrystalline solar panels delivering up to 14% efficiency. Because the developer controls relatively large size plots of land, less expensive fixed-array panel mounting will be employed, contributing to making the offer price to SCPPA competitive. Additionally, fixed mount technology offers better project reliability as there are no moving parts in the assembly and racking. Project Sites and interconnection: The projects will be built on two parcels of vacant, agriculturally-disturbed land in the City of Lancaster, in an area that has been zoned for the development of solar power. The 80-acre Antelope Big Sky parcel is on 80th Street West and will interconnect to SCE s 66kV Antelope-Lancaster line. The 67-acre Summer Solar parcel is on West Avenue H and will interconnect to SCE s 66kV Antelope-Rosamond line. Each parcel will accommodate 20 MW of capacity, to which Azusa will have a 17.5% interest in each.

Page 3 KEY COMMERCIAL TERMS The highlights of the proposed transaction are as follows: 1. Project Capacity: 40 MW consisting of two independently interconnected photovoltaic projects, 20 MW AC capacity each 2. Expected Capacity Factor: 28% 3. Pricing: Energy: $77.34/ MWh at Commercial Operations Date (COD) increasing by 1.5% annually for the term of the contract Capacity: $5.1/MWh (equiv.), increasing by 1.5% annually for the term of the contract 4. Expected annual Azusa energy off take about 17,000 MWH (on peak/super peak only) 5. Guaranteed Energy Production/Delivery: 80%, based on 28% facility Capacity Factor (under delivery triggers various remediation/makeup requirements and provisions) 6. COD: January 1, 2015 7. Term: 25 years 8. Facility Location: City of Lancaster, Los Angeles County, CA 9. Delivery Point(s): ISO PNode established at the 66kV bus side of the Antelope Substation, ISO South of Path 15 (SP15) operating region. 10. Silverado/Seller guarantees facilities and sourced energy compliance with RPS 11. Grounds for early termination by Buyers: A) Inability by Seller to secure construction permits by guaranteed date B) Inability by Seller to start construction by guaranteed date C) Seller missing the COD D) Facility available capacity falling below 50% of Contract Capacity for more than 18 months 12. Credit Support: A) Pre-Initial COD Security by Seller: $500,000 cash, letter of credit or parent guaranty B) Between Initial Synchronization and Final COD Security by Seller: $1,000,000 cash, letter of credit or parent guaranty C) Delivery Term Security by Seller: Equal to 6 months of revenue or a minimum of $1,500,000 cash, letter of credit or parent guaranty

Page 4 13. Milestones No. Expected Date Guaranteed Date 1 N/A N/A PPA Effective Date Milestone Description Daily Liquidated Damages per Day of Delay (not to run concurrently) Performance Security deposit at milestone achievement Project Development Security 2 complete 3/31/2013 Submits interconnection application. $4,000 3 complete 3/31/2013 Files a CEC Pre-Certification application. $4,000 4 complete 9/1/2013 Files CUP application. $4,000 5 complete 9/1/2013 Receives a completed System Impact Study or Phase I Interconnection Study. $4,000 6 complete 1/15/2014 Obtains Site Control. $4,000 7 complete 3/1/2014 Receives a completed interconnection Facility Study or Phase II Interconnection Study. $4,000 8 1/31/13 6/15/2014 Receives Conditional Use Permit or equivalent $4,000 9 3/31/13 6/15/2014 Files interconnection agreement with FERC or other jurisdictional entity as applicable. $4,000 10 complete 8/1/2014 Receives CEC Pre-Certification. $4,000 11* 3/15/2014 9/1/2014 Executes an Engineering, Procurement and Construction ( EPC ) contract. $4,000 12* 3/15/2014 9/1/2014 Executes financing documents $4,000 13* 4/15/2014 9/15/2014 Receive final Construction Permit(s). $4,000 14* 5/1/2014 10/1/2014 Begins construction of the Facility. $4,000 15* 9/15/2014 12/15/2014 Initial Synchronization Date. $4,000 16* 12/1/2014 12/31/2014 Commercial Operation Date $10,000 Between Initial Synchronization and Final COD Security, posted upon Initial Synchronization Delivery Term Security Upon COD 14. Equity Option: SCPPA has the Right of First Offer for any proposed sale of the facility and/or sale of the Project(s).

Page 5 CONTRACT EXECUTION There are four (4) agreements related to Azusa s participation in the project: Upon the Board s authorization, Azusa would execute two Power Sales Agreements (PSAs) with SCPPA, one for each 20 MW project. Upon the execution of PSAs by Azusa (and Riverside and Pasadena), SCPPA would execute two (2) Power Purchase Agreements (PPAs) agreements, one each with the Silverado Power s subsidiaries - Antelope Big Sky Ranch, LLC and Summer Solar, LLC. As stated above, the SCPPA Board has already voted to approve the PPAs and have SCPPA Executive Director execute the PSA agreements with Azusa, Riverside and Pasadena. FISCAL IMPACT The Silverado Projects will require no capital contribution. Azusa would only pay for actual energy and capacity received at the contract stipulated prices. The projected annual cost to Azusa, based on the anticipated project output, would be about $1.4 million during the first year, increasing 1.5% per annually for the remaining term of the contract (24 years). Assuming 3% discount (inflation) rate, the average price paid in today s dollars for the combined energy and capacity product during the term of the agreement would be about $69.50/MWH. Prepared by: Yarek Lehr, Assistant Director of Resource Management Attachments: Due to the length of the below documents, they are only being distributed electronically. However, hardcopies are available with the Utility Board Agenda posted for public review at the Library at 729 N. Dalton Ave., and at Azusa Light & Water 2 nd floor office at 729 N. Azusa Ave. 1. Antelope Big Sky Ranch Solar Project PSA 2. Antelope Big Sky Ranch Solar Project PPA (Appendix C to the above PSA) 3. Summer Solar Project PSA 4. Summer Solar Project PPA (Appendix C to the above PSA)