HELIOMOTION QUICK ASSEMBLY GUIDE PV-3

Similar documents
HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

HELIOMOTION QUICK ASSEMBLY GUIDE PV-1300

HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

Installation, Operation and Maintenance Manual

Solar Hybrid Inverter SP Brilliant Grid Series

User Manual 1.5KVA-3KVA INVERTER / CHARGER

Solar Hybrid Inverter SP Efecto Series

User Manual 1KVA-5KVA INVERTER / CHARGER

User Manual 1.5KVA-3KVA INVERTER / CHARGER. Version: 1.1

User Manual 4KVA/ 5KVA INVERTER / CHARGER. With MPPT Controller

User Manual 1KVA-5KVA INVERTER / CHARGER

Solar Hybrid Inverter SP Efecto Series

User manual. Solar Hybrid 1-5KVA. Uninterruptible Power Supply / Charger

User Manual 5KVA/5KW INVERTER / CHARGER. Version: 1.3

User Manual 3KVA-5KVA INVERTER / CHARGER. Version: 1.1

Solar Hybrid Inverter SP Brilliant Series

SOLAR INVERTER/CHARGER 1000VA/1500VA/2000VA. Appliances. PC TV Light Electricfan

MPPT Controller PVTS Series User Manual. User Manual. 800W-4000W Hybrid solar inverter. Version: 1.4

100W Basic Kit (GS-100-Basic)

User Manual 1KVA/ 2KVA/ 3KVA INVERTER / CHARGER

Photovoltaics. MPI Hybrid Series

User Manual 1KVA-5KVA INVERTER / CHARGER. Version: 2.1

Steca Elektronik INVERTER / CHARGER WITH MPPT: SOLARIX PLI

FlinSlim Lite Solar Hybrid Inverter 1KVA-5KVA USER MANUAL. Version: 1.3

User Manual 1KW-5KW SOLAR INVERTER / CHARGER. Version: 1.2

User Manual LV 3KVA-24V INVERTER / CHARGER. Version: 1.1

User Manual. Axpert King 3.2KW/5.2KW 48V MPPT SOLAR INVERTER. Version: 1.0

SOLARINVERTER MPPT 4KVA - 5KVA

Solar Hybrid Inverter SP Initial Series

Application. Battery. Public Grid GS HYBRID INVERTER

User Manual SOLARMAX 1KVA/ 2KVA/ 3KVA INVERTER / CHARGER

SOLAR INVERTER/CHARGER SOLAR INVERTER/CHARGER MPPT 2KVA- 3KVA. Appliances. Airconditioning Fridge. Washing machine

Battery Power Inverters

SBC V In-Car Charger Dual Input (Solar MPPT & DC)

according to VDE AR-E Manual V 3.1

1KVA/ 2KVA/ 3KVA/ 4KVA/ 5KVA MS, LV MPPT INVERTER / CHARGER. User Manual. Version: 2.3

User Manual 1KVA-5KVA (PF1) INVERTER / CHARGER. Version: 1.0

RFQ-YEM Solar Lighting System for UNDP

Solar Hybrid Power Generating System CPS1200EOH12SC CPS2200EOH24SC CPS3000EOH24SC. User s Manual K01-C

Solar inverter with MPPT AX II - M series: 4 / 5 kva, AX II - P series: 3 kva. With integrated star point grounding* according to VDE AR-E 2510-

400W / 600W / 1000W / 1500W DIY Wind Turbine

SOLAR INVERTER/CHARGER SOLAR INVERTER/CHARGER 3KW-5KW. Appliances. Airconditioning Fridge. Washing machine

User Manual WatchPower App

SOLAR INVERTER/CHARGER SOLAR INVERTER/CHARGER 3KW 120VAC. Appliances. Airconditioning Fridge. Washing machine

SK-10. Features. Solar Charge Controller User Manual. Important Safety Information

HYBRID SOLAR INVERTER

HYBRID SOLAR INVERTER HYBRID SOLAR INVERTER 3KW-5KW. Appliances. Airconditioning Fridge. Washing machine

Pure Sine Wave Inverter GP-HS1500. Owner s Manual

Eclipse Solar Suitcase

Duo Battery Charge Controller

GS-100+ Preconfigured Kits

Solar Inverter Manual

HYBRID SOLAR INVERTER

Steca Elektronik SOLARIX PLI

User Manual 3KW/5KW INVERTER / CHARGER. Version: 1.0

HYBRID SOLAR INVERTER HYBRID SOLAR INVERTER 3KW-5KW. Appliances. Airconditioning Fridge. Washing machine

SAFETY INSTRUCTIONS INTRODUCTION

Sunwize Power Ready Express Quick Start

DUAL/TRIPLE MPPT INVERTER / CHARGER. User Manual

SOLAR INVERTER/CHARGER

Pure Sine Wave Inverter Charger

CENTAURI ENERGY SERVER TECHNICAL DATA kw POWER

Oberbauer/ITEX Solar Power Systems

Solar Charge Controller

User Manual 3KVA/5KVA 24V INVERTER / CHARGER. Version: 1.1

GS-100D+ Preconfigured Kits Manual

Steca Solarix PLI. Inverter / Charger with Solar Charge Controller. Installation and operating instructions. Download manual at

SOLAR INVERTER/CHARGER SOLAR INVERTER/CHARGER PWM 4KVA- 5KVA. Appliances. Airconditioning Fridge. Washing machine

R series solar charger inverter 1000W to 6000W

DC TO AC POWER INVERTER PWRIC150012W INSTRUCTION MANUAL

CONTENTS 1. INTRODUCTION SAFTY INSTRUCTION CABLE CONNECTION SYSTEM DESCRIPTION OPERATION... 9

The Traveler Series: Wanderer

Don't let the shadows of yesterday hide the sunshine of tomorrow Nandina Morris

SCC-MPPT Solar Charge Controller

NB NB 1511 NB NB 4031 TRUE ON-LINE DOUBLE CONVERSION UPS

User Manual 3KVA/5KVA INVERTER / CHARGER. Version: 1.1

STONESTAR AUSTRALIA PTY LTD

SOLAR INVERTER/CHARGER

ETATRACK active. Installation of Controller and Motor. 1 Function of the ETATRACK active Controller

Manual for Inverter system type PCI05

Manual. BlueSolar Grid Inverter 1500 / / / / / 230

User Manual. Solar Charge Controller 3KW

SCC-MPPT Solar Charge Controller

Gay E. Canough. OFF-GRID Design. Dr. Gay E. Canough, Master trainer. Living Off the Grid

SCC-MPPT Solar Charge Controller

Sunwize Water Pumping Kit Quick Start

User Manual G1 Solar MPPT Inverter Solar MPPT Charger English version..1

MPPT Solar Integrated Inverters (500VA~2500VA) User Manual THE SOLAR TECH CO.,LTD. Solar Integrated Inverter Series 500VA~2500VA 13.

Power Inverter. User s Manual. Diamond Series CPD1200EILCD

User Manual. UPower Series. Inverter/charger

SMT. Installation and Operation Manual. Model:SMT WITH MPPT TECHNOLOGY

INVERTER/CHARGERS Off-Grid Power Solutions

PREMIER POWER PACK INSTRUCTION MANUAL EN54-4 POWER SUPPLY UNIT INSTRUCTION MANUAL. GLT.MAN-138 Issue: /05/2016 N.R.P.J.

General safety and installation information.

APPENDIX: APPROCIMATR BACK-UP TIME TABLE

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

The Traveler Series: Wanderer

OASIS-UM-01. User Manual. Inverter/Charger Oasis 6000 Rev 1.0. Oasis 6000 Series MAY 2012 ISSUE 01

CONTENTS 1. INTRODUCTION SAFTY INSTRUCTION CABLE CONNECTION SYSTEM DESCRIPTION INVERTER OPERATION...

Alliance Towel Dispensing System. Operation Manual

Transcription:

HELIOMOTION QUICK ASSEMBLY GUIDE PV-3 HelioZenit Revision 1, 2019

PART I - FOUNDATION

Soil founda on 1 Make a hole for the concrete at your chosen location. The hole for a PV-3 should be at least 65x65cm, 70cm deep (~300 liter). Refer to the manual for more information. 2 Fill the hole with concrete up to a few centimeters below ground level. 3 Push the rod unit into center of the concrete and let the flange rest on top of it. Use a spirit level to align the flange horizontally. Allow the concrete time to harden before assembling the remainder of the power plant. Cover the concrete with soil after it has cured for 4 weeks. Rod unit

Bedrock founda on 1 Drill four holes vertically into the bedrock using the rod unit as a template. Make the holes 20 mm wide and 300 mm deep. Use compressed air to remove any dust or water from the holes to ensure a clean bonding surface. Rod unit 2 Make sure the rod unit fits well into the holes. Use an angle grinder to cut off excess length from the bottom side of the threaded rods, so that the steel plate ends up close to the bedrock. 3 Fill the holes half full with chemical anchor adhesive (~500ml). Push the rod unit into the holes and give the adhesive a few minutes to cure before continuing the assembly.

4 Column needs to be turned so that the square tube faces true south in the northern hemisphere or true north in the southern hemisphere. To do so follow these steps: 1. Launch the compass app on your smart phone. This compass is GPS compensated, making it more accurate than a regular compass. 2. Align the phone to true south (or north) according to the compass. 3. Rotate the column so that the edge of the tube lines up with the edge of the phone. Make sure the compass is not distorted by being too close to any metal objects. This alignment can be fine-tuned after the installation is complete and the tracker has turned towards the sun. 4. Adjust bottom nuts to vertically align the column. 5. Tighten top nuts and then bottom nuts to secure the column.

PART II - TRACKER 4x 6x

1 4x 2 6x

PART III - FRAMEWORK 2x 4x 2x 4x 6x 2x

1 4x 2x 2 1000mm 2000mm 1000mm 2x 6x

493mm 3 930mm 930mm 2x 4 493mm 4x

5 6

PART IV - PANELS 3x 12x 16x 16x

1 C 3x 12x B 1. Lift a panel onto the frame as illustrated with the cable box (B) facing leftwards. 2. Lock the panel to the frame with four panel clamps (C). 2 3. Repeat these steps for the remaining panels. E F Remove the extension rod and attach only the shorter angle rod. Make sure to prevent the panels from swinging downwards when changing the rod. Leave both fork joints (F) and one of the clevis eye mating pieces (E) unscrewed half a turn to allow for full range of movement.

3 1. Attach PV cables to the frame using cable ties and self-adhersive clip anchors. 2. Have the electrician connect the PV cables together according to application. Standard applications are listed below. Battery-tied application The MPPSolar PIP3024MSX solar charger/inverter supports 60-115 VDC PV input. Therefore, all 3 panels (when using 24V-38V panels) can be connected in series. 16x 16x Series 33V 9A 100V 9A J Grid-tied application The Kaideng WVC-600 grid-tied microinverter has two PV inputs, each supporting a panel with up to 300W rated output (voltage >22 Vmp and <50 Voc). Mount the Microinverters (M) and Junction box (J) as illustrated so that they can connect to the panels. M M 3x M M J

4 K K

Grid-tied system AC switch (S) + - L1 L2 L3 Transformer (T) 24VDC N GG Ground (G) Neutral L N L1 L2 L3 24VDC 2x1mm² Utility AC (U) AC 5x2.5mm² M M M P P P Ground (G) 6mm² Terminator The PV solar panels (P), microinverters (M) and utility AC (U) must be connected by a certified electrician. However, preparation work may be done by a layman as long as local code requirements are followed. AC wires must be at least 1.5mm² thick and use an outdoor cable. Be mindful of the AC labels and wire colors: Neutral (N) is blue, Phase 1 (L1) brown, Phase 2 (L2) black, Phase 3 (L3) gray and ground (G) green-yellow.

Grid- ed system 1. Acquire an outdoor underground cable long enough to reach from the junction box (K) on the column to the nearest fuse box inside the house. A 1-phase system needs a cable with two wires plus a surrounding shield (1-phase cable), whereas a 3-phase system needs a cable with four wires plus the shield (3-phase cable). The thickness of the wires should be at least 2.5mm² for cable lengths up to 40 meter or 6mm² for cable runs up to 100 meter. Indoor cable sections can use an indoor cable of the same size and with the same number of conductors. Please consult your electrician for the exact cable to use according to local code requirements. 2. Wire the cable from the junction box (K) to the fuse box. It is recommended to pull underground sections through a cable duct. The duct needs to be burried so that the top of the duct is 35 cm below ground. If the cable runs over bedrock it needs to be protected by a strong hose (or a metal U-profile). 3. Make sure that all cable sections above ground are properly attached and protected so the cable cannot be accidentally moved or damaged. Sections coming out of the ground need to be protected by for example a metal U-profile. 4. Fill out and attach the included self adhesive warning labels. These labels need to be provided near the solar installation, the fuse box, and the utility meter, to indicate the presence of on-site generation and the placement of the AC switch (S). Contact a certified electrician and have them inspect the installation and carry out the remaining tasks. 1. Make the electrical connections as illustrated on the previous page. 2. Connect the AC cable to the selected phase(s) through fuse(s) in the fuse box. 3. Turn on the AC switch (S) in the junction box to power the inverter(s) and solar tracker. It takes a few minutes for the tracker to find a GPS signal before it start to track the sun. 4. Check the status lights on the inverter(s). Grid feed-in starts after about 30 seconds during sunshine.

Ba ery- ed system P U V A PV- 24V+ 24V- 24V- PV+ PV- 2.5-4mm² 2.5mm ² 16mm² 24V+ 3A PV+ 3A 16A 125A K 24V+ PV+ 24V- PV- 24V+ 24V Breaker (F) M 24V Breaker (F) PV Breaker (J) Battery Breaker (G) 24V- 2.5mm² 24V+ 16mm² B 24V- 16mm² The solar panels (P) and AC connection (U) must be installed by a certified electrician. However, the preparation work may be done by a layman as long as local code requirements are followed. Please read the solar station's user manual for additional information on how to install and configure the station. 1. Mount the solar station (V) indoors on a wall where you want it, preferably at face level. Use a small screwdriver to remove the service panel at the bottom of the station to access its terminals. 2. Put up the junction box (M) on the wall below the solar station. Make sure all switches are turned off. 3. Connect the batteries (B) together to get the required voltage for the solar station. Be very careful to avoid short circuiting the batteries. Use a voltage meter to confirm you have wired the batteries correctly.

Ba ery- ed system 4. Wire an underground cable (MCMK) with four conductors (4x2.5mm²) from junction box (A) to junction box (K). It is recommended to pull underground sections through a cable duct. Make sure that cable sections above ground are properly attached. Sections coming out of the ground need to be protected by for example a U-profile made of metall. Contact a certified electrician and have them inspect the installation and carry out the remaining tasks. 1. Connect the wires as illustrated on the previous page. 2. Wire the AC output from the solar station to the fuse box to distribute power to outlets (U). Bear in mind that the sine wave from the solar station is not synchronized to the utility grid and can therefore not be used to power any 3-phase loads. 3. If the building has utility power then connect it to the AC input terminal on the solar station. 4. Connect the PV cable's connectors to the solar panels (P). Make sure that the polarity is correct at the PV switch (J) and from there to the solar station (V). 5. Reattach the service panel to the bottom of the solar station. 6. Switch on the 24V breakers (F) in the junction box (K) to start the solar tracker. It takes a few minutes for the tracker to begin following the sun. 7. Turn on the battery switch (G) to power on the solar station (V). The station will beep for a few seconds. 8. Turn on the PV switch (J) to enable solar charging. 9. Turn on the solar station's inverter using the switch found at the bottom right or right side of the device. 10. Confirm that outlets (U) connected to the solar station are powered.

Ba ery- ed system The solar station can be configured using the buttons below the display. To access the settings hold the enter button on the right side of the display for a few seconds. Recommended changes from the default settings are listed in red in the table below. Please refer to the solar station's manual for more information. Numbe r 01 De sc ription 230VAC output source priority Se tting SbU (solar or battery) 02 Maximum charging current 60A 03 AC input voltage range APL 04 Power saving mode SdS (disabled) 05 Battery type Gel 06 07 Auto restart on overload Auto restart on high temperature LtE (enabled) TtE (enabled) 12 Voltage point back to utility 22V (44V) 13 Voltage point back to battery FUL (full charge) 16 Charge source priority OSO (only solar) 18 19 Alarm control Auto return to default screen bof (alarm off) EPS (yes) 20 Backlight control LON (on) 22 Beep when primary source interrupted AOF (off) 23 Overload bypass bye (enabled) Keep in mind that batteries should not be left completely discharged for any longer period of time as it reduces their max capacity and lifespan. If the winter season has little or no sunshine care must be taken to prevent the batteries from being drained in one of the following ways: 1. If utilty or generator power is available, setting 16 (charging priority) of the solar station can be switched from OSO (charge only from the sun) to CSO (charge from the sun if available, otherwise from utlity/generator). 2. If the system is not used during winter the batteries should be left fully charged and completely disconnected from all loads. Note: The solar station's inverter consumes power to maintain 230VAC, about 20 watt for the 24V model and 40 watt for the 48V model. It is possible to turn off only the inverter without turning off the solar charger using the button below the inverter. Alternatively, power saving mode (04) can be enabled to reduce the inverter's consumption. The inverter will then only switch on when there is a detectable load connected.