Universal Side of Pole Mount

Similar documents
Custom Side of Pole Mount

Top-of-Pole Mount for 4 Modules (TPM4) For Module Types D, E, F, & G

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

MULTI-POLE MOUNT LARGE GROUND MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

Top-of-Pole Mount for 6 Modules (TPM6) For Module Type D

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C

MULTI-POLE MOUNT MULTI-POLE MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

PRODUCT CATALOG. Tamarack Solar Products

MULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D SP PCN

Top-of-Pole Mount for 2 Modules (TPM2) For Module Types C, D, E, F, G, & H

Detroit Speed, Inc. Rear Coilover Tower Brace Kit Camaro P/N:

Top-of-Pole Mount for 8 Modules (TPM8) For Module Types D, E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Top-of-Pole Mount for 1 Module (TPM1) For Module Type H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

PIRANHA I & 2 INSTALL GUIDE

1-3/8 Designer Metals Telescoping Traversing Rod Installation Instructions

Rating when used as a weight distributing hitch with spring bars:

PIRANHA I & 2 INSTALL GUIDE

New! Price List and Sizing Chart. Single Row Series. Double Row Series. Series 5000 for 21 2 Schedule 40 pole (formerly U-22)

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G When High Wind Version (HWV) or 6h x 2w, L

Real Square 2011 RS400PRO Quick Start User Instructions v. 10.1

MIRROR, GLASS AND PANEL TRIM

Top-of-Pole Mount for 15 Modules (TPM15) For Module Types E, F, & G ASSEMBLY INSTRUCTIONS

Rating when used as a weight distributing hitch with spring bars:

Series 3 & 4 Stainless Steel - Accessories

Safety and Installation Instructions

Installation Guide. PV Booster Single Axis Tracker. Mechanical Roof Attachment.

AP-Xtreme Sim-Racing Chassis Master Assembly Guide

BUTTERFLY VALVES. Standard & True Lug Design. Sample Engineering Specification. Optional Accessories. Lever Handle. True Lug.

Installation Manual. For. High Speed Alumavator and Platinum. 10 and 23 Degree. Elevator Boat Lifts

SFI SPECIFICATION 6.1 EFFECTIVE: FEBRUARY 26, 2014 *

Installation instructions

Installation Manual. For. Alumavator and Platinum. Vertical Installation. Elevator Boat Lifts

Page REV 1: Added 'Step 2: See the "REMOVE THIS TAB, BOTH SIDES" callout near Detail A. Modify four SB375-4 Snap Bushings as shown.

Mustang. MOD1 Coilover Kit FXXADK0100, FXXADK0200, FXXADK0400 FXXA1K0100, FXXA1K0200, FXXA1K0400

CAUTION: Never work on a hot exhaust system. Allow time for the vehicle to cool. Always wear eye protection when working under a vehicle.

TO BE USED FOR MAINTENANCE MICHIGAN DEPARTMENT OF TRANSPORTATION. 2 3/16" x 2 3/16" x 10 Ga. 12" 15.5" 1 1/2" x 1 1/2" x 12 Ga.

Installation Instructions

Two Seas Metalworks Shell Lane fax Rev

PORTA-DOCK, INC. 100A 1284 ALUMINUM CANTILEVER BOAT LIFT

Components for your PV Solar Electric System

Carousel Unit User Manual Replacing the Check Stand Motor

PV-Wind SOFTWARE for Windows User s Guide

Land Cruiser UZJ100 Front Bumper Installation Instructions

Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

NISSAN #2744. Gross Trailer Weight (Maximum)...16,000 lbs. Vertical Load Weight (Max. Pin Weight)...4,000 lbs. SYSTEM TOW CAPACITY

SECTION 35iS/U: LANDING GEAR & ENGINE MOUNT

Parts Catalog Issued: Jan 17, Bed Rails

SPECIAL SPECIFICATION 8676 Solar Panel Power Supply System

Anakata New Generation Wind turbines 400W-1400W

PRODUCTS FOR PV SOLAR MOUNTING APPLICATIONS ROOF MOUNT SYSTEMS...3. GROUND and pole MOUNT SYSTEMS...5. L Feet...9. Corrugated/IBR Roof Mounts...

A B C D E F. Tools Required (supplied by others)

Pickup Truck Rack. Installation instructions for Ford - Chevy - Ram

STANDARD 80 SERIES GUYED TOWER GENERAL USE FEATURES. Phone (309) Fax (309) The Industry Standard

EZ SunBeam Ground Mount System. with Self-grounding Hardware UL2703 Compliant. Pub. D10034-V003 Copyright of 28

ASSEMBLY INSTRUCTIONS

MAINTENANCE WEIGHT RATINGS WARNINGS. warning: never exceed your vehicle manufacturer's recommended towing capacity

INSTALLA TION INSTRUCTIONS 31330

CONTENTS. Model & Parameter List 3. Installation Specification of Guyed Tower 5. Installation Specification of Tapered Tower 13

A B C D E F. b.tools Required (supplied by others) 3/16" Drill Bit 3/8" Wrench Phillips Head Screwdriver

panelclaw.com Polar Bear III for 10 Degree

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

ROOFING SOLUTIONS DESIGN GUIDE PURLINS AND GIRTS DESIGN GUIDE PURLINS AND GIRTS S&T029N

INSTALLATION MANUAL. IEC version. TSM_IEC_IM_2012_RevB

Detroit Speed, Inc. Second Generation Camaro/Firebird Mini-Tub Kit Camaro/Firebird P/N: ,

Installation Instructions February 2009

Off Grid Cabin Special Pkg 1-170W PV

672W Off Grid Residential Package

INSTALLATION INSTRUCTIONS

Universal Mounting Kit #0820

UniRac. 28 MOUNTING STRUCTURES Roof Mounts. SolarMount

Solar Fountain Sculpture Set User Guide

Installation Manual. For. Trident Boat Lifts

Installation Instructions - D-Series Warming Cabinet Instruction Door for Hinge UseReversal (Glass and Stainless Steel Doors)

Miata High Flow Air Inlet Assembly Part No

Installation Manual. KEITH KMD Drive 3.65/97mm. Original Instructions.

800 Deere Rd. Prescott, WI CertiSafe Floor Mount

Installation Instructions

Series HCD Airfoil Control Damper

BMW F8x M3 & M4 Valvetronic Exhaust System

BESTEEL Model 170 Curtain Tracks BESTEEL Model 171-N Curtain Tracks BESTEEL Model 171-R Curtain Tracks

Pontoon Assembly Instructions and manual. Read before using hoist.

Installation Instructions

SFI SPECIFICATION 6.3 EFFECTIVE: FEBRUARY 26, 2014 *

Photovoltaic Module with Battery Back-up Installation & Maintenance Information IF Figure 1. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE

Renogy MTS-TM100. Flat Roof Tilt Mount E Philadelphia St, Ontario, CA Version: 1.1

The H-MAC Heavy Metal Articulating Chassis Construction Guide

PARTS LIST TORQUE SPECIFICATIONS

Wind Energy System.

42A FLB WOOD BUNKS 43A FLB ALUMINUM BUNKS ALUMINUM CANTILEVER BOAT LIFT

ZOMEWORKS. UTRK-040 Track Rack. Assembly Instructions

SHELVING PRODUCTS. Maximize Your Storage Space

PIRANHA 5 INSTALLATION GUIDE

WJ AUTO TRANS. ATLAS SHIFTER

B9900BTSA Fender Mounting Instructions for MIN1352 & MIN1354 Fenders

Maxx LNX Power Center Mount Legrest

ATLAS TRANSFER CASES CABLE SHIFTER units built after 5/1/12

YGE-Z 60 Cell Series PV Modules

155A 2500 LB. Gear Drive Winch ALUMINUM NARROW PONTOON LIFT

Detroit Speed, Inc. Detroit Speed Control Arm and Spindle Kit A-Body P/N: &

Transcription:

Page 1 of 8 Universal Side of Pole Mount (Two panels shown, punched channel for a variety of module types.) A. TOP CHANNEL B. BOTTOM CHANNEL C. PANEL RAILS: MAY EITHER BE ALUMINUM ANGLE WITH HOLES PUNCHED FOR MOUTING YOUR PANEL OR T-SLOT UNIVERSAL ALUMINUM EXTRUSIONS FOR SLIDING YOUR PANEL MOUNTING BOLTS IN, DEPENDING ON THE MODEL YOU ORDERED. D. BRACES: ALUMINUM ANGLE E. TOP BRACKET F. BOTTOM BRACKET Note: Rail and brace dimensions may vary depending on the model of SOP you order. Custom attachment systems for larger posts also available. Number of panels may vary. SIDE OF POLE MOUNT FOR 1 or 2 PV PANELS Standard design for 3 or 4 schedule 40 or 80 pipe Revision Not to Scale 05.01.15

Page 2 of 8 Hardware Package for SOP Mounts Components Included Hardware SOP-X, SOP-K for 1 - Panel size "B","C", "D" AND SOP-S for 2 - Panel size "A" Included Hardware SOP-Y - "B"&"C" for 2 - Panel size "B" & "C" Included Hardware SOP-Y - "D" for 2 - Panel size "D" with steel pipe clamp attachment system For Attaching 4-3/8" round U- Cross Channels 8-3/8" whiz nuts to Post 4-1/2" round U- 8-1/2" washers 8-1/2" locknuts 8-1/2" 16-1/2" washers 8-1/2" locknuts 4 - pipe clamp halves 6-1/4" X 5/8" stainless For Rail / Brace steel / Bracket 6-1/4" stainless steel whiz Connections 8-1/4" X 5/8" stainless For Attaching steel Brackets to 8-1/4" stainless steel whiz Cross Channels 6-1/4" X 5/8" stainless steel 6-1/4" stainless steel whiz 6-3/8" X 1" 6-3/8" whiz 8-1/4" X 5/8" stainless steel 8-1/4" X 5/8" stainless steel 8-1/4" stainless steel whiz 8-1/4" stainless steel whiz For Attaching Panels to Rails 1/4" X 5/8" stainless steel 1/4" stainless steel whiz (Quantity dependent on how many panels will be used. 4 - nuts and per panel) 9-1/4" X 5/8" stainless steel 9-1/4" X 5/8" stainless steel 9-1/4" stainless steel whiz 9-1/4" stainless steel whiz (4 per panel plus one extra) (4 per panel plus one extra) SOP-X, SOP-S, and SOP-K mounts are for 3" Schedule 40 or 80 pipe (3" inside diameter/ 3.5" outside diameter) unless otherwise specified. SOP-Y mounts are for a 4" Schedule 40 or 80 pipe (4" inside diameter/ 4.5" outside diameter) unless otherwise specified. Any SOP mount can be special ordered to fit a 4 or larger post for an additional charge. Panel Size "A" Panels up to 140 watts OR Dimensions 26.5" X 59.5" 10.94 Sq.Ft. MAX Panel Size "B" Panels 145-205 watts OR Dimensions 32.5" X 62.5" 14.10 Sq.Ft. MAX Panel Size "C" Panels 225-260 watts 60 cell OR Dimensions 39.5" X 65.5" 17.96 Sq.Ft. MAX Panel Size "D" Panels 265+ watts 72 cell OR Dimensions 39.2" X 77.1" 20.98 Sq.Ft. MAX

Page 3 of 8 General Specialties Recommendations for Pole and Dimension for Side of Pole Mounts We cannot guarantee a standard 1.67 safety factor if these recommendations are not observed. Since we cannot assess each customer's individual site and conditions, a professional installer and the local building department should be consulted for the safest and most effective installation. SOP Model and Panel Size (Letters in refer to panel size. See Capacity Chart) Post Size (sch = schedule, or thickness of pipe wall) Max Pole @ 45 of array @ 45 Max Pole @ 60 of array @ 60 Max Pole @ 90 of array @ 90 SOP K A or B For 1 module size A and B up to 14.10 sq. ft. max 3 sch 40 3 sch 80 Special order: 12 6 16 6 10 2 14 2 17 8 17 8 11 13 6 8 4 10 10 17 4 17 4 9 6 12 6 6 9 17 17 SOP X C or D For 1 module size C and D up to 22 sq. ft. max 3 sch 40 3 sch 80 Special order: 8 11 16 5 2 8 2 13 2 17 2 6 6 8 6 12 6 17 3 4 5 4 9 4 13 10 5 9 7 3 10 9 14 6 1 3 3 7 7 1 10 10 SOP S A For 2 modules size A ONLY up to 22 sq. ft. max 3 sch 40 3 sch 80 Special order: 8 10 6 15 6 4 6 7 12 16 6 6 6 8 6 12 6 16 6 2 3 4 3 8 3 12 3 5 6 7 3 10 6 14 6 0 8 2 5 5 8 9 8 B For 2 modules size B ONLY up to 28.2 sq. ft. max 11 6 15 6 7 10 11 10 9 6 13 4 3 8 9 8 3 11 3 5 6 2 C For 2 modules size C ONLY up to 36 sq. ft. max 9 3 12 6 4 3 7 6 7 6 10 1 8 4 2 8 6 1 10

Page 4 of 8 SOP Model and Panel Size (Letters in refer to panel size. See Capacity Chart) Post Size (sch = schedule, or thickness of pipe wall) Max Pole @ 45 of array @ 45 Max Pole @ 60 of array @ 60 Max Pole @ 90 of array @ 90 D For 2 modules size D ONLY up to 42 sq. ft. max Special order: 5 sch 40 5 sch 80 6 sch 40 5 9 10 6 13 9 18 9 0 9 5 6 8 9 13 9 15 8 6 11 15 17 6 2 8 5 2 9 2 11 8 7 4 9 6 13 3 15 0 8 1 10 6 7 8 4 Dimension of Post Hole for Standard SOP Installation SOP Model Pipe Size Depth of Hole Width of Square Hole Diameter of Round Hole SOP - K 3 4 60 14 14 SOP -X 3 4 48 14 14 SOP - S 3 4 48 16 16 For 2 B or C size modules For 2 D size modules 4 60 16 20 4 5 6 60 16 16 18 20 20 24 : There is not adequate clearance for these arrays with this size pipe. Use heavier schedule pipe or larger pipe diameter. WARNING: Your building department may require the foundation for the post for a PV array to be designed by a structural engineer licensed in the state where the PV array is to be erected. This is required because failure will result in costly damage to the PV modules. The specs for a foundation described here, is suitable for most soil types, but no warranty of it s suitability for your soil or wind conditions is offered or implied.

Page 5 of 8 Universal Side of Pole Mount for 1 or 2 PV Panels (single panel mount shown here) A E B D F C A. TOP CHANNEL B. PANEL RAILS: (MAY EITHER BE ALUMINUM ANGLE WITH HOLES PUNCHED FOR MOUNTING YOUR PANEL OR T-SLOT ALUMINUM EXTRUSIONS FOR SLIDING YOUR PANEL MOUNTING BOLTS IN, DEPENDING ON MODEL YOU ORDERED) C. BRACES D. BOTTOM CHANNEL E. TOP BRACKET F. BOTTOM BRACKET E F These instructions are for either a one panel SOP mount or a two panel SOP mount. The assembly details are the same. Where instructions refer to a single panel, remember that if your mount has two panels, the process is the same. Keep approximately ¼ space between panels. Also, note that rail and brace dimensions may vary depending on the model of SOP you ordered.

Page 6 of 8 Lightly clamp two channels to your post with the four U-Bolts provided. To determine the approximate spacing between the two channels, use a panel rail to gauge the distance from the top of the top channel to the bottom of the bottom channel. Hold a level on centerline as shown. Note bubble. Now move level to outer end of channel next to brackets. The bubble on the level must read the same; this will ensure that the panels are in plane. Now tighten the U-Bolts. If the channels are not in plane then you will have a twist to your panel(s). For T-Slot Rails: Lay T-Slot rails across the short axis of the panel as shown left. Slide stainless into T-Slot of rail and position so they are opposite to the mounting holes on the frame of the panels as shown in center. Then roll the rails over so the slip into the holes on the panel frame. Place the flange nut on your finger with the flange UP and thread onto the bolt from underneath as shown in right. Finger tighten. Now measure the distance between the inside of each rail. This is measurement A. For Pre-Punched Angle Rails: Attach panel rails to solar module across the width of the panel. Make sure the part of the rail with the punched slots toes-out toward the ends of the panel. Insert the in the holes provided from underneath facing out and tighten on the flange nut. It is important that the flange nut bears against the rail and not the panel frame. Before you lightly bolt the brackets on to the channels, make sure that the measurements from the OUTSIDE of one bracket to the OUTSIDE of the other bracket on each channel is the same as measurement A. The smaller brackets go on top and the larger brackets with the dogleg go on the bottom channel. NOTE: If you have extremely small panels you may need to invert the brackets and/or the rails to face the opposite direction from that listed here for your panels to fit.

Page 7 of 8 Attach braces to the bottom channel brackets as shown. Attach panel rail assembly to the outside of the top channel brackets as shown below. Attach braces to bottom of panel rails as shown at left. To adjust the panel to a more vertical orientation, refasten braces to bottom channel brackets in holes provided. If you want to adjust your panel dead vertical, remove braces entirely and position bottom channel so holes in bottom channel bracket line up with holes in the bottom of the rail. The bottom channel can be moved up the post, closer to the top channel, to achieve a more horizontal adjustment for the panel.

Page 8 of 8