Half Moon Bay North Apartment Block Transportation Impact Assessment. Full Report. March 15, Prepared for: Mattamy Homes.

Similar documents
Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Traffic Impact Analysis Update

One Harbor Point Residential

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

APPENDICES. No Cumulative Impact Project Alternative Traffic Analysis Memorandum (May 2016)


830 Main Street Halifax Regional Municipality

LOST LAKE CORRIDOR REVIEW

Parking/Traffic Assessment Study

D & B COMMERCIAL TRAFFIC IMPACT ANALYSIS

Re: Residential Development - Ogilvie/Cummings Transportation Overview

Re: Cyrville Road Car Dealership

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

June 21, Mr. Jeff Mark The Landhuis Company 212 North Wahsatch Avenue, Suite 301. Colorado Springs, CO 80903

Weaver Road Senior Housing Traffic Impact Analysis

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Proposed Pit Development

Barrhaven Honda Dealership. Dealership Drive, Ottawa, ON. Transportation Brief

April Salvation Army Barrhaven Church 102 Bill Leathem Drive Transportation Brief

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

886 March Road McDonald's Transportation Study

Rockingham Ridge Plaza Commercial Development Halifax Regional Municipality

APPENDICES. APPENDIX D Synchro Level of Service Output Sheets

JOHNSON RANCH RAPID CITY, SOUTH DAKOTA TRAFFIC IMPACT ANALYSIS

1012 & 1024 McGarry Terrace

RESPONSE TO TRAFFIC IMPACT STUDY COMMENTS

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

Village of Richmond Transportation Brief

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

KUM & GO 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266

DIVISION STREET PLAT TRAFFIC IMPACT ANALYSIS

Provide an overview of the development proposal including projected site traffic volumes;

Sweetwater Landing Traffic Impact Analysis

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

2405 Mer Bleue Orleans, (Ottawa), ON Community Transportation Study Mattamy Homes. Prepared By: Stantec Consulting Ltd. Version 2

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

APPENDIX A LEVEL OF SERVICE CONCEPTS, ANALYSIS METHODOLOGIES,STANDARDS OF SIGNIFICANCE

Lakeside Terrace Development

Downtown One Way Street Conversion Technical Feasibility Report

Paisley & Whitelaw - Paisley Park OPA / ZBA for Mixed Density Residential Use

Traffic Impact Study. Residences at Bancroft Block 14, Lot 2 Borough of Haddonfield, Camden County, New Jersey

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

10 th Street Residences Development Traffic Impact Analysis

770 SOMERSET STREET RESIDENTIAL DEVELOPMENT

Oakbrook Village Plaza City of Laguna Hills

FIRGROVE ELEMENTARY TRAFFIC IMPACT ANALYSIS

Wellings Communities Holding Inc and Extendicare (Canada) Inc Hazeldean Road. Transportation Impact Study. Ottawa, Ontario. Project ID

CitiGate Retail Development

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Date: December 20, Project #:

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

Wellington Street West

STANDARD LIMITATIONS

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

2.0 Development Driveways. Movin Out June 2017

Traffic Impact Study Proposed Commercial Development Ballwin, Missouri. Technical Memorandum for Traffic Impact Study

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers

Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Lacey Gateway Residential Phase 1

King Soopers #116 Thornton, Colorado

Alpine Highway to North County Boulevard Connector Study

MEMO. McCORMICK RANKIN CORPORATION. File FROM: Keyur Shah DATE: February 1, 2010 COPIES: OUR FILE: SUBJECT: TO:

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

TRANSPORTATION MASTER PLAN AND TRANSPORTATION IMPACT ASSESSMENT FOR THREE SISTERS MOUNTAIN VILLAGE RESORT CENTRE ASP

CastleGlenn Consultants Inc.

105 Toronto Street South, Markdale Transportation Impact Study. Paradigm Transportation Solutions Limited

TRAFFIC IMPACT ANALYSIS

267 O Connor Street Residential Development

DRAFT. Kanata Mews Development 329 March Road, City of Ottawa. Transportation Brief. Prepared for:

MURRIETA APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF MURRIETA, CALIFORNIA

MEMO. McCORMICK RANKIN CORPORATION. File Mark VanderSluis, Keyur Shah DATE: October 26, 2009 COPIES: OUR FILE: TO: FROM: Jack Thompson

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

TIS / TB/ CTS Check List

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Proposed Hotel and Restaurant Development

Memorandum. Megan Costa, SOCPA Sam Gordon, Town of DeWitt Jeanie Gleisner, CNYRPDB Meghan Vitale DATE: April 20, 2017

Traffic Impact Statement (TIS)

MMM Group Limited. Communities. Transportation. Buildings. Infrastructure

Traffic Impact Analysis

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Minto Mahogany Stage 2

1140 Wellington Street West Transportation Brief

Addendum to Traffic Impact Analysis for Port Marigny Site Mandeville, LA

1354 Carling Avenue. Community Transportation Study/ Transportation Impact Study

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

Sugarland Crossing Gwinnett County, Georgia

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Ingraham High School Parking and Traffic Analysis

TRANSPORTATION IMPACT STUDY ALCONA SOUTH SECONDARY PLAN SLEEPING LION DEVELOPMENT TOWN OF INNISFIL

Transcription:

Half Moon Bay North Apartment Block Transportation Impact Assessment Full Report March 15, 2018 Prepared for: Mattamy Homes Prepared by: Stantec Consulting Ltd.

Table of Contents 1.0 SCREENING... 1 1.1 SUMMARY OF DEVELOPMENT... 1 1.2 TRIP GENERATION TRIGGER... 1 1.3 LOCATION TRIGGERS... 2 1.4 SAFETY TRIGGERS... 2 1.5 SUMMARY... 2 2.0 SCOPING... 3 2.1 EXISTING AND PLANNED CONDITIONS... 3 2.2 STUDY AREA AND TIME PERIODS... 11 2.3 EXEMPTIONS REVIEW... 12 3.0 FORECASTING... 13 3.1 DEVELOPMENT-GENERATED TRAVEL DEMAND... 13 3.2 BACKGROUND NETWORK TRAVEL DEMAND... 19 3.3 DEMAND RATIONALIZATION... 21 4.0 ANALYSIS... 28 4.1 DEVELOPMENT DESIGN... 28 4.2 PARKING... 28 4.3 BOUNDARY STREET DESIGN... 29 4.4 ACCESS INTERSECTIONS DESIGN... 30 4.5 TRANSPORTATION DEMAND MANAGEMENT... 31 4.6 NEIGHBOURHOOD TRAFFIC MANAGEMENT... 31 4.7 TRANSIT... 31 4.8 REVIEW OF NETWORK CONCEPT... 31 4.9 INTERSECTION DESIGN... 31 5.0 CONCLUSIONS... 31 ii

LIST OF TABLES Table 1 TRANS Trip Generation Rates for the Proposed Development... 4 Table 2 City of Ottawa Scheduled Transportation Upgrades... 9 Table 3 Background Developments... 10 Table 4 Exemptions Review... 12 Table 5 Trip Generation Status Quo (i.e. Realigned Greenbank Road not in place)... 13 Table 6 Trip Generation Assuming Realigned Greenbank Road is in place... 14 Table 7 Trip Distribution Status Quo (i.e. Realigned Greenbank Road not in place)... 14 Table 8 Trip Distribution Assuming Realigned Greenbank Road is in place... 15 Table 9 Transportation Network Plans... 19 Table 10 Other Developments... 21 Table 11 MMLOS Conditions Segments... 29 Table 12 Synchro Results Site Driveways (2024 Total Traffic)... 30 LIST OF FIGURES Figure 1 Site Location and Proposed Site Accesses... 3 Figure 2 Proposed Site Plan... 4 Figure 3 Study Area Transit Routes and Stops... 6 Figure 4 Existing AM Peak Hour Traffic Volumes... 7 Figure 5 Existing PM Peak Hour Traffic Volumes... 8 Figure 6 Background Developments... 11 Figure 7 Trip Assignment Weekday AM Peak Hour (Status Quo without Realigned Greenbank Road)... 16 Figure 8 Trip Assignment Weekday PM Peak Hour (Status Quo without Realigned Greenbank Road)... 17 Figure 9 Trip Assignment Weekday AM Peak Hour (with Realigned Greenbank Road)... 18 Figure 10 Trip Assignment Weekday PM Peak Hour (with Realigned Greenbank Road)... 19 Figure 11 2019 Background Traffic Weekday AM Peak Hour (Status Quo without Realigned Greenbank Road)... 22 Figure 12 2019 Background Traffic Weekday PM Peak Hour (Status Quo without Realigned Greenbank Road)... 23 Figure 13 2019 Total Traffic Weekday AM Peak Hour (Status Quo without Realigned Greenbank Road)... 24 Figure 14 2019 Total Traffic Weekday PM Peak Hour (Status Quo without Realigned Greenbank Road)... 25 Figure 15 2024 Total Traffic Weekday AM Peak Hour (Status Quo without Realigned Greenbank Road)... 26 Figure 16 2024 Total Traffic Weekday PM Peak Hour (Status Quo without Realigned Greenbank Road)... 27 Figure 17 2024 Total Traffic with Realigned Greenbank Road in Place... 27 LIST OF APPENDICES INTERSECTION PERFORMANCE WORKSHEETS... A.1 iii

Screening Report 1.0 SCREENING 1.1 SUMMARY OF DEVELOPMENT Municipal Address Description of Location Land Use Classification Residential Development Stacked Houses (LUC 231 - Low-rise condominiums (1 to 2 floors) Development Size (units) 60 Development Size (m 2 ) Number of Accesses and Locations 7603 (Total Site Area) 2 Total (1 Access to Watercolours Way, 1 Access to Seeley s Bay Street) Phase of Development 1 Buildout Year 2019 If available, please attach a sketch of the development or site plan to this form. 1.2 TRIP GENERATION TRIGGER Considering the Development s Land Use type and Size (as filled out in the previous section), please refer to the Trip Generation Trigger checks below. Land Use Type Single-family homes Townhomes or apartments Minimum Development Size 40 units 90 units Office 3,500 m 2 Industrial 5,000 m 2 Fast-food restaurant or coffee shop 100 m 2 Destination retail 1,000 m 2 Gas station or convenience market 75 m 2 * If the development has a land use type other than what is presented in the table above, estimates of person-trip generation may be made based on average trip generation characteristics represented in the current edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual. If the proposed development size is greater than the sizes identified above, the Trip Generation Trigger is satisfied. 1

Screening Report 1.3 LOCATION TRIGGERS Yes No Does the development propose a new driveway to a boundary street that is designated as part of the City s Transit Priority, Rapid Transit or Spine Bicycle Networks? Is the development in a Design Priority Area (DPA) or Transit-oriented Development (TOD) zone? * *DPA and TOD are identified in the City of Ottawa Official Plan (DPA in Section 2.5.1 and Schedules A and B; TOD in Annex 6). See Chapter 4 for a list of City of Ottawa Planning and Engineering documents that support the completion of TIA). If any of the above questions were answered with Yes, the Location Trigger is satisfied. 1.4 SAFETY TRIGGERS Yes No Are posted speed limits on a boundary street are 80 km/hr or greater? Are there any horizontal/vertical curvatures on a boundary street limits sight lines at a proposed driveway? Is the proposed driveway within the area of influence of an adjacent traffic signal or roundabout (i.e. within 300 m of intersection in rural conditions, or within 150 m of intersection in urban/ suburban conditions)? Is the proposed driveway within auxiliary lanes of an intersection? Does the proposed driveway make use of an existing median break that serves an existing site? Is there is a documented history of traffic operations or safety concerns on the boundary streets within 500 m of the development? Does the development include a drive-thru facility? If any of the above questions were answered with Yes, the Safety Trigger is satisfied. 1.5 SUMMARY Does the development satisfy the Trip Generation Trigger? Does the development satisfy the Location Trigger? Yes No Does the development satisfy the Safety Trigger? If none of the triggers are satisfied, the TIA Study is complete. If one or more of the triggers is satisfied, the TIA Study must continue into the next stage (Screening and Scoping). 2

Scoping Report 2.0 SCOPING 2.1 EXISTING AND PLANNED CONDITIONS 2.1.1 Proposed Development Figure 1 illustrates the location of the subject development as well as the location of the two proposed site accesses. The proposed development is located at 2444 Watercolours Way in the Barrhaven South community of Ottawa; the site is anticipated to be occupied in 2019. The site is bound by Watercolours way to the north, future Realigned Greenbank Road to the west, a vacant land parcel to the south, and Seeley s Bay Street to the east. The proposed site plan indicates that a total of two site accesses are proposed; one access to Watercolours Way and one access to Seeley s Bay Street. There are no physical restrictions at the access points. Multiple existing Single-House driveways are currently provided within 200m from the proposed site access to Seeley s Bay Street. Similarly, it is anticipated that the proposed site access to Watercolours Way will be opposite driveways to future single-family homes. Figure 1 Site Location and Proposed Site Accesses Subject Site 3

Scoping Report Figure 2 depicts the proposed site plan. The City of Ottawa designates the subject site as a General Mixed Use Zone which allows residential developments amongst other types of developments. As can be seen in the site plan, this residential development consists of one phase and includes 60 stacked townhouses and 84 parking spaces. Land Use Code 231 - Low-rise condominiums (1 to 2 floors) is thought to be the most representative of the proposed land use. Figure 2 Proposed Site Plan Table 1 outlines the trip generation rates, which were obtained from Table 6.3 in the 2009 TRANS Trip Generation Study for Residential Rates. Table 1 TRANS Trip Generation Rates for the Proposed Development Land Parcel Land Use Code Units Residential Stacked Townhouses 231 - Low-rise condominiums (1 to 2 floors) AM Peak Hour PM Peak Hour In Out Rate In Out Rate 60 30% 70% 0.60 56% 44% 0.66 4

Scoping Report 2.1.2 Existing Conditions 2.1.2.1 Roads and Traffic Control The roadways under consideration in the study area are described as follows: Seeley s Bay Street Seeley s Bay Street is a municipally-owned, two-lane local road with a sidewalk along the west side and the intersection with Cambrian Road is stop-controlled along Seeley s Bay Street. Given that no posted speed limit is currently provided, the default speed is 50 kph. There are no parking restrictions on Seeley s Bay Street. Watercolours Way Watercolours Way is a municipally-owned, two-lane local road with a sidewalk along the south side. Given that no posted speed limit is currently provided, the default speed is 50 kph. There are no parking restrictions on Watercolours Way. 2.1.2.2 Walking and Cycling Sidewalks are currently provided along the west side of Seeley s Bay Street and along the south side of the Watercolours Way. There are currently no existing bicycle lanes in the immediate vicinity of the site. 2.1.2.3 Transit Transit service is currently provided via route 95. Route 95 is a regular bus route that runs from the Minto Centre Recreation Complex to Trim Road and operates on a 15-minute headway during the morning peak period northbound and during the afternoon peak period southbound. The closest transit stops to the site are located at the intersection of Cambrian Road and River Mist Road, approximately 670 metres away. As part of the 2031 Network Concept, the City of Ottawa s 2013 Transportation Master Plan (TMP) identifies a new atgrade Bus Rapid Transit (BRT) on Realigned Greenbank Road; however, it is not within the 2031 Affordable Network meaning there is no implementation timeline. Figure 3 illustrates the transit routes and stops near the study area. 5

Scoping Report Figure 3 Study Area Transit Routes and Stops Source: OC Transpo System Map, Accessed January 2018 2.1.2.4 Traffic Management Measures No traffic management measures are currently provided near the subject site. 2.1.2.5 Traffic Volumes Existing (2017) traffic counts were provided by the City of Ottawa at the Cambrian Road at Seeley s Bay Street intersection. These volumes were used to derive the northbound and southbound through volumes at the Seeley s Bay Street at site access #1 intersection. Figure 4 and Figure 5 illustrate the existing traffic volumes at the study area intersections during the AM and PM peak hour, respectively. 6

Scoping Report Figure 4 Existing AM Peak Hour Traffic Volumes Realigned Greenbank Road Seeley's Bay Street 34 Watercolours Way 9 Site Access 2 34 9 Site Access 1 26 8 2 461 7 435 Cambrian Road 141 134 7

Scoping Report Figure 5 Existing PM Peak Hour Traffic Volumes Realigned Greenbank Road Seeley's Bay Street 15 Watercolours Way 38 Site Access 2 15 38 Site Access 1 12 3 13 209 25 197 Cambrian Road 417 392 2.1.2.6 Collision History Collision statistics from the City of Ottawa s Open Data database was reviewed to determine if the streets or intersections surrounding the subject site exhibited any identifiable collision patterns. A review of the three-year collision history showed that there are no existing safety concerns related to the boundary streets to the proposed site. Only two property-damage-only collisions were recorded vicinity of the subject site in the last three years. The first collision took place on Seeley s Bay Street between Burritts Rapids Place and Watercolours Way, and the second took place on Watercolours Way between Freshwater Way and Seeley s Bay Street. 2.1.3 Planned Conditions 2.1.3.1 Road Network Improvements Table 2 outlines several significant transportation improvements near the proposed site. 8

Scoping Report Table 2 City of Ottawa Scheduled Transportation Upgrades Project Description TMP Phase Strandherd Drive Widening Strandherd Drive Widening Chapman Mills Drive Longfields Drive Widening Realigned Greenbank Road Widen from two to four lanes between Fallowfield Road and Maravista Drive Widen from two to four lanes between Maravista Drive and Jockvale Road New four lane arterial road from Longfields Drive to Strandherd Drive, includes Bus Rapid Transit Widen from two to four lanes between Cambrian Road to Prince of Wales Drive New four lane road from near Jockvale Road to Cambrian Road, includes Jock River Bridge Phase 1 (2014 2019) Phase 2 (2020 2025) Phase 2 (2020 2025) Phase 3 (2026 2031) Phase 3 (2026 2031) Realigned Greenbank Road The most noteworthy improvement identified in the above table is the Realigned Greenbank Road project given that it abuts the western limits of the subject site. Although the TMP suggests that Realigned Greenbank Road will be constructed during Phase 1 (2014 2019) of the TMP, based on the current status of the project, the City of Ottawa has indicated that the timing has been changed and that this section of Realigned Greenbank Road will be constructed and operational by Phase 3 (2026 2031). In 2014 Stantec prepared the Half Moon Bay North Draft Plan #2 Transportation Impact Study to support Mattamy s draft plan application which was approved by the City. Within the 2014 study a sensitivity analysis was performed which determine that the development could proceed in advance of the construction of Realigned Greenbank Road. For the purposes of this Transportation Impact Assessment, it is proposed that the transportation forecasts within the original 2014 TIS and particularly the forecasts along Realigned Greenbank Road would be utilized within the subject site plan application for assessing the Realigned Greenbank Road at Watercolours Way intersection. New forecasts that explicitly accounts for future background developments, discussed in section 2.1.3.2, will be will be used to assess all the other study area intersections. 2.1.3.2 Future Background Developments The Barrhaven South community has experienced substantial growth over the past few years and that growth is anticipated to continue well into the future. There are numerous developments scheduled to occur near the subject site, as outlined in Table 3 and as illustrated in Figure 6 below. 9

Scoping Report Table 3 Background Developments Development Location Size Build-Out Mattamy s Half Moon Bay South Phase 4 Mattamy s Half Moon Bay North Phases 7, 8 South of Half Moon Bay South Phase 3, between Realigned Greenbank Road and Existing Greenbank Road North of Half Moon Bay North Phase 5 and 6, south/east of Realigned Greenbank Road 265 residential units 2018 471 residential units 2019 Minto s Quinn s Pointe 1 West of Existing Greenbank Road, South of Half Moon Bay South 475 residential units 2019 Glenview s 3387 Borrisokane Road Mattamy s Half Moon Bay West North of Cambrian Road between Borrisokane Road and Mattamy s Half Moon Bay West North of Cambrian Road between Borrisokane Road and Realigned Greenbank Road 288 residential units 2022 945 residential units 2024 Citi Gate s Highway 416 Employment Lands Between Highway 416 and Strandherd Drive, south of Fallowfield, north of the train tracks 350k ft 2 GFA (95 ha.) business park Interim phase: 2019 Ultimate phase: 2029 Mattamy s Half Moon Bay South South of Half Moon Bay South Phase 4, north of Quinn s Pointe 2, west of Existing Greenbank Road, east of Realigned Greenbank Road 270 residential units and 69k sq.ft. GFA specialty retail Interim: 2025 Ultimate: 2031 Minto s Quinn s Pointe 2 North of Barnsdale, between existing and Realigned Greenbank Road. 1,200 residential units 59k sq.ft. GFA schools Interim phase: 2025 Ultimate phase: 2031 10

Scoping Report Figure 6 Background Developments 2.2 STUDY AREA AND TIME PERIODS 2.2.1 Study Area Given that the development proposal is only expected to trigger the Design Review Component of the City s 2017 Transportation Impact Assessment Guidelines, the scope of the transportation assessment is proposed to include the following study area intersections: Cambrian Road at Seeley s Bay Street; Seeley s Bay Street at Watercolours Way; Seeley s Bay Street at Site Access 1 (full movements); Watercolours Way at Site Access 2 (full movements); and Realigned Greenbank Road at Watercolours Way. 11

Scoping Report 2.2.2 Time Periods The scope of the transportation assessment includes the following analysis time periods: Weekday AM peak hour; and Weekday PM peak hour. 2.2.3 Horizon Years The scope of the transportation assessment includes the following horizon years: Existing conditions; 2019 future background conditions; 2019 total future conditions (site build-out); and 2024 total future conditions (5 years beyond build-out). 2.3 EXEMPTIONS REVIEW Table 4 summarizes the Exemptions Review table from the City of Ottawa s 2017 Transportation Impact Assessment Guidelines. Table 4 Exemptions Review Module Element Exemption Considerations Exempted? Design Review Component 4.1 Development Design 4.2 Parking 4.1.2 Circulation and Access Only required for site plans 4.1.3 New Street Networks Only required for plans of subdivision Yes 4.2.1 Parking Supply Only required for site plans No 4.2.2 Spillover Parking Only required for site plans where parking supply is 15% below unconstrained demand No Yes Network Impact Component 4.5 Transportation Demand Management 4.6 Neighbourhood Traffic Management 4.8 Network Concept All Elements 4.6.1 Adjacent Neighbourhoods Not required for site plans expected to have fewer than 60 employees and/or students on location at any given time Only required when the development relies on local or collector streets for access and total volumes exceed ATM capacity thresholds Only required when proposed development generates more than 200 person-trips during the peak hour in excess of the equivalent volume permitted by established zoning 4.9 Intersection Design All Elements Not required if site generation trigger is not met Yes Yes Yes Yes 12

Forecasting Report 3.0 FORECASTING 3.1 DEVELOPMENT-GENERATED TRAVEL DEMAND 3.1.1 Trip Generation and Mode Shares The construction timing of Realigned Greenbank is not currently known; however, it is unlikely to occur within 5 years of the build-out of the subject development. Notwithstanding this, based on the proximity of the site to future Realigned Greenbank Road, and based on the notion that Watercolours Way is planned to have an intersection with Realigned Greenbank Road, analysis was completed for scenarios with and without Realigned Greenbank Road in the transportation network. Under the status quo scenario (i.e. without Realigned Greenbank Road), the transit modal share is assumed to be low given that the nearest transit stop is approximately 670 metres away (Cambrian Road / River Mist Road), and being serviced by route 95 which meanders through Barrhaven South. With Realigned Greenbank Road extended to Cambrian Road and including the Bus Rapid Transit component of the facility, the transit share is anticipated to be much higher given that dedicated higher-order transit facilities will be located immediately adjacent to the site. Table 5 shows the trip generation for the proposed development with under the status quo condition (i.e. without Realigned Greenbank Road). The modal share is consistent with previous reports in the study area that examine a future condition prior to Realigned Greenbank Road being in place. Table 6 shows the trip generation for the proposed development with Realigned Greenbank Road in place. The modal share is consistent with previous reports that assumed Realigned Greenbank Road within the future network. Table 5 Trip Generation Status Quo (i.e. Realigned Greenbank Road not in place) Land Use # Units AM Peak Hour PM Peak Hour In Out Total In Out Total Trip Generation Rates 231 - Low-rise condominiums (TRANS rates) 60 31% 69% 0.60 56% 44% 0.66 Conversion to Person Trips Auto Trip Gen 11 25 36 22 17 40 231 - Low-rise condominiums Auto Mode Share 44% 44% Person Trip Gen 25 56 82 50 40 90 Modal Share Adjustments Auto 90% 23 51 74 44 36 80 Passenger 5% 1 3 4 3 2 5 231 - Low-rise condominiums Walk / Bike 0% 0 0 0 0 0 0 Transit 5% 1 3 4 3 2 5 Other 0% 0 0 0 0 0 0 13

Forecasting Report Table 6 Trip Generation Assuming Realigned Greenbank Road is in place Land Use # Units AM Peak Hour PM Peak Hour In Out Total In Out Total Trip Generation Rates 231 - Low-rise condominiums (TRANS rates) 60 31% 69% 0.60 56% 44% 0.66 Conversion to Person Trips Auto Trip Gen 11 25 36 22 17 40 231 - Low-rise condominiums Auto Mode Share 44% 44% Person Trip Gen 25 56 82 50 40 90 Modal Share Adjustments Auto 61% 17 33 51 30 25 55 Passenger 10% 2 6 8 5 4 9 231 - Low-rise condominiums Walk / Bike 0% 0 0 0 0 0 0 Transit 26% 6 15 21 13 10 23 Other 3% 0 2 2 2 1 3 3.1.2 Trip Distribution The distribution of site trips is consistent with the trip distribution assumptions applied in the Half Moon Bay North Draft Plan #2 Transportation Impact Study, February 2014, which was approved by the City. Table 7 summarizes the trip distribution with under the Status Quo scenario and was used to forecast the trip distribution at study area intersections. Table 8 summarizes the trip distribution with Realigned Greenbank Road in place and was used to forecast the trip generation at the intersection of Realigned Greenbank Road and Watercolours Way for the 2024 horizon only. Table 7 Trip Distribution Status Quo (i.e. Realigned Greenbank Road not in place) Direction Distribution Borrisokane Road North Via (to/from) Borrisokane Road South Existing Greenbank Road North North 45% 33% 12% Cambrian Road East East 5% 5% South 5% 2% 3% West 5% 3% 2% Internal (South Nepean) 40% 15% 15% 10% Total 100% 51% 2% 29% 18% 14

Forecasting Report Table 8 Trip Distribution Assuming Realigned Greenbank Road is in place Direction Distribution Borrisokane Road North Via (to/from) Borrisokane Road South Realigned Greenbank Road North North 45% 20% 25% Cambrian Road East East 5% 5% South 5% 2% 3% West 5% 2% 3% Internal (South Nepean) 40% 30% 10% Total 100% 22% 2% 58% 18% 3.1.3 Trip Assignment Figure 7 and Figure 8 summarize the trip assignment to the study area road network, for the status quo scenario, during the weekday AM and PM peak hours, respectively. Figure 9 and Figure 10 summarize the trip assignment to the study area road network, with Realigned Greenbank Road in place, during the weekday AM and PM peak hours, respectively. 15

Forecasting Report Figure 7 Trip Assignment Weekday AM Peak Hour (Status Quo without Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 3 3 7 3 Watercolours Way 7 7 Site Access 2 3 Site Access 1 7 36 16 27 9 4 27 12 Cambrian Road 12 16

Forecasting Report Figure 8 Trip Assignment Weekday PM Peak Hour (Status Quo without Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 6 6 5 6 Watercolours Way 5 5 Site Access 2 6 Site Access 1 5 25 32 19 6 8 19 24 Cambrian Road 24 17

Forecasting Report Figure 9 Trip Assignment Weekday AM Peak Hour (with Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 20 10 4 Watercolours Way 2 12 24 Site Access 2 Site Access 1 10 5 4 4 6 3 2 4 2 Cambrian Road 2 18

Forecasting Report Figure 10 Trip Assignment Weekday PM Peak Hour (with Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 14 18 3 Watercolours Way 4 21 17 7 9 3 3 4 5 4 3 4 4 Site Access 2 Site Access 1 Cambrian Road 3.2 BACKGROUND NETWORK TRAVEL DEMAND 3.2.1 Transportation Network Plans The City of Ottawa s 2013 Transportation Master Plan was reviewed to determine what transportation network modifications will occur in the study area, or may affect study area roadways. Table 9 lists the transportation network modifications in the study area. Table 9 Transportation Network Plans Project Description TMP Phase Strandherd Drive Widening Strandherd Drive Widening Widen from two to four lanes between Fallowfield Road and Maravista Drive Widen from two to four lanes between Maravista Drive and Jockvale Road Phase 1 (2014 2019) Phase 2 (2020 2025) 19

Forecasting Report Project Description TMP Phase Chapman Mills Drive Longfields Drive Widening Realigned Greenbank Road New four lane arterial road from Longfields Drive to Strandherd Drive, includes Bus Rapid Transit Widen from two to four lanes between Cambrian Road to Prince of Wales Drive New four lane road from near Jockvale Road to Cambrian Road, includes Jock River Bridge Phase 2 (2020 2025) Phase 3 (2026 2031) Phase 3 (2026 2031) Realigned Greenbank Road The most noteworthy improvement identified in the above table is the Realigned Greenbank Road project given that it abuts the western limits of the proposed development. Although the TMP suggests that Realigned Greenbank Road will be constructed during Phase 1 (2014 2019) of the TMP, based on the current status of the project, the City of Ottawa has indicated that the timing has been changed and that this section of Realigned Greenbank Road will be constructed and operational by Phase 3 (2026 2031). In 2014 Stantec prepared the Half Moon Bay North Draft Plan #2 Transportation Impact Study to support Mattamy s draft plan application which was approved by the City. Within the 2014 study a sensitivity analysis was performed which determined that the development could proceed in advance of the construction of Realigned Greenbank Road. For the purposes of this Transportation Impact Assessment, it is proposed that the transportation forecasts within the original 2014 TIS and particularly the forecasts along Realigned Greenbank Road would be utilized within the subject site plan application for assessing the Realigned Greenbank Road at Watercolours Way intersection. New forecasts that explicitly accounts for future background developments will be will be used to assess all the other study area intersections. 3.2.2 Background Growth A 2% annual growth rate was applied to through traffic on Cambrian Road, which is consistent with previous reports. This rate is conservative given most growth on Cambrian Road will be explicitly accounted for in section 3.2.3. 3.2.3 Other Developments Table 10 lists the other developments which will impact study area intersections. These background developments are consistent with those being considered by previous TIA s. 20

Forecasting Report Table 10 Other Developments Development Location Size Build-Out Mattamy s Half Moon Bay South Phase 4 Mattamy s Half Moon Bay North Phases 7, 8 Minto s Quinn s Pointe 1 Glenview s 3387 Borrisokane Road Mattamy s Half Moon Bay West Citi Gate s Highway 416 Employment Lands Mattamy s Half Moon Bay South Minto s Quinn s Pointe 2 South of Half Moon Bay South Phase 3, between Realigned Greenbank Road and Existing Greenbank Road North of Half Moon Bay North Phase 5 and 6, south/east of Realigned Greenbank Road West of Existing Greenbank Road, South of Half Moon Bay South North of Cambrian Road between Borrisokane Road and Mattamy s Half Moon Bay West North of Cambrian Road between Borrisokane Road and Realigned Greenbank Road Between Highway 416 and Strandherd Drive, south of Fallowfield, north of the train tracks South of Half Moon Bay South Phase 4, north of Quinn s Pointe 2, west of Existing Greenbank Road, east of Realigned Greenbank Road North of Barnsdale, between existing and Realigned Greenbank Road. 265 residential units 2018 471 residential units 2019 475 residential units 2019 288 residential units 2022 945 residential units 2024 350k ft 2 GFA (95 ha.) business park 270 residential units and 69k sq.ft. GFA specialty retail 1,200 residential units 59k sq.ft. GFA schools Interim phase: 2019 Ultimate phase: 2029 Interim: 2025 Ultimate: 2031 Interim phase: 2025 Ultimate phase: 2031 3.3 DEMAND RATIONALIZATION 3.3.1 2019 Background Traffic Figure 11 and Figure 12 show the 2019 background traffic forecasts under the status quo scenario during the weekday AM and PM peak hours, respectively. The background traffic includes traffic from the developments listed in Table 10. Realigned Greenbank Road will not be in place by the 2019 horizon and therefore this scenario in was not considered within the 2019 horizon. The background traffic demands are not expected to exceed capacity and therefore demand rationalization was not required. 21

Forecasting Report Figure 11 2019 Background Traffic Weekday AM Peak Hour (Status Quo without Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 1 0 5 0 34 Watercolours Way 5 1 9 Site Access 2 39 Site Access 1 10 30 9 2 849 8 819 Cambrian Road 512 503 22

Forecasting Report Figure 12 2019 Background Traffic Weekday PM Peak Hour (Status Quo without Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 5 0 2 0 15 Watercolours Way 2 5 38 Site Access 2 17 Site Access 1 43 14 3 14 661 29 647 Cambrian Road 819 790 3.3.2 2019 Total Traffic Figure 13 and Figure 14 show the 2019 total traffic with under the status quo scenario (i.e. without Realigned Greenbank Road) during the weekday AM and PM peak hours, respectively. The total traffic demands are not expected to exceed capacity and therefore demand rationalization was not required. 23

Forecasting Report Figure 13 2019 Total Traffic Weekday AM Peak Hour (Status Quo without Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 1 3 5 3 7 37 Watercolours Way 7 5 1 16 Site Access 2 3 39 Site Access 1 7 36 16 10 57 18 6 876 20 819 Cambrian Road 524 503 24

Forecasting Report Figure 14 2019 Total Traffic Weekday PM Peak Hour (Status Quo without Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 5 6 2 6 5 21 Watercolours Way 5 2 5 43 Site Access 2 6 17 Site Access 1 5 25 32 43 33 9 22 680 53 647 Cambrian Road 843 790 3.3.3 2024 Total Traffic Figure 15 and Figure 16 show the 2024 total traffic under the status quo scenario (i.e. without Realigned Greenbank Road in place) during the weekday AM and PM peak hours, respectively. Figure 17 shows the 2024 total traffic with Realigned Greenbank Road in place during the weekday AM and PM peak hours. The total traffic demands are not expected to exceed capacity and therefore demand rationalization was not required. 25

Forecasting Report Figure 15 2024 Total Traffic Weekday AM Peak Hour (Status Quo without Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 1 3 5 3 7 37 Watercolours Way 7 5 1 16 Site Access 2 3 39 Site Access 1 7 36 16 10 57 18 6 1085 20 1028 Cambrian Road 643 622 26

Forecasting Report Figure 16 2024 Total Traffic Weekday PM Peak Hour (Status Quo without Realigned Greenbank Road) Realigned Greenbank Road Seeley's Bay Street 5 6 2 6 5 21 Watercolours Way 5 2 5 43 Site Access 2 6 17 Site Access 1 5 25 32 43 33 9 22 805 53 772 Cambrian Road 1027 974 Figure 17 2024 Total Traffic with Realigned Greenbank Road in Place Weekday AM Peak Hour Weekday PM Peak Hour Realigned Greenbank Road Realigned Greenbank Road 64 39 12 373 23 0 35 546 62 0 Watercolours Way 41 11 Watercolours Way 20 7 0 3 487 4 0 8 393 10 10 5 27

Analysis Report 4.0 ANALYSIS 4.1 DEVELOPMENT DESIGN 4.1.1 Design for Sustainable Modes Bicycle facilities: the bike racks are located at the west and north-west parts of the site, between block 1 and 2 and block 1 and 4. Pedestrian paths are provided to the other blocks of the development. The location of the bike racks will provide convenient access to Watercolours Way and Realigned Greenbank Road when it is constructed. Parking areas: pedestrian paths are provided from the parking area to all blocks of the development. Transit facilities: transit service is currently provided at the intersection of Cambrian Road and River Mist Road. Pedestrian paths within the proposed development provide convenient access to this transit stop. When Realigned Greenbank Road is constructed and the transitway extended south, all units within the site will be within 400 metres of the transit stop at Realigned Greenbank Road and Cambrian Road. 4.1.2 Circulation and Access The proposed development will have two accesses; one access to Watercolours Way and one access to Seeley s Bay Street. The two accesses connect to a parking area at the centre of the development; the site has been designed to allow for garbage trucks to access the site without driving over curbs or being blocked by parked vehicles. 4.1.3 New Street Networks Not applicable; exempted during screening and scoping. 4.2 PARKING 4.2.1 Parking Supply Auto Parking - As per City of Ottawa Zoning By-law 2016-249 (Sections 101 and 102), the minimum parking space rate and minimum visitor parking space rate is 1.2 and 0.2 parking spaces per dwelling unit, respectively. The proposed development has 60 units and therefore 84 parking must be provided for residents and their guests. The proposed development provides the required 84 parking spaces. Bicycle Parking As per City of Ottawa Zoning By-law 2016-249 (Section 111), the minimum bicycle parking rate is 0.5 bicycle parking spaces per dwelling unit. The proposed development has 60 units and therefore 30 bicycle parking spaces must be provided. The proposed development provides required 30 bicycle parking spaces. 4.2.2 Spillover Parking Not applicable; exempted during screening and scoping. 28

Analysis Report 4.3 BOUNDARY STREET DESIGN 4.3.1 Design Concept The multi-modal level of service (MMLOS) was evaluated for Cambrian Road, Seeley s Bay Road, and Watercolours Way to assist with developing a design concept that maximizes the achievement of the MMLOS objectives. The proposed development is located within 600 metres of a future transit station and is therefore subject to different targets for pedestrians and trucks when compared to the targets for a developing community (pedestrian LOS target is A instead of B, truck LOS target is E instead of no target). The Ultimate Cycling Network from the Ottawa Cycling Plan designates Cambrian Road as a local cycling route and therefore Cambrian Road is subject to a LOS target of B instead of D. Seeley s Bay Road and Watercolours Way are both local roadways and therefore neither transit nor truck LOS is applicable to these road segments. Table 11 presents the MMLOS conditions for segments between signalized intersections. Table 11 MMLOS Conditions Segments Pedestrian Cycling Transit Truck Criteria Cambrian Road Seeley s Bay Road Watercolours Way Sidewalk width 1.8m 1.8m 1.8m Boulevard width 3.6m 0m 0m AADT > 3000? Yes No No On-Street parking No No No Operating Speed 60 kph 30 kph 30 kph Level of Service D A A Type of facility Mixed Mixed Mixed Number of travel lanes 2 2 2 Bike lane width N/A N/A N/A Operating speed 60 kph 40 kph 40kph Centreline (yes/no) No No No Bike lane blockage freq. N/A N/A N/A Level of Service F A A Type of Facility Mixed Parking/driveway friction Limited Level of Service D Curb lane width > 3.7m Number of travel lanes 2 Level of Service B Target A B for Cambrian Road D otherwise Not applicable Not applicable D Not applicable Not applicable Notes: Auto LOS is not considered for segments in the MMLOS Guidelines. Mixed means either cyclists or transit are mixed with general traffic, i.e. they do not have their own dedicated facilities. The number of travel lanes is two-way, i.e. in both directions. Bike lane blockage frequency is only applicable when cycling is in mixed traffic and in a commercial area. E for Cambrian Road None otherwise 29

Analysis Report The analysis shows the pedestrian and cycling LOS for Cambrian Road is below the target LOS. The pedestrian LOS can be improved by increasing the sidewalk width to two metres, which is expected to occur when Cambrian Road is widened to four lanes, as identified in the Cambrian Road Widening Environmental Assessment. However, there is no way to meet the pedestrian LOS target for Cambrian Road without reducing the operating speed below 30 kph or reducing the AADT to below 3,000, which is unlikely to occur. The cycling LOS can be improved by implementing on-street bike lanes, which is expected to occur when Cambrian Road is widened to four lanes, as identified in the Cambrian Road Widening Environmental Assessment. For the interim, it may be possible to implement on-street bike lanes; there is 10 metres of pavement between curbs, which would allow for 3.5 metre general traffic lanes and 1.5 metre cycling lanes. On-street parking would likely need to be prohibited. 4.4 ACCESS INTERSECTIONS DESIGN 4.4.1 Location and Design of Access The two site driveways are located on local roadways and are located approximately 30 metres from the intersection of Seeley s Bay Street and Watercolours Way and approximately 80 metres from the intersection of Realigned Greenbank Road and Watercolours Way. This exceeds the City requirement of 18 metres between the private approach and the nearest intersecting street line, as per the Private Approach By-law No. 2003-447, S.25, L. Both accesses have a width of six metres which is above the minimum of 2.4 metres and below the maximum width of nine metres. The intersections will be two-way stop controlled. 4.4.2 Intersection Control The two site driveways are low-volume driveways located on low-volume local roadways and therefore two-way stop control is appropriate. 4.4.3 Intersection Design Table 12 summarizes the Synchro results for the site driveways for 2024 Total Traffic conditions. Appendix A contains the intersection performance worksheets. The analysis shows that the intersections will operate well under two-way stop-control. Table 12 Synchro Results Site Driveways (2024 Total Traffic) Intersection Seeley s Bay Street at East Access Watercolours Way and North Access Intersection Control Two-way stop control Two-way stop control Queue 95 Approach / Movement LOS Delay (s) th (veh) NB Left / Through / Right A (A) 7.3 (7.3) 0.0 (0.1) EB Left / Through / Right A (A) 8.7 (8.6) 0.1 (0.1) Overall Intersection 4.4 (3.8) NB Left / Through / Right A (A) 8.4 (8.3) 0.0 (0.0) WB Left / Through / Right A (A) 7.2 (7.2) 0.0 (0.0) Overall Intersection 5.0 (4.7) 30

Conclusions Report The two site driveways will be two-way stop-controlled intersections and therefore are not subject to the MMLOS guidelines for intersections. 4.5 TRANSPORTATION DEMAND MANAGEMENT Not applicable; exempted during screening and scoping. 4.6 NEIGHBOURHOOD TRAFFIC MANAGEMENT Not applicable; exempted during screening and scoping. 4.7 TRANSIT Not applicable; exempted during screening and scoping. 4.8 REVIEW OF NETWORK CONCEPT Not applicable; exempted during screening and scoping. 4.9 INTERSECTION DESIGN Not applicable; exempted during screening and scoping. 5.0 CONCLUSIONS Based on the transportation evaluation presented in this study, Mattamy Homes proposed Half Moon Bay North Apartment Block in Barrhaven South should be permitted to proceed from a transportation impact perspective. STANTEC CONSULTIUNG LTD. 31

INTERSECTION PERFORMANCE WORKSHEETS A.1

HCM 2010 TWSC 2444 Watercolours Way TIA 4: North Access & Watercolours Way 2024 Ultimate AM Intersection Int Delay, s/veh 5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 5 0 3 1 0 7 Future Vol, veh/h 5 0 3 1 0 7 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 100 100 100 100 100 100 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 0 3 1 0 7 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 5 0 12 5 Stage 1 - - - - 5 - Stage 2 - - - - 7 - Critical Hdwy - - 4.12-6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218-3.518 3.318 Pot Cap-1 Maneuver - - 1616-1008 1078 Stage 1 - - - - 1018 - Stage 2 - - - - 1016 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1616-1006 1078 Mov Cap-2 Maneuver - - - - 1006 - Stage 1 - - - - 1018 - Stage 2 - - - - 1014 - Approach EB WB NB HCM Control Delay, s 0 5.4 8.4 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 1078 - - 1616 - HCM Lane V/C Ratio 0.006 - - 0.002 - HCM Control Delay (s) 8.4 - - 7.2 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0 - - 0 - Stantec Consulting Ltd. Synchro 8 Report HCM 2010 TWSC 2444 Watercolours Way TIA 2: Seeley's Bay St. & East Access 2024 Ultimate AM Intersection Int Delay, s/veh 4.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 7 36 16 10 39 3 Future Vol, veh/h 7 36 16 10 39 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 100 100 100 100 100 100 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 7 36 16 10 39 3 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 83 41 42 0-0 Stage 1 41 - - - - - Stage 2 42 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 919 1030 1567 - - - Stage 1 981 - - - - - Stage 2 980 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 910 1030 1567 - - - Mov Cap-2 Maneuver 910 - - - - - Stage 1 981 - - - - - Stage 2 970 - - - - - Approach EB NB SB HCM Control Delay, s 8.7 4.5 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1567-1008 - - HCM Lane V/C Ratio 0.01-0.043 - - HCM Control Delay (s) 7.3 0 8.7 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0-0.1 - - Stantec Consulting Ltd. Synchro 8 Report

HCM 2010 TWSC 2444 Watercolours Way TIA 4: North Access & Watercolours Way 2024 Ultimate PM Intersection Int Delay, s/veh 4.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 2 0 6 5 0 5 Future Vol, veh/h 2 0 6 5 0 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 100 100 100 100 100 100 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 0 6 5 0 5 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 2 0 19 2 Stage 1 - - - - 2 - Stage 2 - - - - 17 - Critical Hdwy - - 4.12-6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218-3.518 3.318 Pot Cap-1 Maneuver - - 1620-998 1082 Stage 1 - - - - 1021 - Stage 2 - - - - 1006 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1620-994 1082 Mov Cap-2 Maneuver - - - - 994 - Stage 1 - - - - 1021 - Stage 2 - - - - 1002 - Approach EB WB NB HCM Control Delay, s 0 3.9 8.3 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 1082 - - 1620 - HCM Lane V/C Ratio 0.005 - - 0.004 - HCM Control Delay (s) 8.3 - - 7.2 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0 - - 0 - Stantec Consulting Ltd. Synchro 8 Report HCM 2010 TWSC 2444 Watercolours Way TIA 2: Seeley's Bay St. & East Access 2024 Ultimate PM Intersection Int Delay, s/veh 3.8 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 5 25 32 43 17 6 Future Vol, veh/h 5 25 32 43 17 6 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 100 100 100 100 100 100 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 5 25 32 43 17 6 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 127 20 23 0-0 Stage 1 20 - - - - - Stage 2 107 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 868 1058 1592 - - - Stage 1 1003 - - - - - Stage 2 917 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 850 1058 1592 - - - Mov Cap-2 Maneuver 850 - - - - - Stage 1 1003 - - - - - Stage 2 898 - - - - - Approach EB NB SB HCM Control Delay, s 8.6 3.1 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1592-1017 - - HCM Lane V/C Ratio 0.02-0.029 - - HCM Control Delay (s) 7.3 0 8.6 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0.1-0.1 - - Stantec Consulting Ltd. Synchro 8 Report