STAFF REPORT. MEETING DATE: September 23, City Council. Michael Frank, City Manager Russ Thompson, Public Works Director

Similar documents
Item No. 10 Town of Atherton

3.15 SAFETY AND SECURITY

Technical Training Workshop: Quiet Zones

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

traversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

SAN RAFAEL CITY COUNCIL AGENDA REPORT

CAR 10-1 TRAFFIC CALMING CAR 10-1 OPR: Engineering 06/06

SAN RAFAEL CITY COUNCIL AGENDA REPORT

City of Palo Alto (ID # 6416) City Council Staff Report

CITY OF OAKLAND INTRODUCTION

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

City of Lafayette Staff Report Circulation Commission

Work Session. Agenda Item # 2. Meeting Date April 20, Daryl Braithwaite Public Works Director. Prepared By. Suzanne Ludlow City Manager

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW

West Broadway Reconstruction/LRT Design. March 19, 2015

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

CITY OF POWAY MEMORANDUM

Executive Summary EXECUTIVE SUMMARY Parking Issues Trenton Downtown Parking Policy and Sidewalk Design Standards E.S. Page 1 Final Report 2008

Mt. Diablo Unified School District

Final Administrative Decision

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

TRAFFIC CALMING PROGRAM

Doran Street and Broadway/Brazil Grade Separation Project

Decision on Merced Irrigation District Transition Agreement

Parking Management Element

1

Applicable California Vehicle Code Sections, 2015 Edition

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

Merger of the generator interconnection processes of Valley Electric and the ISO;

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

FREQUENTLY ASKED QUESTIONS

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: November 7, 2016

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

ACTION TRANSMITTAL No

EXCEPTION TO STANDARDS REPORT

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Traffic Regulations Guidelines

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013

Turnpike Mitigation Program Application

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

JCP&L Verbatim Response to Middletown Township s Questions

FREQUENTLY ASKED QUESTIONS

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

DISTRICT ADMINISTRATIVE RULE

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

SANDAG Vanpool Program Guidelines as of February 2018

CITY OF PLACENTIA RESIDENTIAL PERMIT PARKING PROCEDURES AND GUIDELINES 2017

TOWN COUNCIL ACTION REPORT. May 2, 2013

Harlem Avenue between 63 rd and 65 th

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

Downtown Parking/Wayfinding Study. Review of Recommendations to City Council: January 16, 2018

Exposition Light Rail Transit Project

Business Item No

SAN JOSE CAPITAL OF SILICON VALLEY

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Plan Check Policies and Guidelines

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

METRO / DON SEPULVEDA ANSWERS to Questions from Northridge Residents July, 2015

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT MOTOR VEHICLE SAFETY POLICY

AVE MARIA STEWARDSHIP COMMUNITY DISTRICT

Plan Check Policies and Guidelines

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

800 Access Control, R/W Use Permits and Drive Design

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

DRAFT Subject to modifications

MEMORANDUM. Proposed Town of Chapel Hill Green Fleets Policy

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

MSRC CLEAN TRANSPORTATION FUNDING LOCAL GOVERNMENT PARTNERSHIP

Taxi Task Force. Work Plan Progress Report, September 9, Updates since the last meeting are highlighted.

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Berkeley Unified School District Transportation Guide for Special Needs Students

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014

Waco Rapid Transit Corridor (RTC) Feasibility Study

Transportation Coordination Toolkit

City of Grand Forks Staff Report

OATAC On March 14, 2018 the E-Bike Working Group met at the Northview Community Centre.

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

Public Information Workshop

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012

Joint Legislative Program Evaluation Oversight Committee March 14, 2012

Parks and Transportation System Development Charge Methodology

TOWNSHIP OF RARITAN COUNTY OF HUNTERDON, NEW JERSEY ORDINANCE #16-06 REVISED

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

TRAFFIC REGULATION APPROVAL PROCESS

Light Emitting Diode (LED) Induction

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT

Transcription:

STAFF REPORT MEETING DATE: September 23, 2014 TO: City Council 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org FROM: Michael Frank, City Manager Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: UPDATE ITEM ON QUIET ZONES REQUEST Consider the update that staff will provide on the potential establishment of Quiet Zones within Novato relating to the Sonoma Marin Area Rail Transit District (SMART) and North Coast Railroad Authority. This staff report and the presentation will provide information and outline process options for next steps. RECOMMENDATION A. Accept staff update and receive public comment on the potential establishment of Quiet Zones within Novato. B. Direct staff to further pursue assessment of indemnification, increased risk and potential liability issues related to Quiet Zones within Novato. C. Direct staff to initiate discussions with SMART regarding their proposed memorandum of understanding and potential transfer of liability to the City. D. If analysis of liability shows minimal or manageable risk, direct staff to return to Council to initiate a Quiet Zone application. If analysis of liability shows significant risk, then return to Council either once a test train is running or once the railroad is operational in order to fully evaluate the Quiet Zone policy option. DISCUSSION Since the last presentation to the City Council in September 2012, little has changed regarding Quiet Zone regulations. As the SMART project construction nears completion, staff felt it was necessary to revisit the issue of Quiet Zones and update Council and the community. Over the last few months the public awareness of Quiet Zones has heightened. Many neighborhood and other citizen groups have formed to express their concerns. Recent workshops on the issue in San Rafael received considerable testimony from the public regarding potential cc14_153; 9/18/2014 1 Novato City Council Agenda Staff Report Date: File No.

health impacts of increased noise levels, and a reduction in quality of life due to the sounding of SMART train horns. Recognizing this concern, staff is exploring the possibility of Quiet Zone implementation including assessing the City s, and taxpayer s, potentially significant exposure to liability, while ensuring the safety of its residents. The City is committed to bringing forward clear information and options to the City Council and community so a decision can be made about Quiet Zones. Liability Liability is the key policy issue for Council to review as it considers Quiet Zones. Liability for Quiet Zone occurrences is a significant concern in light of the scope of potential damages from a rail accident. Without Quiet Zones, the responsibility for railroad crossing safety sits with the operating railroad company. If a city takes action to establish quiet zones and eliminate horn blasts, the city may be required to take on some of this liability. The Train Horn Final Rule provides a structure to balance the risk of removing one safety measure (horns) by adding other safety measure and physical improvements to the Quiet Zone crossings. However, the Rule does not prohibit railroad companies from discussing and attempting to shift risk to the local agency. An agreement outlining indemnification and clarifying responsibilities is often written and agreed to by the public agency and the railroad company. The City is self-insured. It has, however, liability insurance above a certain threshold through an insurance pool, Bay Cities Joint Powers Insurance Authority (BCJPIA), comprised of cities throughout the Bay Area. Within the current Memorandum of Coverage, there is no exclusion for quiet zones. However, no other city within our insurance pool has quiet zones. Staff is also talking to BCJPIA to better understand the City s liability and coverage. The City has received a first draft of SMART s proposed indemnification agreement and staff will be doing further research to bring options and information back to the City Council. Additionally City staff has been reaching out to cities throughout the State to understand their experience with Quiet Zones including the numbers and types of claims and lawsuits. These insights will also be shared with Council. Staff s preliminary research suggests there is not a simple or clear assessment of risk available. Preliminary Recommendation It is not anticipated that SMART will take any position on whether Quiet Zones should be established. Although staff has been told Quiet Zones can be established in as little as three months, staff is assuming that it will take six months to establish a Quiet Zone in Novato. Based on this estimate the City will likely need to decide whether to pursue Quiet Zones sometime in 2015. The City has time to conduct the needed research to bring a recommendation back to the City Council on Quiet Zones. The City s ability to obtain insurance coverage appears likely based on preliminary discussions with our insurance pool, but additional time is needed to fully vet the issue, and identify the cc14_153;9/18/2014 2

associated costs. Staff recommends additional study is needed to understand the potential increased risks and associated financial impacts to the City, and the possibility of negotiating an indemnification agreement with SMART. FISCAL IMPACT The cost of liability coverage is still under review. SMART is covering the cost of the additional safety improvements required for Quiet Zone implementation. ALTERNATIVES None. This item is informational. ATTACHMENTS 1. Background Information and maps cc14_153;9/18/2014 3

Background Information and Maps Quiet Zone Background Information At-Grade Crossing Warning Devices When railroad tracks and public streets cross one another they are referred to as an at-grade crossing. These crossings can pose the obvious safety risk of a collision between trains on the tracks and those using the public street. Modern railroads use active warning devices to reduce risks at crossings. These involve systems that detect the impending arrival of a train and activate electronic bells, red flashing lights, and gates that come down and physically prevent motorists, bikes and pedestrians from crossing over the tracks. In a standard crossing gate design, gates are limited to the driver s side lane on either side of the tracks, with a total of two gates installed. In addition, electronic bells are mounted at intersections and make the iconic ding, ding, ding sound when trains approach. They are required safety features for most public crossings. The decibel levels of bells adhere to national standards which requires them to sound at between 61 and 91 decibels (dba), as heard 50 feet away. While active warning systems are highly effective at reducing the risk of collision, occasionally a determined motorist will ignore signs, flashing red lights and bells and will actually drive around lowered gates in the left lane in order to cross the railroad tracks. In order to reduce the risk of this type of activity, additional safety measures are typically required. Train Horn Final Rule In 2005, the Federal Railroad Administration (FRA) adopted new regulations regarding the use of train horns with the Final Rule on Use of Locomotive Horns at Highway-Rail Grade Crossings, commonly known as the Train Horn Final Rule. As a result, train horns are now required by the federal government to sound at grade crossings. Contained in this rule is a provision for local jurisdictions in the United States to manage the use of train horns through the creation of Quiet Zones. The Train Horn Final Rule standardized the method with which locomotive horns are used and the quality of the horn sound. Outside of quiet zones, railroads must sound the locomotive horn 15-20 seconds prior to a train s arrival at the highway-rail grade crossing, but not more than 1/4 mile in advance of the crossing. The pattern for sounding the horn is two long, one short and one long blast repeated or prolonged until the locomotive occupies the highway-rail grade crossing. The rule also prescribes both a minimum and maximum volume level for the train horn, 96 dba and 110 dba, respectively when measured at 100 feet in front of the locomotive. The rule addresses use of the horn only with respect to highway-rail grade crossings. Railroads remain free to use the horn for other purposes as prescribed in railroad operating rules on file with the FRA, and railroads must use the horn as specified in other FRA regulations. This

includes sounding horns as trains leave stations, if pedestrians or workers are present within the railroad corridor, or if other active warning safety equipment malfunctions. Locomotive engineers are empowered, but not required, to sound the horn in the case of a perceived emergency, even in a Quiet Zone. Quiet Zone Defined The intent of the federal quiet zone regulations was to give local communities the opportunity to promote neighborhood quality of life without compromising safety. In general, a quiet zone is defined as a section of a rail line at least one-half mile in length that contains one or more consecutive public railroad crossings at which locomotive horns are not routinely sounded. A quiet zone is specific to the use of the train horn and does NOT include other railroad conditions and equipment such as rail joints, engine braking, engine noise, car suspension or railroad crossing lights and bells. When an entity requests to establish a quiet zone, it must choose between two classes of safety measures, in addition to the standard mandatory at-grade crossing measures, that must be installed at the crossing(s). The decision is essentially the one that will not increase the number of accidents at a given crossing as a result of the elimination of the locomotive horn blast. The first set of measures, called Supplemental Safety Measures, or SSMs, consist of physical barriers: 1. Temporary closure of a public Highway-Rail Grade Crossing; 2. Four-Quadrant Gate System; 3. Gates with medians or channelization devices; 4. One-way street with gate(s); and 5. Permanent closure of the Highway-Rail Grade Crossing. Use of SSMs at all crossings within the quiet zone is generally sufficient to reduce the Risk Index calculations as set out by the FRA to qualify for quiet zone designation on an almost automatic basis. Alternative Safety Measures, or ASMs, by contrast involve an evaluation by the FRA before approval is granted and are subject to annual reevaluation based on revised estimates of risk reduction of the measures employed on a nationwide basis. A common form is represented by the use of an additional gate, on one side of the crossing, with a curb median located on the opposite side. An ASM may be selected due to site-specific constraints, where the configuration of the crossing and close proximity of nearby intersections and driveways preclude the use of curb medians on both sides of the crossing. ASMs consist of the following: 1. Modified SSMs (SSMs which do not meet all FRA requirements) 2. Non-engineered ASMs such as: a. Programmed enforcement b. Public education and awareness

c. Photo enforcement 3. Engineered ASMs (measures that improve geometrics such as sight distance). Quiet Zone Safety Requirements The FRA has established a Risk Calculator to help local jurisdictions through this evaluation by calculating a Quiet Zone Risk Index (QZRI). The QZRI is measured against the National Significant Threshold (NSRT) and Risk Index with Horns (RIWH) to determine what level of additional safety measures would be required to meet the minimum criteria for establishing a Quiet Zone. The RIWH is the average risk level at a crossing in a proposed Quiet Zone that would exist if a train was blowing its horn. In other words, by definition, the safety improvements are implemented to offset the risk of the train not blowing the horn. SMART s crossings will be equipped with Quiet Zone ready modern features, including 12 flasher lights, 4 gate lights, redundant constant warning time devices, electronic bells, and modern vehicle and pedestrian gate mechanisms, and medians in some locations. This means that the capital improvements that would be required to make a crossing eligible for a Quiet Zone are being installed by SMART as part of their improvements to the rail system. Each measure is designed to prevent cars, bikes and pedestrians from going around lowered gates at crossings, one of the most common causes of grade crossing incidents. Staff has met with SMART, FRA, and the California Public Utilities Commission (CPUC) staff on the required improvements at each Novato crossing. SMART is in the process of constructing all of the identified SSMs and ASMs. Construction and Maintenance of Safety Measures SMART will be the entity to implement and maintain signal-related SSMs and ASMs within its right-of-way. Quad gates, for example, would be maintained by SMART, along with all other gates and signals. However, the construction and maintenance of many of the proposed curb medians are partly outside the SMART right-of-way, and will require the City s involvement to maintain. Process to Establish a Quiet Zone The CPUC acts as the state oversight agency working in coordination with the FRA and requires that a diagnostic review be conducted for every crossing within a potential Quiet Zone to determine needed safety improvements. The process of establishing a Quiet Zone officially begins when a city or county files a Notice of Intent to establish a Quiet Zone with the California Public Utilities Commission (CPUC), and applicable railroads (in this case SMART and the NCRA). The aforementioned agencies have 60 days to comment on the Notice of Intent. Once the CPUC has verified the information provided, the FRA has approved the proposed Quiet Zone, and the necessary safety measures have been installed, then the local public authority can issue a Notice of Establishment. The Notice of Establishment is sent to the FRA, all applicable

railroads, Caltrans, any local governments affected, and any private property owners affected by private crossings. Railroads are to cease routinely blowing the train horns at grade crossings within 21 days. As mentioned previously, once a Quiet Zone has been established, a train operator may still sound the train horn for emergencies, worker protection, or if there is any potential danger (such as a pedestrian standing on the track). Affected Crossings SMART is improving thirteen public and private crossings located in and around Novato. The ten public crossings are being upgraded to allow the City to establish a Quiet Zone if desired. The ten public crossings will be improved as follows: 1. Grandview Avenue (County):SSM - quad gates. 2. Renaissance Avenue: ASM - exit gate on north side with median on south side. 3. Hanna Ranch Road: SSM - medians. 4. Franklin Pedestrian: SSM - gate arms with swing gates. 5. Grant Avenue: ASM - exit gate on east side with median on the west side. 6. Olive Avenue: ASM - exit gate on the east side, median on the west side. 7. Rush Creek Place: SSM - quad gates. 8. Bel Marin Keys Pedestrian: SSM - gate arms with swing gates 9. Roblar Road: ASM - exit gate on east side with median on west side 10. Hamilton Parkway: SSM - medians In addition, SSMs in the form of quad gates will be installed at a private crossing on Golden Gate Place. With that said, there are several private driveway crossings that will not be receiving any additional safety improvements as they are not required by the Train Horn Final Rule to establish a Quiet Zone. The City and County have discussed in the past negotiating a Memorandum of Understanding that would assign the City the authority to establish a Quiet Zone over the Grandview Avenue crossing. This negotiation is still on-going. Novato Crossings A general map of the crossings and associated ¼-mile zones where horns would be typically be sounded pursuant to FRA regulations is on the following pages.

Novato At-Grade Crossing Locations North

Novato At-Grade Crossing Locations South

SMART / QUIET ZONES UPDATE PUBLIC WORKS DEPARTMENT

Tonight: City Manager Introduction 1. Staff Recommendations 2. Train Horns and Quiet Zones Who regulates railroad crossings Safety Measures Assessment of Risk 3. General Discussion of Crossings in Novato 4. SMART Improvements What is Being Installed? 5. How are Quiet Zones Established? 6. Potential Timeline 7. Next Steps City Attorney Liability Comments 2

RECOMMENDATIONS: 1. Staff update / public comment on QZs. 2. Direct staff to further pursue assessment of indemnification, increased risk and potential liability issues related to QZs. 3. Direct staff to initiate discussions with SMART regarding their proposed MOU and potential transfer of liability to the City. 4. If analysis of liability shows minimal or manageable risk, direct staff to return to Council to initiate a QZ application. If analysis of liability shows significant risk, then return to Council either once a test train is running or once the railroad is operational in order to fully evaluate the QZ policy option. 3

WHEN IS A TRAIN REQUIRED TO SOUND HORN? (No Quiet Zone) Train horns required 24-hours per day Trains must sound horn 15-20 seconds before approach to an atgrade crossing, but not more than ¼-mile away Horns must continue to sound until locomotive occupies crossing Horn pattern is 2 long, 1 short & 1 long blast (repeated) FRA requires minimum and maximum levels of 96 and 110 dba 4

WHO REGULATES QUIET ZONES: In 2005 the Federal Railroad Administration (FRA) adopted: Final Rule on Use of Locomotive Horns at Highway-Rail Grade Crossings Commonly known as: The Final Train Horn Rule 5

SAFETY MEASURES Safety measures reduce risk caused by absence of horns. Must demonstrate to FRA that absence of horn does not increase risk according to Risk Assessment Calculator. QZ Risk Index at or below Nationwide Threshold (NSRT) QZ Risk Index with Safety Measures is BELOW Risk Index with Horns (RIWH) SUPPLEMENTARY SAFETY MEASURES (SSMs) Four Quadrant Gates Dual Gates with Median Islands One-way Street with Gates Temporary or Permanent Closure 6

ALTERNATIVE SAFETY MEASURES (ASMs) Modified SSMs Non-Engineered Measures: Video / Photo Enforcement Public Education and Awareness Training Programmed Enforcement Engineered ASMs Improved geometrics Improved sight distance Must be evaluated by FRA and require annual reevaluation. 7

8

CALCULATION OF RISK INDEX PER FRA: 9

SMART and NCRA Crossings in Novato 10 SMART Crossings 7 Streets / 3 Public Pedestrian 2 NCRA Crossings along Hwy 37 2 Streets (Renaissance Road & Grandview Avenue) 10

ATHERTON STATION Novato Station HAMILTON STATION Hamilton Station 11

Fireman s Fund Novato Station Proposed Station Below grade of roads & freeway, less visible Adjacent to North Redwood Commercial / Office area HAILTON STATION Hamilton Station 12

13

ATHERTON STATION HAMILTON PARKWAY Novato Station Charter School Adjacent homes look down on site Main Gate Road narrow HAMILTON STATION Proposed Hamilton Station Station & Park-n-Ride 14

ATHERTON STATION HAMILTON PARKWAY Novato Station Charter School Adjacent homes look down on site Main Gate Road narrow HAMILTON STATION Proposed Hamilton Station Station & Park-n-Ride 15

HOW ARE QUIET ZONES ESTABLISHED? Step 1: Step 2: Step 3: Step 4: Step 5: Determine limits of quiet zone which crossings? Diagnostic Review by FRA / CPUC for Private & Pedestrian crossings Use FRA Risk Calculator to assess if zone qualifies Issue Notice of Intent (60 day comment period) Railroads notified (SMART, NCRA, etc.) Private crossing owners FRA & CPUC FRA / CPUC Final Field Review Modify SSMs at public crossings if required Submit updated National Grade Crossing Inventory form Issue Notice of Quiet Zone Establishment to FRA and others (60 day comment period) 16

PARKWAY ATHERTON STATION POSSIBLE TIMELINEAMILTON Novato Station Charter School Adjacent homes look down on site Main Gate Road narrow HAMILTON STATION Proposed Hamilton Station Station & Park-n-Ride 17

WHAT ARE THE NEXT STEPS? 1. Public Input Tonight 2. Staff / City Attorney to Provide Additional Assessment of: indemnification issues potential increased risk / liability to City 3. Memorandum of Understanding with SMART Understand Needs and Liability Sharing 4. If Minimal or Manageable Risk --> Council Initiate Quiet Zone Application -or- If Significant Risk --> Return to City Council Once Test Train is Running, or the Railroad is Fully Operational, to Fully Evaluate Quiet Zone Policy. 18

QUESTIONS??

RUSH CREEK: OLIVE AVE: GOLDEN GATE DRIVE: 20

GRANT AVE: FRANKLIN PED X-ING: HANNA RANCH RD: 21

HAMILTON PARKWAY: 22