RETROTEC 3 or 6 FAN PANEL SYSTEM INSTALLATION MANUAL

Similar documents
JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

Hunter Automatics HA-8. Installation Manual

INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER

A B C D E F. Tools Required (supplied by others)

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

Contents. Section 5: Adjustments Ball Detect Adjustment Transport Band Tension Adjustment

Pontoon Assembly Instructions and manual. Read before using hoist.

PRODUCT MANUAL Gecko Wireless One Zone LED Dimmer and Receiver

A B C D E F. b.tools Required (supplied by others) 3/16" Drill Bit 3/8" Wrench Phillips Head Screwdriver

ENCORE 52" X-TREME. 2-BAG GRASS CATCHER for units w/ S/N and above ASSEMBLY AND PARTS DIAGRAMS

2013 RT / 2014RT / 2015 RT - Shock Spring Adjuster Installation Instructions

How to remove and replace the Foonf/Fllo fabric

E-LIFT II+ SYSTEM WITH SPRING LEVER FOR A-SERIES AND FULL FRAME LOOMS

Installation Manual TWM Performance Short Shifter Cobalt SS/SC, SS/TC, HHR SS, Ion Redline and Saab 9-3

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS

Grass Catcher. Instructional / Parts Manual Part Number: January ( & ) & Drive Kits ( , , )

IMPORTANT! DO NOT THROW AWAY THE SHIPPING CARTON AND PACKING MATERIAL

CBEA/CJAA Timing belt procedure. Written by: greengeeker Photos by: DanG144, Kriesel, coalminer16. Required tools:

GENUINE PARTS INSTALLATION INSTRUCTIONS

TABLE OF CONTENTS. Ram Assembly

Installation Instructions Table of Contents

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

INSTALLATION INSTRUCTIONS

INSTALLATION & OWNER S MANUAL

INSTALLATION INSTRUCTIONS

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

JEEP JK4 STEP SLIDER INSTALLATION BD-SS-100-JK4

PRODUCT MANUAL Gecko Wireless 2 Zone LED Dimmer and Receiver

401B/1KDB CoolRite/FreezeRite Installation Manual I003

DEMA 259B DRAIN MASTER Jr. INSTALLATION INSTRUCTION SHEET

T his chapter contains instructions for installing the RICON S-Series (ADA) Transit Use Wheelchair and Standee Lift

HD 7700 Setup & Operator Manual

GENUINE PARTS INSTALLATION INSTRUCTIONS

Used on 564 SS Gas Fireplaces Only. #8 x 3/8 Sheet Metal Screws. Upper and. Lower Grills. Heat Shield

CBEA/CJAA Timing belt procedure. Written by: greengeeker Photos by: DanG144, Kriesel, coalminer16. Required tools:

HARD FOLDING TONNEAU COVER INSTALLATION GUIDE

TAKE TIME SPORT UTILITY STROLLER DUALLIE IRONMAN DUALLIE. ENGLISH Owner s Instruction Manual

Car Gate - Q Style Installation Instructions.

IDS ILLINOIS, LLC. 2000/2500 DEVICE & OPERATOR

AUTO REWIND AIR HOSE REEL

S-SERIES AND K-SERIES SERVICE MANUAL

Assembly & Installa on Guide RB031-3: TRIPLE CROSSBAR KIT

Operations Manual Eagle 1000 Series Stretch Wrapper

FlexJet Carriage Circuit Board (PCB) Replacement

AmTryke Adult Recumbent Model HP1000 #50-HC-1000

X.L. BAND W/ SPRING ASSIST INSTRUCTION MANUAL

A Division of Thiessen Products, Inc.

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS

MODEL SST1 JOGGER/BIKE TRAILER. Owner s Manual should be kept for future reference

INSTALLATION INSTRUCTIONS

Service and Maintenance. Repositioning of the Motor Conduit Box and Cable Entry Motor Frame Sizes

Chain/Belt Drive Models PRE-INSTALLATION CONSIDERATIONS

Items # and #

DMR 3005 WM ONE ZONE WIRELESS DIMMER RECEIVER

Firehawk Second Stage Regulator Fire Service

Preparing The Printer For Maintenance

USER'S MANUAL and INSTALLATION GUIDE

table of Contents Warranty:

Installation Instructions

OPERATOR, PARTS AND INSTALLATION MANUAL. BX7330 AVENTA TM Tow Bar TOWING PRODUCTS DIVISION

Bag 1. Bag 1. Center Pivot. Center Pivot

Section 5: Parts Replacement

Remove Air Cleaner Cover and. Filter

40 Plug Aerator Model# AE-40T

This is the Unpacking Guide for the Optibike Pioneer Allroad electric bicycle. The Guide provides information required to remove the Allroad from the

Technical Procedure. SUBJECT: Operation, Maintenance and Retrofit Procedures. DATE: February 2018

AmTryke Adult Recumbent Model JT2000 #50-FC-2000

Please read thoroughly before starting installation and check that kit contents are complete.

1000 Park Drive Lawrence, PA Fax

TM-1620 OPERATING INSTRUCTIONS AND OWNERS MANUAL

General Information. Notations and Conventions. Compatibility Check. Kit Description. Call-Outs. Part Lists Great Plains Manufacturing, Inc.

UNPACK AND IDENTIFY THE FOLLOWING PARTS.

M Damper Mount Linkage Kit Installation. Item Description Quantity Item Description Quantity Nuts 2

ECO# 1801 REVISION# 000 ES DATE

36" Galvanized Direct Drive Hyflo Fan Installation and Operators Instruction Manual. Fan and Framing Dimensions

Explorer Version 3 Instructions

INSTALLATION INSTRUCTIONS

CENTER BELT SYSTEM INSTALLATION INSTRUCTIONS CARCG121220

Southwest Windpower Instruction Sheet AIR-X Circuit Replacement Kit

Vehicle Specific Instruction Notes

Prusa i3 Printer Assembly Guide

Crestline Dampening System. Installation Instructions. A.B. Dick 350, 360, 375 Single & Dual Lever Machines. X /01 Rev-A

INSTALLATION INSTRUCTIONS

HEAVY DUTY STAIR LIFT SYSTEM Installation and Service Manual

Rollstar Shade Installation Instructions

INSTALLATION INSTRUCTION 88092

CONTENTS. This Product is Certified by CANADIAN STANDARDS ASSOCIATION and Bears the Mark:

Acoustic Door Closer Instructions

GENUINE PARTS INSTALLATION INSTRUCTIONS

R O A D S M I T H TRIKE CONVERSIONS BY THE TRIKE SHOP

Perfect Park 7000 Installation & Unloading Instructions Operating Manual

G3 UHT TRANSMISSION. G3 UHT Transmission Replacement. G3 UHT Transmission Removal

632 Western Avenue Henniker, New Hampshire Tel. (603) Fax (603) POSITION OF THE ROLLER PLATES

Assembly Manual. 1/10th Formula 1 Car

SNUGRIDE 30 INFANT CAR SEAT

2005 and 09 Mustang install instructions Sequential / Chase Unit Partial Plug-N-Play Kit Meter4it Eng. Updated: 3/28/09

DODGE SLT Installation Instructions

NSGV EVE-ER I, O, & M MANUAL

INSTALLATION, OPERATION + MAINTENANCE

Transcription:

RETROTEC 3 or 6 FAN PANEL SYSTEM INSTALLATION MANUAL M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 1 of 20 2005-03-31

Table of Contents Installation in a Single Door Unpacking System 3 Unfolding Panel 4 Determining Panel Orientation 5 Positioning Panel Against Doorframe 6 Attaching First Retention Strap 7 Cross Brace Installation 9 Top Corner Brace Installation 13 Control Console Set-up 14 Blower Installation 15 Power and Instrumentation Connections 16 Multi-Blower Coordination 17 Taking Gauge Readings 18 Installation in a Double Door Determining Panel Orientation 19 Connecting the Two Panels 20 Securing Panels Against Doorframe 21 Control Console Set-up 14 Blower Installation 15 Power and instrumentation Connections 16 Multi-Blower Coordination 17 Taking Gauge Readings 18 M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 2 of 20 2005-03-31

Installation in a Single Door Unpacking System Have all equipment cases on the side of the test doorway from which the test will be conducted. The test will be done from the side of doorway in which the door swings. All equipment will need to be on this side of the doorway. After unpacking the system the blower cases can be re-closed and positioned side by side to create a platform for the laptop console and analog control panel. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 3 of 20 2005-03-31

Unfolding Panel Lean the panel case against a wall or other vertical surface and open the Velcro closure on the case. Remove the hinged panel and stand it on edge to unfold the sections and lock the butterfly catches opposite the hinges. Determining Panel Orientation M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 4 of 20 2005-03-31

Determining Panel Orientation The side of the panel marked with dimples must be facing the testing equipment and control consol (the test side of the doorway). Spin the panel so these dimples face the blowers and instrumentation. The blower holes are offset to one side of the panel. The panel side with the holes closest to the edge must be oriented on the hinge side of the doorway. You may need to spin or flip the panel to achieve this. Positioning Panel Against Door Frame Once properly oriented, slide the panel against the doorframe. This is best achieved with one person holding the panel in place while another attaches the first retention strap. Again, installation must be performed from the side of the doorway into which the door swings. Take the crossbars and retention straps and proceed to the installation side of the doorway. The bag carrying the retention straps can be hung from a belt or belt loop for convenience. The panel will cover the entire doorway and frame. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 5 of 20 2005-03-31

1). The first strap to attach is the top hinge-side strap. With a helper still holding the panel up, connect the retention strap to the top corner of the panel with one of the small knobs in the bag. 2). Pull the white circular anchor over the top of the door and into the gap between the door and the frame. 3). Position the white anchor behind the door as illustrated so that it is trapped in place. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 6 of 20 2005-03-31

4). Now carefully cinch the retention strap up tight and block the door open with one of the wooden doorstops provided. Note: To release or reposition the strap simply squeeze the release cam. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 7 of 20 2005-03-31

Cross Brace Installation: 1). Use the Cross braces provided to secure the remainder of the retention straps. Slide the retention straps and locking collars onto the crossbars as shown one on each end. 2). Take the first cross brace with the retention straps in place and insert the flattened end into the gap between the door and the frame. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 8 of 20 2005-03-31

3). Slide the cross brace into the hinge gap until snug. 4). Insert the eyebolt on the strap assembly through the panel and attach it using the small knob from the other side of the panel. Pull strap snug. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 9 of 20 2005-03-31

5). Attach the other strap assembly on the cross brace to the other side of the panel and pull snug. Use plastic tri-lobe nut to screw panel snug to doorframe. 6). Reposition the cross brace to align it with the attachment holes in the panel. Retighten both straps. Next slide the white locking collar on the hinge-side so that it pins the retention strap against the door jam. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 10 of 20 2005-03-31

7). Tighten the knob on the locking collar finger tight. Repeat this installation procedure for the lower cross brace. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 11 of 20 2005-03-31

Top Corner Brace Installation 1). Use the short cross to anchor the final top corner of the panel. Connect the final retention strap to the top corner of the panel and slide the white, plastic strap-anchor onto the short brace. 2). Position the short brace diagonally across the upper corner of the doorway as shown Pull the retention strap tight. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 12 of 20 2005-03-31

Control Console Set-up 1). Remove the fans from their cases and re-closed the top. The empty cases can be closed, arranged side by side and used as a platform for the consol and control unit. 2). Rout the room pressure pick-up through the access hole in the center panel. Pull it through so just the tip of the thermometer is exposed to the other side of the panel. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 13 of 20 2005-03-31

Blower Installation 1). The fans twist lock into the panels. The fan handle can be oriented to the right or left to compliment the position of the console. Begin by holding the fan sideways and tipping it so that the foot protrusion extends through the panel. 2). Align the locking block on the top of the fan with the cutout slot in the panel. Slide the locking block through to the backside of the panel and twist lock the fan to secure it to the panel. (Insert) (Twist counter clockwise) M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 14 of 20 2005-03-31

Power and Instrumentation Connections: 1). Once the fans are installed, connect the power cords to each one. 2). The flow pressure pick-up and remote speed control cables can be connected to each of the fans. The system is now ready to begin testing. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 15 of 20 2005-03-31

Multi-Fan Coordination Conduct an initial test to determine the number of running blowers needed to reach the required test pressure. One by one bring each blower up to full speed until the desired room pressure is achieved. Now shut down the system and install blower covers over the unused blowers. During a depressurization test, the covers should be mounted from outside the test enclosure on the side of the test equipment. During pressurization testing, the covers are mounted from inside the test enclosure. This insures that the covers will be pinned up against the blower housing instead of being sucked away during testing. Pressurization Test Depressurization Test M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 16 of 20 2005-03-31

Taking Gauge readings: The Flow Pressure must always be higher than the Room Pressure. Read the gauges very carefully. The 240 Pa mark is easy to misread. Please refer to the diagram below for clarification. 5 Pa. per division 240 Pa. mark 250 Pa. mark You must look at the gauge from directly in front to avoid misreading which number is being indicated Wait 15 to 20 seconds after the last speed control adjustment to let the readings stabilize before writing down the test data or entering it directly into the computer. Tap the gauges lightly to settle the needle and get the most accurate readings possible. Take results from both Room Pressure and Flow Pressure gauges simultaneously since they will sometimes move up and down together. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 17 of 20 2005-03-31

Installation in a double Door Determining Panel Orientation: Move the panels to the side of the doorway in which the doors do not open. If the doors open into a room, the panels will go against the outside of the doorframe on the outside of the room, If the doors pull open from the outside then the panels will need to be placed against the inside of the doorframe, inside the room. Next determine weather the instrumentation will be located inside or outside the room to be tested. The panels are labeled, Insert Blowers from this side of panel. This label must be facing in the direction of the test equipment. The panels must also be arranged so that the six blower holes are offset towards the center. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 18 of 20 2005-03-31

Connecting the Two Panels The connector plate is positioned behind the panels with the twelve connecting knobs being inserted from the front. (Side with labels) Connector plate M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 19 of 20 2005-03-31

Securing Panels against Doorframe: One person should hold the panels in place while another anchors the retention straps. Begin by slipping one of the plastic anchors through the hinge gap and rotate it 90 degrees to set it. If the hinge gap is too narrow to insert the plastic anchor through, reverse feed the eyebolt through the hinge gap from behind the door. Repeat this procedure for the five remaining straps and block the doors open so they don t get pulled shut when the straps are tensioned. Starting with the center retention straps, insert the eyebolt on the free end of the strap through the nearest bolthole in the panel and spin on a three lobed knob. The panels may have to be shifted to get each side equally close to the door jam. Once in place, double check that the plastic anchor is still set properly and cinch the strap snug. The strap must extend horizontally from the anchor to the panel. Slide the anchor up or down to correct any misalignment. Repeat this procedure for the remaining five straps and retighten all six straps one final time to verify set-up integrity. Note: If there is an unfilled gap between the top of the panels and the top of the doorway, it must be taped off with a combination of grill masking film and 2 black polyethylene tape. For console connections and blower installation, refer to pages 14-16. For multi-blower coordination, refer to page 17. For taking gauge readings, refer to page 18. M:\Masters\Manuals\3 or 6 Blower\Retrotec final draft.doc Page 20 of 20 2005-03-31