Interstate Drive Extension

Similar documents
Wentzville Parkway South Phase 2 & 2A

MO 370 Interchange Ramp at Salt River Road - Phase 1

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

Public Information Workshop

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

COST ESTIMATES: Curb-Running

FEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

City of Grand Forks Staff Report

Oaks Commerce Center

Rolling Road (Route 638) Widening Project

EXCEPTION TO STANDARDS REPORT

800 Access Control, R/W Use Permits and Drive Design

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

Items Unit Quantity Unit Price Total Unit Price Total

Dixie Transportation Planning Office

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

Durham-Orange County Corridor Alternatives Analysis JULY Prepared by: U R S Team

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

West Broadway Reconstruction/LRT Design. March 19, 2015

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY

Plan Check Policies and Guidelines

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Plan Check Policies and Guidelines

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

DELETE first sentence of first paragraph that reads: REPLACE with the following:

STREET IMPROVEMENTS PROPOSAL BID ITEMS

CITY of NOVI CITY COUNCIL

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

Purpose: General Provisions:

CONCEPTUAL DESIGN SUBMITTAL MADISON AASF #2 ROTARY WING PARKING APRON Project No. 05H2W

Riverside County Transportation Department Summary of Bids

City of Houston Fondren Road Paving and Drainage

Basic Project Information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

Riverside County Transportation Department Summary of Bids

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Stemmer Ridge Road Street & Utility Improvement Project

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

Lacey Gateway Residential Phase 1

Waco Rapid Transit Corridor (RTC) Feasibility Study

STH 60 Northern Reliever Route Feasibility Study Report

Art Griffith, Capital Projects Manager, ,

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

North Whitfield County Roadway Corridor Study

CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION CONSTRUCTION INFORMATION

Business Advisory Committee. July 7, 2015

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

Turnpike Mitigation Program Application

CT Consultants, Inc.

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

SC Highway 41 Existing Conditions

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

2005 Land Development Review/ State of Public Works

Task Force Meeting January 15, 2009

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

STAFF REPORT # CHANGE OF ZONING

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

FINAL REPORT FORM 1 (Formerly titled Project Monitoring Form 1 - Ridesharing ) Total Project Cost: $

traversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

The Eastern Connector Study November, 2007 planning for the future

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Speed Evaluation Saw Mill Drive

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Purpose and Need Report

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

14.0 Capital Cost Estimate Methodology

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

ACTION TRANSMITTAL No

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

Transcription:

Interstate Drive Extension Sponsor County Highway Project No. RB19-000004 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $2,700,000.00 $2,150,000.00 Project Description This project continues the westward extension of Interstate Drive across western St. Charles County toward Foristell. As part of the David Hoekel Parkway and Interstate Drive project south of I-70 (connecting to the City of Wentzville project), the property owners donated all of the needed Right-of-Way and easements to extend Interstate Drive west of DHP to Schaper Road. The property owners also hired a design consultant, Bax Engineering, to design the road extension. Therefore, this application is only for construction funds, since design and right-of-way will have been completed at no cost to the county.

ÿ,-./012ÿ456.-7824.5 ^ j:!:$ %+*()(& &$&_:!ÿ(;&$s:;:+*_ +:ÿg(':_= 'ÿjk+)*(+ *:!ÿk_:mk'ÿ'(m:ÿmÿ*r:ÿÿ ' ChAi ÿ1.52812ÿ456.-7824.5 ÿ5yzÿ-{ }ÿ4~{ ƒ{~ ÿ,-./012ÿ 0ˆ1-4,24.5 F(*':= ÿˆ4 582œ-0 012213425 6789ÿ7!ÿ# $!ÿ%&&'() *(+ 9:$;(*ÿ<= O ^(;(*_= l' ;:= _(m() *(+= >?@ABCCCCCD PQRISTRMRIÿUSVWIÿXYRIQTVLQÿRLÿZ[\M]ISÿ>N `SLaÿZ[\M]ISÿ>LMNÿIMTRÿRLÿUMWVNÿbLIcIdÿeMScJMf nÿbÿomplsÿqldi[rls 9$E:)*ÿFG&:= HIJÿ>LMN tg: F$ $_u= m()ÿ 'k;:ÿ% F= nc : l+_*$k)*(+ $=ÿ DCCCv_*(; *:!ÿ!*:ÿmÿ);&':*(+=@wxn@xwcwc TVQ[IÿNITVŽQÿMQNÿSVŽ\RBL BJMfÿJVdÿ\MWIÿ IIQÿ[La]dIRINÿMRÿQLÿ[LTRÿRLÿR\Iÿ[LŠQRfhÿ NLQMRINÿMdÿL ÿr\iÿqiininÿ>vž\rbl B MfÿMQNÿIMTIaIQRTÿRLÿIYRIQNÿPQRISTRMRIÿUSVWIÿJITRÿL ÿubeÿrlÿz[\m]isÿ>lmnhÿ \Iÿ]SL]ISRfÿLJQIST \VTÿ]SLpI[Rÿ[LQRVQŠITÿR\IÿJITRJMSNÿIYRIQTVLQÿL ÿpqristrmriÿusvwiÿm[sltÿjitrisqÿzrhÿq\msditÿqlšqrfÿrljmsnÿ`lsvtridhÿœtÿ]msrÿl ÿr\i MdTLÿ\VSINÿMÿNITVŽQÿ[LQTŠdRMQR ÿ?myÿxqžvqiisvqž ÿrlÿnitvžqÿr\iÿslmnÿiyriqtvlqhÿ \ISI LSI ÿr\vtÿm]]dv[mrvlqÿvtÿlqdfÿ LSÿ[LQTRSŠ[RVLQÿ ŠQNT UMWVNÿbLIcIdÿeMScJMfÿMQNÿPQRISTRMRIÿUSVWIÿ]SLpI[RÿTLŠR\ÿL ÿpbicÿ [LQQI[RVQŽÿRLÿR\IÿqVRfÿL ÿ IQR WVdIÿ]SLpI[R ÿr\iÿ]sl]isrfÿljqist jk*k$:@@ccc &+_$(+ ÿ% :+)G=ZRhÿq\MSdITÿqLŠQRfÿbVŽ\JMfÿUI]MSRaIQR l+* F:':&r+:ÿOk; :$= n ÿadaÿinc v ; ('ÿ%!!$:_= )*ÿ9:$_+ÿo ;:=q\svtÿ?ltrv[ ÿ_( + *k$:[ LTRV[šT[[aLhLSŽ ÿ! *: ÿ ÿ ÿ 1778791916789878 212

ST. CHARLES COUNTY ROAD BOARD 2020 TIP FINANCIAL WORKSHEET INTERSTATE DRIVE EXTENSION FUNDING FOR IMPROVEMENTS County Sponsor Federal Other Total Design $200,000.00 $200,000.00 Utility Relocations Right-of-Way $350,000.00 $350,000.00 Construction $2,150,000.00 $2,150,000.00 TOTAL $2,150,000.00 $550,000.00 $2,700,000.00 PERCENT (%) 79.63% 0.00% 0.00% 20.37% 100.00% FINANCIAL PLAN Design County Sponsor Federal Other Total 2020 $200,000.00 $200,000.00 2021 2022 Utility Relocations County Sponsor Federal Other Total 2020 2021 2022 Right-of-Way County Sponsor Federal Other Total 2020 $350,000.00 $350,000.00 2021 2022 Construction County Sponsor Federal Other Total 2020 $2,150,000.00 $2,150,000.00 2021 2022 The value of Design by Others is estimated at $200,000 (by Bax Engineering). The value of Right-of-Way by Others donation for this project is estimated at $350,000 (at $60,000 per acre). The value of Right-of-Way donated for the DHP #1 project was estimated at $654,000 (at $60,000 per acre).

WAY 70 INTERSTATE DR EXTENSION TO SCHAPER RD INTERSTATE DR SO P R U TH AI PO RI E INT RD FUTURE INTERSTATE DR EXTENSION (EST. 2020 ) L KE O E 0) H 2 AVE. 20 E D (EST R Y TU FU RKWA A P SCHAPER RD HIGH INTERSTATE DRIVE EXTENSION TO SCHAPER ROAD PROJECT LENGTH: 0.50 MILES N NOT TO SCALE

Estimate of Project Costs Project Sponsor: Saint Charles County Highway Department Project Title: Interstate Drive Extension to Schaper Road Date: 3/5/2019 Specific Roadway Items Item Quantity Unit Unit Price Amount Clearing and Grubbing 1 Lump Sum $ 50,000.00 $50,000.00 Removal of Improvements 1 Lump Sum $ 20,000.00 $20,000.00 Mobilization 1 Lump Sum $ 120,000.00 $120,000.00 Surveying 1 Lump Sum $ 35,000.00 $35,000.00 Earthwork 35000 Cubic Yards $ 12.00 $420,000.00 Retaining Walls 0 Square Feet $ 25.00 4" Aggregate Base 11000 Square Yards $ 6.00 $66,000.00 Pavement: 2-12' lanes, 6' shoulder 10500 Square Yards $ 45.00 $472,500.00 Side Street center turn Driveways 100 Square Yards $ 40.00 $4,000.00 Curb and Gutter 0 Linear Feet $ 20.00 Enclosed Drainage (future) 1 Lump Sum $ 240,000.00 $240,000.00 Crossroad Drainage 1 Lump Sum $ 100,000.00 $100,000.00 Traffic Control 1 Lump Sum $ 25,000.00 $25,000.00 Erosion Control 1 Lump Sum $ 40,000.00 $40,000.00 Temporary Pavement 0 Square Yards $ 30.00 Sodding 0 Square Yards $ 5.00 Seeding 3.5 Acres $ 3,500.00 $12,250.00 Pavement Markings 7500 Linear Feet $ 1.00 SUBTOTAL $7,500.00 $1,612,250.00 Specific Bicycle Items Item Quantity Unit Unit Price Amount SUBTOTAL Specific Pedestrian Items Item Quantity Unit Unit Price Amount 5 Foot Wide Sidewalks 2800 Square Yards $ 40.00 SUBTOTAL $112,000.00 $112,000.00

Specific Transit Items Item Quantity Unit Unit Price Amount SUBTOTAL Miscellaneous Other Items Item Quantity Unit Unit Price Amount SUBTOTAL Construction Cost Total Contingency Inflation Preliminary Engineering Right-of-Way Construction Engineering/Inspection Project Total (rounded) $1,724,250.00 $350,000.00 $20,000.00 $200,000.00 $350,000.00 $50,000.00 $2,700,000.00

Interstate Drive Extension to Schaper Road Project Schedule Start Date (MO/YR) Finish Date (MO/YR) Field Surveys and Property Base Map 09/18 10/18 Develop and Submit Conceptual Plans 08/18 11/18 Public Meeting/Hearing N/A N/A Develop and Submit Preliminary Plans 11/18 03/19 Preliminary Plans Approved 03/19 04/19 Develop and Submit Right-of-Way Plans 04/19 06/19 Review and Approval of Right-of-Way Plans 07/19 08/19 Right-of-Way Acquisition N/A N/A Utility Coordination 04/19 12/19 Develop and Submit PS&E 09/19 12/19 Advertise for Bids 01/20 02/20 Submit and Receive Bids for Review and Approval 02/20 03/20 Project Implementation/Construction 04/20 12/20