Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator

Similar documents
CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete.

TOWNSHIP OF UPPER ST. CLAIR PROPOSED CAPITAL IMPROVEMENT PROGRAM

CITY OF BELLEVILLE 2017 Capital Budget

Summary of Funding Sources

Summary of Approved Funding Sources

2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested

CITY OF NORWALK, CONNECTICUT

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt

TOWN OF NORTH BERWICK CAPITAL IMPROVEMENT PROGRAM

Town of Yarmouth Capital Improvement Plan FY FY2025

Burlington Capital Improvement Plan: FY FY 2023

City of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM

ROSS TOWNSHIP 5 YEAR CAPITAL IMPROVEMENT PLAN

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

Working for Broward. Working for Coral Springs. September, 2016

Capital Improvement Program (CIP) Fiscal Years 2017/ /2021

Pay Station EMV Chip Reader & Processor Upgrades

FY Projects

ROSS TOWNSHIP 5 YEAR CAPITAL IMPROVEMENT PLAN

Capital Improvement Plan Review

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

FY-15 FY-16 FY-17 CIP - CATEGORY/DESCRIPTION

Presented to Council November 7, :30 p.m. More images

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269)

PARTIAL PROGRAM OF PROJECTS FFY

SAN JOSE CAPITAL OF SILICON VALLEY

2013 Capital Budget Capital Improvement Program

10/24/17 CITY OF BOTTINEAU Page: 1 of 49 10:37:40 Expenditure Budget Report -- MultiYear Actuals Report ID: B240 For the Year: 2018

Purpose of Capital Improvement Program

STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION RE: PENNICHUCK WATERWORKS, INC. DW 13-

Claremont Capital Improvement Program Summary Matrix

TRANSPORTATION ENGINEERING SERVICES: Street Project Management

HENRY COUNTY GOVERNMENT CAPITAL IMPROVEMENT PLAN DISCUSSION

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets.

INCORPORATED VILLAGE OF ROCKVILLE CENTRE ADOPTED BUDGET

Fixed Asset Allocations by Budget Unit for FY

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including:

City of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status

Public Works Department, Capital Improvement Program Project Tracking

2019 Bond Program. Bond Advisory Committee Rankings. November 12, 2018

Sales and Use Transportation Tax Implementation Plan

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

Capital Improvement Plan, Summary, All '10/'11. City of St. Albans, Vermont Contact Fire Chief. Fire -E-1. Description. Justification.

AGENDA INTERCITY TRANSIT AUTHORITY WORK SESSION January 20, :30 P.M. 1) APPROVAL OF AGENDA 1 min.

CITY OF WEATHERFORD 2011 BUDGET

Region: Year Total Expense Total Revenue Difference , , Prior Years

Public Works. Capital Projects FY

Stormwater Utility Agency Mission Agency Overview

Parking Utility Agency Overview

Treasure Island Toll Policy, Affordability and Transit Pass Programs. TIMMA Board Meeting December 11, 2018

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT

Parking Utility Function: Public Works & Transportation

Public and Fleet Electric Vehicle Charging Infrastructure Strategy

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

Capital Improvement Plan Presentation January 10, 2017

An Asset Management Plan for Transit And Access Transit Fleet

Balancing the Transportation Needs of a Growing City

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

Town of East Greenwich Adopted Fiscal Year 2019 Budget

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Compressed Natural Gas (CNG) Fueling Station #

CITY OF HEATH, TEXAS ANNUAL OPERATING BUDGET FISCAL YEAR

City of Des Moines. Operating Budget & Governmental CIP. January 22, 2018

Business Advisory Committee. November 3, 2015

PUBLIC FACILITIES DIRECTORY

Agenda Report ARTS, RECREATION AND COMMUNITY SERVICES DEPARTMENT

CAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment

OFFICE OF FLEET MANAGEMENT FISCAL YEAR 2015 BUDGET TESTIMONY APRIL 7, 2014 EXECUTIVE SUMMARY

LACEY CITY COUNCIL MEETING July 09, 2015

City of Fernandina Beach, Florida Annual Budget

FIVE YEAR CAPITAL IMPROVEMENT PROGRAM FY

CAPITAL IMPROVEMENT PROGRAM COMMITTEE RECOMMENDATION

SEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A

Project Funding

CITY OF WEST PEORIA SUMMARY OF REVENUES,. FY2013 FY2014 FY2015 FY2015 FY2016 FY2017 ACTUAL BUDGET BUDGET ACTUAL BUDGET BUDGET NOTES

City of Brooklyn Park, Minnesota. Capital Equipment Plan Issued by:

City of Pittsburg Five Year Capital Improvements Plan. Introduction

Capital Improvement Plan

City Budget Fleet Services Capital Budget Analyst Notes

Minnesota Avenue Station Parking Garage Repair Project

Capital Needs Assessment Riders Advisory Council July2, 2008

Appendix C. Cost Estimates

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015

City of Grand Forks Staff Report

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Custom Budget Comp through FY18 Expenses

Transcription:

City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement Plan -- Revised Following the review and discussion during the Common Council meeting on July 13 th, several modifications have been made to the proposed Capital Improvement Plan. Attached for your review and consideration is a revised copy of the plan that illustrates the changes in yellow highlighted cells. Two areas have been increased: $16,000: Traffic speed monitors for the police department for 2010. $20,000 (increase) Upgrade for City Hall computer network for 2010. Several infrastructure and road improvement projects have been deferred to future years. The specific projects deferred from 2010 include: $300,000: Upper Tatlock tennis court renovations. $500,000: Valley View Avenue reconstruction. $300,000: Greenfield Avenue reconstruction. $600,000: Beechwood Road reconstruction. $25,000 (reduction) Drainage improvement projects. The proposed changes result in a revised total for City Projects that will amount to $6,786,300. Of that total, $1,000,000 will be reimbursed through a federal grant resulting in a final City Projects total of: $5,786,300. I look forward to responding to any comments or questions that you may have.

July, 2010 City of Summit Proposed 2010- Capital Improvement Plan Presented to: The Honorable Mayor Jordan Glatt & Members of Common Council By: Christopher J. Cotter, City Administrator Attached is the proposed capital improvement plan covering the period 2010. This plan incorporates replacement schedules for equipment and recommendations by department heads for projects, facility improvements that typically have a useful life of ten or more years. The plan includes specific proposals for 2010 and pending projects through. Those items in the current budget year that are aligned with the 2010 goals of Common Council are shown in bold. The following is the full listing of 2010 Council goals: 1. Fiscal Responsibility 2. Downtown 3. Safety 4. Infrastructure An explanation of several significant projects and recommended changes in the plan follows: Fire Department: Equipment: Scheduled equipment replacement projects include firefighter protective gear; automatic external defibrillators, radio pagers and a response vehicle assigned to incident command. Fire Headquarters: Included in this category are replacements for an air compressor, windows in the hose tower section of the facility and funding for replacement of an aged heating system. A request for an upgraded phone system has been moved to 2011 in anticipation of the pending regional communications project and the Millburn and Summit Fire Department shared services study. Page 1

July, 2010 Consolidated Radio Fire & Police: Funding included here will include acquisition of new radios for the fire and police department, a multi-agency, multijurisdictional computer aided dispatch system and related equipment necessary to fund the City s portion of a regional dispatch center. Funding is provided in the amount of $3 million of which $1 million will be paid through a federal grant. The costs are estimates pending the completion of the project implementation plan. Police Department: Replacement of automatic electronic defibrillators (AEDs) are included here. Municipal Court: The acquisition of a heavy duty shredder is proposed. Administration/Clerk Finance: Information Technology: Projects include: Scheduled replacement of computers and funding for improvements to the software used for Tax Collection as well as improvements to the City Hall phone system. Department of Community Programs Municipal Golf Course Improvements: $8,000 is included this year for replacement of the club house roof. Family Aquatic Center: $35,000 is included for installing replacement windows in the main building. Upper Tatlock Tennis Courts: Funding is included to resurface and repair the tennis courts at a cost of $300,000. Community Center: Funding for window replacement at a cost of $75,000 is included here. Community Programs Equipment: Projects include acquisition of a lightning detection system for the Family Aquatic Center and replacement of playground equipment at the Mabie Playground. Department of Community Services Project Infrastructure: This section includes the most significant and costly capital improvement projects. Each of the projects have been included in previous capital improvement plans as part of programmed, infrastructure upgrades. Pedestrian Safety Improvements: $150,000 is included as part of the continuing initiative for pedestrian improvements and traffic calming. Page 2

July, 2010 Drainage Improvements: $150,000 is included for general drainage improvement projects and upgrades to the City s storm water sewer system. Road Improvements: Based on recommendations of the City Engineer, a road reconstruction program is developed for the capital plan. Typically, the project is offset by assessments to property owners for the installation of replacement curbing and sidewalks; however, those costs are included in the initial project budget. Certain projects are eligible for funding in part from grants by the New Jersey Department of Transportation. Bellevue Avenue Drainage Improvement: Funding in the amount of $500,000 as part of a major storm water drainage improvement project. Blackburn Road Drainage Improvement: Funding in the amount of $250,000 is included to address drainage improvements. DCS Equipment & Buildings: Annual Vehicle Replacement: $422,000 is proposed for the replacement of several vehicles in the DPW fleet. Traffic Signal Controllers: $18,500 is included for the upgrade of existing traffic signal controllers. Computer Network Upgrade: $40,000 is proposed for the continuing upgrade of the City s computer network. Geographic Information System (G.I.S.): $150,000 is proposed for continued implementation of the City s GIS program. Storm Water Requirements: $50,000 is included for continuing compliance with the New Jersey Storm Water Act regulations. Transfer Station Building Maintenance $22,000 is proposed for facility maintenance. City Garage: $30,000 is allocated for soil remediation associated with removal of underground storage tanks at 41 Chatham Road, the city s municipal garage. City Hall: $21,000 is proposed for various maintenance improvements to City Hall. Parking Services Parking Lots Upgrade: $50,000 is included in a multi-year initiative to upgrade the various parking lots. Park & Shop Lots: $700,000 is included for the installation of devices at the park and shop lot to accommodate a paid parking system. Sewer Utility Vehicle Replacement: $290,000 is allocated for vehicle replacement. Page 3

July, 2010 Infrastructure Improvements: Continuing the investment in rehabilitation of the City s sanitary sewer system, $800,000 is included in this year s budget. Financial Analysis Municipal Debt Service Capital projects are funded either through cash payment or long term bonding paid typically over a 20-year period. An analysis of the current debt service the annual cost for paying down existing debt -- for all municipal and school improvement projects is shown on the following page. Later this year a bond sale is anticipated that will include the sale of accumulated short term debt in amount of $20 million for various municipal and school projects completed during the past several yeas. The actual impact on debt service w ill be dependent on how the repayment schedule will be structured. Once again I m thankful for all of the efforts of our department heads and to Acting City Treasurer Scott Olsen, for their contribution to this capital plan. I look forward to responding to any comments or questions that you may have. Respectfully submitted, Christopher J. Cotter, City Administrator Capital Plan Total: The current year plan total is $8.2 million. A federal grant for a combined communication center will reduce that amount to $7.2 million. In order to achieve a $5 million target, significant projects will need to be postponed, including roadway and draining improvements. I look forward to discussing the various options with you. Page 4

July, 2010 City of Summit Comparison of Total Debt Service $7,000,000.00 $6,000,000.00 $5,000,000.00 Amount $4,000,000.00 $3,000,000.00 $2,000,000.00 $1,000,000.00 $0.00 2010 2011 2012 2013 2014 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Year Page 5

Fire Department Total 2010- Equipment Fire Hydrant Markers 3,000 3,000 6,000 Replace Fire Hose 11,000 13,000 15,000 39,000 Replace Turn Out Gear 11,500 12,000 12,000 12,500 13,000 13,000 74,000 Purchase/Replace 2 AED's 4,300 4,300 8,600 Replace Small Equipment 8,000 9,000 10,000 27,000 SCBA Update Program 23,000 23,500 24,000 70,500 Replace Hydraulic Rescue Equipment 30,000 30,000 60,000 Replace Fire Prevention Vehicle 2 45,000 45,000 Replace Engine # 2 600,000 600,000 Replacement of Special Services Vehicle 50,000 50,000 Computer, Server, and Hub Upgrades 13,000 13,500 26,500 Recall Pagers 10,000 10,000 Replace Incident Command Vehicle 75,000 75,000 Fire Equipment Subtotal $ 100,800 $ 117,000 $ 668,500 $ 107,800 $ 26,500 $ 71,000 $ 1,091,600 Fire Headquarters Mechanical High Density Mobile File Sys 18,000 18,000 Replace Air Compressor 8,000 8,000 Replace Carpet and Furniture 14,000 14,000 Replace Carpeting 7,000 9,000 16,000 Replace Office Furniture 7,000 9,000 16,000 Replace/Upgrade Telephone System 35,000 35,000 Replace Windows in Hose Tower 7,000 7,000 Interior Painting 18,000 18,000 36,000 Heating System Eval. & Boiler Replacement 95,000 95,000 Fire Headquarters Subtotal $ 110,000 $ 50,000 $ 245,000 Fire Department Totals $ 210,800 $ 117,000 $ 668,500 $ 107,800 $ 76,500 $ 71,000 $ 1,336,600 Consolidated Dispatch Consolidated Dispatch System 3,000,000 3,000,000 Consolidated Dispatch Total $ 3,000,000 $ 3,000,000 Capital Improvement Plan 1

Total 2010- Police Department Speed Monitors 16,000 16,000 32,000 Replacement of Defibrillators 40,000 40,000 Long Weapon Replacement 35,000 35,000 Evidence Beast System Replacement 12,000 12,000 Evidence Processing System 27,000 27,000 Variable Message Board Replacement 16,000 16,000 Alco-Tester Replacement 15,000 15,000 Furniture Replacement 100,000 100,000 Replace Copiers (3) 25,000 25,000 Replace In-Car Video System 60,000 60,000 Replace In-Car Computer System 60,000 60,000 Police Department Totals $ 56,000 $ 55,000 $ 15,000 $ 135,000 $ 41,000 $ 120,000 $ 422,000 Capital Improvement Plan 2

Municipal Court Total 2010- Replace Copier 10,000 10,000 Commercial Shredder 5,000 5,000 Municipal Court Total $ 5,000 $ 10,000 $ 15,000 Library PC Workstation Upgrade 19,500 19,500 39,000 Computer Lab Laptop Upgrade - Library Total $ 19,500 $ 19,500 $ 39,000 Administration/Clerk/Finance City Hall Computerization (Admin) 18,000 18,000 20,000 22,000 24,000 25,000 127,000 Upgrade Tax Collection Software 30,000 30,000 Increase City Hall Telephone Capacity 20,000 20,000 40,000 Administration/Clerk/Finance Total $ 68,000 $ 38,000 $ 20,000 $ 22,000 $ 24,000 $ 25,000 $ 197,000 Capital Improvement Plan 3

Department of Community Programs Total 2010- Facility Repair/Maintenance Cornog Field house Renovations 250,000 750,000 1,000,000 Golf Course - Pond, Dam, Building Improvements 500,000 500,000 1,000,000 Metro Homes Concession Stand Upgrade 100,000 100,000 Metro Homes Track Replacement 100,000 100,000 Metro Homes Artificial Turf Replacement 500,000 500,000 Family Aquatic Center Renovations 1,000,000 1,000,000 Family Aquatic Center Buildings 50,000 450,000 500,000 Family Aquatic Center Windows 35,000 35,000 Family Aquatic Center Parking Lot 400,000 400,000 Recreation Center Rehabilitation 2,000,000 2,000,000 Upper Tatlock Field House Rehabilitation 50,000 450,000 500,000 Upper Tatlock Field Tennis Court 300,000 300,000 Upper Tatlock Artificial Turf Field 500,000 500,000 Memorial Field Track Rehabilitation 250,000 250,000 Wilson Park Phase II 750,000 750,000 Replace Bleachers Metro Homes Field 500,000 500,000 Golf Course Roof 8,000 8,000 Community Center Gym Windows 75,000 75,000 Subtotal Community Programs Facility Repair $ 118,000 $ 5,000,000 $ 3,150,000 $ 750,000 $ 500,000 $ 9,518,000 Capital Improvement Plan 4

Total 2010- Community Programs Equipment Park Furnishing 10,000 10,000 Lightning Detection Systems 35,000 35,000 70,000 Replace Equipment at Mabie Playground 25,000 75,000 100,000 Subtotal Community Programs Equipment $ 60,000 $ 120,000 $ 180,000 Community Programs Totals $ 178,000 $ 5,120,000 $ 3,150,000 $ 750,000 $ 500,000 $ 9,698,000 Community Programs Construction Projects (DCS) Memorial Brook Wall Repair & Fence 500,000 500,000 Total Community Programs Construction $ 500,000 $ 500,000 Capital Improvement Plan 5

Total 2010- Department of Community Services Infrastructure Pedestrian Safety Improvement Project 150,000 125,000 100,000 100,000 100,000 100,000 675,000 Drainage Improvement Projects 125,000 125,000 100,000 100,000 100,000 100,000 650,000 Waldron Avenue Improvements 500,000 100,000 Improve Valley View Avenue 800,000 800,000 Improve Bellevue Avenue 500,000 500,000 Bellevue Drainage Basin Improvements 500,000 500,000 Improve Hillcrest Avenue 600,000 600,000 Improve Bedford Road 500,000 500,000 Improve Sunset Drive 600,000 600,000 Improve Miele Place & Plain Street 350,000 350,000 Improve Greenfield Road 300,000 300,000 Miscellaneous Road Projects 20,000 20,000 20,000 20,000 20,000 100,000 Improve Beechwood Road-Hillcrest-Hawthorne 600,000 600,000 Improve Beechwood Road-Hawthorne-DeForest 250,000 250,000 Euclid Avenue 200,000 200,000 Hawthorne Place 500,000 500,000 Essex Road Reconstruction 900,000 900,000 Ashland Road Paving 250,000 250,000 DeForest Avenue Paving 300,000 300,000 Whittredge Road Sec 1 (Summit - Essex) 500,000 500,000 Whittredge Road Sec 2 (Essex - Prospect) 900,000 900,000 Kent Place Blvd Paving 650,000 650,000 Beekman Road Paving 750,000 750,000 Druid Hill Road Improvements 1,000,000 1,000,000 Warwick Road Improvements 500,000 500,000 Fernwood Road Improvements 1,000,000 1,000,000 Edgemont Avenue Improvements 500,000 500,000 Badeau Avenue Improvements 500,000 500,000 Wallace Road Improvements 400,000 400,000 Shadyside Avenue 450,000 450,000 Blackburn Drainage Project 250,000 250,000 Fairview Ave 450,000 450,000 Subtotal DCS Infrastructure $ 2,495,000 $ 2,320,000 $ 2,670,000 $ 2,320,000 $ 4,270,000 $ 2,850,000 $ 16,525,000 Capital Improvement Plan 6

Total 2010- Equipment Annual Vehicle Replacement 422,000 403,000 425,000 425,000 425,000 2,100,000 Traffic Signal Controllers 18,500 18,500 19,500 22,000 22,000 100,500 Upgrade City Computer Network 60,000 40,000 125,000 40,000 40,000 305,000 G.I.S. System 150,000 150,000 150,000 150,000 150,000 750,000 Storm Water Requirements 50,000 50,000 50,000 50,000 50,000 250,000 Subtotal DCS Equipment $ 700,500 $ 661,500 $ 769,500 $ 687,000 $ 687,000 $ 3,505,500 DCS Buildings Transfer Station Bay Doors 60,000 60,000 Transfer Station Building Maintenance 22,000 22,000 UST Soil Cleanup/Tank 41 Chatham Road 30,000 30,000 60,000 City Hall Chiller 200,000 200,000 City Hall - Building Maintenance 21,000 21,000 21,000 21,000 21,000 105,000 Subtotal DCS Buildings $ 73,000 $ 251,000 $ 21,000 $ 81,000 $ 21,000 $ 447,000 Department of Community Services Total $ 3,268,500 $ 3,232,500 $ 3,460,500 $ 3,088,000 $ 4,978,000 $ 2,850,000 $ 20,477,500 CITY TOTAL S $ 6,786,300 $ 8,572,500 $ 7,814,000 $ 4,122,300 $ 5,139,000 $ 3,566,000 $ 35,685,100 Capital Improvement Plan 7

Total 2010- Parking Services Utility Parking Lots Upgrade 50,000 50,000 5,000 5,000 5,000 5,000 120,000 Park & Shop Lots Program 700,000 700,000 Replace Parking Services Truck 35,000 35,000 Replace Change Machine 10,000 10,000 Parking Services Utility Totals $ 750,000 $ 60,000 $ 5,000 $ 5,000 $ 5,000 $ 40,000 $ 865,000 Sewer Utility Equipment Vehicle Replacement 290,000 290,000 Subtotal Sewer Equipment $ 290,000 $ 290,000 Joint Meeting Share 937,000 1,008,000 1,945,000 General Rehabilitation Projects 800,000 825,000 850,000 900,000 950,000 950,000 5,275,000 Total Sewer Utility $ 1,090,000 $ 1,762,000 $ 850,000 $ 900,000 $ 950,000 $ 1,958,000 $ 7,510,000 TOTAL CITY ALL S $ 8,626,300 $ 10,394,500 $ 8,669,000 $ 5,027,300 $ 6,094,000 $ 5,564,000 $ 44,060,100 Capital Improvement Plan 8