UIC CODE Brakes Brakes with composite brake blocks General conditions for the certification of composite brake blocks

Similar documents
UIC CODE Brakes Disc brakes and their applications - General conditions for the certification of brake parts

INTEROPERABILITY UNIT

UIC CODE rd edition, March 2016 Last update 01/04/2018 Translation or original

- LL brake blocks: the process of homologation - UIC/CER/UIP programme and homologation procedure

UIC CODE th edition, July 2016 Last update Translation. Brakes Air Brakes for freight trains and passenger trains

Friction Material. Freight Cars High-Speed Trains Light Rail Vehicles Locomotives Metros Passenger Coaches Regional and Commuter Trains

The trend of noise regulation in Japan

1. H. Julius Hackett General Manager Phone: (850) Extension 201 Cell: (850)

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918)

SECTION 1 - APPLICANT INFORMATION. 1) Legal Name: 2) Mailing Address: 3) Physical Address (if different from mailing address):

DRAFT RECOMMENDATION N. 006REC1072

3.2 Steer Design. A. Concept Development & Selection Process. B. Configuration Summary

CALENDAR OF FILING DEADLINES AND SEC HOLIDAYS

Appendix 1B: Ferry statistics

CEE nd Midterm Examination (50 minutes)

PET(S) FIRST & LAST NAME: January 2019

MONTHLY NEW RESIDENTIAL CONSTRUCTION, APRIL 2017

Acoustic Pass-by Test of the Europe Train First preliminary results. DB Systemtechnik GmbH H. Heckelmueller T.TVI32(3) Munich, October 22nd, 2012

MONTHLY NEW RESIDENTIAL CONSTRUCTION, FEBRUARY 2017

MONTHLY NEW RESIDENTIAL CONSTRUCTION, JULY 2017

U.S. Department of Transportation

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998

James Graham, P.E. Standards Coordinator Transformers Committee

Inventory Levels - All Prices. Inventory Levels - By Price Range

Approved profiles. Version May Approved profiles v2.29: _25 1 of 15

Inventory Levels - All Prices. Inventory Levels - By Price Range

THE CALIFORNIA STATE UNIVERSITY Commercial Paper Equipment Financing (CPEF) Fiscal Year Financing Schedules *

Ambient PM 10 Monitoring Sechelt, B.C Update

Notre Dame High School 26 Acts of Kindness Calendar

Airworthiness Directive

MONTHLY NEW RESIDENTIAL CONSTRUCTION, AUGUST 2017

Inventory Levels - All Prices. Inventory Levels - By Price Range

BrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule)

No. CONSUMER PRICE INDICES. Information bulletin. Moscow 2019

MONTHLY NEW RESIDENTIAL CONSTRUCTION, NOVEMBER 2017

Department of Transportation. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

2013 Carolyn Wilhelm, Wise Owl Factory,

SGS North America, Inc.: Grant of Expansion of Recognition. AGENCY: Occupational Safety and Health Administration (OSHA), Labor.

DEPARTMENT OF TRANSPORTATION. Agency Information Collection Activities; Extension of a Currently-Approved

Airworthiness Directive

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

MONTHLY NEW RESIDENTIAL SALES, APRIL 2017

APPENDIX 16 TO THE GENERAL CONTRACT OF USE FOR WAGONS WAGON VEHICLE DATA

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company

December Individual Quality Review Calendar FY 18 FY 19. Mon Tues Wed Thu Fri Sat. Sun METRO1 SAMPLE TO REGION

PURCHASING MEMORANDUM

VALTHERMO Contact Wires and Stranded Conductors

MONTHLY NEW RESIDENTIAL SALES, SEPTEMBER 2018

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Civil Aviation Authority Czech Republic

ClearRoute Training Courses

TYPE CERTIFICATE DATA SHEET

Massaging System Bath Blower Relocation Kit

Notice to Registered Entities of SPP RE 2015 Reporting Requirements Schedule

CERTIFICATE OF COMPLIANCE

Hydrogen & Fuel Cell Standards Update. Julie Weis, Sara Marxen, and Julie Cairns August 2014

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. LARGE MANUFACTURING SERVICE RATE SCHEDULES (November 2018)

FLORENCE ELECTRICITY DEPARTMENT. MANUFACTURING SERVICE RATE--SCHEDULE TDMSA (October 2015) Availability

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

Power Reducer Box. Sunny WebBox PLC. Inverter unit. Fig. 1: SMA Sunny GEU STP STP 15000TLEE-10

EASA Update. ARSA Symposium, Washington DC. 20 March Karl SPECHT

MEDIA KIT ELECTRONIQUE. The brand for electronics and decision makers engineers

CERTIFICATE OF COMPLIANCE

APPENDIX 6A. Air Quality Monitoring Results

PURCHASING MEMORANDUM

Net Metering Webinar

Airworthiness Directive

UNICO MANUFACTURING CO. (PE) (PTY) LTD BRAKE FLUID DOT3 IDENTIFICATION OF THE SUBSTANCE / PREPARATION AND COMPANY

Extraordinary NSA Meeting. Lille, the 29 th of July 2009

ASME B31.8 INTERPRETATIONS VOLUME 13

TYPE-CERTIFICATE DATA SHEET

NCAA Division I Championship Subdivision Football Recruiting Calendar August 1, 2017, through July 31, 2018

Preliminary 2014 Ontario Road Safety Annual Report Selected Statistics

<Nationwide> Improving moderately ( )

DEPARTMENT OF TRANSPORTATION

(Text with EEA relevance)

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 1E12

Capacity Market Rules for Energy Storage Resources

TYPE-CERTIFICATE DATA SHEET

Individual Certification Programs Status Update

Rotorcraft Rulemaking and Policy Update

ELECTROMAGNETIC SINGLE-DISC CLUTCHES

PART PROGRESSION LIST AND PART PRICE LIST S As of October 12, 2006

TRANSFER FLOW INCORPORATED INSTRUCTION SHEET NUMBER 374 IS DEPARTMENT OF TRANSPORTATION SPECIAL PERMIT SP

NDT & Welding Inspection Training and Certification Center

Guideline for Multi-combination Vehicles

Airworthiness Directive Schedule

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY. PARTIAL STREET LIGHTING SERVICE RATE 117 Page 1 of 5

VC ACADEMIC CALENDAR. Sun Mon Tue Wed Thu Fri Sat. Sum 10 Wk. & Sum II Final Exams. Cancel Fall 16 wk. & Fall I Non-Pays

CERTIFICATE OF COMPLIANCE

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

BALL RACES SINGLE-ROW AND DOUBLE-ROW

Review of Motorcycle Noise Regulation in Japan (Review of UN R41-04 Limit Value)

Legal Aid Reform: what is supposed to happen when?

Standard wagons - Ordinary bogie wagons - Characteristics

TYPE-CERTIFICATE DATA SHEET

Bank of Japan. Research and Statistics Department FOR RELEASE 8:50 A.M. Thursday, October 25, All items

Introduction: RECHARGE in Europe

Electric Vehicles and the Environment (EVE IWG)

Transcription:

Appendix to UIC CODE 541-4 4 th edition, December 2010 Lat update 15/07/20 Tranlation Brake Brake with compoite brake block General condition for the certification of compoite brake block Appendix M Compoite brake block certified for international traffic Appendix M conit of 3 table one table per friction coefficient category. For K-block the Deign rule for compoite brake block (K) (9 th edition, Augut 2013) are to be applied. For LL-block the Uage guideline for compoite (LL) brake block (10 th edition, Augut 2013) are to be applied The table given in thi appendix: are updated regularly, correpond to the above date of update.

WEBSITE: www.uic.org page: 2 Appendix M - Compoite brake block certified for international traffic M.1: Compoite brake block with high friction level (K) Product with proviional certification for ervice tet a per UIC Leaflet 541-4 Manufacturer Type decription deignation (if different) (organic / intered) C333 Coid 704 Coid 704 Coid 704 Jurid 822 Nominal wheel diameter Ø axle load Braking regime / peed force per block holder [mm] [t] [kn] 730 7,5/17,5 7,5/15,75 7,5/14,25 5 5 5 14.5 (bi 5 Configur ation Certified a per leaflet edition no. Remark Certification begin/ expire 1 x Bgu 4 B 12 RP A7 01.02.2011 31.01.20 1 x Bgu 4 FS DT/IRTB.SF.05 01.07.2011 30.0.20 2 x Bg 4 B 12 RP O3 09.01.2014 08.01.20 1 x Bgu 4 B 12 RP O3 03.08.2015 02.08.20 2xBg 4 B 12 RP O 01.02.2017 31.01.20 1 x Bgu 4 B 12 RP N12 31.07.2015 30.07.20 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 3 Fully certified product Manufacturer Type decription deignation (if different) Nominal wheel Ø axle load Braking regime / peed force per block holder Configuration Certified a per leaflet edition no. Remark Certification begin/ expire (organic / intered) [mm] [t] [kn] K40 1.8 2 x Bg 4 # 14 01.02.2015 31.01.2025 K40 1.8 2 x Bg 4 # 14 03.07.2015 02.07.2025 C333 5 1 x Bgu 3 # 1 01.07.2011 30.0.2021 C333 2 x Bg 4 #13 01.07.2014 30.0.2024 C333 5 3 03.07.2015 02.07.2025 C333 (geintert) 4,5 20 25 1 x Bgu 4 # 10 01.07.2013 30.0.2023 C333 4,5 25 1 x Bgu 4 # 10 01.07.2013 30.0.2023 3, 2 x Bg 2 x Bgu 4 # 11 15.10.2003 30.0.2023 5 1 x Bgu 4 # 2 01.03.2011 28.02.2021 7,5 17,5 5.5 14.5 2 x Bg 4 # 3 01.08.2011 31.07.2021 7,5 8.7 12,2 2 x Bg 4 # 4 01.02.2012 31.01.2022 4,5 20 25 1 x Bgu 4 # 7 01.01.2013 31.12.2022 4,5 25 1 x Bgu 4 # 7 01.01.2013 31.12.2022 9,25 1 10.1 10.1 2 x Bg 4 # 8 01.02.2013 31.01.2023 5,8 25 4.5 1.5 2xBgu 4 #15 0.05.2015 05.05.2025 Coid 704 2 x Bg 4 # 01.07.201 30.0.202 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 4 Manufacturer Type decription deignation (if different) Nominal wheel Ø axle load Braking regime / peed force per block holder Configuration Certified a per leaflet edition no. Remark Certification begin/ expire (organic / intered) [mm] [t] [kn] Coid 704 3, S 2 x Bgu 4 # 01.02.2017 31.01.2027 Coid 704 730 7,5/17,5 7,5/15,75 7,5/14,25 14.5 2 x Bg 4 #21 01.02.2017 31.01.2027 Frenoplat FR513 2 x Bg 3 # 5 01.07.2012 30.0.2022 Frenoplat FR513 730 7,5 17,5 5.5 14.5 2 x Bg 4 # 9 01.05.2013 30.04.2023 Frenoplat FR513 3, 20 empty laden 01.11.2014 31.10.2024 Frenoplat FR513 3, empty laden 17 01.11.2014 31.10.2024 Jurid 81 M : J81M 3, S 2 x Bg 2 x Bgu 3 # 17 01.07.2005 15.04.2025 Jurid 81 M : J81M 730 7,5 17,5 5.5 14.5 2 x Bg 4 # 01.07.2012 30.0.2022 Jurid 81 M : J81M 7,5 5.5 14.5 2 x Bg 4 # 12 01.05.2014 30.04.2024 Jurid 81 M :J81M Min 7,5 Max 17,5 ( mm) 15,75 ( mm) Min 5.5 Max 15 ( mm) 1 ( mm) 2 x Bg 4 # 01.07.201 30.0.202 Jurid 822 3,.5 1 x Bgu 4 # 20 01.02.2017 31.01.2027 K40 730 3,/20 3,/ 3,/17,5 (up to max axle load) 1,8/ 1,8/17 1,8/1 2 x Bg 4 #22 01.02.20 31.01.2028 # 1 In accordance with Report FS DT/IRTB.SF.05 of 0.04.2011 # 2 In accordance with Report B12 RP A7 # 3 In accordance with Report B12 RP N5 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 5 # 4 In accordance with Report B12 RP C4 # 5 In accordance with Report B12 RP D2 It i recommended to oberve the development of wear in wheel block following thi block initial fitting. # In accordance with Report B12 RP N5 & N # 7 In accordance with Report B12 RP C7 # 8 In accordance with Report B12 RP C9, vehicle without load-changeover device # 9 In accordance with Report B12 RP D3 #10 In accordance with Report B 12 RP C13 #11 In accordance with report B 12 RP C8 #12 In accordance with report B 12 RP N10 #13 In accordance with report B 12 RP C3 #14 In accordance with report B 12 RP A #15 In accordance with report B12 RP C15 #1 In accordance with report B12 RP D4 #17 In accordance with report B12 RP N9 # In accordance with report B12 RP N9 # In accordance with report B12 RP O3 #20 in accordance with report B 12 RP N12 #21 In accordance with report B12 RP O #22 In accordance with report B12 RP A1 (See page 11) The thickne of the wheel rim i related to the diameter of the running urface (calculated from minimal wheel diameter a min minu inner wheel diameter b1) mut not be below a minimum value of 30 mm (Reaon: thermal limit of worn wheel). Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: Information on update for K block Date of update: Body in charge: Deciion: 13.4.2011 B12.13 Incluion of the lit of certified product from the deign rule for K block, 7th edition 13.4.2011 SET 7 Completion of the lit by the product in 1xBgu configuration in accordance with the deciion made by SET 7 on 4.3.2011 (e-mail conultation) 1.7.2011 SET 7 Completion of the lit by the product C333 in 1xBgu configuration in accordance with the deciion made by SET 7 on 29..2011 1.7.2011 B12.13 Completion of the lit of proviionally certified product by C333 in1xbgu (SS) 2xBg (S/SS) configuration Deciion by B12.13 on 1..2011 10.8.2011 SET 7 Completion of the lit by the product & J81M for nominal wheel diameter of mm under the tated general condition, in accordance with the deciion made by B12.13 on 8.8.2011 (outcome of e-mail conultation initiated on bai of deciion taken at meeting on 29..2011) 01.0.2012 SET 7 Completion of the lit by the product for wheel with diameter mm. Reult documented in Report B12/C4. Deciion taken at meeting/by email conultation on 2.01.2012 01.0.2012 B12.13 Completion of the lit of approved product by K40 under above mentioned boundary condition, deciion of B12.13, 7 th meeting on 22 nd & 23 rd May 2012 01.08.2012 SET 7 Completion of the lit by certification of Jurid 81M on wheel with diameter of 730 mm under above mentioned boundary condition (certification for wheel with diameter mm ince 1 t Augut 2011). Deciion of SET 7 during 224 th meeting on 28 th & 29 th June 2012 01.08.2012 SET 7 Completion of the lit by certification of FR513 in configuration 2xBg under above mentioned boundary condition, Deciion of SET 7 during 224 th meeting on 28 th & 29 th June 2012 02.02.2013 SET 7 Lit extended to include certification of the for wheel with diameter mm. Reult of expert appraial contained in B12/C7. Deciion taken at meeting / by email on 15.11.2012 02.02.2013 SET 7 Lit extended to include certification of the for wheel with diameter mm. Reult of expert appraial contained in B12/C7. Deciion taken at meeting / 225th meeting on 23./24.01.2013 30.04.2013 SE T 7 Lit extended to include certification of the FR513 for wheel with diameter 730 mm. Reult of expert appraial contained in B12/D3. Deciion taken by email inquiry from 20.02.2013 05.07.2013 SET 7 Lit extended to include certification of the C333 for wheel with diameter mm. Reult of expert appraial contained in B12/C13. Deciion taken 22th meeting on /.0.2013 05.07.2013 SET 7 Lit extended to renew certification of the. Reult of expert appraial contained in B12/C8. Deciion taken at 22th meeting on /.0.2013 09.01.2014 B 12.13 Completion of the lit of proviionally certified product by Coid 704 in 2xBg configuration in accordance with the deciion of B 12.13 at it 83 rd meeting on 13/14 November 2013 01.04.2014 B 12.13 Completion of the lit of proviionally certified product by Coid 704 in 2xBgu configuration in accordance with the deciion of B 12.13 at it 85 th meeting on 25/2 March 2014 01.04.2014 SET 7 Lit extended to extend the certification of the Jurid 81M. Reult of expert appraial contained in B12/N10. Deciion taken by E-Mail urvey from 14 th April 2014 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 7 Date of update: Body in charge: Deciion: 01.07.2014 SET 7 Completion of the lit by certification of C333 in configuration 2xBg, Reult of expert appraial contained in B12/C3. Deciion taken during 228 th meeting on 24 th & 25 th June 2014 01.11.2014 SET 7 Lit completed to extend the certification of the Frenoplat FR513. Reult of expert appraial contained in B12/D4. Deciion taken by E-Mail urvey from 29 th September 2014 01.02.2015 SET 7 Completion of the lit by certification of K40 in configuration 2xBg, Reult of expert appraial contained in B12/A. Deciion taken during 228 th meeting on 21 t & 22 nd January 2015 15.05.2015 SET 7 Lit completed to extend the certification of the Jurid 81M. Reult of expert appraial contained in B12/N9. Deciion taken by E-Mail urvey from 23 rd March 2015 15.05.2015 SET 7 Lit completed to extend the certification of the. Reult of expert appraial contained in B12/C15. Deciion taken by E-Mail urvey from 20th April 2015 01.08.2015 SET 7 Completion of the lit by certification of K40 in configuration 2xBg SS.brake, Reult of expert appraial contained in B12/A. Completion of the lit by certification of C333 in configuration 2xBg SS.brake, Reult of expert appraial contained in B12/C3. Deciion taken during 230th meeting on 1t to 3rd July 2015 01.08.201 SET 7 Completion of the lit by certification of Coid 704 in configuration 2xBg S-brake, wheel Ø mm, Reult of expert appraial contained in B12/O3. Completion of the lit by extenion of certification of Jurid 81M in configuration 2xBg, wheel Ø - mm SS.brake, Reult of expert appraial contained in B12/N14. Deciion taken during 232nd meeting on 22nd 23rd June 201 01.02.2017 SET 7 Completion of the lit by certification of Coid 704 in configuration 2xBgu SSbrake, wheel Ø mm, & 2xBg with wheel Ø 730- mm.reult of expert appraial contained in B12/O3 & B 12/O. Completion of the lit by certification of Jurid 822 in configuration 1xBgu, wheel Ø S-brake. Reult of expert appraial contained in B12/N12. Deciion taken during 233rd meeting on th & th January 2017 October 2017 B 12.13 Prolongation of preliminary certification of Jurid 822 in configuration 1xBgu, wheel-ø mm, SS-brake, baed on report B 12 N12 Prolongation of preliminary certification of in configuration 1xBgu, wheel-ø mm, SS-brake, baed on report B 12 A7 01.02.20 SET 7 Completion of the lit by extenion of certification of K40 in configuration 2xBg, wheel Ø -730 mm S- SS.brake, Reult of expert appraial contained in B 12 A1. Deciion taken during 235th meeting on 17th th January 20 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 8 M.2: Compoite brake block with medium friction level (L) Fully certified product Manufacturer Type decription Permitted application/ remark Certified in accordance with leaflet edition no.. Application for certification made by End of certification ICER Brake ICER 903/2 Supplementary block brake for coache up to 200 km/h 4 ICER Brake 31.12.20 - Friction Product Ferodo 3325 F Supplementary block brake for coache up to 200 km/h 4-31.12.20 Wabtec L249 Supplementary block brake for coache up to 200 km/h 4 30.0.2022 Information on update for L block Date of update: Body in charge: Deciion: 01.08.2012 UIC SET 7 Completion of lit by certification of L249 under above mentioned boundary condition, deciion of SET 7, 224th meeting on 28 th & 29 th June 2012 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 9 M.2: Compoite brake block with low friction level (LL) Product with proviional certification for ervice tet a per UIC Leaflet 541-4 Manufacture r Type decription abbreviate d deignation (if different) Nominal wheel diamete r Ø Min. / max. axle load Brakin g regime / peed force per block holde r Configuratio n Certifie d a per leaflet edition no. Remark Certificatio n expire (organic / intered) [mm] [t] [kn] J847 (up to 50 2 x Bg 2 x Bgu 4 #1 10.09.20 Nota #1 According to B 12 RP N11 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 10 Product with full certification a per UIC Leaflet 541-4 Manufacturer Type decription deignation (if different) Nominal wheel diameter Ø axle load Braking regime / peed force per block holder Configuration Certified a per leaflet edition no. Remark Certification expire (organic / intered) [mm] [t] [kn] C952-1 3, 50 30.04.2023 C952-1 3, 50 2 x Bgu 4 30.04.2023 Icer Rail / IB 11* 3, 50 2 x Bg 4 30.04.2023 Icer Rail / IB 11* 3, 50 2 x Bg 2 x Bgu 4 30.04.2023 C952-1 5 20 empty laden 12 45 #2 Acc. to B 12 DT 444 31.01.2025 Icer Rail / IB 11* 5 20 empty laden 12 45 #2 Acc. to B 12 DT 444 31.01.2025 C952-1 5 empty laden 12 40 #2 Acc. to B 12 DT 444 31.01.2025 Icer Rail / IB 11* 5 empty laden 12 40 #2 Acc. to B 12 DT 444 31.01.2025 Icer Rail / IB 11* 730 3, 14t) 2,5 40 #2 Acc. to B 12 RP A 30.0.2028 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 11 Icer Rail / IB 11* 80 3, 14, 2,5 40 #2 Acc. to B 12 RP A 30.0.2028 Nota #1 Nota #2 Until it i demontrated that thi block i interchangeable with cat iron determining the braking performance againt UIC Leaflet 544-1 hall continue to be performed with thi configuration prior to fitting vehicle with thi block. The thickne of the wheel rim i related to the diameter of the running urface (calculated from minimal wheel diameter amin minu inner wheel diameter b1) mut not be below a minimum value of 30 mm (Reaon: thermal limit of worn wheel). Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 12 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com

WEBSITE: www.uic.org page: 13 Information on update for LL block Date of update: Body: Deciion: 1..2011 B12.13 Incluion of the lit of proviionally certified product from the deign rule for LL block, 7th edition 01.0.2012 B12.13 Extenion of proviional approval of the exiting product by two year in accordance with the deciion taken by WG B12.13 at it 75th meeting on 8.3.2012 01.05.2013 SET 7 Full certification iued for the C952-1 IB11*: deciion of SET 7 at it 225th meeting on 24.01.2013 01.0.2013 SET 7 Conideration of the deciion by E-Mail urvey from 24th April 2013 concerning unlimited interchangeability with cat iron brake block on the bai of report B 12 DT 440. 04.12.2014 B12.13 Proviional approval iued on the bai of report B12/N11, decided by WG B12.13 at it 88 th meeting on 04.12.2014 01.02.2015 SET 7 Conideration of the reult of report B12 DT 444, approved at the 229th meeting SET 7 on 22.01.2015 15.07.20 SET 7 Extenion of the certification of the brake block IB 11* baed on the reult of B 12 RP A approved by SET 7 at the 23 th meeting (Agenda point 3.2.2) on 27 th & 28 th June 20 Body reponible: UIC-SET 7 Braking File name: e541x4_a_m_07-.docx DB Sytemtechnik GmbH T.TVI 1, Mr. Frank Minde, Pioniertraße 10, D-32423 Minden Tel: +49 (0) 571 393 5100 E-Mail: Frank.Minde@deutchebahn.com