PRICE LIST OF FEES FOR USING THE 1435 MM TRACK GAUGE RAILWAY INFRASTRUCTURE MANAGED BY PKP POLSKIE LINIE KOLEJOWE S.A. EFFECTIVE FROM 9 DECEMBER 2018

Similar documents
TERMS OF USE OF THE RAIL NETWORK for the user of the railway siding the infrastructure manager

Aaren Healy, 20 September 2017 / 1

1 Example calculation

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

Current Development of the Tariff Structure in the Electricity System of the Republic of Macedonia

UPPER CUMBERLAND ELECTRIC MEMBERSHIP CORPORATION. RESIDENTIAL RATE--SCHEDULE RS (March 2019) Availability. Character of Service.

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I

U.S. Census Bureau News Joint Release U.S. Department of Housing and Urban Development

Portland General Electric Company Fourteenth Revision of Sheet No P.U.C. Oregon No. E-18 Canceling Thirteenth Revision of Sheet No.

The train-path pricing system. Who pays how much to rail infrastructure?

ELECTRIC SERVICE RATE SCHEDULES. Effective November 1, 2017

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

Oregon Withholding Tax Tables

2 nd. Monitoring period: 01/01/ /12/2011. Version 2.0. June 20, Climate Bridge Ltd.

Methodology of Cost Allocation

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Introduction to Charging: Which Parties Pay Which Charges?

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

Network Safeworking Rules and Procedures

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 Lihue, Kauai, Hawaii First Revised Sheet 80 Cancels Original Sheet 80

National Conference of State Transportation Specialists

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE ("MSC")

JEA Distributed Generation Policy Effective April 1, 2018

PURCHASED GAS ADJUSTMENT RIDER SCHEDULE

Annual General Shareholders Meeting of Grupa LOTOS S.A. convened for June 30, 2009

Superseding Revised Sheet No. 63 REVISED SHEET NO. 63 Effective March 1, 2011 Effective September 1, 2012 ENERGY COST ADJUSTMENT CLAUSE

PUBLIC SERVICE COMPANY OF NEW MEXICO ELECTRIC SERVICES

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Compatibility Between Electric Trains and Electrification Systems

Please Refer to Attached Sample Form

YOUR CONTACT WITH ELECTRICITY COMPANIES

Schedule D DOMESTIC SERVICE

RAILWAY SIDING RULES AND REGULATIONS:

Satellite and mobile communications HGV tolls in Germany: innovative, environmentally friendly and fair

Alert: Electromobility infrastructure

Advanced World Transport. Destination Europe

February 4, 2019 VIA ELECTRONIC FILING. Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR Attn: Filing Center

DECISION AND ORDER 2018 NSUARB 21 M08500 NOVA SCOTIA UTILITY AND REVIEW BOARD IN THE MATTER OF THE MOTOR CARRIER ACT. -and-

42 PGC Rate E-Factor Total Rate Currently effective Rate Increase (Decrease) in Rate 0.

Wholesale Developer Services Charges

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No.

MONTHLY NEW RESIDENTIAL CONSTRUCTION, APRIL 2017

MONTHLY NEW RESIDENTIAL CONSTRUCTION, FEBRUARY 2017

PET(S) FIRST & LAST NAME: January 2019

MSRC CLEAN TRANSPORTATION FUNDING LOCAL GOVERNMENT PARTNERSHIP

MONTHLY NEW RESIDENTIAL CONSTRUCTION, JULY 2017

MONTHLY NEW RESIDENTIAL SALES, APRIL 2017

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

Consolidated Edison Company of New York, Inc.

SERVICE CLASSIFICATION NO. 4

Manufacturing operating and maintaining different rolling stock

CN is offering our Fleet Integration Program for grain shippers who are using privately owned, covered hopper cars for

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

MONTHLY NEW RESIDENTIAL SALES, SEPTEMBER 2018

The German Tolling Prospects

RIDER RTP REAL-TIME PRICING

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Validity: 9 December 2018 to 14 December List of Infrastructure Services 2019

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

Notice of proposed amendment to Service Charges for Regulatory Year ending 31 March 2019

Introduction of High Speed trains in Poland and Rail Baltica

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

Bob Costello American Trucking Associations

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

PS 127 Abnormal / Indivisible Loads Policy

HyLAW. HyDrail Rail Applications Assessment. Main Author(s): [Dainis Bošs, Latvian Hydrogen association] Contributor(s):

THE ST. LAWRENCE SEAWAY TRAFFIC REPORT

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED

MONTHLY NEW RESIDENTIAL CONSTRUCTION, AUGUST 2017

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY. LARGE TIME-OF-DAY ELECTRIC SERVICE RATE 58 NON-MANUFACTURERS Page 1 of 5

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS

Inventory Levels - All Prices. Inventory Levels - By Price Range

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

Streamlined Application Decision Perimeter Seating Bus Additional Vehicles

PUBLIC SERVICE COMPANY OF NEW MEXICO ELECTRIC SERVICES COGENERATION AND SMALL POWER PRODUCTION FACILITIES

7th national report on promoting the use of biofuels and other renewable fuels in transport in Portugal Directive 2003/30/EC

Inventory Levels - All Prices. Inventory Levels - By Price Range

BEFORE THE NEW MEXICO PUBLIC REGULATION

Charging Delivery Body. 29 th January 2018

Fuel Mix Disclosure and CO 2 Emissions 2012

MONTHLY NEW RESIDENTIAL CONSTRUCTION, NOVEMBER 2017

Appendix G Examples and Recommended Methods

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 310 of New York, Inc. Superseding Original Leaf No.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

Transcription:

PRICE LIST OF FEES FOR USING THE 1435 MM TRACK GAUGE RAILWAY INFRASTRUCTURE MANAGED BY PKP POLSKIE LINIE KOLEJOWE S.A. EFFECTIVE FROM 9 DECEMBER 2018 TAKING INTO ACCOUNT THE MODIFICATIONS ADOPTED BY RESOLUTION NO. 391/2018 OF THE MANAGEMENT BOARD OF PKP POLSKIE LINIE KOLEJOWE S.A. OF 22 MAY 2018. 1. Handling fees for capacity allocation applications 2. Calculation of unit rates of standard fees 3. Calculation of unit rates of shunting fees 4. Calculation of reservation fees 5. Calculation of stabling fees 6. Calculation of train timetable study fees Basis for calculation of unit rates of standard and shunting fees for using the 1435 mm track gauge railway infrastructure managed by PKP Polskie Linie Kolejowe S.A. during the existence of the 2018/2019 train timetable approved by Decision No. DRR-WLKD.730.7.2018.AO of 22 August 2018 issued by President of the Railway Transport Office (UTK) Basis for calculation of handling fees for capacity allocation applications, reservation, stabling and train timetable study fees relating to the 1435 mm track gauge railway infrastructure managed by PKP Polskie Linie Kolejowe S.A. during the existence of the 2018/2019 train timetable approved for use by Resolution No. 168/2018 of 26 February 2018 of the Management Board of PKP Polskie Linie Kolejowe S.A. Warsaw, 2018 State as at: 28.08.2018 Page 1 of 6

1. Handling fees for capacity allocation applications The handling fee for capacity allocation applications is PLN 100.00. The handling fee for capacity allocation applications is collected if no capacity is allocated based on the application, except when capacity is not allocated for reasons attributable to PKP Polskie Linie Kolejowe S.A. 2. Calculation of unit rates of standard fees 2.1. Proportional rates 2.1.1. Subrate varying according to direct costs 2.1.1.1. Subrate varying according to train weight and railway line The subrate varying according to train weight and railway line is obtained by multiplying the average rate according to train weight and railway line by: 1) the rate factor varying the average rate according to total planned train gross weight; 2) the rate factor varying the average rate according to railway line. The average rate according to train weight and railway line is S MK = 7.77 PLN/train-km. 2.1.1.2. s 2.1.1.2.1. s according to total planned train gross weight M<60 0,3800 2520 M<2580 2,3359 60 M<120 0,5100 2580 M<2640 2,3792 120 M<180 0,6200 2640 M<2700 2,4380 180 M<240 0,7400 2700 M<2760 2,4634 240 M<300 0,8400 2760 M<2820 2,5076 300 M<360 0,9000 2820 M<2880 2,5407 360 M<420 0,9600 2880 M<2940 2,5789 420 M<480 0,9800 2940 M<3000 2,6300 480 M<540 0,9850 3000 M<3060 2,6520 540 M<600 0,9910 3060 M<3120 2,6939 600 M<660 0,9980 3120 M<3180 2,7244 660 M<720 1,0000 3180 M<3240 2,7633 720 M<780 1,0644 3240 M<3300 2,7972 780 M<840 1,1016 3300 M<3360 2,8232 840 M<900 1,1422 3360 M<3420 2,8524 900 M<960 1,1698 3420 M<3480 2,8874 960 M<1020 1,2132 3480 M<3540 2,9204 1020 M<1080 1,2471 3540 M<3600 2,9467 1080 M<1140 1,2849 3600 M<3660 2,9745 1140 M<1200 1,3466 3660 M<3720 3,0102 State of: 24.07.2018 Page 2 of 6

1200 M<1260 1,3742 3720 M<3780 3,0202 1260 M<1320 1,4230 3780 M<3840 3,0540 1320 M<1380 1,4621 3840 M<3900 3,0772 1380 M<1440 1,5000 3900 M<3960 3,0958 1440 M<1500 1,5655 3960 M<4020 3,1159 1500 M<1560 1,5914 4020 M<4080 3,1458 1560 M<1620 1,6427 4080 M<4140 3,1630 1620 M<1680 1,6814 4140 M<4200 3,1790 1680 M<1740 1,7225 4200 M<4260 3,1961 1740 M<1800 1,7899 4260 M<4320 3,2093 1800 M<1860 1,8199 4320 M<4380 3,2298 1860 M<1920 1,8686 4380 M<4440 3,2431 1920 M<1980 1,9065 4440 M<4500 3,2497 1980 M<2040 1,9490 4500 M<4560 3,2614 2040 M<2100 2,0142 4560 M<4620 3,2717 2100 M<2160 2,0395 4620 M<4680 3,2823 2160 M<2220 2,0922 4680 M<4740 3,2903 2220 M<2280 2,1245 4740 M<4800 3,2959 2280 M<2340 2,1686 4800 M<4860 3,3011 2340 M<2400 2,2323 4860 M<4920 3,3045 2400 M<2460 2,2551 4920 M<4980 3,3069 2460 M<2520 2,3073 4980 M<5040 3,3083 2.1.1.2.2. s according to railway line The railway line for a given train path is determined as an average railway line weighted by the length of indvidual travel sections, rounded to the first decimal place. The available railway line categories are specified in the List of the railway lines managed by PKP Polskie Linie Kolejowe S.A. and their tariff categories, effective from 9 December 2018, published in the 2018/2019 Network Statement. 1.0 1.2191 2.6 0.9397 1.1 1.2069 2.7 0.9196 1.2 1.1936 2.8 0.8996 1.3 1.1793 2.9 0.8798 1.4 1.1642 3.0 0.8602 1.5 1.1482 3.1 0.8410 1.6 1.1315 3.2 0.8222 1.7 1.1142 3.3 0.8039 1.8 1.0962 3.4 0.7862 1.9 1.0778 3.5 0.7690 State of: 24.07.2018 Page 3 of 6

2.0 1.0588 3.6 0.7526 2.1 1.0395 3.7 0.7369 2.2 1.0198 3.8 0.7220 2.3 1.0000 3.9 0.7080 2.4 0.9799 4.0 0.6951 2.5 0.9598 2.1.1.3. Subrate varying according to traction The subrate varying according to traction for trains and shunting operations based on electric traction is 0.22 PLN/km. 2.1.2. Subrate varying according to type of transport services The subrate varying according to type of transport services for freight trains of at least 660 tonnes gross weight, used for providing transport services other than intermodal transport is PLN 1.28 /train-km 1. 2.2. Calculation of standard fees The standard fee is a total of the following components: 1) the subtotal of distances travelled by train of given gross weight multiplied by the subrate varying according to train gross weight for the part of the path with the same gross weight and the average railway line for the entire train path as set out in section 2.1.1.1; and 2) the distance travelled by train using electric traction multiplied by the subrate varying according to traction for trains using electric traction as set out in section 2.1.1.3; and 1 The revenues from the basic and shunting fee for the use of the railway infrastructure with the track gauge of 1435 mm in the period for which the 2018/2019 train schedule applies, shall be monitored and reported to the President of the Railway Transport Office (UTK) as at 31 March 2019, 30 June 2019, 30 September 2019 and 14 December 2019 until the end of the following month. After the end of the 2018/2019 train schedule application, the difference between the revenues from the basic and shunting fee and the planned revenues from the basic and shunting fee for the use of railway infrastructure with a track gauge of 1435 mm for 2019 will be determined according to the multi-annual programme. The part of the unit basic fee rate related to the type of performed transport services shall be reimbursed in full to the carriers when the actual revenue from the basic fee and the shunting fee for the use of the railway infrastructure with the track gauge of 1435 mm are higher than the revenue planned under the multiannual programme, i.e. PLN 66.8 million. The part of the unit basic fee rate related to the type of performed transport services shall be reimbursed in part to the carriers if the difference between the actual and planned revenues from the basic fee and the shunting fee for the use of railway infrastructure with the track gauge of 1435 mm is greater than zero and lower than PLN 66.8 million, as provided for in the multi-annual programme. The part of the rate to be reimbursed to the carriers relating to the type of performed transport service shall be set as the difference between PLN 1.28 per 1 train km and the updated rate part relating to the type of performed transport service. The updated part of the unit basic fee rate relating to the type of performed transport service shall be determined as the quotient of the difference between the actual and planned revenues from the basic fee and the shunting fee and the service provided by freight trains subject to a part of the rate depending on the type of transport service, as provided for in the multi-annual programme. After the end of the 2018/2019 train schedule application, at the latest by 31 January 2020, correction invoices shall be issued taking into account the reimbursement of the part of the unit basic fee rate relating to the type of performed transport service, in whole or in part. State of: 24.07.2018 Page 4 of 6

3) the distance travelled by train multiplied by the subrate varying according to type of transport services as set out in section 2.1.2. 3. Calculation of unit rates of shunting fees The shunting fee is calculated by multiplying the unit rate of shunting fee according to the table below by the distance travelled according to the List of travel distances used in the calculation of shunting fees as attached in Appendix 2.8 to the 2018/2019 Network Statement. No. 1 2 Specification Motive power unit or sets of motive power units using electric traction Motive power unit or sets of motive power units using another type of traction Unit rate of shunting fee (PLN/km of travel distance) 3.57 3.35 4. Calculation of reservation fees 4.1. Reservation fees for unused allocated capacity The reservation fee for unused allocated capacity, which is collected when an applicant fails to appoint a railway undertaking to take over the allocated capacity or a railway undertaking appointed by the applicant fails to conclude a Contract of Capacity Use with PKP Polskie Linie Kolejowe S.A., is equal to 100% of the standard fee for the planned journey, however, not less than PLN 1,000. 4.2. Reservation fees for unused allocated train path In the event that a railway undertaking fails to use, in whole or in part, the train path allocated under the annual timetable for reasons attributable to the railway undertaking, the reservation fee for the unused portion of the allocated train path is equal to: 1) 25% of the standard fee for planned train journey: a) if no request to cancel the allocated train path is submitted, b) for the period from when a cancellation request is submitted to the day preceding the date of timetable update which is still open to applications for train path allocation; 2) 5% of the standard fee for planned train journey if a request to cancel the allocated train path is submitted, for the period from when a timetable update, still open to applications for train path allocation, is effective to the end of the existence of the annual train timetable. The fee referred to in section 2 is not collected during periods when a train timetable is changed at the request of the railway line manager. In the event that a railway undertaking fails to use, in whole or in part, the train path allocated otherwise than under the annual timetable for reasons attributable to the railway undertaking, the reservation fee for the unused portion of the allocated train path is equal to: 1) 25% of the standard fee for planned train journey if no request to cancel the allocated train path is submitted or it is submitted in less than 12 hours before the scheduled time of departure of the train; 2) 20% of the standard fee for planned train journey if a request to cancel the allocated train path is submitted in at least 12 hours and less than 36 hours before the scheduled time of departure of the train; 3) 15% of the standard fee for planned train journey if a request to cancel the allocated train path is submitted in at least 36 hours and less than 72 hours before the scheduled time of departure of the train; State of: 24.07.2018 Page 5 of 6

4) 10% of the standard fee for planned train journey if a request to cancel the allocated train path is submitted in at least 72 hours and not more than 30 days before the scheduled time of departure of the train; 5) 0% of the standard fee for planned train journey in the case when cancellation of allocated train path was submitted more than 30 calendar days prior to scheduled train departure. The reservation fee is not collected if the failure to use the allocated train path is due to submitting an application for modification of the allocated train path under a timetable update. If a portion of the allocated capacity is not used due to reducing the planned train weight by a railway undertaking, a reservation fee is collected, equal to 50% of the amount by which the standard fee is reduced due to the reduction in the train weight, where such reduction requires no changes to the allocated train path. 5. Calculation of stabling fees The fee for stabling operations of at least 2 hours duration is equal to the duration of stabling operations multiplied by the unit rate of 1.48 PLN/h of stabling operations. 6. Calculation of train timetable study fees The train timetable study fee is calculated based on the hourly rate of 57.92 PLN/h. State of: 24.07.2018 Page 6 of 6