BUILDING PERMIT FEES

Similar documents
Fee Schedule for Whitehall Township

Keycodes Inspection Agency PO Box 391 Bethlehem, Pennsylvania

PUBLIC NOTICE. Borough of Tenafly ORDINANCE NO

MASTER FEE SCHEDULE. SECTION 1: Refuse/Garbage and Recycling Fees (C of O Sec )

MASTER FEE SCHEDULE. $50 initial minimum charge plus $20 per hour if minimum is exceeded COMMERCIAL RATES. Once per week collection

RESOLUTION NO A RESOLUTION BY THE CITY COUNCIL OF THE CITY OF

2015 Proposed Fees and Charges. Schedule of Proposed Fees and Charges to be Considered by Council of the Town of East Gwillimbury

BUILDING PERMIT FEES BUILDING VALUATION DATA

TABLE II Electrical Permit Fees

PLANNING AND DEVELOPMENT DIVISION OF BUILDING & INFRASTRUCTURE HAMILTON COUNTY,OHIO. SCHEDULE OF FEES January 1, 2019, EDITION

LACEY FEE SCHEDULE Effective July 1, Flea Market/Swap Meet/Sellers Permit Notary $3. NSF Check or Returned Check $20

City of St. Anthony Village Silver Lake Road St. Anthony, Minnesota FEE SCHEDULE

$25.00 (residential: 1roll cart & recycling roll cart)

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

MASTER FEE SCHEDULE. MONTHLY FEE 2X/Week Collection

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

MASTER FEE SCHEDULE. RESIDENTIAL Polycart: $13.29 N/A Additional Polycart $8.50 N/A Single bag additional trash $0.40 per tag N/A

MASTER FEE SCHEDULE. RESIDENTIAL Polycart: $13.29 N/A Additional Polycart $8.50 N/A Single bag additional trash $0.40 per tag N/A

Application for Service Residential Subdivision / Development

One City Plaza, Suite B P.O. BOX 1287 Cabot, Arkansas Phone Revised: April 2, 2019

$25 per occasion Birth/Death Certificates $10 $500 + $250,000 Bond & Cert. of Insurance $50 resident annual (expires in Dec.)

APPLICATION FOR FY Dumpster Program RETURN AT LEAST SIX WEEKS PRIOR TO REQUESTED DATE OF DELIVERY

One City Plaza, Suite B P.O. BOX 1287 Cabot, Arkansas Phone Revised: May 06, 2016

TOWN OF GRAND ISLAND ADOPTED FEE SCHEDULE Adopted 1/2/2018 Amended 5/21/2018. NSF Fee: Insufficient Funds Fee $ 20.00

Exhibit A BUILDING AND CONSTRUCTION

ORDINANCE NO. AN ORDINANCE ADOPTING FEES AND CHARGES FOR FISCAL YEAR 2018.

Village of Orland Park Fee Schedule As of January 1, 2016

Borough of Quakertown 2018 Fee Schedule

Schedule of Electrical Permit Fees. Contractor

Temporary Sales Trailer Application

CITY OF ESTHERVILLE, IOWA MISCELLANEOUS FEES & CHARGES. At Sewer Main.. $

RESOLUTION TOWNSHIP OF SUMPTER SEWER, WATER, RUBBISH RATES, CAPITAL BENEFIT CHARGES

2018 Fee Schedule MISCELLANEOUS

Fee Schedule July 1, June 30, 2018

REGULATIONS GOVERNING WATER SERVICE

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

BRISTOL WATER DEPARTMENT

CHAPTER 14 MOBILE HOMES AND MOBILE HOME PARKS PART 1 MOBILE HOME PARK REGULATIONS

BRISTOL WATER DEPARTMENT

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

$ homes in a subdivision. The Fee includes an S-1 Pedestal. $ homes in a subdivision. The Fee includes an S-2 Pedestal.

2018 FEE SCHEDULE. Administration Agendas, City Council. Business Licenses Business license (annual) $ Building

New RepairBase Line Item additions for the Update

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Commercial Electric Service Handbook

CHAPTER 90. STREETS, SIDEWALKS AND PUBLIC WAYS ARTICLE II. USE OF STREETS, SIDEWALKS AND PUBLIC WAYS DIVISION 10. SIDEWALK CAFÉS

BGE Service Application Guidelines Residential Single Projects

TOILET AND URINAL REBATE REQUIREMENTS

STANDARD DRAWING INDEX

TABLE OF CONTENTS. Page I. PERMITS AND LICENSES FEES Plumbing Permits 3-4. Gas Permits 4. Mechanical Permits 4-6. Electrical Permits 6-9

Approval of the Proposed Miscellaneous Fees & Charges Adjustments Effective January 18, 2019 (FY 2019)

Comprehensive Schedule of Fees Animal Control Dog License Spayed or Neutered $10.00 Unaltered $20.00 Replacement tag $5.00

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.

SALLAL WATER ASSOCIATION

Guidelines for Filming in The City of Vernon. General Requirements

CITY OF SWARTZ CREEK RATES, FEES PERMITS & CHARGES FOR SERVICES. 1. Chapter 1: Municipal Ordinance Violations Bureau (Parking Fines)

City of Newaygo RESOLUTION Council Member Walerczyk, supported by Council Member Palmiter, moved to adopt the following resolution:

Memorandum City of Lawrence Planning & Development Services

COMPREHENSIVE SCHEDULE OF FEES

TOWN OF LAGRANGE FY RATE SCHEDULE

Chapter 19 MOBILE HOMES AND MOBILE HOME PARKS AND TRAVEL TRAILERS AND TRAVEL TRAILER PARKS

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

CITY OF GRAND ISLAND UTILITIES DEPARTMENT ELECTRIC RATE SCHEDULE Effective October 1, Ordinance No. 9133

Oaks Commerce Center

EXHIBIT SUMMARY. Exhibit Summary. Effective: 10/1/2016 Customer Class

FEE SCHEDULE. UPDATE, December 20, 2010

Technology Fee Total Fee Amusement buildings An operational permit is required to operate a special amusement building $ $12.00 $162.

Schedule 'B' Bylaw #635-DA-18 The Inspections Group Inc. Building Permit Fee Schedule

ORDINANCE NO THE CITY COUNCIL OF THE CITY OF OTHELLO, WASHINGTON DOES ORDAINS AS FOLLOWS:

City of Dell Rapids Fines, Fees and Rates: (The following municipal fines, fees and rates are set as needed by City Council Ordinance or Resolution.

PASCO COUNTY UTILITIES SERVICE CONNECTION APPLICATION Single Residential or Commercial

RESOLUTION NO. Date Passed: November 14, 2016 ESTABLISHING CITY OF ROCHELLE WATER RATES, EFFECTIVE JULY 1, 2017

CITY OF PLACENTIA RESIDENTIAL PERMIT PARKING PROCEDURES AND GUIDELINES 2017

MOBILE AREA WATER AND SEWER SYSTEM FEE SCHEDULE EFFECTIVE JANUARY 1, 2018

Resident Permit and Visitor Permit Guidelines

CITY OF THE DALLES - CITY FEE SCHEDULE Effective June 1, 2016

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS

CONSTRUCTION MANAGER/GENERAL CONTRACTOR METHOD OF PAYMENT

BY-LAW NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE TOWN OF MARKHAM HEREBY ENACTS AS FOLLOWS:

Chapter 70 ELECTRICITY

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

Please Refer to Attached Sample Form

CITY OF ROMULUS FEE SCHEDULE

APPLICATION FOR OBSTRUCTION PERMIT

Spa Location and Preparation 4-5. Wood or Synthetic Deck Installation 6. Delivery Access Backyard Delivery 7. How To Measure For Backyard Delivery 8

VILLAGE OF TARRYTOWN - MASTER FEE SCHEDULE

KIAWAH ISLAND UTILITY, INC. 31 Sora Rail Road Johns Island, S.C (843)

COMMERCIAL QUICK REFERENCE

CHAPTER 50: GARBAGE GENERAL PROVISIONS

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

Municipal Water Utility of the City of Cedar Falls, Iowa Water Rates Schedules Table of Contents 2019

TOWN OF TARBORO PROPOSED FEE SCHEDULE

CITY OF LAURINBURG SCHEDULE OF FEES

UPPCO SERVICE MANUAL

MAINTENANCE CATAGORIES. Visual inspection, cleaning. Repair large scale cracks or settling, major repairs/ replacement. Hire Structural Engineer.

Installation and Operation Manual

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

STREET IMPROVEMENTS PROPOSAL BID ITEMS

Chapter PARKING REGULATIONS

Transcription:

D-2-a 07/01/11 BUILDING PERMIT S COMMERCIAL RATES Rate MINIMUM New Assembly New Business New Education New Factory/Industrial New Institutional New Mercantile New Storage New Miscellaneous Renovation/Change in Use Renovation/No change in Use Addition Shed Fence Sign Sign/Temporary Temporary Trailer Miscellaneous Demolition Commercial Emergency Repair Zoning Certificate Revision to Permit (Plus permit fee of revised area) Sidewalk Café w/surrounding enclosure Permit (NEW) Sidewalk Café w/surrounding enclosure Permit (RENEWAL) Sidewalk, Curb & Gutter Permit (First 50 linear feet) -Each additional 50 linear feet or fraction 0.009 c.c 0.009 c.c 0.009 c.c $64.00 $100.00 $64.00 $50.00 $25.00-1st Reinspection $75.00-2nd Reinspection $200.00-3rd Reinspection and Subsequent Reinspections $500.00 Re-Inspection of Sewer Lateral (TV) $250.00 PERMIT EXTENSION / TRANSFER / REFUND: Permit Extension $50.00 Permit Transfer $40.00 APPLICATION REFUND: - If Review of Application has not started $40.00 - If Review of Application has started 50% of permit fee - Permit Refund (Prior to Expiration of Permit and Construction has not Started) 50% of permit fee OTHER S: Working Without Permit Temporary Certificate of Occupancy (Condo / Apartment Unit Only) Temporary Certificate of Occupancy Extension (Condo / Apartment Unit Only) Building Appeals Board Fee Builders License Fee Stop Work Removal Fee Double Permit Fee $50.00 $25.00 $200.00 $ $150.00 c.c = cost of construction

WATER / SEWER CONNECTIONS AND WATER METER CHARGES 9-g Updated 6-1-2014 **Water Connection Fees (Does not include Meter Fees) Water Meter Fees Connection Fee Connection Fee (Tap/Labor/Materials) Meter 6% Total Connection Connection (TAP ONLY) City Install to Prop. Line Meter Size Cost Tax Charge Size Size/Type Contractor Install (Up to 20' run) less vault 3/4" Meter/Kornerhorn $ 288.00 $ 17.28 $ 305.28 3/4" 3/4" $400.00 $9,412.43 Anti-Theft/Detector Check $ 288.00 $ 17.28 $ 305.28 1" Meter/Kornerhorn $ 457.00 $ 27.42 $ 484.42 1-1/2" Meter/Flange $ 462.00 $ 27.72 $ 489.72 1" 1" $400.00 $9,412.43 2" Compound Meter $ 1,748.00 $ 104.88 $ 1,852.88 3" Compound Meter $ 2,048.00 $ 122.88 $ 2,170.88 4" Compound Meter $ 3,127.00 $ 187.62 $ 3,314.62 1-1/2" 1-1/2" $400.00 $9,721.43 4" Fire Flow Meter $ 5,456.00 $ 327.36 $ 5,783.36 6" Compound Meter $ 4,332.00 $ 259.92 $ 4,591.92 6" Fire Flow Meter $ 7,451.00 $ 447.06 $ 7,898.06 2" 2" $400.00 $10,068.30 8" Fire Flow Meter $ 9,642.00 $ 578.52 $ 10,220.52 10" Fire Flow Meter $ 12,758.00 $ 765.48 $ 13,523.48 10" x 12" Fire Flow Meter $ 13,604.00 $ 816.24 $ 14,420.24 3" 3" $1,000.00 $12,040.00 12" Fire Flow Meter *Market Cost $. $. 4" 4" Tap Only $1,800.00 4" Service Line $15,485.80 *MARKET COST: Contact Purchasing @ 301-600-1907 ABOVE PRICES EFFECTIVE TO 03/05/15 Prices subject to change at anytime 6" 6" Tap Only $2,200.00 6" Service Line $16,033.60 6" Hydrant $2,200.00 **Sewer Connection Fees 6" $8,231.30 8" 8" Tap Only $2,800.00 8" Service Line $22,783.20 6" or 8" TAP ONLY $500.00 10" 12" 10" Tap Only $3,400.00 10" Service Line $25,890.70 12" Tap Only $3,400.00 12" Service Line $28,207.30 ** NOTE: If the water & sewer lines have been installed in the right-of-way to the property lines, NO connection fee needs to be collected. Note: Prices subject to change at anytime. Water Connection Guidelines 1. All connection and water meter/detector check fees are to be paid at time of application. 2. The City will make all taps ¾ through 12. (For over 12", contact your Construction Inspector or Water Superintendent). 3. All services ¾ and larger that do not have a branch line between the property line and building will have a meter and/or detector check installed inside the building, when possible. 4. Service can be broken down inside the building for fire and domestic use. 5. All installations and materials will meet City of Frederick Standards and Specifications and will require approval of City of Frederick inspectors and water department before water will be turned on. 6. Per Frederick City Plumbing Code, all water services (3/4 and larger) need water valve located at the property line. 7. WATER LOCATE: Contact "Miss Utility" at 1-800-257-7777 at least 48 hours prior to date needed. 8. DEVELOPER is responsible for having all pipe and other service-related items installed, tested and backfilled and street, sidewalk, ground repairs made (per City of Frederick Standards and Specifications). 9. WATER TAP a. Prior to calling for water tap to be made, Developers are to have excavation complete and tapping sleeve and valve installed and tested - This MUST be witnessed and approved by City Inspector. b. Contact assigned Construction Inspector to tap installation. Inspector will notify the Water Department to make the tap which is normally able to be made by the Water Dept within 24 hours of notification. 10. METERS and METER Settings that are to be installed by the Developers are to be picked up at the City of Frederick s Department of Public Works. (NOTE: Receipt for payment of connection and meters is required before meters will be released).

9-e 07/01/11 PLUMBING PERMIT S (RESIDENTIAL & COMMERCIAL) PERMIT TYPE: Minimum charge for plumbing permit to include the first fixture or appliance. $ 30.00 Each additional fixture $ 10.00 Building Water Service $ 30.00 Building Sewer Service $ 50.00 Building Storm Service $ 50.00 Roof Drain and Down Spout (tie into) $ 10.00 Storm Water Main $ 10.00 Irrigation System Residential $ 30.00 Wet Heating Equipment Installation (1st. Appliance; Includes Backflow Preventer) $ 45.00 Wet Heating Equipment; Each Additional Appliance with Backflow Preventer $ 10.00 Phasing of Plumbing Permit (Each Additional Phase) $ 75.00 Appeal Board Fee $ 200.00 Working Without Permit Double Permit Fee 1ST RE-INSPECTION $ 75.00 2ND RE-INSPECTION $ 200.00 3RD RE-INSPECTION AND SUBSEQUENT RE-INSPECTIONS $ 500.00 PERMIT TRANSFER / REFUND: PERMIT TRANSFER $ 40.00 PERMIT REFUND (PRIOR TO EXPIRATION OF PERMIT & CONSTRUCTION HASN'T STARTED) $ 40.00 PERMIT REVISION $ 40.00

9-d 07/01/11 GAS PERMIT S (RESIDENTIAL & COMMERCIAL) PERMIT TYPE: GAS PERMIT S Minimum charge per gas permit (appliance replacement, piping charge, repair includes first appliance $ 30.00 Each Additional Appliance $ 15.00 New Residential Service to include first Appliance $ 50.00 New Commercial Service to include first Appliance $ 50.00 Each Additional Appliance $ 15.00 Wet Heater Equipment Installation each appliance includes back flow prevent $ 50.00 Phasing of Gas Permit (each additional phase) $ 50.00 Appeal Board Fee $ 200.00 Double Working Without Permit Permit Fee 1ST RE-INSPECTION $ 75.00 2ND RE-INSPECTION $ 200.00 3RD RE-INSPECTION AND SUBSEQUENT RE-INSPECTIONS $ 500.00 PERMIT TRANSFER / REFUND: PERMIT TRANSFER $ 40.00 PERMIT REFUND (PRIOR TO EXPIRATION OF PERMIT & CONSTRUCTION HASN'T STARTED) $ 40.00 PERMIT REVISION $ 40.00

9-f 07/01/11 UTILITY PERMIT S PERMIT TYPE: UTILITY PERMIT S Water Main; First 100 LF $75.00 Water Main; Each Additional 100 LF or Fraction $50.00 Sewer Main; First 100 LF $75.00 Sewer Main; Each Additional 100 LF or Fraction $50.00 Storm Water Main; First 100 LF $75.00 Storm Water Main; Each Additional 100 LF or Fraction $50.00 Rain Leader or Downspout Tied into Storm Drain; Each $10.00 Irrigation System $75.00 Backflow Preventer Installed by Licensed Plumber $30.00 Sub-Meter Hook-Up $30.00 Appeal Board Fee $200.00 Double Working Without Permit Permit 1ST RE-INSPECTION $ 75.00 2ND RE-INSPECTION $ 200.00 3RD RE-INSPECTION AND SUBSEQUENT RE-INSPECTIONS $ 500.00 PERMIT TRANSFER / REFUND: PERMIT TRANSFER $ 40.00 PERMIT REFUND (PRIOR TO EXPIRATION OF PERMIT & CONSTRUCTION HASN'T STARTED) $ 40.00 PERMIT REVISION $ 40.00

9-c 07/01/11 BUILDING DEPT FIRE CODE PERMIT S (RESIDENTIAL & COMMERICAL) FIRE CODE PLAN REVIEW S PERMIT TYPES RATE UNIT MINIMUM Assembly $ 0.16 s.f. $ Educational $ 0.16 s.f. $ Health Care $ 0.16 s.f. $ Detention & Correctional $ 0.16 s.f. $ Residential $ 0.16 s.f. $ Mercantile $ 0.12 s.f. $ Business $ 0.12 s.f. $ Industrial $ 0.08 s.f. $ Storage $ 0.08 s.f. $ Other $ 0.12 s.f. $ Permit Revisions - based only on the revised areas $ Flat Shell Building - shall be 50% of the fee calculated using the above rates. Permit fee for finish-out of shell spaces shall be as calculated within. Basement Finish-Outs for Building permits $ Flat Basement Finish-Outs for Sprinkler permits $ 100.00 Flat Sprinkler and Combined Sprinkler/Standpipe Systems (shell buildings shall be 50% of the fee calculated using the adopted rate for this category) $ 0.08 s.f. $ 300.00 Standpipe Systems $ 400.00 Flat Fire Alarm and Detection Systems (shell buildings shall be 50% of the fee calculated using the adopted rate for this category) $ 0.04 s.f. $ 300.00 Fire Pumps $ 800.00 Flat Kitchen Hood Suppression Systems $ 400.00 Flat Gaseous and Chemical Extinguishing Systems - based on per lb of extinguishing agent (no charge for agent reserve supply) $ 4.00 lb. $ 300.00 or per 30,000 cubic feet of volume, or portion thereof, of protected space $ 300.00 c.f. $ 300.00 or per each wet chemical system, which of the above is greater $ 300.00 $ 300.00 Foam Systems - cost per sprinkler for water/foam system PLUS cost per nozzle or applicator device $ 8.00 ea. $ 300.00 Smoke Control System - cost per 50,000 cubic feet of volume, or portion thereof, of protected or controlled space $ 300.00 Flammable or Combustible Liquid/Gas Storage Tank(s) - per gallon of maximum tank capacity (Exception - tanks used to provide fuel to heat or other utility service to building $ 0.08 gal. $ 300.00 Outside Storage of Flammable or Combustible Materials $ 300.00 Flat Appeal Board Fee $ 200.00 Flat Working Without Permit Double Permit Fee 1st. Reinspection $ 75.00 Flat 2nd. Reinspection $ 200.00 Flat 3rd. Reinspection and subsequent reinspections $ 500.00 Flat TECHNICAL ASSISTANCE: Fire Plans Reviewer $ 75.00 Flat Fire Plans Inspector $ 75.00 Flat PERMIT TRANSFER / REFUND Permit Transfer $ 40.00 Application Fee Refund: If review of application has not started $ 40.00 If review of application has started 50% of Permit Fee Permit Refund (prior to expiration of permit and construction has not started) 50% of Permit Fee

9-a 07/01/11 ELECTRICAL PERMIT S (COMMERICAL) CONCEALED WIRING: All switches, lighting & receptacles to be counted as outlets First 50 Outlets $ 122.00 Each additional 25 outlets or fraction thereof $ 24.00 SURFACE WIRING: (Exposed electrical wiring systems) - Completed installations, where wiring and fixtures are installed and can be inspected on one visit. (Automatic Re-inspection Fee applies) First 50 Outlets $ 92.00 Each additional 25 outlets or fraction thereof $ 12.00 Equipment ( Such as Heating Unit, Cooling Unit, Washer, Dryer, Dishwasher and Similar Appliances, Welders, Water Heaters, Motors, Generators, Transformers, Vaults, Enclosures, Substations, Cable Heat, Temporary Trailer) 1st Piece of Equipment $ 61.00 Each Additional Piece of Equipment $ 12.00 COMMERCIAL SERVICES AND DERS (Includes 6 Outlets) Temporary Service $ 61.00 Not over 400 AMP $ 85.00 Not over 1000 AMP $ 98.00 Over 1000 AMP $ 183.00 ELECTRIC SIGNS First Sign $ 61.00 Each Additional Sign $ 12.00 LIGHT POLES AND STREET LAMPS First 5 Poles $ 61.00 Each Additional Pole $ 12.00 POOLS, HOT TUBS AND SPAS (Includes Bonding, Motor, Lights) Above Ground Pool $ 122.00 In Ground Pool $ 183.00 WORKING WITHOUT PERMIT Double Permit Fee APPEALS BOARD $ 200.00 REINSPECTION S: 1st. Reinspection $ 75.00 2nd. Reinspection $ 200.00 3rd. Reinspection and Subsequent Reinspections $ 500.00 LICENSING S: Bi-annual for New License - Pro Rated @ $10. Month (Min. Fee $50.00) $ 240.00 Renewal - Master Electrician's License (General, Limited or Restricted) $ 240.00 Appeals from Refusal of License to Board of Arbitration $ 15.00 PERMIT TRANSFER / REFUND: Permit Transfer $ 40.00 Permit Refund (Prior to Expiration of Permit and Construction has not Started) $ 40.00

PARK DEVELOPMENT : With HOA Pool Facility: $568 per unit Without HOA Pool Facility: $868 per unit