VST Newsletter. Vapor Systems Technologies, Inc. A message from Glenn K. Walker President, VST. Inside this issue: Glenn K. Walker

Similar documents
VST EVR Total Balance System Solution

New Amendment to Executive Orders VR-203-N & VR-204-N

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-204-U. Relating to Certification of Vapor Recovery Systems

EVR Hose Configuration

The VST Enviro-Loc Vapor Recovery System

Glenn K. Walker. Product Bulletin. VST Balance Nozzle Clip Removal and CARB Advisory

Ground Mount / Piping / Electrical Quick Reference ECS Membrane Processor: PMC and ISD

Volume 13 Dec, Pleasant Valley Drive * Springboro, OH * * (937)

Stay-put scuff guard helps to protect the dispensers from scratches and the breakaway during a drive-off event

Update on Enhanced Vapor Recovery (EVR) and In-Station Diagnostics (ISD) at Gasoline Dispensing Facilities

BALANCE EVR SYSTEMS:

Enhanced Vapor Recovery and In-Station Diagnostics. Presented by: Matthew Schuessler, N Cal Territory Mgr 1

Susie. Hello and Happy New Year!

Important Information: Aboveground Gasoline Storage Tanks Upcoming Standing Loss Control & Phase I/II EVR Requirements

Healy VP Troubleshooting Guide

Volume 6 September, Pleasant Valley Drive * Springboro, OH * * (937)

Volume 4 March, Pleasant Valley Drive * Springboro, OH * * (937)

Installation Manual ECS Membrane Processor: PMC and ISD

Volume 8 March, Pleasant Valley Drive * Springboro, OH * * (937)

One Solution You Can Trust!

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT DRAFT STAFF REPORT

Executive Order VR-205-B VST Phase II EVR System with Hirt Thermal Oxidizer. Exhibit 2 System Specifications

San Joaquin Valley Air Pollution Control District Vapor Recovery Requirements for Permitted Agricultural Gasoline Storage and Dispensing Operations

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-209-A

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-203-F

Emco Logo on Scuff INSTALLATION INSTRUCTIONS

Installation & Maintenance Manual Green Machine PMC / ISD California

Compliance Strategies and Benefits

Franklin Fueling Systems

ENVIRO-LOC Low Permeation Premium Conventional Curb Pump Hose assemblies are available for purchase from VST Model V58EC.

Executive Order VR-205-B VST Phase II EVR System with Hirt Thermal Oxidizer

TRANSFER OF GASOLINE FROM STATIONARY UNDERGROUND STORAGE TANKS INTO VEHICLE FUEL TANKS (Effect. 03/01/06: Rev. 03/26/08)

Vapor Systems Technologies, Inc. Petroleum Products List Price Schedule

INSTALLATION INSTRUCTIONS

Vapor Recovery Assist System

FUEL DISPENSING AND STORAGE EQUIPMENT FORM 1306 (See Form 1306 Requirements and Instructions) Form 1300 must accompany this application.

State of California AIR RESOURCES BOARD EXECUTIVE ORDER NVR-1-C. Relating to Certification of Non-Vapor Recovery Hoses

The penalties for violating air pollution regulations can be $10,000 per day or more. Notice of Violation (NOV)

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

GILBARCO ENCORE 300 & 500 SERIES DISPENSER RETROFIT with VDC control valves for HEALY SYSTEMS, INC. MODEL VP1000 VAPOR RECOVERY ASSIST SYSTEM OUTLINE

Frequent Mishaps and Solutions with Regulated Underground Storage Tanks in Pennsylvania

Air Quality Requirements for Gasoline Dispensing

San Joaquin Valley Unified Air Pollution Control District

Franklin Fueling Systems

Compliance Strategies and Benefits. Brian Derge Tanknology Inc. December 6, 2012

GASBOY 9800 SERIES DISPENSER RETROFIT for HEALY SYSTEMS, INC. MODEL VP1000 VAPOR RECOVERY ASSIST SYSTEM OUTLINE

Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective 1/11/2017

Heavy-Duty Low-NOx and Phase 2 GHG Plans

Pennsylvania DEP: Maintaining UST Compliance and Regulation Updates. NISTM 8 th Annual Pennsylvania Storage Tank Conference May 18, 2017

Exhibit 5. Vapor to Liquid Volume Ratio (Executive Orders VR-201-F and VR-202-F) (Healy Model 900 EVR Nozzle)

THE PUBLIC UTILITIES BOARD ACT April 22, Graham F. J. Lane, C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B.

E. Augusta, Spokane, WA (509) E. Augusta, Spokane, WA (509)

Stage II Vapor Recovery at Gasoline Dispensing Facilities

Ohio EPA. Division of Air Pollution Control. Engineering Guide #12

SCAQMD s Proposition 1B Goods Movement Emission Reduction Program

Your Fuel Can Pay You: Maximize the Carbon Value of Your Fuel Purchases. Sean H. Turner October 18, 2017

REGULATION II PROHIBITIONS. 1.1 Purpose To limit the emission of gasoline vapor into the atmosphere during the filling of motor vehicle fuel tanks.

ADDENDUM NO. #1 ITB # FLORIDA A&M UNIVERSITY (FAMU) FUEL STORAGE TANK INSPECTIONS December 8, 2017

4. No person shall install a coaxial Phase I vapor recovery system unless the system was certified by CARB after January 1, 1994.

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

RULE 449 TRANSFER OF GASOLINE INTO VEHICLE FUEL TANKS

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

The purpose of this rule is to limit emissions of gasoline vapors from the transfer of gasoline into motor vehicle fuel tanks.

Horizon. Dependable. Protecting. dispensing. your investment. Behind Every Successful Forecourt

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT

Gallagher Vapour Recovery

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

Fleet Sustainability Policy

Phase-Two Water Detector

Say hello to the Wayne Ovation 2 fuel dispenser

Massachusetts Department of Environmental Protection Underground Storage Tank Program

FINAL UNDERGROUND STORAGE TANK RULE CHANGES. Heather Peters UST Compliance and Technology Unit

WHY ARE THESE NOZZLES FOUND IN MORE LOCATIONS THAN ANY OTHER

Executive Orders VR-203-F and VR-204-F VST Phase II EVR System. Exhibit 5 Liquid Removal Test Procedure

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

FuelsManager and Radar Tank Gauging for Overfill Prevention

PROTECT YOUR BUSINESS WITH INSITE360

The Balance of Power: Exploring Recent Developments and Potential Changes to the Power Industry. CSMA Napa Conference November 8, 2018

HA PRO INSTALLERʼS MANUAL. HA-008 v3. User s/installer s Manual

Underground Oil Storage Tanks Annual Inspection Report

Owner s Manual Supplement. Liquefied Petroleum Gas (LPG) Fuel System for 1998 GM Medium Duty Chassis (C-60/C-70) with 6.0L and 7.

Oregon Withholding Tax Tables

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR-302-B

NYS Diesel Emissions Reduction Act (DERA) & 6NYCRR Part 248. To: New York State Automobile Dealers Association, Truck Division. June 30, 2010 webinar

RULE 448 GASOLINE TRANSFER INTO STATIONARY STORAGE CONTAINERS Adopted (Amended , , , , , ) INDEX

On the Road With NHTSA: A Decade of Detours

Vapor Recovery Central Vacuum System

Caltrans Zero Emission Vehicle (ZEV) Experience. California Department of Transportation (Caltrans) Division of Equipment (DOE)

Request For Bids. Sewer Cleaner Truck

Department of the Environment. Moving Away From Stage II Vapor Recovery

Overview of an Underground Storage Tank Inspection

FUEL DISPENSING SYSTEMS SE-27. Component Details. 12V DC - 15 GPM Metered Tank-top Dispensing System

WITH ENTERPRISE HOLDINGS

Examinations of Working Places in Metal and Nonmetal Mines. AGENCY: Mine Safety and Health Administration, Labor.

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach

BOOM HEIGHT CONTROL PRECISION DEFINED SPRAYING REFINED

Rural School Bus Pilot Project Applicant Webinar February 16, 2017 Grant Specific Q&A

The purpose of this rule is to limit emissions of gasoline vapors from the transfer of gasoline into motor vehicle fuel tanks.

March 22, Internal Audit Report Parts, Fuel and Chemicals Inventory Anchorage Water and Wastewater Utility

Transcription:

Vapor Systems Technologies, Inc. VST Newsletter November 06, 2009 A message from Glenn K. Walker President, VST Hello from Springboro, Ohio! Inside this issue: VST Zero Exec. Order Signed Nozzle Replacement Front-End Kits Special Pricing: Membrane Processor VST Green Machine Update Other Updates This is an update to our August 28, 2009 newsletter telling you of VST s plans. Things in the EVR world are certainly moving along, and while they are, VST continues to listen to the market to continually improve our processes and product offerings. As always, my door is open to your comments, questions, and suggestions. I enjoy hearing from the field and welcome your calls. Kindest personal regards... Glenn K. Walker Glenn K. Walker President, Vapor Systems Technologies, Inc. 650 Pleasant Valley Drive Springboro, Ohio 45066 walker@vsthose.com PH: 1-800-VST HOSE (878-4673). FX: (937) 704-9443

Page 2 November 06, 2009 VST Zero For those of you who are tired of the field service calls and compliance issues associated with EVR vacuum assist fueling systems, you are now able to convert back to Balance using the CAS tank for pressure management. Features & Benefits Zero moving parts Zero carbon footprint Zero vapor pumps Zero electrical consumption Product Release Status: VR-209-A Executive Order Issued 11.04.09 (non-isd) VR-210 (ISD) expected December, 2009 **See attached brochure** Zero modification to balance dispensers Remember Nozzle Replacement Front-End Kits (VST-FEK-100) Front-end kits are available for repairing nozzles damaged by customer abuse. With over 750 VSTcertified contractors available in California, getting a nozzle repaired is quick and easy. See your distributor to purchase front-end kits.

Page 3 November 06, 2009 SPECIAL PRICING VST Membrane Processor (ECS-1) VST recently offered special pricing and payment terms for the Membrane Processor to our distributors. Contact your distributor for details. We are pleased to announce the upcoming release of our newest generation back-end pressure management system: The VST Green Machine Features & Benefits Installs anywhere in the world Works with or without a vapor recovery system Works with balance or assist vapor recovery systems Near limitless capacity Single-vent installation Remote monitoring access available VST Green Machine Product Release: Completed 6-month CARB testing Challenge-mode testing underway Anticipated Executive Order has moved from 11.01.09 to 1st quarter, 2010

Page 4 11.06.09 New Breakaway Program VST announced a core credit program for the EVR breakaway on 09.29.09 This is an interim step as we are working with the regulatory agencies to provide a CARB-approved and UL sanctioned field repair program. Increased Production VST has nearly tripled production to meet the delivery needs of the EVR market. We now stand ready to deliver whatever component you may need in 2-3 days. Most orders ship within 24 hours Certified Contractors VST now has over 750 certified contractors trained to support VST s equipment installed in California EVR Nozzle Re-Build Program VST will include a $65 core value to help customers reduce maintenance expenses VST accepting cores now, with production shipments of rebuilds starting 12.01.09 0 Added 3 Field Engineers VST has added to the California field support: Three field technicians available to assist with our VST equipment Help with site surveys for those operators who have not already upgraded to EVR. On-line Warranty Tracking Announced 10/23/09 Go to: www.vsthose.com Click on Customer Support Select Product Warranty from the drop down box

Tired of all those expensive alarms from your EVR Vacuum Assist System? Stressed by all those expensive maintenance calls? VST ZERO is the Solution. FFS Assist (Healy) VST Balance (VST Zero) Non-ISD ISD Non-ISD ISD Annual Testing $ $ $ $ Communication n/a $ Zero $ Moving parts $ $ Zero Zero Electrical Installation & Consumption $ $ Zero Zero V/L Nozzle Test $ $ Zero Zero Nozzle Adjustments by ASC $ $ Zero Zero Warranty nozzle replacement (requires ASC test) $ $ Zero Zero Weekly Physical Testing (may require an ASC) $ $ Zero Zero Quarterly Physical Testing (may require an ASC) $ $ Zero Zero Vapor Pumps (post-warranty replacement cost) $ $ Zero Zero Vapor Systems Technologies, Inc.

The VST Zero EVR System. Simply the lowest cost, easiest to install and operate clean air solution in the industry. + + VST Hanging Hardware FFS Clean Air Separator Veeder-Root In-Station Diagnostics Unhappy with your current EVR Vacuum Assist System? Problems with station shut downs, complex nozzles, and replacement of costly vapor pumps? VST Zero is the simple solution for you. VST Zero is the combination of currently certified VST hanging hardware, existing Franklin Fueling Clean Air System and a Veeder-Root TLS-350 with EVR software. This hybrid has met all CARB testing requirements. The key savings of this system are the elimination of the vapor pump in the dispenser and replacement of the vacuum-assist hanging hardware. The result: lower equipment and maintenance costs with reduced compliance testing. The VST Zero is undergoing internal review as well as going through the district (CAPCOA) review process. Although final Executive Orders have not been issued, VST can say that the Zero system has passed all of the required challenge mode testing of night time shut downs in winter fuels. Once the Final Executive Orders * are issued, VST Zero will be available as the lowest cost EVR approach in the state of California. VST Zero EVR system advantages: 1. Lowest cost EVR approach 2. Zero moving parts 3. Zero carbon footprint 4. Zero vapor pumps 5. Zero electrical consumption - $2,000/yr per station savings (eliminating electrical demand) 6. Substantially reduces compliance testing as well as annual testing 7. Zero modification needed to balance dispensers * Executive Orders VR-209 (NON-ISD) Issued November 2009. For non ISD applications. Veeder-Root In Station Diagnostics is not required. VR-210 (ISD) Expected December 2009 Relative to operation of the system VST-120-10/09 Vapor Systems Technologies, Inc. 650 Pleasant Valley Drive Springboro, Ohio 45066 (USA) Toll Free: 1-888-878-4673 Phone: 937-704-9333 Fax: 937-704-9443 www.vsthose.com